EFR - 6409
April 14, 2022
Planning and Building Department
City of Cupertino
10300 Torre Ave
Cupertino, CA 95014
RE: Permit Application
Applicant: New Cingular Wireless PCS, LLC (“AT&T”)
Property Owner: Apple, Inc.
Property Address: 1 Infinite Loop Cupertino, CA 95014
Dear Planning & Building:
New Cingular Wireless PCS, LLC (“AT&T”) seeks a building permit to modify an existing
wireless facility at the above-referenced property. Your building permit application form along
with the applicable application fee of $_____ is submitted with this letter. AT&T applies for the
building permit under Section 6409 of the federal Middle Class Tax Relief and Job Creation Act
of 2012 (47 U.S.C.A. §1455). That law provides:
“a State or local government may not deny, and shall approve, any eligible
facilities request for a modification of an existing wireless tower or base station that
does not substantially change the physical dimensions of such tower or base station.”
To assist with your review, an Eligible Facilities Request (EFR) Application is enclosed that
applies the proposed modification to the relevant law and regulations, and it includes information
pertinent to your review. As demonstrated in the EFR Application, this modification is an EFR
and must be approved. Federal rules provide a 60-day timeline for EFR applications to be
processed or they will be deemed approved after written notice on or after Day 61.
AT&T respectfully requests that the building permit be issued as soon as possible but no later
than 60 days from the date of this letter, so that AT&T can proceed with this modification
immediately. If you have any questions regarding this application, please contact me.
Respectfully,
Greg Davis
Greg Davis
Zoning Specialist
J5 Infrastructure Partners
Phone: (415) 830-2003
Email: gdavis@j5ip.com
CCL01039 – Project Description
MODIFICATION TO AN UNMANNED TELECOMMUNICATIONS FACILITY,
CONSISTING OF THE FOLLOWING:
· REMOVE AND REPLACE (6) EXISTING PANEL ANTENNAS, (2) PER SECTOR
· REMOVE (3) RRUS 11 B12, (1) PER SECTOR
· INSTALL (3) RRUS 4478 B12A, (1) PER SECTOR
· INSTALL (3) DIPLEXERS, (1) PER SECTOR
· REMOVE (5) (E) STRINGS OF 170AH BATTERIES FROM (E) BATTERY AND
DCPP RACKS
· INSTALL (5) STRINGS OF 190 AH BATTERIES IN (E) BATTERY AND DCPP
RACKS
· INSTALL GROUNDING AT TOP AND BOTTOM OF EXISTING RACK
· INSTALL (1) 6648 BBU WITIHIN EXISTING EQUIPMENT RACK
· INSTALL NEW RF SAFETY MARKINGS, SIGNS & POST AT ROOFTOP
Page 1 of 4 Applicant Initials _____
Eligible Facilities Request Application
(47 U.S.C. § 1455(a))
Applicant:
Applicant/Agent Contact Information:
Property Owner:
Property Location (e.g., address, parcel no., GPS coordinates):
Project Description:
Date of filing:
30 days after filing:
“To toll the timeframe for incompleteness, the reviewing State or local government must provide written
notice to the applicant within 30 days of receipt of the application, clearly and specifically delineating all
missing documents or information. Such delineated information is limited to documents or information
meeting the standard under paragraph (c)(1) of this section.” 47 C.F.R. 1.40001(c)(3)(i).
60 days after filing:
“Timeframe for Review. Within 60 days of the date on which an applicant submits a request seeking
approval under this section, the State or local government shall approve the application unless it
determines that the application is not covered by this section.” 47 C.F.R. 1.40001(c)(2).
Page 2 of 4 Applicant Initials _____
1. Is the proposed modification an Eligible Support Structure? Please check the
applicable boxes:
An “Eligible Support Structure” means “Any tower or base station as defined in this section, provided that
it is existing at the time the relevant application is filed with the State or local government under this
section.” 47 C.F.R. 1.40001(b)(4).
☐ “Tower” means “Any structure built for the sole or primary purpose of supporting any Commission-
licensed or authorized antennas and their associated facilities, including structures that are constructed for
wireless communications services including, but not limited to, private, broadcast, and public safety
services, as well as unlicensed wireless services and fixed wireless services such as microwave backhaul,
and the associated site.” 47 C.F.R. 1.40001(b)(9).
Or
☐ “Base Station” means “A structure or equipment at a fixed location that enables Commission-licensed
or authorized wireless communications between user equipment and a communications network. The term
does not encompass a tower as defined in this subpart or any equipment associated with a tower.
(i) The term includes, but is not limited to, equipment associated with wireless communications
services such as private, broadcast, and public safety services, as well as unlicensed wireless services
and fixed wireless services such as microwave backhaul.
(ii) The term includes, but is not limited to, radio transceivers, antennas, coaxial or fiber-optic cable,
regular and backup power supplies, and comparable equipment, regardless of technological
configuration (including Distributed Antenna Systems and small-cell networks).
(iii) The term includes any structure other than a tower that, at the time the relevant application is
filed with the State or local government under this section, supports or houses equipment described in
paragraphs (b)(1)(i)-(ii) of this section that has been reviewed and approved under the applicable
zoning or siting process, or under another State or local regulatory review process, even if the
structure was not built for the sole or primary purpose of providing such support.
(iv) The term does not include any structure that, at the time the relevant application is filed with the
State or local government under this section, does not support or house equipment described in
paragraphs (b)(1)(i)-(ii) of this section.”
47 C.F.R. 1.40001(b)(1).
And
☐ “Existing” – “A constructed tower or base station is existing for purposes of this section if it has been
reviewed and approved under the applicable zoning or siting process, or under another State or local
regulatory review process, provided that a tower that has not been reviewed and approved because it was
not in a zoned area when it was built, but was lawfully constructed, is existing for purposes of this
definition.” 47 C.F.R. 1.40001(b)(5).
2. What is the baseline height of the Eligible Support Structure? Please complete the
Baseline Height Worksheet and insert baseline height here . For modifications
that will not change the height of the Eligible Support Structure, insert “N/A.”
Page 3 of 4 Applicant Initials _____
3. Is the proposed modification an Eligible Facilities Request?
An “Eligible Facilities Request” means “Any request for modification of an existing tower or base
station that does not substantially change the physical dimensions of such tower or base station,
involving:
(i) collocation of new transmission equipment;
(ii) removal of transmission equipment; or
(iii) replacement of transmission equipment.”
47 C.F.R. 1.40001(b)(3); 47 U.S.C.1445(a).
“Collocation” means “The mounting or installation of transmission equipment on an eligible
support structure for the purpose of transmitting and/or receiving radio frequency signals for
communications purposes.” 47 C.F.R. 1.40001(b)(2).
“Transmission equipment” means “Equipment that facilitates transmission for any Commission-licensed
or authorized wireless communication service, including, but not limited to, radio transceivers, antennas,
coaxial or fiber-optic cable, and regular and backup power supply. The term includes equipment
associated with wireless communications services including, but not limited to, private, broadcast, and
public safety services, as well as unlicensed wireless services and fixed wireless services such as
microwave backhaul.” 47 C.F.R. 1.40001(b)(8).
3.1 Please check all applicable boxes that describe the proposed modification:
☐ Collocation of new transmission equipment
☐ Removal of transmission equipment
☐ Replacement of transmission equipment
3.2 Please complete the Substantial Change Worksheet to determine if the proposed
modification substantially changes the physical dimensions of the Eligible Support
Structure. Based on the Substantial Change Worksheet, will the proposed modification
substantially changes the physical dimensions of the Eligible Support Structure? .
If you answered “Yes,” stop because the application is not an eligible facilities request.
4. Compliance with State and Federal regulations and codes. The proposed modification–
Check all applicable boxes
☐ Will comply with FCC regulations regarding human exposure to radio frequency
electromagnetic fields
☐ Will comply with Federal Aviation Administration (FAA) and FCC tower lighting
requirements
☐ Will comply with applicable state environmental regulations
☐ Will comply with applicable building codes
Page 4 of 4 Applicant Initials _____
☐ Will comply with applicable fire codes
☐ Will comply with other non-discretionary and generally applicable structural and
safety codes
☐ Will comply with Section 106 historic preservation review, if applicable
☐ Will comply with the National Environmental Policy Act (NEPA), if applicable
5. Attachments:
☐ Completed Baseline Height Worksheet
☐ Completed Substantial Change Worksheet
☐ Letter of authorization
☐ Applicable non-discretionary permit fees
☐ Building drawings, including site details and plans
☐ Documentation of property rights to site
☐ Prior approval for Eligible Support Structure
☐ Other:
Baseline Height Worksheet Page 1 of 2 Applicant Initials _____
Baseline Height Worksheet
1. Does the application seek approval for collocation or replacement of transmission
equipment?
☐ No. Stop, the height will not increase for removal of transmission equipment.
Continue to #7 and respond “N/A.”
☐ Yes. Continue to #2.
2. Was the tower or base station subject to previous review and approval by the local
jurisdiction (as originally built or as modified to its current state)?
☐ Yes. Continue to #3.
☐ No. Does the application seek to modify a tower or base station that was in a
zoned area when built?
A. ☐ No. Was the tower or base station lawfully constructed?
i. ☐ Yes. Continue to #3.
ii. ☐ No. Stop, the application is not an Eligible Facilities
Request.
B. ☐ Yes. Stop, the application is not an Eligible Facilities Request
(because the tower or base station is not considered “existing”).
3. Does the application seek to collocate transmission equipment that will be separated
horizontally on a base station (such as on a rooftop)?
A. ☐ Yes. Continue to #7. The baseline height is that of the original support
structure (e.g., the height of the rooftop, penthouse).
B. ☐ No. Continue to #4.
4. Has the tower or base station been modified per a previous approval by the local
jurisdiction?
A. ☐ No. Continue to #7. The baseline height is the originally-approved height of
the tower or base station.
B. ☐ Yes. Continue to #5.
Baseline Height Worksheet Page 2 of 2 Applicant Initials _____
5. Was the tower or base station modified based on approval by the local jurisdiction issued
before February 17, 2012?1
A. ☐ Yes. Continue to #6.
B. ☐ No. Continue to #7. The baseline height is the height of the tower or base
station as of February 17, 2012.
6. Was the tower or base station modified to the maximum height approved by the local
jurisdiction per any approval(s) before February 17, 2012?
A. ☐ Yes. Continue to #7. The baseline height is the existing height of the tower or
base station.
B. ☐ No. Continue to #7. The baseline height is the height as approved by the local
jurisdiction before February 17, 2012.
7. Insert baseline height here and at item 2 to the Eligible Facilities Request
Application.
1 The Spectrum Act was passed by Congress on February 17, 2012 and signed into law by the President on February
22, 2012. The FCC’s Report and Order and regulations refer to the date of passage rather than date of enactment as
the trigger for the analysis. Approvals issued after February 17, 2012 do not affect the baseline dimensions for
determining whether an application proposes a substantial change.
Substantial Change Worksheet Page 1 of 4 Applicant Initials _____
Substantial Change Worksheet
Definition of “Substantial Change”:
“Substantial Change” means “A modification substantially changes the physical dimensions of an eligible
support structure if it meets any of the following criteria:
(i) for towers other than towers in the public rights-of-way, it increases the height of the tower by more
than 10% or by the height of one additional antenna array with separation from the nearest existing
antenna not to exceed twenty feet, whichever is greater; for other eligible support structures, it increases
the height of the structure by more than 10% or more than ten feet, whichever is greater;
(A) Changes in height should be measured from the original support structure in cases where
deployments are or will be separated horizontally, such as on buildings’ rooftops; in other
circumstances, changes in height should be measured from the dimensions of the tower or base station,
inclusive of originally approved appurtenances and any modifications that were approved prior to the
passage of the Spectrum Act.
(ii) for towers other than towers in the public rights-of-way, it involves adding an appurtenance to the body
of the tower that would protrude from the edge of the tower more than twenty feet, or more than the width
of the tower structure at the level of the appurtenance, whichever is greater; for other eligible support
structures, it involves adding an appurtenance to the body of the structure that would protrude from the
edge of the structure by more than six feet;
(iii) for any eligible support structure, it involves installation of more than the standard number of new
equipment cabinets for the technology involved, but not to exceed four cabinets; or, for towers in the public
rights-of-way and base stations, it involves installation of any new equipment cabinets on the ground if
there are no pre-existing ground cabinets associated with the structure, or else involves installation of
ground cabinets that are more than 10% larger in height or overall volume than any other ground cabinets
associated with the structure;
(iv) it entails any excavation or deployment outside the current site2;
(v) it would defeat the concealment elements of the eligible support structure; or
(vi) it does not comply with conditions associated with the siting approval of the construction or
modification of the eligible support structure or base station equipment, provided however that this
limitation does not apply to any modification that is noncompliant only in a manner that would not exceed
the thresholds identified in § 1.40001(b)(7)(i)-(iv).”
47 C.F.R. 1.40001(b)(7).
1. Check the box that describes the Eligible Support Structure:
☐ Base station. Continue to #2.
☐ Tower located in the public right-of-way. Continue to #2.
☐ Tower located outside of the public right-of-way. Continue to #3.
2 “Site” – “For towers other than towers in the public rights-of-way, the current boundaries of the leased or owned
property surrounding the tower and any access or utility easements currently related to the site, and, for other
eligible support structures, further restricted to that area in proximity to the structure and to other transmission
equipment already deployed on the ground.” 47 C.F.R. 1.40001(b)(6).
Substantial Change Worksheet Page 2 of 4 Applicant Initials _____
2. Answer the following questions about the proposed modification and proceed as
instructed:
A. Is the baseline height for the Eligible Support Structure greater than 100 feet?
☐ Yes. Continue to item 2B.
☐ No. Continue to item 2C.
B. Does the proposed modification increase height by more than 10% of the baseline
height?
☐ Yes. Continue to item 11.
☐ No. Continue to item 2D.
C. Does the proposed modification increase height by more than 10 feet?
☐ Yes. Continue to item 11.
☐ No. Continue to item 2D.
D. Does the proposed modification add any appurtenance that would protrude more
than 6 feet from edge of the Eligible Support Structure?
☐ Yes. Continue to item 11.
☐ No. Continue to item 4.
3. Answer the following questions about the proposed modification and proceed as
instructed:
A. Will the proposed modification increase height by more than 10% of the baseline
height of the Eligible Support Structure?
☐ Yes. Continue to item 3B.
☐ No. Continue to item 3C.
B. Will the proposed modification increase height by more than the height of one
additional antenna array with separation from the nearest existing antenna not to exceed
20 feet?
☐ Yes. Continue to item 11.
☐ No. Continue to item 3C.
Substantial Change Worksheet Page 3 of 4 Applicant Initials _____
C. Does the proposed modification add any appurtenance that would protrude more
than 20 feet from the edge of the Eligible Support Structure?
☐ Yes. Continue to item 3D.
☐ No. Continue to item 4.
D. Does the proposed modification add any appurtenance that would protrude more
than the width of the tower structure at the level of the appurtenance?
☐ Yes. Continue to item 11.
☐ No. Continue to item 4.
4. Does the proposed modification involve installation of more than standard number of
equipment cabinets for the technology involved, not to exceed four?
☐ Yes. Continue to item 11.
☐ No. If the Eligible Support Structure is a base station, continue to item 5.
If the Eligible Support Structure is a tower in the public right-of-way,
continue to item 5.
If the Eligible Support Structure is a tower outside of the public right-of-
way, continue to item 8.
5. Does the proposed modification involve installation of any new equipment cabinets on
the ground?
☐ Yes. Continue to item 6.
☐ No. Continue to item 8.
6. Are there any pre-existing ground cabinets associated with the Eligible Support
Structure?
☐ Yes. Continue to item 7.
☐ No. Continue to item 11.
7. Are the proposed new ground cabinets more than 10% larger in height or overall volume
than any other ground cabinets associated with the Eligible Support Structure?
☐ Yes. Continue to item 11.
☐ No. Continue to item 8.
Substantial Change Worksheet Page 4 of 4 Applicant Initials _____
8. Does the proposed modification involve excavation or deployment outside of the current
site3?
☐ Yes. Continue to item 11.
☐ No. Continue to item 9.
9. Will the proposed modification defeat the existing concealment elements of the Eligible
Support Structure?
☐ Yes. Continue to item 11.
☐ No. Continue to item 10.
10. Will the proposed modification comply with conditions associated with the siting
approval(s)?
A. ☐ Yes. Continue to item 12.
☐ No. Describe the non-compliance:
Continue to item 10B.
☐ Not applicable. Continue to item 12.
B. Is the non-compliance with conditions associated with the siting approval(s) based
on any of the following: (a) height, (b) protrusion of any appurtenance from edge of the
Eligible Support Structure, (c) number of equipment cabinets to be installed, (d) location
of excavation, or (e) impact to concealment elements that would not exceed the
thresholds outlined above?
☐ Yes. Continue to item 12.
☐ No. Continue to item 11.
11. The proposed modification is a substantial change to the physical dimensions of the
existing tower or base station. Insert “Yes” in item 3.2 of the Eligible Facilities Request
Application.
12. The proposed modification is not a substantial change to the physical dimensions of the
existing tower or base station. Insert “No” in item 3.2 of the Eligible Facilities Request
Application.
3 See footnote 2.