Loading...
12100214I CITY OF CUPERTINO BUILDING PERMIT I BUILDING ADDRESS: CONTRACTOR: UPPAL CONSTRUCTION PERMIT NO: 12100214 CO OWNER'S NAME: MANGHNANI PRAKASH AND REKHA 12245 PETERSBURG DR I DATE ISSUED: 03/07/2013 1 I OWNER'S PHONE: 4088577138 I MILPITAS, CA 95035 I PHONE NO: (408) 507-6750 I ❑ LICENSED CONTRACTOR'S DECLARATION License Class Lic. # Contractor v PM1 C e J14S i Cn Date 1 hereby affirm that 1 am licensed under the provisions of Chapter 9 (commencing with Section 7000) of Division 3 of the Business & Professions Code and that my license is in full force and effect. 1 hereby affirm under penalty of perjury one of the following two declarations: I have and will maintain a certificate of consent to self -insure for Worker's Compensation, as provided for by Section 3700 of the Labor Code, for the performance of the work for which this permit is issued. I have and will maintain Worker's Compensation Insurance, as provided for by Section 3700 of the Labor Code, for the performance of the work for which this permit is issued. APPLICANT CERTIFICATION I certify that l have read this application and state that the above information is correct. 1 agree to comply with all city and county ordinances and state laws relating to building construction, and hereby authorize representatives of this city to enter upon the above mentioned property for inspection purposes. (We) agree to save indemnify and keep harmless the City of Cupertino against liabilities, judgments, costs, and expenses which may accrue against said City in consequence of the granting of this permit. Additionally, the applicant understands and will comply with all non -point source regulations per the Cupertino Municipal Code, Section,�j' 9.18. ❑ OWNER -BUILDER DECLARATION 1 hereby affirm that I am exempt from the Contractor's License Law for one of the following two reasons: 1, as owner of the property, or my employees with wages as their sole compensation, will do the work, and the structure is not intended or offered for sale (Sec.7044, Business & Professions Code) 1, as owner of the property, am exclusively contracting with licensed contractors to construct the project (Sec.7044, Business & Professions Code). 1 hereby affirm under penalty of perjury one of the following three declarations: I have and will maintain a Certificate of Consent to self -insure for Worker's Compensation, as provided for by Section 3700 of the Labor Code, for the performance of the work for which this permit is issued. I have and will maintain Worker's Compensation Insurance, as provided for by Section 3700 of the Labor Code, for the performance of the work for which this permit is issued. 1 certify that in the performance of the work for which this permit is issued, l shall not employ any person in any manner so as to become subject to the Worker's Compensation laws of California. If, after making this certificate of exemption, I become subject to the Worker's Compensation provisions of the Labor Code, 1 must forthwith comply with such provisions or this permit shall be deemed revoked. APPLICANT CERTIFICATION 1 certify that l have read this application and state that the above information is correct. 1 agree to comply with all city and county ordinances and state laws relating to building construction, and hereby authorize representatives of this city to enter upon the above mentioned property for inspection purposes. (We) agree to save indemnify and keep harmless the City of Cupertino against liabilities, judgments, costs, and expenses which may accrue against said City in consequence of the granting of this permit. Additionally, the applicant understands and will comply with all non -point source regulations per the Cupertino Municipal Code, Section 9.18. JOB DESCRIPTION: RESIDENTIAL COMMERCIAL CONSTRUCT A TWO STORY RESIDENCE (3211 SQ FT)WITH ATTACHED GARAGE (552 SQ FT) AND COVERED PORCHES (323 SQ FT). Sq, Ft Floor Area: I Valuation: $500000 APN Number: 34214026.00 j Occupancy Type: PERMIT EXPIRES IF WORK IS NOT STARTED WITHIN 180 DAYS OF4WAMIT ISSUANCE OR 180 DAYST CALLED INSPECTION. RE -ROOFS: All roofs shall be inspected prior to any roofing material being installed. If a roof is installed without first obtaining an inspection, I agree to remove all new materials for inspection. Signature of Applicant: _ Date: ALL ROOF COVERINGS TO BE CLASS "A" OR BETTER HAZARDOUS MATERIALS DISCLOSURE I have read the hazardous materials requirements under Chapter 6.95 of the California Health & Safety Code, Sections 25505, 25533, and 25534. 1 will maintain compliance with the Cupertino Municipal Code, Chapter 9.12 and the Health & Safety Code, Section 25532(x) should I store or handle hazardous material. Additionally, should I use equipment or devices which emit hazardous air contaminants as defined by the Bay Area Air Quality Management District I will maintain compliance with the Cupertino Municipal Code, Chapter 9.12 and the Health & Safety Code, SecPill 25505, 25533, and 25534, / Owner or authorized agent: Date: .� / 1 CONSTRUCTION LENDING AGENCY I hereby affirm that there is a construction lending agency for the performance of work's for which this permit is issued (Sec. 3097, Civ C.) Lender's Name Lender's ARCHITE T'S DECLARATION I understand my plans shall be used as public records. Licensed Professional CITY OF CUPERTINO BUILDING PERMIT BUILDING ADDRESS: 22-7 CONTRACTOR: UPPAL CONSTRUCTION PERMIT NO: 12100214 1 O 100 L.tba n c)n pr. CO OWNER'S NAME: MANGHNANI PRAKASH AND REKHA 2245 PETERSBURG DR DATE ISSUED: 03/07/2013 OWNER'S PHONE: 4088577138 MILPITAS, CA 95035 PHONE NO: (408) 507-6750 Cifz LICENSED CONTRACTOR'S DECLARATION JOB DESCRIPTION: RESIDENTIAL 11 COMMERCIAL License Class___ Lic. # LY 3 Z 9 S,— ADDRESS CHANGED TO 10100 LEBANON DR.CONSTRUCT / Contractor % (�r�� C coS 1 inDate, ATWO STORY RESIDENCE (3211 SQ FT)WITH ATTACHED i,4 ( GARAGE (552 SQ FT) AND COVERED PORCHES (323 SQ I hereby affirm that 1 am licensed under the provisions of Chapter 9 REVISION #I- TRUSS CALCS- ISSD OTC 6/12/20I3 (commencing with Section 7000) of Division 3 of the Business & Professions Code and that my license is in full force and effect. I hereby affirm under penalty of perjury one of the following two declarations: I have and will maintain a certificate of consent to self-insure for Worker's Compensation, as provided for by Section 3700 of the Labor Code, for the Sq. Ft Floor Area: Valuation: $500000 performance of the work for which this permit is issued. have and will maintain Worker's Compensation Insurance, as provided for by Section 3700 of the Labor Code, for the performance of the work for which this APN Number: 34214026.00 Occupancy Type: permit is issued. APPLICANT CERTIFICATION I certify that I have read this application and state that the above information is PERMIT EXPIRES IF WORK IS NOT STARTED correct. I agree to comply with all city and county ordinances and state laws relating WITHIN 180 PERMIT ISSUANCE OR to building construction, and hereby authorize representatives of this city to enter upon the above mentioned property for inspection purposes. (We) agree to save 180 D O ALLED INSPECTION. indemnify and keep harmless the City of Cupertino against liabilities, judgments, costs, and expenses which may accrue against said City in consequence of theL;'-� G I granting of this permit. Additionally, the applicant understands and will comply ued by: Date: O with all non-point source regulations per the Cupertino Municipal Code, Section 9.18. dt___ RE-ROOFS: Signature Date All roofs shall be inspected prior to any roofing material being installed. If a roof is installed without first obtaining an inspection, I agree to remove all new materials for inspection. ❑ OWNER-BUILDER DECLARATION Signature of Applicant: Date: I hereby affirm that I am exempt from the Contractor's License Law for one of the following two reasons: ALL ROOF COVERINGS TO BE CLASS "A" OR BETTER 1, as owner of the property, or my employees with wages as their sole compensation, will do the work, and the structure is not intended or offered for sale (Sec. 7044, Business & Professions Code) 1, as owner of the property, am exclusively contracting with licensed contractors to HAZARDOUS MATERIALS DISCLOSURE construct the project (Sec. 7044, Business & Professions Code). I have read the hazardous materials requirements under Chapter 6.95 of the California Health & Safety Code, Sections 25505, 25533, and 25534. I will I hereby affirm under penalty of perjury one of the following three maintain compliance with the Cupertino Municipal Code, Chapter 9.12 and the declarations: Health & Safety Code, Section 25532(a) should I store or handle hazardous I have and will maintain a Certificate of Consent to self-insure for Worker's material. Additionally, should I use equipment or devices which emit hazardous Compensation, as provided for by Section 3700 of the Labor Code, for the air contaminants as defined by the Bay Area Air Quality Management District I performance of the work for which this permit is issued. will maintain compliance with the Cupertino Municipal Code, Chapter 9.12 and I have and will maintain Worker's Compensation Insurance, as provided for by the Health & Safety Code, Sections 25505, 25533, and 25534. Section 3700 of the Labor Code, for the performance of the work for which this Owner or authorized agent: +^� �Date: permit is issued. I certify that in the performance of the work for which this permit is issued, I shall not employ any person in any manner so as to become subject to the Worker's Compensation laws of California. If, after making this certificate of exemption, l CONSTRUCTION LENDING AGENCY become subject to the Worker's Compensation provisions of the Labor Code, I must I hereby affirm that there is a construction lending agency for the performance of forthwith comply with such provisions or this permit shall be deemed revoked. work's for which this permit is issued (Sec. 3097, Civ C.) Lender's Name APPLICANT CERTIFICATION Lender's Address I certify that 1 have read this application and state that the above information is correct. I agree to comply with all city and county ordinances and state laws relating to building construction, and hereby authorize representatives of this city to enter upon the above mentioned property for inspection purposes. (We) agree to save indemnify and keep harmless the City of Cupertino against liabilities, judgments, ARCHITECT'S DECLARATION costs, and expenses which may accrue against said City in consequence of the I understand my plans shall be used as public records. granting of this permit. Additionally, the applicant understands and will comply with all non-point source regulations per the Cupertino Municipal Code, Section Licensed Professional 9.18. Signature Date CONSTRUCTION PERMIT APPLICATION COMMUNITY DEVELOPMENT DEPARTMENT • BUILDING DIVISION 10300 TORRE AVENUE • CUPERTINO, CA 95014-3255 —a I (4Q8) 777-3W8 • FAX (408) 7N-3333 • building a�cupertino.org CUPERTINO /d/'GDrg,�N6:. ❑ NEW CONSTRUCTION ❑ ADDITION ❑ ALTERATION / TI ❑ REVISION /DEFERRED ORIGINAL PERMIT # WWI PROJECT ADDRESS �l►/y r /�, �lJ` APN # l c OWNERNAME Gj / E-MAIL STREET ADDRESS Ifo { � CITY, P �^ / q1—/ >,,-t FAX CONTACT NAMEr /! / _ PHON "V JVC /� E-MAIL STREET ADDRESS S �/ / !❑ CITY, E, IP Q/S(j/ y _ FAX El OWNER ❑ OWNER -BUILDER OWNERAGENT E6 CONTRACTOR ❑ CONTRACTOR AGENT ❑ ARCHITECT ❑ENGINEER ❑ DEVELOPER ❑ TENANT CONTRACTOR N LICENSE NUMBER LICENSE TYPE BUS. LIC !i COMPANY NAME v E-MAIL FAX - STREET ADDRESS CITY, STATE, ZIP PHONE ARCHITECT/ENGINEERNAME LICENSE NUMBER BUS. LIC 41 i b COMPANY NAME ^ ,9�� E-MAIL FAX STREET ADDRESS CITY, STATE, ZIP 1 . /.0-'�! l PHONE DESCRIPTION OF WORK P6 �i �GA� C- EXISTING USE PROPOSED USE CONSTR TYPE # STORIES USE TYPE OCC. SQ.FT. VALUATION ($) EXISTG NEW FLOOR DEMO TOTAL AREA AREA AREA NET AREA BATHROOM KITCHEN OTHER REMODEL AREA REMODEL AREA REMODEL AREA PORCH AREA DECK AREA TOTAL DECK/PORCH AREA GARAGE AREA: DETACH ❑ ATTACH 41 DWELLING UNITS: IS A SECOND UNIT YES SECOND STORY ❑YES BEING ADDED? [0] NO ADDITION? ❑NO PRE -APPLICATION ❑YES IF YES, PROVIDE COPY OF IS THE BLDG AN E) YES RECEIVED BY; ,: r� r , TOTAL VALUATION: PLANNING APPL # ❑ NO PLANNING APPROVAL LEITER EICHLER HOME? ❑ NO „� ter-- G •�'—'-�� By my signature below, I cerci to -each' bf e following: I am the property owner or authorized agent to act on the property owner's behalf, I have read this application and the inform 'on I hav o ked is correct 'have read the Description of Work and verify it is accurate. I agree to comply with all applicable local ordinances and state s elating t . " it ng construction, I authorize representatives of Cupertino to enter abov Iden�f d pr�pe�ty for inspection purposes. . 1 Signature ofApplic D ! (%/ `r PPLtMENTAX INFORMATION REQUIRED PLAN CHECK TYPE. ry RaUTINCSLiP New SFD o , AultifamilydwellingS: Apply for demolition permit for ©ovERTHE coIINZER L7 BiTIIDINGPLANREVIEW existing building(s}--DeI>�tion permit is required prior to issuance of building c� permit for new building. i�' EXPRESS r PiANNI1VG PLAN xEwiEty C' ©PUBLIC Commercial Bldgs: Provide a completed Hazardous Materials Disclosure STANDARD woxxs form if any Hazardous Materials are being used as part of this project. _ Copy of Planning Approval Letter or Meeting with Planning prior to 0 submittal of Building Permit application. snlvrrnRY sEWER])I`sTx[cF ❑ tENVIRONMENTALHEALTH i BldgApp_2011.doc revised 06121/11 CVPERTINO I-) ( A 1 -ham j T) .�. CONSTRUCTION PERMIT APPLICATION COMMUNITY DEVELOPMENT DEPARTMENT • BUILDING DIVISION 10300 TORRE AVENUE • CUPERTINO, CA 95014-3255 (408) 777-3228 • FAX (408) 777-3333 • building(acupertino.org M NEW CONSTRUCTION ❑1ADpITION ❑ ALTERATION / TI ❑ REVISION / DEFERRED ORIGINAL PERMIT # PROJECT ADDRESS , , /I. APN OWNER NAME�1,a 1C,0LSk PHONE -7 _ -7/ ? r E-MAIL lC1 ,�,ey, STREET ADDRESS I hN p 1\ _ STATE, ZIP U (A q J f FAX CONTACT N ^ PHONE rr E-MAIL kom 6e LLiQ C.1, STREET ADDRESS (_ \ C` x ' • I S r S Q `d f CITY, STATE, ZIP ^ CA n kr 6v �� 77�� ��"ll ❑ OWNER ❑ OWNER -BUILDER ❑ OWNER AGENT ❑ CONTRACTOR ❑ CONTRACTOR AGENT ARCHITECT ❑ ENG94EER ❑ DEVELOPER ❑ TENANT CONTRACTORNAW t LICENSE NUMBER LICENSE TYPE BUS. LIC # COMPANY NAME E-MAIL FAX STREET ADDRESS CITY, STATE, ZIP PHONE ARCHTTECT/EN GINEERNAXE �, C LICENSE NUMBER C _ I gi C2 ` ( 1b O,k BUS. LIC# COMPANY NAME I E-MAIL � Ga 1 STREET ADDRESS I, r S f. '^, CITY, STATE, ZIP k I A PHONE d �'' Z , DESCRIFr[ONOF WORK ► y - `v �u C A �I },a� `' 9 L.X�o6Ms 3 s ay, ZAo rVo� l` 2 L=00TS s L �, EXISTING USC^ IV"" ROPOSt. COi�jaTR. iG awl TYPE . �{16Q,J" # STORIES.7 r� USE TYPE OCC. SQ.FT. VALUATION ($) EXISTG AREA I '2 ` NEW FLOOR AREA DEMO AREA I �� � \\\ TOTAL NET AREA BATHROOM KITCHEN OTHER REMODEL AREA REMODEL AREA REMODEL AREA PORCH AREA DECK AREA TOTAL DECKIPORCH AREA GGA,RAGE AREA: DETACH AtJ/ SZ ATTACH # DWELLING UNITS: IS A SECOND UNIT ❑ YESfEICH-LEIR COND STORY YES BEING ADDED? ODDITION? NO PRE -APPLICATION []YES IF YES, PROVIDE COPY OF PLANNING APPL # Q NO P ING AP ROV LETTER THE BLDG AN [] YES HOME? (RNO RECEIVED BY: TOTAL VALUATION: By my signature below, I certify to each of the following: I am the property owner or authorized agent to act on the property owner's behalf I have read this application and the information I have Vi ption of Work and verify it is accurate. I agree to comply with all applicable local ordinances and state laws relatin di atives of Cupertino to enter the above dentifred property for inspection purposes. lliw�� Signature of Applicam/Agent:Date: �U Z— SUPPLEMENTAL INF TION REQUIRED PLAN CHECK TYPE OUTING SLIP ❑ ovER-THE-CoUNTER BUILDING PLAN REVIEW New SFD or Multifamily dwellings: Apply for demolition permit for existing building(s). Demolition permit is required prior to issuance of building permit for new building. ❑ I,.� PPL..ANNNING K AN REVIEW _ Commercial Bldgs: Provide a completed Hazardous Materials Disclosure S�RD 1.r1'PUBLIC WORKS form if any Hazardous Materials are being used as part of this project. ❑ LARGE Copy of Planning Approval Letter or Meeting with Planning prior toMAJORSEWER 7SANDISTRICT submittal of Building Permit application. ❑ ENVIRONMENTAL HEALTH B1dgApp_2011.doc revised 06/21/11 1O hl CITY OF CUPERTINO FEW FEE ESTIMATOR - BUILDING DIVISION OCCUPANCY TYPE: ADDRESS: DATE: 10/30/2012 REVIEWED BY: bobs. PC FEE ID APN: BP#: /�1poa/ 'VALUATION: $500,000 *PERMIT TYPE: Building Permit PLAN CHECK TYPE: New Construction PRIMARY SFD or Duplex USE: 2nd Unit? Yes • No PENTAMATION 1R3SFD PERMIT TYPE: i WORK construct new sfd 3211 s.f., garo a s.f. 552 porch s.f. 417 s.f. SCOPE Suppl. Insp. Fee -.0 Reg. Q OT OCCUPANCY TYPE: TYPE OF CONSTR. FLR AREA s.f. PC FEES PC FEE ID BP FEES BP FEE ID R-3 (Custom) II-8,111-B,IV,V-B 4,180 $3,058.38 IR3PLNCK $3,358.32 IR3INSP Permit Fee: $3,358.32 Suppl. Insp. Fee -.0 Reg. Q OT 0,0 hrs $0.00 PME Unit Fee: $0.00 PME Permit Fee: $0.00 Construction Tax: IBCONSTAXR # new units $629.29 E) Work Without Permit? 0 Yes Q No $0.00 TOTALS: 4,180 1 $3,058.38 1 1 1 $3,358.32 Stron&? Motion Fee: 1BSEISMICR c. r7<�-w, NOTE: This estimate does not include fees due to other Departments (i.e. Planning, Public Works, Fire, Sanitary Sewer District, School District_ etcl_ These fees oro hosed an the nreliminary information available and are anly an estimate_ Contort the Dent for addn'1 info_ FEE ITEMS (Fee Resolution 11-053 0,'T'1112) FEE QTY/FEE MISC ITEMS Plan Check Fee: $3,058.38 Select a Misc Bldg/Structure or Element of a Building Suppl. PC Fee: Q Reg. 0 OT 0,0 hrs $0.00 PME Plan Check: $0.00 Permit Fee: $3,358.32 Suppl. Insp. Fee -.0 Reg. Q OT 0,0 hrs $0.00 PME Unit Fee: $0.00 PME Permit Fee: $0.00 Construction Tax: IBCONSTAXR # new units $629.29 E) Work Without Permit? 0 Yes Q No $0.00 Advanced Planning Fee: 1PLLONGR $543.40 Select a Non -Residential 0 Building or Structure C) i 11-4/1 Stron&? Motion Fee: 1BSEISMICR $50.00 Select an Administrative Item Bldg Stds Commission Fee: IBCBSC $20.00 SUBTOTALS: $7,659.39 $0.00 TOTAL FEE: $7,659.39 Revised: 10/01/2012 CUPERTINO /0/or9l,OC /SUBCONTRACTOR LIST Building Department City Of Cupertino 10300 Torre Avenue Cupertino, CA 95014-3255 Telephone: 408-777-3228 Fax: 408-777-3333 JOB ADDRESS: V c PERMIT # I Z1 U OWNER'S NAME: Aek- /, /V lqlyi PHONE # e . ;Z 6 2 �E GENERAL CONTRACTOR: + L S . BUSINESS LICENSE # ADDRESS: Q 2 L4 5-' � .5 0PC 1 VP CITY/ZIPCODE: S *Our municipal code requires all businesses working in the city to have a City of Cupertino business license. NO BUILDING FINAL OR FINAL OCCUPANCY INSPECTION(S) WILL BE SCHEDULED UNTIL THE GENERAL CONTRACTOR AND ALL SUBCONTRACTORS HAVE OBTAINED A CITY OF CUPERTINO BUSINESS LICENSE. I am not using any subcontractors: Signature Date Please check applicable subcontractors and complete the following information: q, --C Owner / Contractor Signature 31-7//-; Date SUBCONTRACTOR BUSINESS NAME BUSINESS LICENSE # Cabinets & Millwork Cement Finishing Electrical Excavation Fencing Flooring / Carpeting Linoleum / Wood Glass / Glazing Heating Insulation Landscaping Lathing Masonry Painting / Wallpaper Paving Plastering Plumbing Roofing Septic Tank Sheet Metal Sheet Rock Tile q, --C Owner / Contractor Signature 31-7//-; Date CUPERTINO CONTRACTOR / SUBCONTRACTOR LIST Building Department City Of Cupertino 10300 Torre Avenue Cupertino, CA 95014-3255 Telephone: 408-777-3228 Fax: 408-777-3333 JOB ADDRESS: Iwo Lcbonon DY. gT n b PERMIT # 1 ?-(CC ;2-1 OWNER'S NAME: PHONE # 96b- SOI - (a TSO GENERAL CONTRACTOR: , , G�,Q CkTS-111 (I1D)1(,(' BUSINESS LICENSE # 3190 2 ADDRESS:22ys P -e-rS_ t Pr. 10S, GA 95035 CITY/ZIPCODE: *Our municipal code requires all -businesses working in the city to have a City of Cupertino business license. NO BUILDING FINAL OR FINAL OCCUPANCY INSPECTION(S) WILL BE SCHEDULED UNTIL THE GENERAL CONTRACTOR AND ALL SUBCONTRACTORS HAVE OBTAINED A CITY OF CUPERTINO BUSINESS LICENSE. I am not using any subcontractors: Signature Date Please check applicable subcontractors and complete the following information: C Owner / Contractor Signature date SUBCONTRACTOR BUSINESS NAME BUSINESS LICENSE # Cabinets & Millwork Cement Finishing 6 0-nzcllc z. Cm V4'r' 5 L � .] b Electrical Excavation Fencing Flooring / Carpeting Linoleum / Wood Glass / Glazing Heating Insulation Landscaping Lathing Masonry Painting / Wallpaper Paving Plastering S R L 1! "95 -3 3 G % f Plumbing L C - 1.J i S ' 7T 0 IV Roofing T d Fcofi 1_ -23/55- .23155Septic SepticTank Sheet Metal Sheet Rock Tile C Owner / Contractor Signature date CUPERTINO PURPOSE UTILITY RELEASE REQUEST FORM COMMUNITY DEVELOPMENT DEPARTMENT • BUILDING DIVISION ALBERT SALVADOR, P.E., C.B.O., BUILDING OFFICIAL 10300 TORRE AVENUE • CUPERTINO, CA 95014-3255 (408) 777-3228 • FAX (408) 777-3333 • building(d)cupertino.org RECEIVED j MAR 0 5 2014 1/ BY__Jz� For residential single family or duplex construction, there are cases where gas and electric utilities are requested to be released prior to the issuance of the certificate of occupancy. Upon approval from the building inspector, the City of Cupertino is allowing both utilities to be released prior to the final sign -off of the building. INSTRUCTIONS 1. Download this form at: http://www.coertino.org/index.aspx?page=297. 2. Complete the form and obtain signatures from both the owner of the property and the primary contractor. 3. Fax, E -Mail, Mail or hand deliver the original signed form to: City of Cupertino Building Division Attn: Utility Release Request Form 408-777-3228 office 10300 Torre Ave. 408-777-3333 fax Cupertino, CA 95014 building cuuertino.org 4. Schedule a Gas Meter Release inspection (#403) and/or Electric Meter Release inspection (#404). Please note, a Gas Test inspection (#506) is required prior to or at the same time of the Gas Meter Release inspection. BUILDING INFORMATION (Please complete the following information): APN _ Lf— 646-o4:, BLDG PERMIT #:/ Z 1 0 �l Z / V -7DATE: [ V /s' / l SITEr ^ ADDRESS: 16700 �.b OWNER'S NAME: P raked s ! 11.lo n I � vi � [� PHONE #: !/ US - 5 -7 -7(14 0 -7 FAX #: yat -- 2 i4 D MAILING ADDRESS (if different from site address): CONTRACTOR: 0PP�� ���S%�uCTip JJ � PHONE#: 2 6.2— ZFAX FAX#: 6 2 - % 2 6 CONTACT: fl �w E#.HOW 5-o -4- 67 SO Ill FAX # 2 I request the City to release my utilities prior to obtaining a final inspection approval for the building. I fully understand the occupants of the building cannot move into the residence until they receive all of the required final sign -offs and the City has issued a certificate of occupancy for the building. , �� A Jt� sH M✓C� i,� 2 Y Owner: ..... T............................................................................. Print:..... u ................................. Date: .... ........q....j............ Contractor:... ^�.��'..^........U.ff)f..................................... Print: .... �.C.t� AN ...... I�PPAL...................... Date:..-2�.L..l.l. j.q..... UtiliryReleaseForm_2011.doc revised 08109111 March 01, 2013 PLAN REVIEW EXPIRATION NOTICE COMMUNITY DEVELOPMENT DEPARTMENT • BUILDING DIVISION ALBERT SALVADOR, P.E., C.6,0, BUILDING OFFICIAL 10300 TORRE AVENUE • CUPERTINO, CA 95014-3255 (408) 777-3228 • FAX (408) 777-3333 • buddinq[ckupertino.ong Prakash & Rekha Manghnani 22750 Stevens Creek Blvd. Cupertino, CA 95014 SUBJECT: PLAN REVIEW EXPIRATION NOTICE Site Address: 22750 Stevens Creek Blvd. zr- Building Permit Application 912100214 (New House) Expiration Date: 04/28/13 The permit is ready to issue w/ conditions -please pick up before expiration date. As a courtesy, the Building Department makes every effort prior to the expiration of a construction permit application to notify the applicant of the impending expiration. Per the California Building Code Section 105.3.2, ... "an application for a permit for any proposed work shall be deerned to have been abandoned /80 days after the date of filing, unless such application has been pursued in good faith or a permit has been issued " This notification letter is issued as a reminder that the construction permit application for the specified project will expire on the date shown above unless the following action is taken: A. A building permit application is approved and the building permi'. is paid for and issued prior to the expiration date specified; or B. A request for an extension is submitted in writing with a justifiable cause demonstrated to the Building Official prior to the expiration date of the application. A $42.00 fee shall apply to all extension requests, payable to the City of Cupertino at the time the request is made. Each extension, if granted will be for a period of not more than 90 day_,. Extension requests shall be hand delivered to the building department or e-mailed to suew(ct),crcrtino.org. If a plan review application expires, the renewal of the application will NOT be granted unless the construction plans comply with the 2010 California Codes and any new local regulations that came into effect from the date of the original application. Additional plan review (and associated fees) will be required to verify compliance with these new regulations. The plans will become null and void after the expiration date if a building permit is not secured or an extension is not granted. You will have 15 business days pick up your documents or they will be recycled. The permit application will then be voided in the Permit System and all documents pertaining to the permit application will be recycled. Sincerely, Susan Winslow, Administrative Clerk City of Cupertino Building Department suew@cupertino.org (408-777-3246) PlanRevie ivExpiration Nolice. docreviscil 12 00 /0 09 CUPERTINO CM Building Department CITY OF CUPERTINO 10300 TORRE AVENUE • CUPERTINO, CA 95014-3255 TELEPHONE: (408) 777-3228 • FAX: (408) 777-7606 OFFICIAL NOTIFICATION OF NEW/ADDRESS CHANGE TO: All Agencies FROM: City of Cupertino DATE: April 29, 2013 RE: New/ Change of Address APN #342-14-026 Please note the following address change: The house at 22750 Stevens Creek Blvd has been demolished and a new house is being built. The address is being changed to 10100 Lebanon Dr. See attached map. The new address will take effect in 30 days. Please update your records accordingly. If you have any questions, please call me at (408) 777-3246. Sincerely, Susan Winslow Administrative Clerk Cupertino Building Dept 408-777-3246 or suew@cupertino.org m cn n C O 7� O v O C O 3 CD 3 d TI O N cn x 0 0 0 U) n D mr m cn m M0 v Ph 0 0 0 0 0 ® 3 3 3 cr 03 N 0 -o;u O O N -1 -o� N r �1 m C1 'p O < N Oy, `G �G nMcm << m Z (a N Q. 'O m �. rt Q. Q 3 o 3 `< CL D N CL •" N O O N � C1 CL C1 V! N a m r O N L r-4- 0 � h _0 V 0 —O�Q�� cz 10IL1510 r1 1 � 1 T ..� SUBMI-9AL .,t r NEW HOME FOR MANGHNANI RESIDENCE CUPERTINO, CA 95014 OA . F,- CUPERTINi- 8ijildinp Oepartmer;? _-._. OR 17 2012 REVIEWED FOPC, " C . PuANC,F -Reviewed TITLE 24 ENERGY REPO T FRI ENERGY CONSULTANTS, LLC TITLE 24 ENERGY CONSULTANTS 21 N. HARRISON AVE. CAMPBELL, CA. 95008 408-866-1620 FAX: 408-866-6832 EMAIL: info@friconsulting.com BUILDING ENERGY ANALYSIS REPORT PROJECT: Manghnani Residence 22750 Stevens Creek Blvd Cupertino, CA 95014 Project Designer: Hometec Architecture, Inc. 619 North First Street San Jose, CA 95112 408-995-0496 Report Prepared by: Nicholas L Bignardi R08-11-2009 FRI Energy Consultants, LLC 21 N. Harrison Ave Suite 210 Campbell, CA 95008 408-866-1620 Job Number: 0120518 Date: 10/1212012 The EnergyPro computer program has been used to perform the calculations summarized in this compliance report.This program has approval and is authorized by the California Energy Commission for use with both the Residential and Nonresidential 2008 Building Energy Efficiency Standards. This program developed by EnergySoft, LLC—www.energysoft.com. Ener Pro 5.1 by Ener Soft User Number:1315 RunCode:2012-10-12T09:51:12 ID:0120518 f EQUIPMENT LIST AND INSULATION PLACEMENT NOTE NEW HOME FOR #0120518 MANGHNANI RESIDENCE 22750 STEVENS CREEK BLVD. CUPERTINO, CA 95014 NOTE: MINIMUM HEATING AND COOLING LOAD CALCULATIONS ARE GENERATED BY THE COMPUTER PROGRAM. THERE ARE OTHER DESIGN FACTORS THAT MUST BE CONSIDERED, DUCT FLOW, COIL SIZING, OVERSIZING SAFETY MARGIN, ETC. IT IS THE RESPONSIBILITY OF THE MECHANICAL CONTRACTOR OR WHOEVER DESIGNS AND INSTALLS THE HEATING AND COOLING SYSTEM TO MAKE THE FINAL DECISION ABOUT THE SIZE OF THE EQUIPMENT TO BE INSTALLED. THE HVAC EQUIPMENT USED MUST MEET THE EFFICIENCIES SHOWN IN THE TITLE 24 CALCULATIONS. THESE ARE AS FOLLOWS: HEATING: NEW FURNACE (S) MUST HAVE AN AFUE OF . 90 OR BETTER. FURNACE (S) MUST BE ABLE TO HANDLE THE HEATING LOAD. AIR CONDITIONING: AIR-CONDITIONING TO BE INSTALLED MUST HAVE A MINIMUM SEER OF 13 . SETBACK THERMOSTAT: A SETBACK THERMOSTAT IS REQUIRED FOR EACH NEW FURNACE. WHOLE HOUSE VENTILATION REQUIREMENTS: NOTE: THIS IS A REQUIREMENT FOR ALL NEW BUILDINGS AND ANY ADDITION THAT IS LARGER THAN 1000 FT SQUARED. CFM equation: Ventilation Rate (cfm)= (CFA/100) +7 .5 x (# of bedrooms + 1) Equation given above can be used or Table 4-7 of the 2008 Residential Manual may be used to determine the required Ventilation. HOT WATER HEATER: WE SHOW 2 TANKLESS WATER HEATERS IN OUR CALCULATIONS. THE FIRST 5 FT. OF PIPES FROM THE STORAGE TANK MUST BE INSULATED WITH ONE INCH OF INSULATION FOR BOTH HOT AND COLD WATER PIPES. TABLE 150-B PIPE INSULATION MINIMUM THICKNESS REQUIREMENTS PIPE DIAMETER Less than or Equal to Greater than 2 inches 2 inches INSULATION THICKNESS REQUIRED (in SYSTEM inches Domestic hot water above 105°F 1.0 1.5 Hydronic heating supply lines (above 200°F 1.0 2.0 to 250°F) 1 Hydronic heating supply lines(105°F to 1.0 1.5 200°F Cooling system refrigerant suction, chilled 0.75 1.0 water and brine lines 1 Steam hydronic heating systems or hot water systems with pressure above 15 psi shall meet the requirements of TABLE 123-A. FAUCETS AND SHOWERHEADS: SHOWERHEADS AND FAUCETS MUST BE ON P THE CEC APPROVAL LISTING IN ORDER TO BE INSTALLED. THIS CAN BE CHECKED THROUGH THE BUILDING DEPARTMENT ISSUING THE BUILDING PERMIT, THE CALIFORNIA ENERGY COMMISSION 916-654-4080, OR BY CALLING OUR OFFICE 408-866-1620 . INSULATION PLACEMENT: INSULATION TO BE INSTALLED MUST MEET CEC QUALITY STANDARDS . FOR GLAZING U-FACTORS AND SHGC VALUES REFER TO THE CF- 1R 07 THE EP RT . NOTE: ALL R-VALUES AND U-VALUES LISTED ARE MINIMUM VALUES AND CAN BE EXCEEDED. LIGHTING: PERMANENTLY INSTALLED LUMINARIES LOCATED IN BATHROOMS, GARAGES, LAUNDRY ROOMS, AND UTILITY ROOMS SHALL BE HIGH EFFICACY LUMINARIES OR LOW EFFICACY CONTROLLED BY A MANUAL ON AUTOMATIC OFF OCCUPANT SENSOR(S) CERTIFIED TO COMPLY WITH SECTION 119 (D) PERMANENTLY INSTALLED LUMINARIES LOCATED IN ROOMS OTHER THAN IN KITCHENS, BATHROOMS, GARAGES, LAUNDRY ROOMS, AND UTILITY ROOMS SHALL BE HIGH EFFICACY LUMINARIES (EXCEPT CLOSETS LESS THAN 70 FT) OR LOW EFFICACY BULBS CONTROLLED BY A DIMMER SWITCH OR BY AN MANUAL ON AUTOMATIC OFF OCCUPANT SENSOR THAT COMPLIES WITH SECTION 119 (d) . HIGH EFFICACY LUMINARIES OTHER THAN OUTDOOR HID: CONTAIN ONLY HIGH EFFICACY LAMPS AS OUTLINED IN TABLE 150-C, AND DO NOT CONTAIN A MEDIUM SCREW BASE SOCKET (E24/E26) . BALLAST FOR LAMPS 13 WATTS OR GREATER ARE ELECTRONIC AND HAVE AN OUTPUT FREQUENCY NO LESS THAN 20 kHz LUMINARIES THAT ARE RECESSED INTO INSULATED CEILINGS MUST BE APPROVED FOR ZERO CLEARANCE INSULATION COVER (IC) AND ARE CERTIFIED TO ASTM E283 AND LABELED AS AIR TIGHT (AT) TO LESS THAN 2 . 0 CFM AT 75 PASCALS Lamp Power Rating for Non-LED Lighting Minimum Lamp Efficacy for Non-LED (see Note 1), or System Power Rating for LED Lighting,or Minimum System Efficacy for Lighting see Notes 2 3 and 4 LED Lighting 5 watts or less 30 lumens per watt over 5 watts to 15 watts 40 lumens per watt over 15 watts to 40 watts 50 lumens per watt over 40 watts 60 lumens per watt Notes: 1. Determine minimum lamp efficacy category for lighting systems which are not LED using the initial rated lumens divided by the rated watts of the lamp (not including the ballast). 2. To qualify as high efficacy, an LED luminaire shall meet the minimum system efficacy requirements in Table 150-C when determined according to Reference Joint Appendix JA8, and be certified to comply with Section 119(m), and input power shall be determined according to Section 130(d)5. 3. For a Hybrid LED Luminaire to qualify as a high efficacy luminaire, all lighting systems in the luminaire shall qualify as high efficacy according to Section 150(k)1, and the LED Light Engine with Integral Heat Sink shall comply with Note 4,below. 4. To qualify as high efficacy, an LED Light Engine with Integral Heat Sink shall meet the minimum system efficacy requirements in Table 150-C when determined according to Reference Joint Appendix JAB, shall be certified to comply with Section 119(m), and input ower shall be determined according to Section 130(d)5. WHEN IN DOUBT ABOUT MEETING THIS REQUIREMENT CALL FRI ENERGY CONSULTANTS, 408-866-1620. ALL FLUORESCENT BALLAST MUST BE APPROVED BY THE CEC, THIS CAN BE CHECKED THROUGH THE BUILDING DEPARTMENT ISSUING THE BUILDING PERMIT, THE CALIFORNIA ENERGY COMMISSION 916-324-3376, OR BY CALLING OUR OFFICE 408-866-1620 . ALL REFRIGERATORS, REFRIGERATOR-FREEZERS AND FREEZERS MUST BE ON THE CEC APPROVAL LIST THIS CAN BE CHECKED THROUGH THE BUILDING DEPARTMENT ISSUING THE BUILDING PERMIT, THE CALIFORNIA ENERGY COMMISSION 916-324-3376, OR BY CALLING OUR OFFICE 408-866-1620 . 13, %YI.IGN1' I. TT, FW CMING 14, bUCf 0 M lip hoot A1"11C 5PAC� 2, M'Iln FOOF W/A1'11C 3, VAUI 1W hoop 12, GWING\ LIVING SpAC� II, CAN11 FM pl.f?, LIVING SpACr 8, Fl k.A30VF CKAGF TWIC& 5, GAMF 5�PAP. ON W&U 4, rxf W&U CpAWI. 5PACF 9, SI A3 IN51A110N NEW HOME FOR #0120518 MANGHNANI RESIDENCE 22750 STEVENS CREEK BLVD CUPERTINO, CA 95014 THESE ARE MINIMUM INSULATION LEVELS FOR THE ADDITION/ALTERATION ONLY. APPLIC. R-VALUE. INSUL. TYPE 1. TYPICAL FLAT CEILING TYP R-30 INSULATION, BATT OR RIGID 2 . VAULTED ROOF W/ATTIC TYP R-19 INSULATION, BATT OR RIGID 3 . VAULTED ROOF NO ATTIC TYP R-19 INSULATION, BATT OR RIGID 4 . EXTERIOR WALL TYP R-19 INSULATION, BATT OR RIGID 5 . SEPARATION WALL N/A INSULATION, BATT OR RIGID 6. WALL BACKING INTO ATTIC N/A INSULATION, BATT OR RIGID 7 . CRAWL SPACE FLOOR TYP R-19 INSULATION, BATT OR RIGID 8. FLOOR ABOVE GARAGE N/A INSULATION, BATT OR RIGID 9. SLAB EDGE INSULATION' N/A SEE NOTE BELOW 10. BUILT UP ROOF N/A 11. CANTILEVERED FLOOR N/A INSULATION, BATT OR RIGID U-VALUE SHGC 12 . GLAZING TYP 0.40 0.40 DOUBLE NON-METAL LOW-E FRENCH DOORS TYP 0.40 0.40 DOUBLE NON-METAL LOW-E SLIDING GLASS DOORS TYP 0.40 0.40 DOUBLE NON-METAL LOW-E 13 . SKYLIGHTS TYP 0.42 0.32 VELUX SKYLIGHTS 14. HEATING & COOLING DUCTS MINIMUM INSL. R-VALUE 6.0 1 THE MINIMUM DEPTH OF CONCRETE-SLAB FLOOR PERIMETER INSULATION SHALL BE 16 INCHES OR THE DEPTH OF THE FOOTING OF THE BUILDING, WHICHEVER IS LESS. NOTE: THIS CROSS SECTION IS USED ONLY FOR DIAGRAMMATIC PURPOSES AND IS NOT A TRUE CROSS SECTION OF THIS PROJECT. TABLE OF CONTENTS Cover Page 1 Table of Contents 2 Form CF-1R Certificate of Compliance 3 Form MF-1R Mandatory Measures Summary 9 HVAC System Heating and Cooling Loads Summary 12 EnergyPro 5.1 by EnergySoft Job Number: ID:0120519 User Number:1315 PERFORMANCE CERTIFICATE: Residential Part 1 of 5 CF-1 R Project Name Building Type m Single Family ❑Addition Alone Date Manghnani Residence ❑ Multi Family ❑ Existing+Addition/Alteration 10/12/2012 Project Address California Energy Climate Zone Total Cond. Floor Area Addition #of Stories 22750 Stevens Creek Blvd Cupertino CA Climate Zone 04 3,211 n/a 2 FIELD INSPECTION ENERGY CHECKLIST ❑ Yes ❑ No HERS Measures -- If Yes, A CF-4R must be provided per Part 2 of 5 of this form. ❑ Yes ❑ No Special Features -- If Yes, see Part 2 of 5 of this form for details. INSULATION Area Special Construction Type Cavity (f Features see Part 2 of 5 Status Floor Wood Framed w/Crawl Space R-19 1,842 New Wall Wood Framed R-19 2,424 New Roof Wood Framed Attic R-30 1,701 Radiant8arder New Roof Wood Framed Rafter R-19 389 New Floor Wood Framed w/o Crawl Space R-19 252 New FENESTRATION U- Exterior Orientation Area(O Factor SHGC Overhang Sidetins Shades Status Front(W) 74.7 0.400 0.40 none none Bug Screen New Front(Kg 131.8 0.400 0.40 none none Bug Screen New Left(N) 63.0 0.400 0.40 none none Bug Screen New Rear(E) 186.7 0.400 0.40 none none Bug Screen New Rear(E) 118.0 0.400 0.40 none none Bug Screen New Right(S) 64.0 0.400 0.40 none none Bug Screen New Rear(SE) 19.0 0.400 0.40 none none Bug Screen New Skylight 4.0 0.420 0.32 none none None New HVAC SYSTEMS Ot . Heating Min. Eft Cooling Min. Ett Thermostat Status 1 Central Furnace 90%AFUE Split Air Conditioner 13.0 SEER Setback New 1 Central Furnace 90%AFUE Split Air Conditioner 13.0 SEER Setback New HVAC DISTRIBUTION Duct Location Heating Cooling Duct Location R-Value Status HVAC System Ducted Ducted Attic,Ceiling Ins, vented 6.0 New HVAC System Ducted Ducted Attic,Ceiling Ins, vented 6.0 New WATER HEATING Ot . Type Gallons Min, Eff Distribution Status 1 Instant Gas 0 0.92 All Pipes Ins New 1 Instant Gas 0 0.92 AA Pipes Ins New Ener Pro 5.1 by En Soft User Number:1315 RunCode:2012-10-12T09:51:12 ID:0120518 Page 3 of 13 PERFORMANCE CERTIFICATE: Residential (Part 2 of 5) CF-1 R Project Name Building Type ®Single Family ❑Addition Alone Date Manghnani Residence 1 ❑Multi Family ❑Existing+Addition/Alteration 11011212012 SPECIAL FEATURES INSPECTION CHECKLIST The enforcement agency should pay special attention to the items specified in this checklist.These items require special written justification and documentation, and special verification to be used with the performance approach. The enforcement agency determines the adequacy of the justification,and may reject a building or design that otherwise complies based on the adequacy of the special justification and documentation submitted, The Roof R-30 RoofAttic wlRadiant Barrier includes credit fora Radiant Barrier that is Continuous meeting eligibility and installation criteria as specified in Residential Appendix RA4.2.2. HERS REQUIRED VERIFICATION Items in this section require field testing and/or verification by a certified HERS Rater. The inspector must receive a completed CF-4R form for each of the measures listed below for final to be given. EnergyPro 5.1 by Ener Soft User Number:1315 RunCode:2012-1042T09r51:12 ID:0120518 Page 4 of 13 PERFORMANCE CERTIFICATE: Residential (Part 3 of 5) CF-1 R Project Name Building Type m Single Family ❑Addition Alone Date Iw8r19hR8R/Residence C3Multi Family C3Existing+Addition/Alteration 10/12/201 ANNUAL ENERGY USE SUMMARY Standard Proposed Margin TDV kBtufft?- r Space Heating 20.97 17.38 3.59 Space Cooling 7.35 10.82 -3.47 Fans 4.81 5.62 -0.82 Domestic Hot Water 12.30 8.19 4.12 Pumps 0.00 0.00 0.00 Totals 45.43 42.01 3.43 Percent Better Than Standard: 7,5% BUILDING COMPLIES - NO HERS VERIFICATION REQUIRED Fenestration Building Front Orientation: (tM 270 deg Ext,Walls/Roof Wall Area Area Number of Dwelling Units: 1.00 (M 679 207 Fuel Available at Site: Natural Gas (N) 615 63 Raised Floor Area: 2,094 (P 899 324 Slab on Grade Area: 0 (S) 888 64 Average Ceiling Height: 9.1 Roof 2,094 4 Fenestration Average U-Factor: 0.40 TOTAL: 661 Avera e SHGC: 0.40 Fenestration/CFA Ratio: 20.6% REMARKS STATEMENT OF COMPLIANCE This certificate of compliance lists the building features and specifications needed to comply with Title 24, Parts 1 the Administrative Regulations and Part 6 the Efficiency Standards of the California Code of Regulations. The documentation author hereby certifies that the documentation is accurate and complete. Documentation Author Y Com an FRI Energy Consultants,LLC Company Address 21 N.Harrison Ave Suite 210 Name Nicholas L Bignardi R08-11-2009 '." ,,2012 City/State/ZipCity/State/Zip Campbell, CA 95008 Phone 408-866-1620 Signed Date The individual with overall design responsibility hereby certifies that the proposed building design represented in this set of construction documents is consistent with the other compliance forms and worksheets,with the specifications, and with any other calculations submitted with this permit application, and recognizes that compliance using duct design, duct sealing,verification of refrigerant charge, insulation installation quality,artd buildpg envel pe sbaling require installer testing and certification and field verification by an approved HE S,rter, Designer or Owner (per Business & Professions Code Company Hornetec Architecture,Inc. Address 619 North First Street Name Richard A.Hartman 12--f L City/State/Zlp San Jose, CA 95112 Phone 408-995-0496 Signed License# Date Enerakao.5.1 bvEneravSoft laser Number:1315 RunCode:2012-10-12T09:51:12 ID:.0120518 Pace 5 of 13 CERTIFICATE OF COMPLIANCE: Residential (Part 4 of 5) CF-1 R Project Name Building Type ®Single Family ❑Addition Alone Date Manghnani Residence ❑ Multi Family ❑Existing+Addition/Alteration 0/121201 OPAQUE SURFACE DETAILS Surface U- Insulation Joint Appendix Type Area Factor Cavity Exterior Frame Interior Frame Azm Tilt Status 4 Location/Comments Floor 1,842 0.037 R-19 0 180 New 4.4.1-A4 1st Floor Wall 288 0.074 R-19 270 90 New 4.3.1-A5 1 st Floor Wall 262 0.074 R-19 0 90 New 4.3.1-A5 1 st Floor Wall 310 0.074 R-19 90 90 New 4.3.1-A5 1st Floor Wall 441 0.074 R-19 180 90 New 4.3.1-A5 1st Floor Wall 17 0.074 R-19 135 90 New 4.3.1-A5 1st Floor Roof 336 0.031 R-30 0 18 New 4.2.1-A20 1st Floor Roof 389 0.051 R-19 0 16 New 4.2.2-A 12 1 st Floor Floor 252 0.048 R-19 0 180 New 4.4.2-A4 2nd Floor Wall 185 0.074 R-19 270 90 New 4.3.1-A5 2nd Floor Wall 290 0.074 R-19 0 90 New 4.3.1-A5 2nd Floor Wall 235 0.074 R-19 90 90 New 4.3.1-A5 2nd Floor Wall 383 0.074 R-19 180 90 New 4.3.1-A5 2nd Floor Wall 14 0.074 R-19 135 90 New 4.3.1-A5 2nd Floor Roof 1,365, 0.031 R-30 0 18 New 4.2.1-A20 2nd Floor FENESTRATION SURFACE DETAILS ID Type Area U-Factor SHGC Azm Status Glazing Type Location/Comments 1 Window 74.7 0.400 NFRC 0,40 NFRC 270 New Double Non Metal Clear Door Lc ist Floor 2 Window 26.0 0.400 NFRC 0.40 NFRC 270 New Double Non Metal Clear Cow-E ist Floor 3 Window 35.8 0.400 NFRC 0.40 NFRC 270 New Double Non Metal Clear Cow-E ist Floor 4 Window 22.0 0.400 NFRC 0.40 NFRC 270 New Double Non Metal Clear Low-E 1st Floor 5 Window 24.0 0.400 NFRC 0.40 NFRC 270 New Double Non Metal Clear Cow-E ist Floor 6 Window 19.0 0.400 NFRC 0.40 NFRC 0 New Double Non Metal Clear Cow-E ist Floor 7 Window 40.0 0.400 NFRC 0.40 NFRC 90 New Double Non Metal Clear Door Lc 1st Floor 8 Window 80.0 0.400 NFRC 0.40 NFRC 90 New Double Non Metal Clear Door Lc ist Floor 9 Window 26.5 0.400 NFRC 0.40 NFRC 90 New Double Non Metal Clear Low-E 1st Floor 10 Window 33.0 0.400 NFRC 0.40 NFRC 90 New Double Non Metal Clear Cow-E 1st Floor 11 Window 22.5 0.400 NFRC 0.40 NFRC 90 New Double Non Metal Clear Cow-E ist Floor 12 Window 26.0 0.400 1 NFRC 0.40 NFRC 180 New Double Non Metal Clear Low-E ist Floor 13 Window 26.0 0.400 NFRC 0.40 NFRC 180 New Double Non Metal Clear Cow-E ist Floor 14 Window 11.0 0.400 NFRC 0.40 NFRC 135 New Double Non Metal Clear Cow-E 1st Floor 15 Window 24.0 0.400 NFRC 0.40 NFRC 270 New Double Non Metal Clear Low-E 2nd Floor 16 Window 24.0 0.400 NFRC 0.40 NFRC 0 New Double Non Metal Clear Cow-E 12nd Floor (1) LI-Factor Type: 116-A=Default Table from Standards,NFRC=Labeled Value 2 SHGC Type: 116-13=Default Table from Standards,NFRC=Labeled Value EXTERIOR SHADING DETAILS Window Ove hang Left Fin Right Fin ID Exterior Shade Type SHGC H t Wd Len H t LExt RExt Dist Len H t Dist Len H t 1 Bug Screen 0.76 2 Bug Sheen 0.76 3 Bug Screen 0.76 4 Bug Screen 0.76 5 Bug Screen 0.76 6 _gag Screen 0.76 7 Bug Screen 0.76 8 _Bug Screen 0,76 9 Bug Screen 0.76 10 Bug Screen 0.76 11 Bug Screen 0.76 12 Bug Screen 0.76 13_Bug Screen 0.76 14 [@ug Screen 0.76 15 JBug Screen 0,76 16 lBug Screen 0.76 Ener Pro 5.1 by Ener Soft User Number:1315 RunCode;2012-10-12T09:51.12 /D:0120518 Page 6 of 13 CERTIFICATE OF COMPLIANCE: Residential (Part 4 of 5) CF-1R Project Name Building Type ®Single Family ❑Addition Alone Date Manghnani Residence 13Multi Family 13Existing+Addition/Alteration 0/121201 OPAQUE SURFACE DETAILS Surface U- Insulation Joint Appendix Type Area Factor Cavity Exterior Frame Interior Frame Azm Tilt Status 4 Location/Comments FENESTRATION SURFACE DETAILS ID Type Area U-Factor SHGC2 Azm Status Glazing Type Location/Comments 17 Window 20.0 0.400 NERC 0.40 NFRC 0 New Double Non Metal Clear Low-E 2nd Floor 18 Window 66.7 0.400 NFRC 0.40 NFRC 90 New Double Non Metal Clear Door Lc 2nd Floor 19 Window 16.0 0.400 NFRC 0.40 NFRC 90 New Double Non Metal Clear Low-E 2nd Floor 20 Window 20.0 0.400 NFRC 0.40 NFRC 90 New Double Non Metal Clear Low-E 2nd Floor 21 Window 12.0 0.400 NFRC 0.40 NFRC 180 New Double Non Metal Clear Low-E 2nd Floor 22 Window 8.0 0.400 NFRC 0.40 NFRC 135 New Double Non Metal Clear Low-E 2nd Floor 23 Skylight 4.0 0.420 NFRC 0.32 NFRC 0 New Velux Skylight 2nd Floor (1) U-Factor Type: i 16-A=Default Table from Standards,,NFRC=Labeled Value 2 SHGC Type: 116-B=Default Table from Standards,NFRC=Labeled Value EXTERIOR SHADING DETAILS Window Ove hanq Left Fin Right Fin ID Exterior Shade Type SHGC H t Wd Len W t I LExt RExt Dist Len H t Dist Len H t 17 Bug Screen 0.76 18 Bug Screen 0.76 19 Bug Screen 0.76 20 Bug Screen 0.76 21 Bug Screen 0.76 22_Bug Screen 0.76 23 None 1.00 Ener Pro 5.1 by Ener Soft User Number:1315 RunCode;2012-10-12709.51:12 ID:0120518 Page 7 of 13 CERTIFICATE OF COMPLIANCE: Residential (Part 5 of 5) CF-1 R Project Name Building Type ❑ Single Family ❑Addition Alone 7,Da,,e;Manghnani Residence ❑ Mufi Family ❑ Existing+Addition/Alteration 209 BUILDING ZONE INFORMATION Floor Area ft System Name Zone Name New Existing Altered Removed Volume Year Built HVAC System 1st Ffoor 1,842 18,420 HVAC System 2nd Floor 1,369 10,952 Totals 3,2111 01 0 0 HVAC SYSTEMS System Name Qty. Heating Type Min. Eff. Coolinj Type Min. Eff. Thermostat Type Status HVAC System 1 Central Furnace 90%AFUE Split Air Conditioner 13.0 SEER Setback New HVAC System 1 Central Furnace 90%AFUE Split Air Conditioner 13.0 SEER Setback New HVAC DISTRIBUTION Duct Ducts System Name Heating Coolin Duct Location R-Value Tested? Status HVAC System Ducted Ducted Attic, Ceiling Ins, vented 6.0 ❑ New HVAC System Ducted Ducted Attic, Ceiling Ins, vented 6.0 ❑ New WATER HEATING SYSTEMS Ext. Rated Tank Energy Standby Tank Input Cap. Factor Loss or Insul. R- S stem Name Qty. Type Distribution (Btu h) al or RE Pilot Value Status Takagi T-H1 1 Instant Gas All Pipes Ins 199,000 0 0.92 n/a n/a New Takagi T-H1 1 Instant Gas All Pipes Ins 199,000 0 0.92 n/a rr/a New MULTI-FAMILY WATER HEATING DETAILS HYDRONIC HEATING SYSTEM PIPING Hot Water Piping Length ft 0 i� o Pipe Pipe Insul. Control Qty. HP Plenum Outside Buried ¢— S stem Name Len th Diameter Thick. Ener Pro 5.1 by Ener ySoft User Number:1315 RunCode:2012-10-12709:51:12 ID:0120518 Page 8 of 13 MANDATORY MEASURES SUMMARY: Residential Pae 1 of 3 MF-1 R Project Name Date Manghnani Residence 10/12/2012 NOTE: Low-rise residential buildings subject to the Standards must comply with all applicable mandatory measures listed, regardless of the compliance approach used. More stringent energy measures listed on the Certificate of Compliance(CF-1 R,CF-1 R-ADD,or CF- 1 R-ALT Form)shall supersede the items marked with an asterisk(*)below. This Mandatory Measures Summary shall be incorporated into the permit documents, and the applicable features shall be considered by all parties as minimum component performance specifications whether they are shown elsewhere in the documents or in this summary. Submit all applicable sections of the MF-1 R Form with plans. Building Envelope Measures: 116(a)l: Doors and windows between conditioned and unconditioned spaces are manufactured to limit air leakage. §116(a)4:Fenestration products (except field-fabricated windows) have a label listing the certified U-Factor, certified Solar Heat Gain Coefficient SHGC and infiltration that meets the requirements of 10-111(a). 117:Exterior doors and windows are weather-stripped;all joints and penetrations are caulked and sealed. 118(a): Insulation specified or installed meets Standards for Insulating Material. Indicate type and include on CF-6R Form. §118(i):The thermal emittance and solar reflectance values of the cool roofing material meets the requirements of§118(i)when the installation of a Cool Roof is specified on the CF-1 R Form. *§150(a):Minimum R-19 insulation in wood-frame ceiling orequivalent U-factor. §150(b): Loose fill insulation shall conform with manufacturer's installed design labeled R-Value. *§1 50 c : Minimum R-13 insulation in wood-frame wall orequivalent U-factor. *§150(d): Minimum R-13 insulation in raised wood-frame floor orequivalent U-factor. §150(f):Air retarding wrap is tested, labeled and installed according to ASTM E1677-95(2000)when specified on the CF-1R Form. §150(g): Mandatory Vapor barrier installed in Climate Zones 14 or 16. §150(1):Water absorption rate for slab edge insulation material alone without facings is no greater than 0.3%;water vapor permeance rate is no greater than 2.0 permAnch and shall be protected from physical damage and UV light deterioration. Fireplaces, Decorative Gas Appliances and Gas Log Measures: 150 e 1 A: Masonry or factory-built fireplaces have a closable metal or glass door covering the entire opening of the firebox. §150(e)l B:Masonry or factory-built fireplaces have a combustion outside air intake,which is at least six square inches in area and is equipped with a with a readily accessible operable,and tight-fitting damper and or a combustion-air control device. §150(e)2:Continuous burning pilot lights and the use of indoor air for cooling a firebox jacket,when that indoor air is vented to the outside of the buildin ,are prohibited. Space Conditioning,Water Heating and Plumbing System Measures: §110-§113: HVAC equipment,water heaters,showerheads,faucets and all other regulated appliances are certified by the Energy Commission. §113(c)5:Water heating recirculation loops serving multiple dwelling units and High-Rise residential occupancies meet the air release valve backflow prevention,pump isolation valve and recirculation loop connection requirements of§113(c)5. §115:Continuously burning pilot lights are prohibited for natural gas:fan-type central furnaces, household cooking appliances (appliances with an electrical supply voltage connection with pilot lights that consume less than 150 Btu/hr are exempt),and pool and spa heaters. §150(h): Heating and/or cooling loads are calculated in accordance with ASHRAE SMACNA or ACCA. 150(i): Heating systems are equipped with thermostats that meet the setback requirements of Section 112(c). §1500)1A:Storage gas water heaters rated with an Energy Factor no greater than the federal minimal standard are externally wrapped with insulation having an installed thermal resistance of R-12 or greater. §1500)1 B:Unfired storage tanks,such as storage tanks or backup tanks for solar water-heating system, or other indirect hot water tanks have R-12 external insulation or R-16 internal insulation where the internal insulation R-value is indicated on the exterior of the tank. §1500)2: First 5 feet of hot and cold water pipes closest to water heater tank, non-recirculating systems,and entire length of recirculating sections of hot water pipes are insulated per Standards Table 150-13. §1500)2:Cooling system piping (suction,chilled water, or brine lines),and piping insulated between heating source and indirect hot water tank shall be insulated to Table 150-B and Equation 150-A. §1500)2: Pipe insulation for steam hydronic heating systems or hot water systems>15 psi, meets the requirements of Standards Table 123-A. §150(j)3A: Insulation is protected from damage, including that due to sunlight, moisture,equipment maintenance and wind. §1500)3A: Insulation for chilled water piping and refrigerant suction lines includes a vapor retardant or is enclosed entirely in conditioned space. §150(j)4:Solar water-heating systems and/or collectors are certified by the Solar Rating and Certification Corporation. EnergyPro 5.1 by Energy oft User Number:1315 RunCode:2012-10-12709:51:12 /D:0120518 Page 9 of 13 MANDATORY MEASURES SUMMARY: Residential (Page 2 of 3 MF-1 R Project Name Date Manghnani Residence 11011212012 §150(m)1:All air-distribution system ducts and plenums installed, are sealed and insulated to meet the requirements of CMC Sections 601,602,603,604, 605 and Standard 6-5;supply-air and return-air ducts and plenums are insulated to a minimum installed level of R- 4.2 or enclosed entirely in conditioned space. Openings shall be sealed with mastic,tape or other duct-closure system that meets the applicable requirements of UL 181, UL 181A, or UL 181 B or aerosol sealant that meets the requirements of UL 723. If mastic or tape is used to seal openings reater than 114 inch the combination of mastic and either mesh or tape shall be used §150(m)1: Building cavities, support platforms for air handlers, and plenums defined or constructed with materials other than sealed sheet metal,duct board or flexible duct shall not be used for conveying conditioned air. Building cavities and support platforms may contain ducts. Ducts installed in cavities and support platforms shall not be compressed to cause reductions in the cross-sectional area of the ducts. §150(m)2D:Joints and seams of duct systems and their components shall not be sealed with cloth back rubber adhesive duct tapes unless such tae is used in combination with mastic and draw bands. 1 50 m 7: Exhaust fans stems have back draft or automatic dampers. §150(m)8:Gravity ventilating systems serving conditioned space have either automatic or readily accessible, manually operated dampers. §150(m)9: Insulation shall be protected from damage, including that due to sunlight,moisture,equipment maintenance, and wind. Cellular foam insulation shall be protected as above or painted with a coating that is water retardant and provides shielding from solar radiation that can cause degradation of the material. 150 m 10:Flexible ducts cannot have porous inner cores. §150(o):All dwelling units shall meet the requirements of ANSUASHRAE Standard 62.2-2007 Ventilation and Acceptable Indoor Air Quality in Low-Rise Residential Buildings.Window operation is not a permissible method of providing the Whole Building Ventilation required in Section 4 of that Standard. Pool and Spa Heating Systems and Equipment Measures: §114(a):Any pool or spa heating system shall be certified to have:a thermal efficiency that complies with the Appliance Efficiency Regulations;an on-off switch mounted outside of the heater;a permanent weatherproof plate or card with operating instructions;and shall not use electric resistance heating ora pilot light. §114(b)1:Any pool or spa heating equipment shall be installed with at least 36"of pipe between filter and heater, or dedicated suction and return lines or built-up connections for future solar heating. 114(b)2:Outdoor pools ors as that have a heat pump or gas heater shall have a cover. §114(b)3: Pools shall have directional inlets that adequately mix the pool water, and a time switch that will allow all pumps to be set or programmed to run only during off-peak electric demand periods. §150(p): Residential pool systems orequipment meet the pump sizing,flow ratepiping,filters and valve requirements of 150 Residential Lighting Measures: §150(k)1: High efficacy luminaires or LED Light Engine with Integral Heat Sink has an efficacy that is no lower than the efficacies contained in Table 150-C and is not a low efficacy luminalre as specified by§150(k)2. 150(k)3:The wattage of permanently installed luminaires shall be determined as s ecifled by§130(d). §150(k)4:Ballasts for fluorescent lamps rated 13 Watts or greater shall be electronic and shall have an output frequency no less than 20 kHz. §150(k)5: Permanently installed night lights and night lights integral to a permanently installed luminaire or exhaust fan shall contain only high efficacy lamps meeting the minimum efficacies contained in Table 150-C and shall not contain a line-voltage socket or line- voltage lamp holder;OR shall be rated to consume no more than five watts of power as determined by§130(d), and shall not contain a medium screw-base socket. 150(k)6:Lighting integral to exhaust fans in rooms other than kitchens shall meet the applicable requirements of§150(k). 150(k)7:All switching devices and controls shall meet the requirements of§150(k)7. §150(k)8:A minimum of 50 percent of the total rated wattage of permanently installed lighting in kitchens shall be high efficacy. EXCEPTION: Up to 50 watts for dwelling units less than or equal to 2,500 ft2 or 100 watts for dwelling units larger than 2,500 ft2 may be exempt from the 50%high efficacy requirement when:all low efficacy luminaires in the kitchen are controlled by a manual on occupant sensor, dimmer,energy management system(EMCS), or a multi-scene programmable control system;and all permanently installed luminaries in garages, laundry rooms, closets greater than 70 square feet, and utility rooms are high efficacy and controlled by a manual-on occupant sensor. §150(k)9:Permanently installed lighting that is internal to cabinets shall use no more than 20 watts of power per linear foot of illuminated cabinet. EnergyPro 5,1 by EnergySoft User Number:1315 Runcode:2012-10-12T09.51:12 /D:0120518 Page 10 of 13 e MANDATORY MEASURES SUMMARY: Residential (Page 3 of 3 MF-1 R Project Name Date Manghnani Residence 1011212012 §150(k)10: Permanently installed luminaires in bathrooms, attached and detached garages, laundry rooms,closets and utility rooms shall be high efficacy. EXCEPTION 1: Permanently installed low efficacy luminaires shall be allowed provided that they are controlled by a manual-on occupant sensor certified to comply with the applicable requirements of§119. EXCEPTION 2: Permanently installed low efficacy luminaires in closets less than 70 square feet are not required to be controlled by a manual-on occupancy sensor. §150(k)l 1:Permanently installed luminaires located in rooms or areas other than in kitchens, bathrooms, garages,laundry rooms, closets, and utility rooms shall be high efficacy luimnaires. EXCEPTION 1:Permanently installed low efficacy luminaires shall be allowed provided they are controlled by either a dimmer switch that complies with the applicable requirements of§119, or by a manual- on occupant sensor that complies with the applicable requirements of§119. EXCEPTION 2:Lighting in detached storage building less than 1000 square feet located on a residential site is not required to comply with§154 k 11. §150(k)12: Luminaires recessed into insulated ceilings shall be listed for zero clearance insulation contact(IC)by Underwriters Laboratories or other nationally recognized testing/rating laboratory;and have a label that certifies the lumiunaire is airtight with air leakage less then 2.0 CFM at 75 Pascals when tested in accordance with ASTM E283;and be sealed with a gasket or caulk between the luminaire housing and ceiling. §150(k)l3:Luminaires providing outdoor lighting, including lighting for private patios in low-rise residential buildings with four or more dwelling units,entrances, balconies, and porches,which are permanently mounted to a residential building or to other buildings on the same lot shall be high efficacy. EXCEPTION 1: Permanently installed outdoor low efficacy luminaires shall be allowed provided that they are controlled by a manual on/off switch, a motion sensor not having an override or bypass switch that disables the motion sensor, and one of the following controls:a photocontrol not having an override or bypass switch that disables the photocontrol;OR an astronomical time clock not having an override or bypass switch that disables the astronomical time clock;OR an energy management control system(EMCS) not having an override or bypass switch that allows the luminaire to be always on EXCEPTION 2:Outdoor luminaires used to comply with Exceptionl to§150(k)13 may be controlled by a temporary override switch which bypasses the motion sensing function provided that the motion sensor is automatically reactivated within six hours. EXCEPTION 3:Permanently installed luminaires in or around swimming pool,water features, or other location subject to Article 680 of the California Electric Code need not be high efficacy luminaires. §150(k)14: Internally illuminated address signs shall comply with Section 148;OR not contain a screw-base socket, and consume no more than five watts of power as determined according to§130(d). §150(k)l5: Lighting for parking lots and carports with a total of for 8 or more vehicles per site shall comply with the applicable requirements in Sections 130, 132, 134,and 147.Lighting for parking garages for 8 or more vehicles shall comply with the applicable requirements of Sections 130 131 134 and 146. §150(k)16:Permanently installed lighting in the enclosed,non-dwelling spaces of low-rise residential buildings with four or more dwelling units shall be high efficacy luminaires. EXCEPTION: Permanently installed low efficacy luminaires shall be allowed provided that they are controlled by an occupant sensors certified to comply with the applicable requirements of 119. EnergyPro 5.1 by Energysofr User Number:1315 RunCode;2012-10-12709:51:12 !D:0120518 Page 11 of 13 a � HVAC SYSTEM HEATING AND COOLING LOADS SUMMARY Project Name Date Manghnani Residence 10/12/2012 System Name Floor Area HVAC System 1,842 ENGINEERING CHECKS SYSTEM LOAD Number of Systems 1 COIL COOLING PEAK COIL HTG. PEAK Heating System CFM Sensible Latent CFM Sensible Output per System 27,000 Total Room Loads 1,111 23,003 786 550 21,395 Total Output(Btuh) 27,000 Return Vented Lighting 0 Output Btuhl ft 14.7 Return Air Ducts 775 910 Cooling System Return Fan o 0 Output par System 30,000 Ventilation 0 0 0 0 0 Total Output Btuh 30,000 Supply Fan 0 0 Total Output(Tons) 2.5 Supply Air Ducts 775 910 Total Output Btuh/ ft 16.3 Total output s vTon 736.8 TOTAL SYSTEM LOAD F-7724,5531 786 23,215 Air System CFM per System 0 HVAC EQUIPMENT SELECTION Airflow cfm 0 90%AFUE(13 SEER) 28,512 0 27,000 Airflow(cfm/sgft) 0.00 Airflow cfm/Ton 0.0 Outside Air % 0.0% Total Adjusted System Output 28,512 0 27,000 Outside Air(cfm/sgft) 0.00 (Aclusted for Peak Design conditions) Note:values above given at ARI conditions TIME OF SYSTEM PEAK Aug 3 PM Jan 1 AM HEATING SYSTEM PSYCHROMETRICS Airstream Temperatures at Time of Heating Peak 28 OF 67 OF 105 OF Outside Air 0 cfm Heating Coil 104 OF 1ROOM I' 67 OF 68 OF COOLING SYSTEM PSYCHROMETICS Airstream Temperatures at Time of Cooling Peak 88/68 OF 76/62 OF 55/54 OF -10 10 10 b Outside Air ETA 0 cfm Coding Cal 56/54 OF 46.3% I ROOM 76/62°F 75/61 °F EnergyPro 5.f by Energy5off User Number.,1315 RunCode:2012-f0-12T09:51:f2 ID:0120518 Page 12 of 13 HVAC SYSTEM HEATING AND COOLING LOADS SUMMARY Project Name Date Manghnani Residence 10/12/2012 System Name Floor Area HVAC System 1,369 ENGINEERING CHECKS SYSTEM LOAD Number of Systems 1 COIL COOLING PEAK COIL HTG.PEAK Heating System CFM Sensible Latent CFM Sensible Output per5 tem 16,200 Total Room Loads 512 10,770 1,087 336 13,102 Total Output(Btuh) 16,200 Return Vented Lighting 0 Output Stuh! ft 11.8 Return Air Ducts 363 557 Cooling System Return Fan o 0 Output per System 18,000 Ventilation 0 0 0 0 0 Total Output 6tuh 18,000 Supply Fan 0 0 Total Output(Tons) 1.5 Supply Air Ducts 363 557 Total Output Btuh/ ft 13.1 Total Output s t/Ton 912.7 TOTAL SYSTEM LOAD 1 11,496 1,087 14,216 Air System CFM per System 0 HVAC EQUIPMENT SELECTION Airflow cfm 0 copy of 90%AFUE(13 SEER) 17,155 0 16,200 AM low(cfm/sgft) 0.00 Airflow cfmlTon 0,0 Outside Air °h 0.0% Total Adjusted System Output 17,155 0 16,200 Outside Air(efnt/sgft) 0.00 (Adjusted for Peak Design conditions) Note:values above given at ARI conditions TIME OF SYSTEM PEAK Aug 3 PM Jan 1 AM HEATING SYSTEM PSYCHROMETRICS Airstream Temperatures at Time of Heating Peak 28 OF 67 OF 105 OF UNMR Outside Air 0 cfm Heating Coil 104 OF 1 ROOM In 67 OF 68 OF COOLING SYSTEM PSYCHROMETICS Airstream Temperatures at Time of Cooling Peak 88/68 OF 75/62 OF 55/54 OF — - Outside Air .1, a 0 cfm Coding Coif 55/54 OF i 47.2% ; ROOM 1 75/62°F 75162°F __.. 1 Ar 1 .41 EnergyPro 5.1 by EhergySoft User Number:1315 RunCode:2012-10-12T09,51:12 1D:0120518 Page 13 of 13