90-045g - Blackberry Farm - Casey Construction - Utility Improvement, Phase I, Project 93-9105110 10300 Torre Avenue Cupertino, CA 95014-3255 Telephone: (408) 252-4505 FAX: (408) 252-0753 DEPARTMENT OF THE CITY CLERK February 3, 1993 Cit -4 of Cuperti»o Casey Construction 632 Sylvan Way Redwood City, California 94062 CITY COUNCIL ACTION - AWARD OF BID �6 yI L "ice This will confirm the award of contract to you for Blackberry Farm Utility Improvement, Phase I, Project 93-9105. Council awarded this contract to you on February 1, 1993, for your low bid of $98,560.00. Information may be received from the Director of Public Works for the signing of the appropriate documents and for the answering of any questions. Sincerely, DOROTHYfRNELIUS, CMC CITY CLERK cc: Department of Public Works Tegan McLane Business Journal 152 N. 3rd Street San Jose, CA 95112 PUBLIC WORKS CONTRACT FOR PUBLIC WORKS FEB 5 199`3 E. CONTRACT FOR PUBLIC WORKS This CONTRACT made on FEBRUARY 2 , 19 93 by the CITY OF CUPERTINO, a municipal corporation of the State of California, hereinafter called CITY, and CASEY CONSTRUCTION , hereinafter called CONTRACTOR. IT IS HEREBY AGREED by CITY and CONTRACTOR as follows: 1. THE CONTRACT DOCUMENTS. The complete contract consists of the following contract documents: a. Notice to Contractors, Proposal, Time for Completion, Estimated Quantities, Noncollusion Affidavit, Bidder Qualification Form, Sub -Contractors Form and Signature Form. b. Standard Specifications, General Provisions and Special Provisions. C. Plans and Specifications for Phase I, Blackberry Farm Utilit Improvements, Project 93-9105 d. Faithful Performance Bond and Materials Bond. e. Insurance Certificates. f. This Contract for Public Works. All of the above documents are intended to cooperate so that any work called for in one and not mentioned in the other, or vice versa, is to be executed the same as if mentioned in all of said documents. The documents comprising the complete contract are sometimes hereinafter referred to as the Contract Documents. In case of conflict between the Plans and the Specifications on the one hand, and this Contract on the other, the Plans and Specifications shall prevail. 2. THE WORK. CONTRACTOR agrees to furnish all of the tools, equipment, apparatus, facilities, labor, transportation and materials necessary to perform and complete in a good and working order, the work of installing utility improvments as called for, and in the manner designated in, and in strict conformity with, the Plans and Specifications prepared by the Engineer and adopted by CITY, which Plans and Specifications are entitled, respectively, Phase I, Blackberry Farm Utility Improvements, Project 93-9105 , and which Plans and Specifications are identified by the signatures of the parties to this Contract. It is understood and agreed that said tools, equipment, apparatus, facilities, labor, transportation and materials shall be furnished, and that said work shall be performed and completed as required in said Plans and Specifications under the sole direction of CONTRACTOR, but subject to the inspection and approval of CITY, or its representative. Contract Page 1 of 6 02/03/93 08:52 U4082520753 CIT1 CUPERT11NU LdlUU1-UU1 CONTRACT FOR PUBLIC WORKS (Continued). CITY hereby designates as its representaeive for the purpose of this Contract the Engineer, Mr. Bert J. Viskovich. 3. CONTRACT PRICE. CITY agrees to pay, and CONTRACTOR agrees to accept_, in full payment for the work above agreed to be done, the sum of Ninety eight thousand five hundred sixty dollars ($9$,560), subject to additions and/or deductions as provided in the Contract Documents, per Exhibit A attached hereto. A. DISPUTES PERTAININC TO PAYMENT FOR WORK. Should any disputa arise respecting, the true value of the work done, or any work oinitted, or of any extra work which CONTRACTOR may be required to do, or respecting the size of any payment to CONTRACTOR during the performance of this Contract, said dispute shall be determined either by reference to the Unit Prices bid, if applicable, or in accordance with agreement of prices, if applicable, of in accordance with the agreement of the parties, or in accordance with Section 6, paragraph "f" of the General Provisions, 5. PERMITS, COMPLIANCE WITH LAW. CONTRACTOR shall obtain and bear all expense .for all necessary permits other than those from the City, and 1.1-cen.9es for the construction of the project, give all necessary notices, pay all fees required by law, and comply with the laws, ordinances and regulations relating to the work and to the preservation of the public health and safety. 6. INSPECTION BY THE CITY, CONTRACTOR shall at all times maintain proper facilities and provide safe access for inspection by CITY to all parts of the work, and to the shops wherein the work is in preparation. Where the Specifications require work to be specially tested or approved, it shall not be tested or covered up without timely notice to CITY of its readiTiess for inspection and without the approval thereof or consent thereto by CITY, Should any such work be covered up without such notice, approval, or consent, it must, if required by CITY, be uncovered for examination at CONTRACTOR'S expense, 7. EXTRA OR ADDITIONAL WORK AND CIMCES, Should CITY at any time during the progress of the work require any alterations, deviations, additions or omissions from the Plans or Specifications or the Contract Docwnents, CITY shall have the right to do so, and the same shall in no way affect or make void the Contract, but the cost or value thereof will be added to, or deducted from, the amount of the Contract price, as the case moy be, by a fair and reasonable valuation, which shall be determined either by reference to the Unit Prices bid, if applicable, the Standard Specifications, or in accordance with the agreement of the parties. No extra work shall be performed or change be made except by a written order from CITY, duly authorized by resolution of the City Council, and by all agencies whose approval is required by law, stating that tho extra work or change is authorized, and no claim for an addition Co the Contract sum shall be valid unless so ordered, S. CHMCES TO MEET ENVIRONMENTAL REQUIREMENTS, CITY shall have the right to make changes in this Contract during the course of construction to bring ..tha oomplatad improvements into complinnoe with enviromnental requiroments or standards established by State and rederal statutes and regulations after the Contract Page 2 of 6 CONTRACT FOR PUBLIC WORKS (Continued) Contract has been awarded or entered into. CONTRACTOR shall be paid for such changes either by reference to the Unit Prices bid, if applicable, or in accordance with the agreement of the parties. 9. TERMINATION, AMENDMENT OR MODIFICATION. This Contract may be terminated, amended or modified, with the mutual consent of the parties. The compensation payable, if any, for such termination, amendment or modification, shall be determined either by reference to the Unit Price bid, if applicable, the Standard Specifications, or in accordance with the agreement of the parties. 10. TIME FOR COMPLETION. All work under this Contract shall be completed in accordance with the Time for Completion section in the proposal and the Specifications of this project. 11. INSPECTION AND TESTING OF MATERIALS. CONTRACTOR shall notify CITY a sufficient time in advance of the manufacture, production or testing of materials to be supplied under this Contract, in order that CITY may arrange for mill, factory or laboratory inspection and testing of same. 12. TERMINATION FOR BREACH OR INSOLVENCY. If CONTRACTOR should be adjudged a bankrupt, or should make a general assignment for the benefit of creditors, or if a receiver should be appointed on account of insolvency, or if CONTRACTOR or any sub -contractor should violate any of the provisions of the Contract, CITY may serve written notice upon CONTRACTOR and CONTRACTOR'S surety of its intention to terminate the Contract. Such notice shall contain the reasons for CIT'i'S intention to terminate the Contract, and unless within ten(10) days after servir.t; of such notice, such violation shall cease and satisfactory arrangements f. -,r corrections thereof be made, the Contract shall, upon the expiration of sail ten(IO) days, cease and terminate. In the event of any such termination, CITY shall immediately serve notice thereof upon CONTRACTOR'S surety and CONTRACTOR, and the surety shall have the right to take over and perform the Contract; provided, however, that, if the surety within fifteen(15) days after the serving upon it of notice of termination does not give CITY written notice of its intention to take over and perform the Contract, or does not commence performance thereof within thirty(30) days from the date of the serving of such notice, (:IT'i may take over the work and prosecute the same to completion by contract, or h,, any other method it may deem advisable, for the account and at the expense of CONTRACTOR, and CONTRACTOR and CONTRACTOR'S surety shall be liable to CITY f,)r any excess cost occasioned by CITY thereby, and in such event CITY may, liability for so doing, take possession of, and utilize in completing the work, such materials, appliances, plant and other property belonging to CONTRACTFR ;,; may be on the site of the work and necessary therefor. 13. THE CITY'S RIGHT TO WITHHOLD CERTAIN AMOUNTS AND MAKE APPLICATION THERFOF In addition to amounts which CITY may retain under other provisions of !.e Specifications until final completion and acceptance of all work covered by t!.e Contract, CITY may withhold from payment to CONTRACTOR such an amount or amounts as in its judgement may be necessary to pay just claims against CONTRACTOR or sub -contractors for labor and services rendered and materials furnished in and about the work. Contract Page 3 of 6 CONTRACT FOR PUBLIC WORKS (Continued) CITY may apply such withheld amount or amounts to the payment of such claims in its discretion. In doing so, CITY shall be deemed the agent of CONTRACTOR, and any payment so made by CITY shall be considered as a payment made under the Contract by CITY to CONTRACTOR, and CITY shall not be liable to CONTRACTOR for any payment made in good faith. Such payment may be made without prior judicial determination of the claim or claims. With respect to any retention of payment by CITY to ensure performance of the Contract, CONTRACTOR will be entitled to substitute securities as provided in Section 4590 of the California Government Code as more fully described in CITY'S Notice to Contractors. 14. NOTICE AND SERVICE THEREOF. Any notice from one party to the other under this Contract shall be in writing, and shall be dated and signed either by the party giving such notice, or by a duly authorized representative of such party. Any such notice shall not be effective for any purpose whatsoever unless served in the following manner: (a) if the notice is given to CITY either by personal delivery thereof to the Engineer of CITY, or by depositing same in the United States mails, enclosed in a sealed envelope, addressed to CITY OF CUPERTINO, 10300 TORRE AVENUE, CUPERTINO, CA 95014, postage prepaid and certified; (b) if the notice is given to CONTRACTOR, either by personal delivery thereof to CONTRACTOR, or to CONTRACTOR'S duly authorized representative at the site of the project, or by depositing same in the United States mails, enclosed in a sealed e n v e 1 o p e , a d d r e s s e d t o 632 Sylvan Way, Redwood City, CA 94062 , postage prepaid and certified; and (c) if notice is given to CONTRACTOR'S surety or any other person, either by personal delivery thereof to CONTRACTOR'S surety or other person, or by depositing same in the United States mails, enclosed in a sealed envelope, addressed to CONTRACTOR'S surety or person, as the case may be, at the address of CONTRACTOR'S surety or the address of the person last communicated by such person to the party giving the notice, postage prepaid and certified. 15. ASSIGNMENT OF CONTRACT. Neither the Contract, nor any part thereof, nor moneys due or to become due thereunder, shall be assigned by CONTRACTOR without the prior written approval of CITY. 16. COMPLIANCE WITH SPECIFICATIONS OF MATERIALS. Whenever in the Specifications, any material or process is indicated or specified by patent or proprietary name, or by name of manufacturer, such Specifications must be met by CONTRACTOR, unless CITY agrees in writing to some other material, process or article offered by CONTRACTOR which is equal in all respects to the one specified. It shall be CONTRACTOR'S responsibility to prove equality of any such material, process or article offered as a substitution to the one(s) specified. 17. WORKER'S COMPENSATION INSURANCE AND EMPLOYER'S LIABILITY INSURANCE. CONTRACTOR shall take out and maintain during the life of this Contract Worker's Compensation Insurance and Employer's Liability Insurance for all of CONTRACTOR'S employees employed at the site of the project. In case any work is sublet, CONTRACTOR shall require any and all sub -contractors similarly to provide Worker's Compensation and Employer's Liability Insurance for all of the latter's Contract Page 4 of 6 CONTRACT FOR PUBLIC WORKS (Continued) employees unless such employees are covered by the protection afforded by CONTRACTOR. In signing this Contract CONTRACTOR makes the following certification, required by Section 1861 of the Labor Code: "I am aware of the provisions of Section 3700 of the Labor Code which requires every employer to be insured against liability for worker's compensation or to undertake self insurance in accordance with the provisions of the Labor Code, and I will comply with such provisions before commencing the performance of the work of this Contract." 18. ACCIDENT PREVENTION. Precaution shall be exercised at all times for the protection of persons (including employees) and property. The safety provisions of applicable laws, building codes and construction codes shall be observed. Machinery, equipment and other hazards shall be guarded or eliminated in accordance with the safety provisions of the Construction and Safety Orders issued by the Industrial Accident Commission of the State of California. 19. CONTRACTOR'S RESPONSIBILITY FOR THE WORK. CONTRACTOR shall not be responsible for the cost of repairing or restoring damage to the work caused by Acts of God. NEVERTHELESS, CONTRACTOR shall, if the insurance premium is a separate bid item, obtain the insurance to indemnify CITY for any damage to the work caused by Acts of God. "Acts of God" shall include only the following occurrences or conditions and effects: earthquakes and tidal waves, when such occurrences or conditions and effects have been proclaimed a disaster or state of emergency by the President of the United States or by the Governor of the State of California, or were of a magnitude at the site of the work sufficient to have caused a proclamation of disaster or state of emergency having occurred in a populated area. Subject to the foregoing, CITY shall not, in any way or manner, be answerable or suffer loss, damage, expense or liability for any loss or damage that may happen to said building, work, or equipment or any part thereof, or in, on, or about the same during its construction and before acceptance. 20. CONTRACTOR'S GUARANTEE. CONTRACTOR unqualifiedly guarantees the first- class quality of all work and of all materials, apparatus and equipment used or installed by CONTRACTOR or by any sub -contractor or supplier in the project which is the subject of this Contract, unless a lesser quality is expressly authorized in the Plans and Specifications, in which event CONTRACTOR unqualifiedly guarantees such lesser quality; and that the work as performed by CONTRACTOR will conform with the Plans and Specifications or any written authorized deviations therefrom. In case of any defect in the work, materials, apparatus or equipment, whether latent or patent, revealed to CITY within one(1) year of the date of acceptance of completion of this Contract by CITY, CONTRACTOR will forthwith remedy such defects without cost to CITY. 21. ADDITIONAL PROVISIONS. None. IN WITNESS WHEREOF, the parties have executed this Contract, in duplicate, the day and year first hereinabove written. Contract Page 5 of 6 CONTRACT FOR PUBLIC WORKS (Continued) CITY OF CUPERTINO CONTRACTOR s Mel Casey By: '-�' BY: Mayor 1 Attest: Notary Acknowledgement is required. If a citylerk corporation, corporate seal and corporate notary acknowledgement are required. Date:/ l� 19-2 City Clerk APPROVED AS TO FORM AND PROCEDURE: Z % ''City Attorney Contract Amount: NINETY EIGHT THOUSAND FIVE HUNDRED SIXTY DOLLARS ($ 98,560.00) Account Number: 120-9105-953 Purchase Order Number: State of l.0 l� �� V C� On this the day of �u �i�1 - 19,-x, before me, County of c_ CL�4 moi( �7� the undersigned Notary Public, personally appeared 1=1 personally known to me O lY proved to me on the basis of satisfactory evidence to be the person(s) whose name(s) subscribed to the OFFICIAL SEAL within instrument, and acknowledged that ,CC executed it. r'®tiTBETINELEE WITNESS my hand and official seal. W " NOTARY PUBLIC - CALIFORNIA ' SAN MATEO COUNTY t 5&� C<^1 Comm. EATEO April 7, 1993 Notary's Signgfure GENERAL ACKNOWLEDGMENT FORM 7110052 NATIONAL NOTARY ASSOCIATION • 23012 Ventura Blvd • Woodland Flails. CA 9136' CONTRACT FOR PUBLIC WORKS (Continued) INSURANCE AGREEMENT A. Contractor is aware of the provisions of Section 3700 of the Labor Code, which requires every employer to be insured against liability for workers' compensation or undertake self-insurance in accordance with the provisions of that Code, and will comply with such provisions before commencing the performance of the work of this Contract. B. Contractor and all subcontractors will carry workers' compensation insurance for the protection of its employees during the progress of the work. The insurer shall waive its rights of subrogation against the City, the City's officers, agents and employees and shall issue an endorsement to the policy evidencing same. C. Contractor shall carry at all times, on all operations hereunder, commercial or comprehensive general liability insurance, automobile liability insurance and builder's all risk insurance. All insurance coverage shall be in amounts required by the City and shall be evidenced by the issuance of a certificate in a form prescribed by the City and shall be underwritten by insurance companies satisfactory to the City for all operations, subcontract work, contractual obligations, product or completed operations, all owned vehicles and non -owned vehicles. Said insurance coverage obtained by the Contractor, excepting workers' compensation coverage, shall name the City, its engineer, and each of its Directors, Officers,Agents and Employees, as determined by the City, as additional insurers on said policies. Insurers must be licensed to do business in the State of California. The Insurers must also have an "A" policyholder's rating and a financial rating of at least Class VII in accordance with the current Best's Guide Rating. D. Before Contractor performs any work at, or prepares or delivers materials to, the site of construction, Contractor shall furnish certificates of insurance evidencing the foregoing insurance coverages and such certificates shall provide the name and policy number of each carrier and policy and that the insurance is in force and will not be canceled or modified without thirty(30) days written notice to the City. Contractor shall maintain all of the foregoing insurance coverages in force until the work under this Contract is fully completed. The requirement for carrying the foregoing insurance shall not derogate from the provisions for indemnification of the City by Contractor under this Contract and for the duration of the warranty period. Notwithstanding nor diminishing the obligations of Contractor with respect to the foregoing, Contractor shall maintain in full force and effect during the life of this Contract, the following insurance in amounts not less than the amounts specified and issued by a company admitted in California and having a Best's Guide Rating of A -Class VII or better. Worker's Compensation Liability. In accordance with the Worker's Compensation Act of the State of California - $1,000,000 per occurrence. Insurance Agreement Page 1 of 2 CONI'RACr FOR PUBLIC WORKS (continued) Public Liability - either co mnercial general liability or comprehensive general liability; including provi- sions for contractual liability, per- sonal injury, independent contractors and property damage coverages. Builder's All Risk Automobile Liability - comprehensive covering awned, non -owned and hired automobiles. C.cubined single limit of $1.0 million per occurrence; $2.0 million in the aggregate. Amount equal to 100% of the contract price bid; $25,000 deductible is allowed. Combined single limit of $500,000 per occurrence. Professional Liability.,- covering $500,00 per oc urr, $1x0l ion C�(/, wrongful acts, errors, missions or., in the aggregate. acts of negligence of the/Contractor. 7 By: //• C"9 -5z -:-Cr- (Contractor's Name Insurance Agreement Page 2 of 2 A. PROPOSAL, T0: DIRECTOR OF PUBLIC WORKS CITY OF CUPERTINO 10300 TORRE AVENUE CUPERTINO, CA 95014 Proposal Page A - 6 In compliance with the Plans, Specifications and/or Special Provisions for the constructing to completion the Phase I Blackberry Farm Utility Improvements, Project No. 93-9105. I, the undersigned, hereby declare that I have read the proposal requirements, visited the site, and examined all of the above documents. I, the undersigned, hereby propose to do all work required to complete the project in accordance with the Plans, Specifications and/or Special Provisions for the prices set forth in the following schedule. I further understand that said prices include all costs including, but not limited to, local, state and federal taxes or transportation costs. I, the undersigned, also understand that the quantities shown below are estimates only, being given on a basis of comparison of bids, and that The City of Cupertino does not state that the actual amount of work will correspond but reserves the right to increase, decrease or delete the amount of any class or portion of the work or to omit items or portions of the work that may be deemed necessary by the Engineer. The City of Cupertino reserves the right to unilaterally determine and award the contract to any qualified bidder based on the most advantageous proposal, to reject any or all bids or to waive any irregularities in the bidding procedures. The work to be done consists of the furnishing of all labor, methods, processes, tools, machinery and materials required to construct to completion and in working usable order the Phase I, Blackberry Farm Utility Improvements as described in the contract documents. The Base Bid Price shall be the contractor's actual bid price. The totals listed in the Unit Price Schedule are only used as a means to compare bids and are subject to change if errors are found in the quantities. In the event of discrepancies between the written Unit Price and the numerical Unit Price, the written price shall prevail and shall be used to calculate the total for that bid item. The unit prices listed shall be used as the basis for any changes. The bid prices for this project shall be as outlined on the following pages. Casey Construction I; . u' Proposal Page 1 of 8 Proposal Page A - 7 BASE BID PRICES: 1. BID ITEM N0. 1: For all the Domestic Water related Work shown and described on the Plans And Specifications. Item No. 1: the sum of Six Thn,,.cancJ Ej,Zbt Ili-indred Dollars ($ h,800.00 ) 2. BID ITEM N0. 2: For all the Sanitary Sewer related Work shown and described on the Plans And Specifications. Item No. 2: the sum of Ninty One Thousand Seven Hundred and Sixty Dollars ($ 91 X760 . 00 ) . 3. BID ITEM N0. 3: For all the Electrical related Work shown and described on the Plans And Specifications. Item No. 3: the sum of x-,-w;r-:F "I �r�yyyl�' C iGtr/ Dollars ($ 2— ) . Total Bid Price (Bid Item No. 1 + 2 + 3) the sum of �wa 67y'yDlia`/� d-^ I- -, c D o 11 a r s ( $ Z - ) . UNIT PRICE SCHEDULE: For changing quantities of Work items from those indicated by the Plans, upon written instructions f the City, the following unit prices shall prevail. Unit prices listed hereafter refer to all materials installed and completely in place in accordance with all applicable portions of the Specifications and are to include all costs connected with such items including, but not necessarily limited to material, labor, maintenance, overhead, profit for Contractor and or subcontractor. These unit prices shall be used as the basis for any changes. Item Description Unit Unit Price 1. Cleanout to Grade Each $ 300.00 2. 4" Sanitary Sewer Lineal foot $ 25.00 3. 2" Sanitary Sewer Lineal foot $ 20.00 4. 2?" Force main Lineal foot $ 25.00 5. 2?" Force main & 4" Lineal foot $ 35.00 sanitary sewer in joint trench Proposal Page 2 of 8 Addendun 1 Casey Construction 6. 3" Cold water (PVC) " 2Lineal foot $ 32.00 7. lZ" Cold water (PVC) Lineal foot $ 20.00 8. 1" Cold water (PVC) Lineal foot 9. Repair exisitng 3/4" to 2" water line Each $_5 no _ no 10. Repair of exisiting electrical circuit Each $_�_2_5__OQ 11. Add Alternate for the installation of the water services and water meters as shown on plan C-3, revision 1. Lump Sum $ 4800.00 The undersigned agrees to commence Work under this Contract oil a date to be specified in the written Notice to Proceed from the Owner and to complete work on or before April 9, 1993. The Contractor shall diligently prosecute the work to acceptance by the City before the actual dates for completion as set forth above. The Contractor shall pay the City of Cupertino Liquidated damages as set forth in the General Provisions, Section B, paragraph 4b,PROSECUTION AND PROGRESS OF THE WORK, for each and every calendar day's delay beyond dates established in this proposal for each and every portion of the completion process. I, the undersigned agree that if this proposal is accepted, I will enter into a contract with the City of Cupertino to provide all necessary machinery, tools, apparatus, and other means of construction and to do all the work specified in the contract in the manner and time specified. I, the undersigned declare that this bid is made without connection with any person, firm, or corporation malting a bid for the same work, and is in all respects fair, and without collusion or fraud. I, the undersigned recognize that the Director of Public Works of the City of Cupertino will reserve the right to establish the priority of one job over another and each starting date where conflict of construction schedules occur. I, the undersigned, am aware of the provisions of Section 3700 of the Labor Code which requires every employer to be insured against liability for worker's compensation or to undertake self- insurance in accordance with the provisions of that code, and I will comply with such provisions before commencing the performance of the work of this contract. Attached hereto is the required cash, cashier's check, certified check, bid bond, or surety, payable to the City of Cupertino, in the amount of , which amount represents ten percent(10%) of the total amount of the bid as required by law and this Notice to Contractors. Proposal Page 3 of 8 01221ADDE.MW Addendum 1 Casey Construction Proposal Page A - 9 NONCOLLUSION AFFIDAVIT TO BE EXECUTED BY BIDDER AND SUBMITTED WITH BID I, the undersigned, being first duly sworn, deposes and says that I am Owner of C:asPy Construction on , (business title) (business name) the party making the foregoing bid, that the bid is not made in the interest of, or on behalf of, any undisclosed person, partnership, company, association, organization, or corporation. The bid is genuine and not collusive or sham. The bidder has not directly or indirectly induced or solicited any other bidder to put in a false or sham bid, and has not directly or indirectly colluded, conspired, connived, or agreed with any bidder or anyone else to put in a sham bid, or that anyone shall refrain from bidding. The bidder has not in any manner, directly or indirectly, sought by agreement, communication, or conference with anyone to fix the bid price of the bidder or any other bidder, or to fix any overhead, profit, or cost element of the bid price, or of that of any other bidder, or to secure any advantage against the public body awarding the contract of anyone interested in the proposed contract. All statements contained in the bid are true and, further, the bidder has not, directly or indirectly, submitted the bid price or any breakdown thereof, or contents thereof, or divulged information or data relative thereto, or paid, and will not pay, any fee to any corporation, partnership, company, association, organization, bid depository, or to any member or agent thereof to effectuate a collusive or sham bid. I swear the above is true Mel Casey Proposal Page 4 of 8 Proposal z Page A - 10 BIDDER QUALIFICATION FORM In further compliance with the specifications furnished, I, the undersigned, submit the following statements as to my experience and qualifications to perform this work as a part of this proposal. We have been in business under the present name for 15 years. Our experience in work comparable with that required by the proposed contract is 7 years operating under our current business name. Our experience in work comparable with that required by the proposed contract is years operating under the following different name(s). None My Galifornia Contractor's License: Number is 459579 The classification of my Contractor's License is The expiration date for my Contractor's License A (This Section for City use Only) The above information has been verified by LWW on �•%.D'95 Contractors State License Board (800) 321-2752 or (408) 277-1244. Where federal funds are involved, no bid submitted shall be invalidated by the failure of the bidder to be licensed in accordance with the laws of the State of California, however, at the time the contract is awarded the contractor shall be properly licensed. Proposal Page 5 of 8 Casey Construction Proposal Page A - 11 BIDDER HISTORY OF WORK The following is an example of work similar in character to that required in the proposed contract which our organization or personnel in our organization has completed within the past three(3) years. Whom Phone Year Location Class For Performed Number Amount see attached 3 pages #6 A B Proposal Page 6 of 8 Casey Construction ISI. Casey 632 Sylvan Way Redwood Clly, CA 94062 (415) 369-1876 FAX (415)369-1850 Cal Llc. 0 459579 JOE+ I-iF=:FTEFiENCES: 199 Annual. Water System Improvements $120,966. City of Mountain View Mike Ballard 41.5 903-6311 El Camino Way Sewer Replacement $110,176. City of f'a:l o Alto Edward Wu 415 -329-2126 Valparaiso Ave Sewer Rehabilitation $392,366., West Day Sanitary District 415 321-0384 Culvert Rehabilitation -Various Locations $506,146. Cal Trans Jeannie .L- al der,_ mo s 415 570-0588 Sewer- Repair $7,452. City of Santa Clara Sho Yoshida 408 984-7'0145 1991: Northside Manhole Relocation $26j155 City of Santa Clara Sho Yoshida 4078 984 30145 Bradford Street Storm Drainage Improvements $54,198 San I'lateo County/City of Redwood Citv ,I 1 f�, - 6 :7 .....4100/415 780-70010 Eipr-incls Dike- Larie $1.16,,421 Construct bike lane. ret.ai ni ng walls, drain, --Age City of San Mateo - 'Pete Boyle - 77-x;'15 Ralston & Paloma Avenues Water Main Project $106,635 Belmont County Water District 591-8941 Brain Kangas Fou.i l; Engineers 565-041 Miscellaneous drainage repairs - various locations 1;1 I, 42!,-1 City of Fremont -791%1-6701:_7 Re --route Carion Svphon $24,77.!!' City of C;(_(ph( t:i no 408 25:'-71•=171 pg 6 A E Storm Drain $20,500 Town of Woodside 851-7764 C -Rem Engineers - Bob Erickson 571-6400 Town Center Pump Station Enclosure $18,420 Town of Woodside 851-7764 C -Rem Engineers - Bob Erickson 571-6400 Storm Drain Improvements $54.198 Count; of San Mateo 363-4000 City of Redwood City 780-7000 Westlake Boulevard $50,508 Water & Storm Sewer Relocation City of Daly City - Ravi Gehani 991-8000 Vale Street & Jefferson Wells $80,537 Water Main Improvements City of Daly City - Ravi Gehani 991-8000 1990: Summit/Bella Vista $279,000 Water Main Town of Hillsborough - Jack Rush 579-3800 Midway Village, Daly Citv $210,591 Site Drainage Corrections, Retaininq Walls Housinq Authority SMC / FE Jordan Assoc - Ken Mathis 763-2400 City View Condo Project~ Hunters Point Water Main, Curb & Gutter, Site Improvements Redevelopment Apency, SF / Propress Seven Upper Pulqas Creek, San Carlos Debris Collection Basin City of San Carlos - Connie Dillard 593-8011 Brittan Avenue, San Carlos Water Main California Water Service - John Mavlan 343-7698 Casey Construction Continued: pg 6B $151.000 $112,000 1989: Eaton Avenue, San Carlos $250,00@ Water Main California Water Service - John Maylan 343-7698 Brewster Avenue, Redwood City $52,000 Sewer Main Extension San Mateo County - Public Works 363-4100 8000' of Water Main (var1ous contractors) $5(v@,000 City of Redwood City - Bob Kugiama 780-7000 400 Sewer Hook-ups in Emerald Hills WOO. 000 San MaLeo County 36J-4000 1988: Pressure Reducinq Station �51,000 City of Redwood City - John Lvnch 780-7000 1987: Crvstal Springs Terrace $725.000 Water, Sewer, Retaining Walls, Spillway, Paving Town of Hillsborough - Jack Rush 579-3800 Woodrich Road $380,000 Rebuild road. Water. Sewer, Storm Drain, Sidewalk, Curb to GuLter Town of Hillsborough - Jack Rush 579-3800 Miscellaneous: Sewer and Water Repair - various locations - on-qoinq City of San Carlos - Connie Dillard 593-8011 We have done in addition to the above iobs manv jobs for nrivate parties and other contractors involvino water and sewnr wank. Casey Construction � pg 6C Proposal Page A - 12 SUBCONTRACTOR'S FORM The subcontractor(s), as defined in the General Provisions and in Section 7026 of the California Business and Professions Code, that I propose to hire to perform any of the work for this project in an amount in excess of one-half of one percent(0.5%) of the total bid are listed below. Only those listed below shall perform work on this project and each of them has been provided with a full and complete set of plans and specifications for this project by the bidder. 1. Name �r//`%C o•✓� f—_GG'G-;r?/C Address Work to be Performed &--z: 7•r / c'J9 C 2. Name Address Work to be Performed 3. Name Address Work to be Performed 4. Name Address Work to be Performed 5. Name Address Work to be Performed 6. Name Address Work to be Performed Proposal Page 7 of 8 Casey Construction Proposal Page A - 13 BIDDER'S SIGNATURE FORM IF YOU ARE AN INDIVIDUAL, SO STATE. IF YOU ARE A COMPANY OR A CO -PARTNERSHIP, STATE THE COMPANY NAME AND LIST THE NAMES OF ALL INDIVIDUAL CO-PARTNERS COMPOSING THE COMPANY. IF YOU ARE A CORPORATION, STATE THE LEGAL NAME OF THE CORPORATION AND THE NAMES OF THE PRESIDENT, SECRETARY -TREASURER AND MANAGER. THE CORPORATE SEAL MUST BE AFFIXED TO THIS FORM. ENTER THE NAME OF YOUR BUSINESS ON THE LINE OPPOSITE THE APPROPRIATE BUSINESS TYPE. TYPE OF BUSINESS General Engineering NAME OF BUSINESS Casey Construction CORPORATION CO -PARTNERSHIP: INDIVIDUAL Mel Case JOINT VENTURE : _ (Describe) Name and Signature of Bidder: Mel C a sem (Print or Type Name) Date:- Jan 26,1993 Address(mailing & location) 632. Sylvan Way Telephone Number : (415) 369-1876 Acknowledgement of all addenda received is required by circling each addendum number. (V0 3 4 5 6 7 8 9 10 Proposal Page 8 of 8 Public Works Departnx-_nt BLAMERRY FARM UI'ILI`IY I mROVE%Zaus CITY OF CUPE1=0, CALIFIORNIA VIANNNEWHOMM61 e BID OPENING JANUARY 26, 1993 2:00 P.M. J;�mt iry 25, 19'33 The following changes, deletions and/or additions shall be made to 1 k n Project Plans and Specifications: 1. B. GENERAL PROVISIONS 6. Legal P.elations and Responsibilities to the Public Casey Construction c. Insurance Delete everything beginning with the second para.grapli n.!xl substitute the following: Worker's Ccmpensation Liability: In accordance with the Worker's Compennsation Act of -the State of California - $1,000,000 per- occurrence. Public LLability - either cc mTiercial general liability or comprehensive general liability; including provisioris for contractual liability, personal injury, hr1epei0,2nt contractors and property damage coverages. Combined single limit of $2,000,000 in the aggregate. Builder's all Risk: $1,000,000 per oc.,currence; Amount equal to 100% of the contract price bid.; $25,000 deductible is allowed. Automobile Liability - comprehensive covr-ring own --r, non -owned and hired automobiles. Combined single limit of $500,000 fir. oc_,currrix_­. Professional Liability - covering wrongful acts, errors, omissions or acts of negligence of the Contractor. $500,000 per occurrence; $1,000,000 in the aggregate. 2. Contract for Public Works Insurance Agreement Section D Delete everything after the first paragraph and substitute the following: Worker's compensation Liability. Public Liability - either com- mercial general liability or comprehensive general liability; including provisions for contrac- tual liability, personal_ injury, independent contractors and pro- perty damage coverages. Builder's All Risk Automobile Liability - ccopre- hensive covering owned, non - owned and hired automobiles. Professional Liability - covering wrongful acts, errors, omissions or acts of negligence of the Contractor. In accordance with the Wor_ Icer' s Compensation Act of the State of California - $1,000,000 I.er occurrence. Combined single limit of $1.o million per occlzr_-rence; $2.0 million in the aggregate. Amount equal to 100% of the con- tract price bid; $25,000 deduc- tible is allowed. Combined single .limit of $500,000 per occurrence. $500,000 per occurrence; $1.0 million in the aggregate. Please indicate receipt of this Addendum on the last page of the proposXtl. Failure to do so may cause rejection of your bid. Approved by: City of Cupertino j Bert J. Viskovich Director of Public Works Addendum 2 received by Casey Construction