Loading...
BACKFLOW (2)CERTIFICATION OF RE-CLAIMED WATER SYSTEMS c6�°0" CROSS CONNECTION SPECIALISTS CERTIFIED CROSS CONNECTION CONTROL CONSULTANTS 'i' 'i- BACKFLOW PREVENTION VALVE EXPERT INSTALLATION -REPAIRS -TESTING -CERTIFICATION CALIFORNIA (800) 464 -FLOW (3569) LOCAL (408) 269-2600 S q�e. LICENSED CONTRACTOR C.C.L.# 427328 FAX (408) 269-2650 3750-E CHARTER PARK DR., SAN JOSE CA 95136-1356 ACKFLOW PREVENTION SPECIALISTS, INC. MAILING / OWNER �ertino City Center Bldgs SERVICE Cupertino City Center Bldgs Address 20400 Stevens Creek Blvd #230 ADDRESS 20400 Stevens Creek Blvd. Cupertino, CA. 95014 Cupertino, CA. 95014 D CONTACT: Bob Camarda TEL# 408-410-6517 FEB 2 5 2008 MANUFACTURER MODEL NUMBER TYPE SIZE BE IAL NUMBER Febco 805Y DC 2" 13 NEW INSTALLATION: ❑ REPLACEMENT:L] REPLACEMENT DEVICE INFORMATION MANUFACTURER MODEL NUMBER TYPE SIZE SERIAL NUMBER INTERNAL® METER# EXTERNAL ❑ TAG # Hazard TVDe: cooling tower • LOCATION OF DEVICE chiller make up / heat exchanger roof Comments: THE ABOVE REPORT IS CERTIFIED TO BE TRUE IFITIAL TEST B REPAIRED BY FINAL TEST BY PASS CERTIFIED TESTER NO. 11277 DATE 02/14/08 FAIL MO. DAY YR. DATE �' ,Z r "y PASS CERTIFIED TESTER NO. �I? �7 DATE FAIL MO. DAY YR. REDUCED PRESSURE DEVICES PRESSURE TYPE Shutatt Valves DOUBLE CHECK VALVES VACUUM BREAKERS DIFFERENTIAL CHECK VALVE CHECK VALVE AIR INLET CHECK VALVE PRESSURE/RELIEF N0.1 N0.2 VALVE #1 p CLOSED TIGHT ❑ CLOSED TIGHT ❑ OPENED AT_ LBS. OPENED AT LBS CLOSED TIGHT El CLOSED TIGHT INITIAL TEST N lbs. # lbs. OPENED UNDER 2.0 O DID NO NDER I.O R DID NOT OPEN [IrnLEA_KED # LBS. LEAKED ❑ OR DID NOT OPEN ❑ LEAKED ❑ REPAIRS AND 1 (% I �4 (-C- ' ILEAKED I ' �- 21 MATERIALS USED � a`ec S FINAL CLOSED TIGHT CLOSED TIGHT 90XLSS CLOSED TIGHT❑ TEST 'IV �' Z OPENED AT _NUBS PENED AT CLOSED TIGHT NUBS NUBS Comments: THE ABOVE REPORT IS CERTIFIED TO BE TRUE IFITIAL TEST B REPAIRED BY FINAL TEST BY PASS CERTIFIED TESTER NO. 11277 DATE 02/14/08 FAIL MO. DAY YR. DATE �' ,Z r "y PASS CERTIFIED TESTER NO. �I? �7 DATE FAIL MO. DAY YR.