B-2018-1833 CITY OF CUPERTINO BUILDING PERMIT
BUILDING ADDRESS: CONTRACTOR: PERMIT NO: B-2018-1.
22388 SANTAPAULAAVE CUPERTINO, CA 95014-2716 (357 05 034) SUNRUN 833
INSTALLATION
SERVICES INC
SAN LUIS OBISPO, CA
93401
OWNER'S NAME: DATE I: ISSUED. 10/25/2018
OWNER'S PHONE: PHONE NO: 415
( ) 580-6900
0 6900
LICENSED CONTRACTOR'S DECLARATION BUILDING PERMIT INFO:
License Class C46 Lic. #750184
Contractor SUNRUN INSTALLATION SERVICES INC Date 06/30/2020 X BLDG — ELECT , PLUMB
I hereby affirm that I am licensed under the provisions of Chapter 9 (commencing MECH X RESIDENTIAL _ COMMERCIAL
with Section 7000) of Division 3 of the Business & Professions Code and that my
license is in full force and effect. JOB DESCRIPTION:
I hereby affirm under penalty of perjury one of the following two declarations: (N) 27 PANEL ROOF MOUNTED PV SYSTEM - ( 8.9 KW)
i. 1 have and will maintain a certificate of consent to self-insure foi Worker's
Compensation, as provided for by Section 3700 of the Labor Code, for the
performance of the work for which this permit is issued.
is issued.
APPLICANT CERTIFICATION Sq. oorArea: Valuation: $16643.00
1 certify that I have read this application and state that the above
information is correct. I agree to comply with all city and county ordinances APN Number: Occupancy Type:
and state laws relating to building construction, and hereby authorize 35705 034
representatives of this city to enter upon the above mentioned property for
inspection purposes. (We) agree to save indemnify and keep harmless the
City of Cupertino against liabilities, judgments, costs, and expenses which PER
may accrue against said City in consequence of the granting of this permit. MIT EXPIRES IF WORK IS NOT STARTED
Additionally, the applicant understands and will comply with all non-point WITHIN 180 DAYS OF PERMIT ISSUANCE OR
source regulation Code, Section 9.18. 180 DAYS FROM LAST CALLED INSPECTION.
Signature Date 10/25/2018 Issued by: Jasmine Archbold
Date: 10/25/2018
OWNER-BUILDER DE LA TION
I hereby affirm that I xempt from the Contractor's License Law for one of the RE-ROOFS:
following two reasons: All roofs shall be inspected prior to any roofingmaterial being
1. I, as owner of the property, or my employees with wages as their sole g installed. If a roof is
installed without first obtaining an inspection, I agree to remove all new materials for
compensation, will do the work, and the structure is not intended or offered for inspection.
sale (Sec.7044, Business & Professions Code)
2. I, as owner of the property, am exclusively contracting with licensed Signature of Applicant.,-
contractors to construct the project (Sec.7044, Business & Professions Code), Date: 10/25/2018
I hereby affirm under penalty of perjury.one of the following three declarations:
1. I have and will maintain a Certificate of Consent to self-insure for Worker's ALL ROOF COVERINGS TO BE CLASS "A" OR BETTER
Compensation, as provided for by Section 3700 of the Labor Code, for the
performance of the work for which this permit is issued. HAZARDOUS MATERIALS DISCLOSURE
2. I have and will maintain. Worker's Compensation Insurance, as provided for by I have read the hazardous materials requirements under Chapter 6.95 of the
Section 3700 of the Labor Code, for the performance of the work for which this California Health & Safety Code, Sections 25505, 25533, and 25534. I will
permit is issued. maintain compliance with the Cupertino Municipal Code, Chapter 9.12 and the
3. I certify that in the performance of the work for which this pen-nit is issued, I Health & Safety Code, Section 25532(a) should 1 store or handle hazardous
shall not employ any person in any manner so as to become subject to the material. Additionally, should I use equipment or devices which emit hazardous
Worker's Compensation laws of California. If, after making this certificate of air contaminants as defined by the Bay Area Air Quality Management District 1
exemption, I become subject to the Worker's Compensation provisions of the
will maintain compliance with the Cupertino Mu 'cipal Code, Chapter 9.12 and
Labor Code, I must forthwith comply with such provisions or this permit shall the Health & Safety Code, Sections ,
.
APPLICANT CERTIFICATION Date: 10/25/2018
1 certify that I have read this application and state that the above information is CONSTRUCTION LE I G AGENCY
correct. I agree to comply with all city and county ordinances and state laws I hereby affirm that there is a constructi I ding agency for the performance
relating to building construction, and hereby authorize representatives of this city of work's for which this permit is issued c. 3097, Civ C.)
to enter upon the above mentioned property for inspection purposes. (We) agree Lender's Name
to save indemnify and keep harmless the City of Cupertino against liabilities,
judgments, costs, and expenses which may accrue against said City in Lender's Address
consequence of the granting of this permit. Additionally, the applicant understands
and will comply with all non-point source regulations per the Cupertino Municipal ARCHITECT'S DECLARATION
Code, Section 9.18. 1 understand my plans shall be used as public records.
Signature Date 10/25/2018 Licensed