Loading...
CC 09-15-2020 Study Session Item No. 01 Small Cell_Staff PresentationCC 09-15-20 Study Session #1 Small Cell Presentation STUDY SESSION 9/15/2020 SMALL CELL FACILITIES PERMITING GUIDELINES CC 09-15-2020 Study Session #1 What are Small Cells? ●Wireless Antenna ●Located on City Streetlights ●Compared to typical Cell Tower: Smaller in size Lower power output Reduced coverage area Laws and Regulations ●Authority to Regulate Aesthetics and Manage Public Right of Way ●Regulation Must Not Be Based on Health Concerns ●Regulation Must Not Prohibit Wireless Service ●“Shot Clocks” for Application Review Background ●Previous study sessions ●May 16, 2017 ●July 17, 2019 ●May 5, 2020 ●Council recommended enhancements Council Recommendations ●Preferred Siting Guidelines ●Minimum and Maximum height limits ●26’ Min Height Limit ●41’ Max Height Limit in Non-Res Zones ●36’ Max Height Limit in Res Zones ●Permit required to modify existing facilities ●Increase to notification radius and period ●Minimum spacing guidelines Preferred Siting Guidelines ●Category 1 –Preferred Locations ●Category 2 –Less Preferred Locations ●Further broken down by street type ●Category 3 –Least Preferred Locations ●Locations in proximity to occupied structures, schools, playgrounds and intersections. Public Notification Comparisons Cupertino -500’ Radius –21 Days Campbell -300’ Radius –14 Days Los Altos -500’ Radius –10 Days Los Gatos -300’ Radius –20 Days Mountain View -300’ Radius –7 Days Palo Alto -600’ Radius –14 Days Saratoga -Adjacent Properties San Jose -250’ Radius –20 Days Sunnyvale -300’ Radius –14 Days 5 Stages of Permitting in Cupertino 1)Preliminary Assessment 2)Initial Submittal 3)Public Notification 4)Final Submittal 5)Permit Close Out https://www.cupertino.org/our-city/departments/public- works/permitting-development-services/small-cell-information City Web-based Notification & GIS Map Questions?