Loading...
Reso 143CITY OF CUPERTINO 10300 Torre Avenue Cupertino, California 95014 RESO[UTION N0. 143 OF THE ADMINISTRATIVE HEARING OFFICER OF THE CITY OF CUPERTINO APPROVING AN ARCHITECTURAL AND SITE APPROVAL PERMIT TO ALLOW FA(;ADE IMPROVEMENTS TO AN EXISTING COMMERICAL BUILDING LOCATED AT 19900 STEVENS CREEK BLVD. SECTION I: PROJECT DESCRIPTION Application No.: Applicant: Location: ASA-2023-004 Kevin Tallrnan 19900 Stevens Creek Blvd. (APN 369-05-044) SECTION II: FINDINGS WHEREAS, the City of Cupertino received an application for an Architectural and Site Approval to consider allowing modifications to the exterior building materials and landscaping for an existing retail building, as described in Section I. of this Resolution; and WHEREAS, the necessary public notices have been given as required by the Cupertino Municipal Code, and the Administrative Hearing Officer has held at least one pubLic meeting with regard to the application; and WHEREAS, pursuant to the provisions of the California Environmental Quality Act of 1970 (Public Resources Code section 21000 et seq.) ("CEQA"), together with the State CEQA Guidelines (California Code of Regulations, Title 14, Section 25000 et seq.) (hereinafter, "CEQA Guidelines"), the City staff has independently studied the proposed Projectand has determined that the Project is exempt from environmental review pursuant to the categorical exemption in CEQA Guidelines section 15301 and 15332 for the reasons set forth in the staff report dated September 28, 2023 and incorporated herein; and WHEREAS, the applicant has met the burden of proof required to support said application; and Resolution No. 143 ASA-2023-004 September 28, 2023 Page 2 WHEREAS, the Administrative Hearing Officer finds as follows with regard to this application: 1. Theproposal,attheproposedlocation,willnotbedetrimentalorinjurioustoproperty or improvements in the vicinity, and will not be detrimental to the public health, safety, general welfare, or convenience; The applicant proposes to e;rthance portions of the north and east elevations The upgrades include a tower element and enhanced main entrance completed inn a contemporary style, and with materials that are considered qua(ih) and durable. A17 the proposed changes are minor improvements to the existing building and site and will not be detrimenta7 or injurious to property or improvements in the vicinity. 2. The proposal is consistent with the purposes of Chapter 19.168, the General Plan any specific plan, zoning ordinances, applicable planned development permit, conditional use permits, variances, subdivision maps or other entitlements to use which regulate the subject property including, but not limited to, adherence to the following specific criteria: a) Abrupt changes in building scale should be avoided. A gradual transition related to height and bulk should be achieved between new and existing buildings. There are 7?O changes in building scare except the minor height addition of the entry feature and corner. The building will remain within the 45 foot height Limit and vmder the required 1:1 slope line of the Genera7 Plan. No other height or scare modifications are proposed that w'd7 impact the existing massi;ng. b) In order to preserve design harmony between new and existing buildings and in order to preserve and enhance property values, the materials, textures and colors of new building should harmonize with adjacent development by being consistent or compatible with design and color schemes with the future character of the neighborhoods and purposes of the zone in which they are situated. The location, height and materials of walls, fencing, hedges and screen planting should harmonize with adjacent development. Unsightly storage areas, utility installations and unsightly elements of parking lots should be concealed. The planting of ground cover or various types of pavements should be used to prevent dust and erosion, and the unnecessary destruction of existing healthy trees should be avoided. Lighting for development should be adequate to meet safety requirements as specified by the engineering and building departments and provide shielding to prevent spill-over light to adjoining property owners. Resolution No. 143 ASA-2023-004 September 28, 2023 Page 3 Through this proposa7 the applicant has incorporated existing materials with attractive contemporary stone, metal, and composite wood elements that are suited and compatible with the character of the area. Existing mature trees are proposed to be retained. Outdoor Lighting incorporates appropriate shie(ding and is designed to meet the dark-s)a) requirements of the Municipa7 Code. c) The number, location, color, size, height, lighting and landscaping of outdoor advertising signs and structures have been designed to minimize traffic hazard, positively affect the general appearance of the neighborhood and harmonize with adjacent development. There is currently a ground sigrt Located within the front setback area and 7?0 modifications are proposed. At this point, 7?0 sigrts are approved as part of this project. d) With respect to new projects within existing residential neighborhoods, new development should be designed to protect residents from noise, traffic, light and visually intrusive effects by use of buffering, setbacks, landscaping, walls and other appropriate design measures. This application is not a new project and wil7 maintain the existi;ng buffering and setbacks established adjacent to the exist'mg residential neighborhoods. NOW, THEREFORE, BE IT RESOLVED: That after careful consideration of the maps, facts, exhibits, testimony, staff's report and presentation, and other evidence submitted in this matter, subject to the conditions which are enumerated in this Resolution beginning on PAGE 3 thereof, The application for an Architectural and Site Approval, Application no. ASA-2023-004 is hereby approved and that the subconclusions upon which the findings and conditions specified in this resolution are based and contained in the Public Meeting record concerning Application no. ASA-2023-004 as set forth in the Minutes of the Administrative Hearing Meeting of September 23, 2023 and are incorporated by reference as though fully set forth herein. SECTION III: CONDITIONS ADM[NISTERED BY THE COMMUNITY DEVELOPMENT DEPARTMENT 1. APPROVED EXHIBITS Approval is based on the plan set drawn by Stacey Hall titled "Shane Co. Exterior Improvements" consisting of five (5) sheets labeled co.o, co.'i, and A-1 - A-3, except as may be amended by conditions in this resolution. Resolution No. 143 ASA-2023-004 September 28, 2023 Page 4 2. ACCURACY OF PROJECT PL,ANS The applicant/property owner is responsible to verify all pertinent property data including but not limited to property boundary locations, building setbacks, property size, building square footage, any relevant easements and/or construction records. Any misrepresentation of any property data may invalidate this approval and may require additional review. 3. ANNOT ATION OF THE CONDITIONS OF APPROV AL The conditions of approval set forth shall be incorporated into and annotated on the first page of the building plans. 4. EXTERIOR BUIL,DING MATERIALS/TREATMENTS a. The final building exterior plan shall closely resemble the details shown on the original approved plans. b. No fencing is approved within the front setback area. c. All final building exterior treatment plan (including but not limited to details on exterior color, materials, architectural treatments, doors, windows, lighting fixtures, and/or embellishments) shall be reviewed and approved by the Director of Community Development prior to issuance of building permits to ensure quality and consistency. d. Any exterior changes determined to be substantial by the Director of Community Development shall either require a modification to this permit or a new permit based on the extent of the change. 5. WINDOW DET AILS AND BIRD SAFETY All storefront windows shall be kept open and transparent to the greatest extent possible. The final storefront design and window display shall be reviewed and approved by the Director of Community Development prior to issuance of building permits for tenant improvements. No changes shall be made to the transparency of the windows without the express approval of the Director of Community Development. Further, all new and replaced windows shall be in conformance with CMC 19.102.030 Bird-safe Development Requirements. 6. SCREENING All mechanical and other equipment on the building or on the site shall be screened so they are not visible from public street areas or adjoining developments. Screening materials/colors shall match building features and materials. The height of the screening shall be taller than the height of the Resolution No. 143 ASA-2023-004 September 28, 2023 Page 5 mechanical equipment that it is designed to screen. The location of equipment and necessary screening shall be reviewed and approved by the Director of Community Development prior to issuance of building permits. 7. GRADING AND CONSTRUCTION HOURS AND NOISE LIMITS a. All grading activities shall be limited to the dry season (April 15 to October 1), unless permitted otherwise by the Director of Public works. b. Construction hours and noise limits shall be compliant with all requirements of Chapter 10.48 of the Cupertino Municipal Code. c. Grading, street construction, underground utility and demolition hours for work done more than 750 feet away from residential areas shall be limited to Monday through Friday, 7 a.m. to 8 p.m. and Saturday and Sunday, 9 a.m. to 6 p.m. Grading, street constmction, demolition or underground utility work within 750 feet of residential areas shall not occur on Saturdays, Sundays, holidays, and during the nighttime period as defined in Section 10.48.053(b) of the Municipal Code. d. Construction activities shall be limited to Monday through Friday, 7 a.m. to 8 p.m. and Saturday and Sunday, 9 a.m. to 6 p.m. Construction activities are not allowed on hoIidays as defined in Chapter 10.48 of the Municipal Code. Night time construction is allowed if compliant with nighttime standards of Section 10.48 of the Cupertino Municipal Code. e. Rules and regulations pertaining to all construction activities and limitations identified in this permit, along with the name and telephone number of an applicant appointed disturbance coordinator, shall be posted in a prominent location at the entrance to the job site. f. The applicant shall be responsible for educating all contractors and subcontractors of said construction restrictions. The applicant shall comply with the above grading and construction hours and noise limit requirements unless otherwise indicated. 8. BAAOMD BASIC CONTROL MEASURES (DUST CONTROL) Project shall comply with the Bay Area Quality Management District's Basic Construction Mitigation Measures as follows: a. All exposed surfaces (e.g., parking areas, staging areas, soil piles, graded areas, and unpaved access roads) shall be watered two times per day. b. All haul trucks transporting soil, sand, or other loose material off-site shall be covered. c. All visible mud or dirt tracked-out onto adjacent public roads shall be removed using wet power vacuum street sweepers at least once per day. The use of dry power sweeping is prohibited. Resolution No. 143 ASA-2023-004 September 28, 2023 Page 6 d. All vehicle speeds on unpaved roads shall be limited to 15 mph. e. All roadways, driveways, and sidewalks to be paved shall be completed as soon as possible. Building pads shall be laid as soon as possible after grading unless seeding or soil binders are used. f. Idling times shall be minimized either by shutting equipment off when not in use or reducing the maximum idling time to 5 minutes (as required by the California airborne toxics control measure Title 13, Section 2485 of California Code of Regulations [CCR]). Clear signage shall be provided for construction workers at all access points. g. All construction equipment shall be maintained and properly tuned in accordance with manufacturer's specifications. All equipment shall be checked by a certified mechanic and determined to be running in proper condition prior to operation. h. A publicly visible sign shall be posted with the telephone number and person to contact at the City of Cupertino regarding dust complaints. This person shall respond and take corrective action within 48 hours. The BAAQMD phone number shall also be visible to ensure compliance with applicable regulations. Applicant shall indicate compliance with BAAQMD's basic control measures on all demolition, construction and grading permits and construction management plan(s). 9. NOISE AND VIBRATION NOTICE At least 10 days prior to the start of any demolition, ground disturbing, or construction activities, the project applicant/contractor shall send notices of the planned activity by first class mail to off-site businesses and residents within 500 feet of the project site. The City will provide a template notice and mailing addresses for the Applicant's use. The notice must be approved by City staff prior to sending. The project applicant shall provide the City with evidence of mailing of the notice, upon request. Please note that, if pile driving, the requirements for noticing and monitoring outlined in City Code Section 17.04.050 G (3) shall apply. 10. NOISE AND VIBRATION SIGNAGE At least 10 days prior to the start of any demolition, ground disturbing, or construction activities, the project applicant/contractor shall ensure that a sign measuring at least four feet by six feet shall be posted on construction fencing at the entrance(s) to the job site, clearly visible to the public, and include the following: a. Permitted construction days and hours; b. A description of proposed construction activities; Resolution No. 143 ASA-2023-004 September 28, 2023 Page 7 c. Telephone numbers of the City's and contractor's authorized representatives that are assigned to respond in the event of a noise or vibration complaint; and d. Contact information for City's and contractor's authorized representatives that are assigned to respond in the event of a complaint related to fugitive dust, pursuant to the requirements for compliance with BAA0MD's CE0A Air 0uality Guidelines. If the authorized contractor's representative receives a complaint, they shall investigate, take appropriate corrective action, and report the complaint and the action taken to the City within three business days of receiving the complaint. 11. NOISE DURING CONSTRUCTION Prior to issuance of any demolition, grading or building permit, include on plans a note that, during project construction, the project applicant shall incorporate the following measures to reduce noise during construction and demolition activity: a. The project applicant and contractors shall prepare and submit a Construction Noise Control Plan to the City's Planning Department for review and approval prior to issuance of the first permit. The Construction Noise Plan shall demonstrate compliance with daytime and nighttime decibel limits pursuant to Chapter 10.48 (Community Noise Control) of Cupertino Municipal Code. The details of the Construction Noise Control Plan shall be included in the applicable construction documents and implemented by the on-site Construction Manager. Noise reduction measures selected and implemented shall be based on the type of construction equipment used on the site, distance of construction activities from sensitive receptor(s), site terrain, and other features on and surrounding the site (e.g., trees, built environment) and may include, but not be limited to, temporary construction noise attenuation walls, high quality mufflers. During the entire active construction period, the Construction Noise Control Plan shall demonstrate that compliance with the specified noise control requirements for construction equipment and tools will reduce construction noise in compliance with the City's daytime and nighttime decibel limits. b. Select haul routes that avoid the greatest amount of sensitive use areas and submit to the City of Cupertino Public Works Department for approval prior to the start of the construction phase. c. Signs will be posted at the job site entrance(s), within the on-site construction zones, and along queueing lanes (if any) to reinforce the prohibition of unnecessary engine idling. All other equipment will be turned off if not in use for more than 5 minutes. d. During the entire active construction period and to the extent feasible, the use of noise producing signals, including horns, whistles, alarms, and bells will be Resolution No. 143 ASA-2023-004 September 28, 2023 Page 8 for safety warning purposes only. The construction manager will use smart back-up alarms, which automatically adjust the alarm level based on the background noise level or switch off back-up alarms and replace with human spotters in compliance with all safety requirements and law. 12. FUGITIVE DUST CONTROL Prior to issuance of the any demolition, grading, or building permit, include on all permit plans, the full text of each of the Bay Area Air Quality Management District's Basic Control Measures from the latest version of BAA0MD's CE0A Air Quality Guidelines, as subsequently revised, supplemented, or replaced, to control fugitive dust (i.e., particulate matter PM2.5 and PMIO) during demolition, ground disturbing activities and/or construction. 13. DARK SKY COMPLIANCE Prior to issuance of Building Permits, the applicant/property owner shall submit final plans in compliance with the approved lighting plans to comply with development standards of Cupertino Municipal Code Section 19.102.040 0utdoor Lighting Requirements. In the event changes are proposed from the approved plans, said changes mustbe reviewed and approved by the Director of Community Development or their designee. The applicant shall provide all documentation required to determine compliance with the Municipal Code. 14. SIGNAGE Signage is not approved with this application. Signage shall conform to the City Sign Code. 15. DEMOLITION RE0UIREMENTS All demolished building and site materials shall be recycled to the maximum extent feasible subject to the Building Official. The applicant shall provide evidence that materials were recycled prior to occupancy 16. CONSULT ATION WITH OTHER DEPARTMENTS The applicant is responsible to consult with other departments and/or agencies with regard to the proposed project for additional conditions and requirements. Any misrepresentation of any submitted data may invalidate an approval by the Community Development Department. 17. INDEMNIFICATION AND LIMITATION OF LIABILITY As part of the application, to the fullest extent permitted by law, the applicant shall agree to indemnify, defend with the attorneys of the City's choice, and hold harmless the City, its City Council, and its officers, employees, and agents (collectively, the Resolution No. 143 ASA-2023-004 September 28, 2023 Page 9 "indemnified parties") from and against any liability, claim, action, cause of action, suit, damages, judgment, lien, levy, or proceeding (collectively referred to as "proceeding") brought by a third party against one or more of the indemnified parties or one or more of the indemnified parties and the applicant related to any Ordinance, Resolution, or action approving the project, the related entitlements, environmental review documents, finding or determinations, or any other permit or approval authorized for the project. The indemnification shall include but not be limited to damages, fees, and costs awarded against the City, if any, and cost of suit, attorneys' fees, and other costs, liabilities, and expenses incurred in connection with such proceeding whether incurred by the Applicant, the City, or the parties initiating or bringing such proceeding The applicant shall agree to (without limitation) reimburse the City its actual attorneys' fees and costs incurred in defense of the litigation. Such attorneys' fees and costs shall include amounts paid to the City's outside counsel and shall include City Attorney time and overhead costs and other City staff overhead costs and any costs directly related to the litigation reasonably incurred by City. The applicant shall likewise agree to indemnify, defend, and hold harmless the indemnified parties from and against any damages, attorneys' fees, or costs awards, inauding attorneys' fees awarded under Code of Civil Procedure section 1021.5, assessed or awarded against the indemnified parties. The Applicant shall cooperate with the City to enter a Reimbursement Agreement to govern any such reimbursement. The Applicant shall agree to (without limitation) reimburse the City for all costs incurred in additional investigation or study of, or for supplementing, redrafting, revising, or amending, any document (such as an Environmental Impact Report, negative declaration, specific plan, or general plan amendment) if made necessary by proceedings challenging the project approvals and re4ated environrnental review, if the applicant desires to continue to pursue the project. The Applicant shall agree that the City shall have no liability to the Applicant for business interruption, punitive, speculative, or consequential damages. 18. NOTICE OF FEES, DEDICATIONS, RESERV ATIONS OR OTHER EXACTIONS The Conditions of Project Approval set forth herein may include certain fees, dedication requirements, reservation requirements, and other exactions. PASSED AND ADOPTED this 28' day of September 2023 at a noticed Public Meeting of the Administrative Hearing Officer of the City of Cupertino, State of California, held by Resolution No. 143 ASA-2023-004 September 28, 2023 Page 10 the Director of Community Development, or his or her designee, pursuant to Cupertino Municipal Code Section 19.12.120. ATTEST: Gian Martire Senior Planner Administrative Hearing Officer