21-165 Encroachment Agreement, GTE Mobilnet of California Limited Partnership, dba Verizon Wireless, R.O.W, 10741 Larry WayENCROACHMENT AGREEMENT
This Encroachment Agreement (“Encroachment Agreement”), made this day of
, 20 (“Effective Date”) between the City of Cupertino, a political subdivision of
the State of California, hereinafter designated “Licensor” and GTE Mobilnet of California Limited
Partnership, d/b/a Verizon Wireless, with its principal offices at c/o Verizon Wireless, 180
Washington Valley Road, Bedminster, New Jersey 07921, hereinafter designated “Licensee”:
1.Encroachment Agreement. This is an Encroachment Agreement as referenced in that
certain Small Cell License Agreement between Licensor and Licensee dated May 16, 2017
("Agreement"). This Encroachment Agreement shall serve as an encroachment license. All of the
terms and conditions of the Agreement are incorporated hereby by reference and made a part hereof
without the necessity of repeating or attaching the Agreement. In the event of a contradiction,
modification or inconsistency between the terms of the Agreement and this Encroachment
Agreement, the terms of the Encroachment Agreement shall govern. Capitalized terms used in this
Encroachment Agreement shall have the same meaning described for them in the Agreement
unless otherwise indicated herein.
2.Project Description and Locations. Licensee shall have the right to use the ROW for a
Small Cell at the designated areas in the ROW as further described in Attachment 1 attached hereto
(the “Licensed Area”).
3.Equipment. The Small Cell to be installed at the Licensed Area is described in Attachment
1 attached hereto.
4.Term. The term of this Encroachment Agreement shall be as set forth in Section 2 of the
Agreement.
5.Fees. The initial annual Rent for the term of this Encroachment Agreement shall be Three
Hundred Dollars ($300) and paid in accordance with Paragraph 5.1 of the Agreement, as
amended by Section 4, to that certain Settlement Agreement and Mutual Release entered into
between Licensor and Licensee dated October 4, 2017, and as adjusted by Paragraph 5.2 of the
Agreement.
6.Commencement Date. The first day of the month following the date Licensee has
Commenced Installation of its Equipment at the Licensed Area.
7.Approvals/Fiber. It is understood and agreed that Licensee's ability to use the Licensed
Area is contingent upon its obtaining all of the certificates, permits and other approvals
(collectively the "Governmental Approvals") that may be required by any Federal, State or Local
authorities, as well as a satisfactory fiber and electrical connection which will permit Licensee use
of the Licensed Area as set forth above. In the event that (i) any of such applications for such
Governmental Approvals should be finally rejected; (ii) any Governmental Approval issued to
Licensee is canceled, expires, lapses, or is otherwise withdrawn or terminated by
governmental authority; (iii) Licensee determines that such Governmental Approvals may
not be obtained in a timely manner; (iv) Licensee determines that it will be unable to obtain in
a satisfactory manner, or maintain any fiber or power connection; or (v) Licensee determines that
the Licensed Area is no longer technically compatible for its use, Licensee shall have the right
to terminate this Encroachment Agreement. Notice of Licensee's exercise of its right to terminate
shall be given to Licensee in writing by certified
CA_SJ_CUPERTINO_306
545430
10741 LARRY WAY, CUPERTINO, CA 95014
DocuSign Envelope ID: BA803FAD-DF30-4EA4-83B8-03E7DF9AB15F
21February
16th
mail, return receipt requested, and shall be effective upon the mailing of such notice by Licensee, or
upon such later date as designated by Licensee. All rentals paid to said termination date shall be
retained by Licensor. Upon such termination, this Encroachment Agreement shall be of no further
force or effect except to the extent of the representations, warranties and indemnities made by each
party to the other hereunder. Otherwise, Licensee shall have no further obligations for the payment
of Rent to Licensor.
8. Miscellaneous. N/A
[Signature page follows]
DocuSign Envelope ID: BA803FAD-DF30-4EA4-83B8-03E7DF9AB15F
EXECUTED to be effective as of the date shown above.
ATTEST:
, Clerk
APPROVED AS TO FORM
CITY ATTORNEY’S OFFICE
BY:
Print Name: ______________
City Attorney
LICENSOR:
City of Cupertino, a political
subdivision of the State of California
By:
Name:
Title:
LICENSEE:
GTE MOBILNET OF CALIFORNIA
LIMITED PARTNERSHIP,
D/B/A VERIZON WIRELESS
by Cellco Partnership,
its General Partner
By:
Name: Alba Barber
Title: Senior Real Estate Manager
Exhibits:
Attachment 1
DocuSign Envelope ID: BA803FAD-DF30-4EA4-83B8-03E7DF9AB15F
Heather M. Minner
Heather M. Minner
City Engineer
Chad Mosley
2/18/21
Attachment 1
Licensed Area
See attached.
DocuSign Envelope ID: BA803FAD-DF30-4EA4-83B8-03E7DF9AB15F
T-1
TITLE SHEET
DRAWN BY:
CHECKED BY:BPM
APE
IT IS A VIOLATION OF THE LAW FOR ANY PERSON, UNLESS
THEY ARE ACTING UNDER THE DIRECTION OF A LICENSED
PROFESSIONAL ENGINEER, TO ALTER THIS DOCUMENT
0 08/04/20 100% CD
REV DATE DESCRIPTION
MODUS, LLC
240 STOCKTON ST., 3RD FLOOR
SAN FRANCISCO, CA
94108
APPROVED BY:LJB
CA_SJ_CUPERTINO_306
VERIZON WIRELESS
2785 MITCHELL DRIVE, SUITE 9
WALNUT CREEK, CA
94598
(NEAR) 10741 LARRY WAY
CUPERTINO, CA 95014
1 100% CD PLAN CHECK11/16/20
SITE ID:
SITE TYPE:
POLE #:
CX PROJECT ID:
COUNTY:
PSLC:
CA_SJ_CUPERTINO_306
LIGHT POLE
TBD
20191962711
SANTA CLARA
545430
SITE INFORMATION
SITE ADDRESS:
OWNER:
APPLICANT:
LATITUDE:
LONGITUDE:
COUNTY:
ASSESSORS PARCEL NUMBER:
ZONING:
ELEVATION:
CITY OF CUPERTINO
10300 TORRE AVE
CUPERTINO, CA 95014
VERIZON WIRELESS
2785 MITCHELL DRIVE, SUITE 9
WALNUT CREEK, CA 94598
37° 20' 1.99" N NAD83
122° 1' 39.89" W NAD83
SANTA CLARA
PUBLIC RIGHT OF WAY
NEAR 316-02-005
CITY OF CUPERTINO
208.41' AMSL
VICINITY MAPPOLE PHOTO
N
DRAWING INDEX
T-1
SHEET NO.
TITLE SHEET
T-2 GENERAL NOTES
A-1 SITE PLAN & ENLARGED SITE PLAN
A-2
A-4
ELEVATIONS
CIRCUIT DIAGRAM
D-1 DETAILS
CODE COMPLIANCE
ALL WORK AND MATERIALS SHALL BE PERFORMED AND INSTALLED IN ACCORDANCE WITH THE CURRENT
EDITIONS OF THE FOLLOWING CODES AS ADOPTED BY THE LOCAL GOVERNING AUTHORITIES. NOTHING
IN THESE PLANS IS TO BE CONSTRUCTED TO PERMIT WORK NOT CONFORMING TO THESE CODES.
·2019 CALIFORNIA CODE
·2019 CALIFORNIA BUILDING CODE (CBC), BASED ON THE 2018 IBC
·2019 CALIFORNIA RESIDENTIAL CODE (CRC), BASED ON THE 2018 IRC
·2019 CALIFORNIA ELECTRICAL CODE (CEC), BASED ON THE 2017 NEC
·2019 CALIFORNIA MECHANICAL CODE (CMC), BASED ON THE 2018 UMC
·2019 CALIFORNIA PLUMBING CODE (CPC), BASED ON THE 2018 UPC
·2019 CALIFORNIA GREEN BUILDINGS STANDARDS CODE (CALGREEN)
·2019 CALIFORNIA FIRE CODES WITH ALL LOCAL AMENDMENTS
·ANY LOCAL BUILDING CODE AMENDMENTS TO THE ABOVE
·CITY / COUNTY ORDINANCES
SHEET TITLE
ACCESSIBILITY REQUIREMENTS FOR PERSONS WITH DISABILITIES:
FACILITY IS UNMANNED AND NOT FOR HUMAN HABITATION. ACCESSIBILITY IS
NOT REQUIRED IN ACCORDANCE WITH CALIFORNIA ADMINISTRATIVE STATE
CODE PART 2, TITLE 24, CHAPTER 11B, SECTION 1103B.
SURVEY
PROJECT TEAM PROJECT DESCRIPTION
D-2 DETAILS
THE UTILITIES SHOWN HEREIN ARE FOR THE CONTRACTORS CONVENIENCE
ONLY. THERE MAY BE OTHER UTILITIES NOT SHOWN ON THESE PLANS. THE
ENGINEER/SURVEYOR ASSUMES NO RESPONSIBILITY FOR THE LOCATIONS
SHOWN AND IT SHALL BE THE CONTRACTOR'S RESPONSIBILITY TO VERIFY
ALL THE UTILITIES WITHIN THE LIMITS OF THE WORK. ALL DAMAGE MADE TO
THE (E) UTILITIES BY THE CONTRACTOR SHALL BE THE SOLE RESPONSIBILITY
OF THE CONTRACTOR.
CALL 811 BEFORE YOU DIG
IT'S THE LAW
C-1
A-3 ELEVATIONS
VERIZON WIRELESS PROPOSES TO INSTALL A NEW WIRELESS COMMUNICATION SITE ON A LIGHT POLE IN THE PUBLIC RIGHT-OF-WAY.
SCOPE:
·INSTALL (2) 5G ANTENNA/RADIOS INSIDE NEW FRP CONCEALMENT SHROUD ON TOP OF POLE
·INSTALL (1) NEW DISCONNECT / SMART METER ON SIDE OF POLE
·INSTALL NEW POLE AND FOUNDATION TO REPLACE EXISTING
D-3 POLE SPECS
(NEAR) 10741 LARRY WAY
CUPERTINO, CA 95014
(NEAR) 10741 LARRY WAY
CUPERTINO, CA 95014
CA_SJ_CUPERTINO_306
SITE
E-1 ELECTRICAL GENERAL NOTES
E-2 ONE-LINE DIAGRAM & GROUNDING SCHEMATIC
E-3 ELECTRICAL DETAILS
MODUS PROJECT MANAGER:
MODUS, LLC
240 STOCKTON ST., 3RD FLOOR
SAN FRANCISCO, CA 94108
PHONE: (415) 989.1102
EMAIL: VERIZONPOLYGONTEAM@MODUS-CORP.COM
CONSTRUCTION/IMPLEMENTATION MANAGER:
MODUS, LLC
240 STOCKTON ST., 3RD FLOOR
SAN FRANCISCO, CA 94108
PHONE: (415) 989.1102
EMAIL: VERIZONPOLYGONTEAM@MODUS-CORP.COM
A&E PROJECT MANAGER:
MODUS, LLC
240 STOCKTON ST., 3RD FLOOR
SAN FRANCISCO, CA 94108
PHONE: (415) 989.1102
EMAIL: VERIZONPOLYGONTEAM@MODUS-CORP.COM
APPLICANT:
VERIZON WIRELESS
2785 MITCHELL DRIVE, SUITE 9
WALNUT CREEK, CA 94598
CONTACT: CHRIS MOLLER
PHONE: (925) 339.2778
EMAIL: CHRIS.MOLLER@VERIZONWIRELESS.COM
LAND USE PLANNER:
MODUS, LLC
240 STOCKTON ST., 3RD FLOOR
SAN FRANCISCO, CA 94108
PHONE: (415) 989.1102
EMAIL: VERIZONPOLYGONTEAM@MODUS-CORP.COM
SITE ACQUISITION:
MODUS, LLC
240 STOCKTON ST., 3RD FLOOR
SAN FRANCISCO, CA 94108
PHONE: (415) 989.1102
EMAIL: VERIZONPOLYGONTEAM@MODUS-CORP.COM
D-4 CITY STANDARD DETAILS
New pole is not to be black
DocuSign Envelope ID: BA803FAD-DF30-4EA4-83B8-03E7DF9AB15F
S
/
L
S
/
L
S
/
L
S
/
L
S/
L
S/
L
S/
L
S
/
L
S
/
L
S
/
L
F
I
B
E
R
FI
B
E
R
FI
B
E
R
S/L
S/L
S/
L
S/L
S/L S/L S/L S/L S/L
DRAWN BY:
CHECKED BY:BPM
APE
IT IS A VIOLATION OF THE LAW FOR ANY PERSON, UNLESS
THEY ARE ACTING UNDER THE DIRECTION OF A LICENSED
PROFESSIONAL ENGINEER, TO ALTER THIS DOCUMENT
0 08/04/20 100% CD
REV DATE DESCRIPTION
MODUS, LLC
240 STOCKTON ST., 3RD FLOOR
SAN FRANCISCO, CA
94108
APPROVED BY:LJB
CA_SJ_CUPERTINO_306
VERIZON WIRELESS
2785 MITCHELL DRIVE, SUITE 9
WALNUT CREEK, CA
94598
(NEAR) 10741 LARRY WAY
CUPERTINO, CA 95014
1 100% CD PLAN CHECK11/16/20
A-1
SITE PLAN
1ENLARGED SITE PLAN
N
SITE PLAN2
N
1/16"=1'-0"
SCALE
1/2"=1'-0"
SCALE
ELECTRICAL LINE
STREET LIGHT LINE
E
S/L
FIBER LINE(S)FIBER
LEGEND
(N) LOCATION OF VERIZON WIRELESS
ANTENNA AND EQUIPMENT
10741
LARRY WAY
CUPERTINO,
CA 95014
PROPERTY LINE
(E) LANDSCAPE
(E) FACE OF CURB
A.P.N.:
316-02-005
2
A-1
ENLARGED
SITE PLAN
(E)DRIVEWAY
PROPERTY LINE
(E) LANDSCAPE
(E) FACE OF CURB
(E
)
LA
N
D
S
C
A
P
E
(E
)
F
A
C
E
O
F
C
U
R
B
(E
)
C
O
N
C
R
E
T
E
S
I
D
E
W
A
L
K
LUCILLE AVE
LA
R
R
Y
W
A
Y
N
C
2
SECTOR
AZIMUTH 90
5G ASECTOR
AZIMUTH 270
5G A
1
&
2
A-3
N
C
3
N
C
1
(E) CURB & GUTTER
(N) STEEL MAST ARM
(N) LUMINAIRE
(E) FOUNDATION & LIGHT
POLE TO BE REMOVED. (N)
LIGHT POLE & FOUNDATION
TO BE INSTALLED IN PLACE
(N) LOCATION OF VERIZON
WIRELESS ANTENNA IN FRP SHROUD
MOUNTED ON LIGHT POLE
1
&
2
A
-
2
1
&
2
A
-
2
6'
-
0
"
±
B
A
C
K
O
F
P
O
L
E
T
O
R
O
W
L
I
N
E
10741
LARRY WAY
CUPERTINO,
CA 95014
A.P.N.:
316-02-005
PR
O
P
E
R
T
Y
L
I
N
E
(E
)
LA
N
D
S
C
A
P
E
(E
)
F
A
C
E
O
F
C
U
R
B
LUCILLE AVE
N2
N1
N
C
4
(E) PG&E VAULT (POC)
(E) STEEL UTILITY POLE
NC4
(N) CITY SERVICE PULLBOX,
SEE N2 ON CONDUIT TABLE MIN
10' AWAY FROM PG&E BOX
(N) 2'-6" X 4'-0" X 6"
THICK CONCRETE CAP
PER CITY STANDARDS
6
"
M
I
N
.
(N) CONDUIT TRENCHING,
SEE DETAIL 1/D-4
NOTE:
1. FIBER PULLBOX EXACT LOCATION
TO BE VERIFIED IN FIELD
2. UPON COMPLETION OF
CONSTRUCTION, RESTORE
LANDSCAPE AND IRRIGATION TO
LIKE OR BETTER CONDITION, TEST
IRRIGATION
3. UPON COMPLETION OF
CONSTRUCTION, NOTIFY THE
CITY OF NEW STREETLIGHT
INSTALLATION SO THAT NEW
BADGE ID NUMBER CAN BE
PLACED BY THE CITY ONTO THE
NEW STREETLIGHT POLE.
(N) CONDUIT TRENCHING,
SEE DETAIL 1/D-4
(E) WOOD UTILITY POLE
Label carrier ground in City electrical box
DocuSign Envelope ID: BA803FAD-DF30-4EA4-83B8-03E7DF9AB15F
SHUTDOWN
DRAWN BY:
CHECKED BY:BPM
APE
IT IS A VIOLATION OF THE LAW FOR ANY PERSON, UNLESS
THEY ARE ACTING UNDER THE DIRECTION OF A LICENSED
PROFESSIONAL ENGINEER, TO ALTER THIS DOCUMENT
0 08/04/20 100% CD
REV DATE DESCRIPTION
MODUS, LLC
240 STOCKTON ST., 3RD FLOOR
SAN FRANCISCO, CA
94108
APPROVED BY:LJB
CA_SJ_CUPERTINO_306
VERIZON WIRELESS
2785 MITCHELL DRIVE, SUITE 9
WALNUT CREEK, CA
94598
(NEAR) 10741 LARRY WAY
CUPERTINO, CA 95014
1 100% CD PLAN CHECK11/16/20
A-2
EXISTING & PROPOSED
ELEVATIONS
12PROPOSED ELEVATIONEXISTING ELEVATION 1/2"=1'-0"
SCALE
1/2"=1'-0"
SCALE
EXISTING SURFACE
0'-0" AGL
EXISTING SURFACE
0'-0" AGL
(E) FOUNDATION
(E) LIGHT POLE TO BE REPLACED
(E) LUMINAIRE
6'-0" BACK OF POLE TO ROW LINE
4
D-2
(N) FOUNDATION
(N) 6'-0" MAST ARM
NOTES:
1. ALL NEW ANTENNAS, BRACKETS, AND OTHER EQUIPMENT WILL BE PAINTED TO MATCH LIGHT POLE.
2. ALL EXISTING SIGNAGE TO BE RELOCATED SHALL BE FASTENED USING STEEL BANDING PER SHEET
T-2.
T.O. (E) LIGHT SENSOR
27'-3" AGL
T.O. (E) STEEL LIGHT POLE
25'-8" AGL
(N) LIGHT POLE
(N) (2) 5G ANTENNAS
IN FRP SHROUD
6
D-1
(N) FRP CONCEALMENT
SHROUD
1
D-1
T.O. (N) STEEL LIGHT POLE
29'-11" AGL
RAD CENTER OF (N) 5G ANTENNA
31'-7" AGL
T.O. (N) CONCEALMENT SHROUD
35'-6" AGL
8
D-1
3
E-3
(N) SMART METER / DISCONNECT
w/ SHUTDOWN SIGNAGE
4
D-1
5
D-1
PORT HOLE LOCATION
FOR DISCONNECT
1
D-2
(N) LUMINAIRE
1
D-3
6'-0" BACK OF POLE TO ROW LINE
T.O. (N) LIGHT SENSOR
31'-8" AGL
(E) LIGHT ARM
25'-5" AGL
B.O. (N) DISCONNECT
7''-0" AGL
T.O. (N) DISCONNECT
8''-9" AGL
(N) NOTICE SIGNAGE,
FACING STREETSIDE
9
D-1
T.O. (N) NOTICE SIGNAGE
24'-9" AGL
7
E-3
DocuSign Envelope ID: BA803FAD-DF30-4EA4-83B8-03E7DF9AB15F
Certificate Of Completion
Envelope Id: BA803FADDF304EA483B803E7DF9AB15F Status: Completed
Subject: CA_SJ_CUPERTINO_306/E1671534/FM WT Approved 1-25-21/ Manager to Sign.
Source Envelope:
Document Pages: 7 Signatures: 1 Envelope Originator:
Certificate Pages: 5 Initials: 0 Felipe Martinez
AutoNav: Enabled
EnvelopeId Stamping: Enabled
Time Zone: (UTC-08:00) Pacific Time (US & Canada)
felipe.martinez@verizonwireless.com
IP Address: 69.78.66.88
Record Tracking
Status: Original
1/25/2021 10:33:48 AM
Holder: Felipe Martinez
felipe.martinez@verizonwireless.com
Location: DocuSign
Signer Events Signature Timestamp
Alba Barber
alba.barber@verizonwireless.com
Security Level: Email, Account Authentication
(None)
Signature Adoption: Pre-selected Style
Using IP Address: 69.78.66.89
Sent: 1/25/2021 10:34:21 AM
Viewed: 1/25/2021 4:10:12 PM
Signed: 1/25/2021 4:10:35 PM
Electronic Record and Signature Disclosure:
Accepted: 12/30/2020 2:52:40 PM
ID: e293a4bd-9212-4030-bf70-0115b4008976
In Person Signer Events Signature Timestamp
Editor Delivery Events Status Timestamp
Agent Delivery Events Status Timestamp
Intermediary Delivery Events Status Timestamp
Certified Delivery Events Status Timestamp
Carbon Copy Events Status Timestamp
Alissa Ludtke
alissa.ludtke@verizonwireless.com
Security Level: Email, Account Authentication
(None)
Sent: 1/25/2021 10:34:22 AM
Electronic Record and Signature Disclosure:
Not Offered via DocuSign
Witness Events Signature Timestamp
Notary Events Signature Timestamp
Envelope Summary Events Status Timestamps
Envelope Sent Hashed/Encrypted 1/25/2021 10:34:22 AM
Certified Delivered Security Checked 1/25/2021 4:10:12 PM
Signing Complete Security Checked 1/25/2021 4:10:35 PM
Completed Security Checked 1/25/2021 4:10:35 PM
Payment Events Status Timestamps
Cupertino 306 - Encroachment Agreement,
10741 Larry Way
Final Audit Report 2021-02-18
Created:2021-02-14
By:Araceli Alejandre (aracelia@cupertino.org)
Status:Signed
Transaction ID:CBJCHBCAABAAJIaWw_wl0QguOQl2selUKmJsvoj7Xbk1
"Cupertino 306 - Encroachment Agreement, 10741 Larry Way" H
istory
Document created by Araceli Alejandre (aracelia@cupertino.org)
2021-02-14 - 8:00:23 PM GMT- IP address: 73.170.27.253
Document emailed to Marlene Dehlinger (Dehlinger@smwlaw.com) for approval
2021-02-14 - 8:02:53 PM GMT
Email viewed by Marlene Dehlinger (Dehlinger@smwlaw.com)
2021-02-16 - 4:56:38 AM GMT- IP address: 45.41.142.211
Document approved by Marlene Dehlinger (Dehlinger@smwlaw.com)
Approval Date: 2021-02-16 - 5:00:27 AM GMT - Time Source: server- IP address: 52.39.49.65
Document emailed to Heather M. Minner (minner@smwlaw.com) for signature
2021-02-16 - 5:00:29 AM GMT
Email viewed by Heather M. Minner (minner@smwlaw.com)
2021-02-18 - 6:11:12 PM GMT- IP address: 45.41.142.141
Document e-signed by Heather M. Minner (minner@smwlaw.com)
Signature Date: 2021-02-18 - 6:11:39 PM GMT - Time Source: server- IP address: 52.39.49.65
Document emailed to Chad Mosley (chadm@cupertino.org) for signature
2021-02-18 - 6:11:41 PM GMT
Email viewed by Chad Mosley (chadm@cupertino.org)
2021-02-18 - 6:13:17 PM GMT- IP address: 104.47.73.126
Document e-signed by Chad Mosley (chadm@cupertino.org)
Signature Date: 2021-02-18 - 6:13:25 PM GMT - Time Source: server- IP address: 67.164.60.110
Document emailed to Kirsten Squarcia (kirstens@cupertino.org) for signature
2021-02-18 - 6:13:27 PM GMT
Email viewed by Kirsten Squarcia (kirstens@cupertino.org)
2021-02-18 - 10:21:06 PM GMT- IP address: 104.47.44.254
Document e-signed by Kirsten Squarcia (kirstens@cupertino.org)
Signature Date: 2021-02-18 - 10:21:20 PM GMT - Time Source: server- IP address: 69.110.137.176
Agreement completed.
2021-02-18 - 10:21:20 PM GMT