B-2017-0225CITY OF CUPERTINO BUILDING PERMIT - I
BUILDING ADDRESS:
19419 STEVENS CREEK BLVD STE 200 CUPERTINO, CA 95014 (316 20 112)
OWNER'S NAME: MAIN STREET CUPERTINO AGGREGATOR LLC
OWNER'S PHONE: 512-851-4000
LICENSED CONTRACTOR'S DECLARATION
License Class B Lic.'#929658
Contractor VULCAN CONSTRUCTION INC Date 03/31/2019
I hereby affirm that I am licensed under the provisions of Chapter 9 (commencing
with Section 7000) of Division 3 of the Business & Professions Code and that my
license is in full force and effect.
I hereby affirm under penalty of perjury one of the following two declarations:
t. I have and will maintain a certificate of consent to self -insure for Worker's
CONTRACTOR:, PERMIT NO: B-2017-0225
VULCAN
CONSTRUCTION INC
SANTA CLARA, CA
95050
DATE ISSUED: 04/18/2017
PHONE NO: (408) 213-4270
PERMIT INFO:
BLDG —ELECT -PLUMB
MECH _ RESIDENTIAL X COMMERCIAL
JOB DESCRIPTION:
TI - CIRRUS LOGIC - (4276 SF)
Compensation, as provided for by Section 3700 of the Labor Code, for the
performance of the work for which this permit is issued.
2. I have and will maintain Worker's Compensation Insurance, as provided for by
Section 3700 of the Labor Code, for the performance of the work for which this
permit is issued. Sq. Ft Floor Area: Valuation: $427600.00
APPLICANT CERTMCATfON
I certify that I have read this application and state that the above
information is correct. I agree to comply with all city and county ordinances
and state laws relating to building construction, and hereby authorize
representatives of this city to enter upon the above mentioned property for
inspection purposes. (We) agree to save indemnify and keep harmless the
City of Cupertino against liabilities, judgments, costs, and expenses which
may accrue against said City in consequence of the granting of this permit.
Additionally, the applicant understands and will comply with all non -point
source regulations per the Cupertino Municipal Code, Section 9.18.
Signature Date 4.18.
OWNER -BUILDER DECLARATION
I hereby affirm that I am exempt from the Contractor's License Law for one of the
following two reasons:
1. I, as owner of the property, or my employees with wages as their sole
compensation, will do the work, and the structure is not intended or offered for
sale (Sec.704.4, Business & Professions Code)
2. I, as owner of the property, am exclusively contracting with licensed
contractors to construct the project (Sec.7044, Business & Professions Code).
I hereby affirm under penalty of perjury one of the following three declarations:
1. I have and will maintain a Certificate of Consent to self -insure for Worker's
Compensation, as provided for by Section 3700 of the Labor Code, for the
performance of the work for which this permit is issued.
I have and will maintain Worker's Compensation Insurance, as provided for by
Section 3700 of the Labor Code, for the performance of the work for which this
permit is issued.
I certify that in the performance of the work for which this permit is issued, I
-shall not employ any person in any manner so as to become subject to the
Worker's Compensation laws of California. If, after making this certificate of
exemption, I become subject to the Worker's Compensation provisions of the
Labor Code, I must forthwith comply with such provisions or this permit shall
be deemed revoked.
APPLICANI CERTIFICATION
I certify that I have read this application and state that the above information is
correct. I agree to comply with all city and county ordinances and state laws
relating to building construction, and hereby authorize representatives of this city
to enter upon the above mentioned property for inspection purposes. (We) agree
to save indemnify and keep harmless the City of Cupertino against liabilities,
judgments, costs, and expenses which may accrue against said City in
consequence of the granting of this permit. Additionally, the applicant understands
and will comply with all non -point source regulations per the Cupertino Municipal
Code, Section 9.18.
Signature Date 4.18.
APN Number: Occupancy Type:
316 20112 1 B (Tenant Improvements)
PERMIT EXPIRES IF WORK IS NOT STARTED
WITHIN 180 DAYS OF PERMIT ISSUANCE OR
180 DAYS FROM LAST CALLED INSPECTION.
by: SEAN HATCH
RE -ROOFS:
All roofs shall be inspected prior to any roofing material being installed. If a roof is
installed without first obtaining an inspection, I agree to remove all new materials for
inspection.
Signature of Applicant:
Date: 4.18.
ROOF COVERINGS TO BE CLASS "A"
HAZARDOUS MATERIALS DISCLOSURE
I have read the hazardous materials requirements under Chapter 6.95 of the
California Health & Safety Code, Sections 25505, 25533, and 25534. I will
maintain compliance with the Cupertino Municipal Code, Chapter 9.12 and the
Health & Safety Code, Section 25532(a) should I store or handle hazardous
material. Additionally, should I use equipment or devices which emit hazardous
air contaminants as defined by the Bay Area Air Quality Management District I
will maintain compliance with the Cupertino Municipal Code, Chapter 9.12 and
the Health & Safety Code, Sections 25 05, 25533, and 25534.
i
Owner or authorized agent: .v^
Date: 4.18.
CONSTRUCTION LENDING AGENCY
I hereby affirm that there is a construction lending agency for the performance
of work's for which this permit is issued (Sec. 3097, Civ C.)
Lender's Name
Lender's Address
ARCHITECT'S DECLARATION
I understand my plans shall be used as public records.
Licensed
Professional
CUPERTIINO
CONSTRUCTION PERMIT APPLICATION
COMMUNITY DEVELOPMENT DEPARTMENT - BUILDING DIVISION
10300 TORRE AVENUE • CUPERTINO, CA 95014-3255
(408) 777-3228 - FAX (408) 777-3333 - building0-cupertino.orq 17
❑ NEW CONSTRUCTION ❑ ADDITION Q ALTERAY r
—uz
❑ REVISION I DEF� , ORI AL PQMlT#
PROJECT ADDRESS 19419 STEVENS CREEK BLVD :,jl TE 2UU7APNtk
- 2-0 ..• L ,
OwNERNAME CIRRUS LOGIC
PHONE 512-851-4000
E-MAIL
STREETADDRESs 800 WEST ETH STREET
CITY, STATE, ZIP AUSTIN, TX 78701
FAX
CONTACT NAME CHRIS KRAHN PHONE415-365-3407krahn@smithgroupjjr.com
STREETADDRE`s301 Battery St. 7 7 th fir.
CITY, STATE, ZIP SF, CA 94111
FAX 734-780-8907
13OWNER E3owNER.Bumomk ❑ OA`NERAGENT ❑ CONTRACTOR ❑ CONTRACTOR AGENT ISI ARCHITECT ❑ ENGINEER ❑ DEVELOPER 0 TENANT
CONTRACTORNAME -rB�
LICENSENUMBER _
'32 _ �e7
LICENSETY E
BUS. LEC#
COMPANY NAME 1 CA tL Coo) 5_ P<
V T
E-MAIL
FAX
STREET ADDRESS
a 4-161 `� l
CITY, STATE, Z111
44A CA- , S0 5D
PHONE .
lqc,- 213
ARCHITECTIENGINEERNAME JOYCE POLHAMUS
L€CENSENUMBER C-15488
BUS. LIC#
COMPANYNAME Sm]thGroupJJR
E-MAIL
o ce. olhamus smith rou "r.com
FAX
STREET ADDRESS 301 Battery St. 7th fir.
CITY, STATE, ZIP SF, CA 94111
PHONE415-227-0100
DESCRIPTION OF WORK AN ARPRGX �4 04SF TENANT IMPROVEMENT TO INCLUDE OFFICES (OPEN AND P-RIVAT-E)-----
CONFERENCE ROOM, BREAK AREA AND OTHER SUPPORT SPACES.
EXIS'T'ING USE
B -Office
PROPOSED USE CONSTR
B -Office
TYPE
V-13USE
I # STORIES
TYPE
OCC.
SQ.FT,
VALUATION (S)
EXISTDEMO
AREAG4276
AREA NEW FLOOR 0
AREA Q
TOTAL
1 NET AREA 4276
Office
V -B
B
4276
$427,600
BATHROOM
KITCHEN
OTHER
REMODEL AREA
REMODELAREA
REMODELAREA
PORCH AREA
DECK AREA
TOTAL DECKIPORCH AREA
GARAGE AREA: H DETACH
I
ATTACH
11 DWELLING UNITS:
is A SECOND UNIT ❑ YES
1 SECOND STORY ❑ YES
BEINGADDED? [:]NO
ADDITION? ❑NO
PRE -APPLICATION [I YES IF YES, PROVIDE COPY OF
ISTHEBLDGAN ❑YES
RECEIVED BY: -
TOTALVALUATION:
PLANNINGAPPLA ❑NO PLANNINGAPPROVAL LETTER
PICHLERHOME? ❑NO
$427,600
By my signature below, I certify to each of the following: I am the property owner or authorized agent to act on the property owner's behalf. I have read this
application and the information I have pro •ded is correct. I have read the Description of Work and verify it is accurate. I agree to comply With all applicable local
ordinances and state laws relating to • nl� co t ion. I authorize representatives of Cupertino to enter the above -identified property for inspection purposes.
Signature ofApplicant7Agc Date:
SUPPLEMENTAL INFORMATION REQUIRED
PLAN CHECK TYPE
ROUTING.SLIP
13. OVER-THE-COUNTER
CI BUILDINGPLANREVIEW
New SFD or Multifamily dwellings: Apply for demolition permit for
existing building(s). Demolition permit is required prior to issuance of building
permit for new building.
CI EXPRESS
El PLANNING PLAN REVIEW
Commercial Bldgs: Provide a completed Hazardous Materials Disclosure
11 STANDARD
ElPUBLIc woRKs
fo_rm if any Hazardous Materials are being used as part of this project.
❑ LARGK
1] FIRE DEPT
_ Copy of Planning Approval Letter or Meeting with Planning prior to
❑ MAJOR
❑S_ANITARY.SE'WERDISTRICT
submittal of Building Permit application.
❑ ENVIRONMENTAL HEALTH
BldgApp 2011.doc revised 06121111
Page 1 of 12 CalGreen Non-Res Checklist.doc revised 01/01/2017
PURPOSE:
The non-residential provisions of the 2016 CalGreen Code outline planning, design and development methods that
include environmentally responsible site selection, building design, building siting and development to protect, restore and
enhance the environmental quality of the site and respect the integrity of adjacent properties; establishes the means of
conserving water used indoors, outdoors and in wastewater conveyance; outlines means of achieving material
conservation and resource efficiency; and outlines means of reducing the quantity of air contaminants.
Project Name:
Project Address:
Project Description:
Instructions:
1. The Owner or the Owner’s agent shall employ a licensed professional experienced with the 2016 California Green
Building Standards Codes to verify and assure that all required work described herein is properly planned and
implemented in the project.
2. The licensed professional, in collaboration with the owner and the design professional shall initial Column 2 of
this checklist, sign and date Section 1 - Design Verification at the end of this checklist and have the
checklist printed on the approved plans for the project.
3. Prior to final inspection by the Building Department, the licensed professional shall complete Column 3 and sign
and date Section 2 - Implementation Verification at the end of this checklist and submit the completed form to
the Building Inspector.
MANDATORY FEATURE OR MEASURE
Column 2 Column 3
Project
Requirements
Verification
CHAPTER 5 – NONRESIDENTIAL MANDATORY MEASURES
General Requirements
The project meets all the requirements of Divisions 5.101 through 5.508.
Division 5.1 PLANNING AND DESIGN
Planning and Design - Site Development
5.106.1 Storm water pollution prevention. For projects of one acre or less,
develop a Storm Water Pollution Prevention Plan (SWPPP) that has been
designed, specific to its site, conforming to the State Storm water NPDES
Construction Permit or local ordinance, whichever is stricter, as is required for
projects over one acre. The plan should cover prevention of soil loss by storm
water run-off and/or wind erosion, of sedimentation and/or of dust/particulate
matter air pollution.
CALGREEN NON-RESIDENTIAL CHECKLIST –
MANDATORY ITEMS
COMMUNITY DEVELOPMENT DEPARTMENT • BUILDING DIVISION
ALBERT SALVADOR, P.E., C.B.O., BUILDING OFFICIAL
10300 TORRE AVENUE • CUPERTINO, CA 95014-3255
(408) 777-3228 • FAX (408) 777-3333 • building@cupertino.org
Cirrus Logic
19419 Stevens Creek Blvd. Suite 200, Cupertino, CA 95014
Commercial Office - Tenant Improvement of existing shell space, 4276 sf
Phuong Devries
04/13/17
Page 2 of 12 CalGreen Non-Res Checklist.doc revised 01/01/2017
5.106.4 Bicycle parking. Comply with Sections 5.106.4.1 and 5.106.4.2; or
meet local ordinance, whichever is stricter.
5.106.4.1.1 Short-Term bicycle parking. If the qualified project is
anticipated to generate visitor traffic, provide permanently anchored bicycle
racks within 200 feet of the visitors’ entrance, readily visible to passers-by,
for 5 percent of visitor motorized vehicle parking spaces being added, with
a minimum of one two-bike capacity rack.
5.106.4.1.2 Long-Term bicycle parking. For qualified buildings with over
10 tenant-occupants or for additions or alterations that add 10 or more
tenant vehicular parking spaces, provide secure bicycle parking for 5
percent of tenant vehicle parking spaces being added, with a minimum of
one space.
5.106.5.2 Designated parking for clean air vehicles. Provide designated
parking for any combination of low-emitting, fuel-efficient and carpool/van pool
vehicles as shown in Table 5.106.5.2.
5.106.5.3 Electric vehicle (EV) charging. Construction shall comply with
Section 5.106.5.3.1 or Section 5.106.5.3.2 to facilitate future installation of
electric vehicle supply equipment {EVSE).
5.106.5.3.1 Single charging space requirements. When only a single
charging space is required per Table 5.106.5.3.3, a raceway is required to
be installed at the construction and shall be installed in accordance with
the California Electrical Cod.
5.106.5.3.2 Multiple charging spaces requirements. When multiple
charging spaces are required per Table 5.106.5.3.3, raceway(s) is/are
required to be installed at the time of construction and shall be installed in
accordance with the California Electrical Code.
5.106.5.3.3 EV charging space calculation. Table 5.106.5.3.3 shall be
used to determine if single or multiple charging space requirements apply
for the future installation of EVSE.
5.106.5.3.4 Identification. The service panel or subpanel(s) circuit
directory shall identify the reserved overcurrent protective device space(s)
for future EV charging as “EV CAPABLE”.
5.106.5.3.5 Future EV spaces count as designated parking. Future
charging spaces qualify as designated parking as described in Section
5.106.5.2 Designated parking for clean sir vehicles.
5.106.8 Light pollution reduction. Outdoor lighting systems shall be
designed and installed to comply with the following:
1. The minimum requirements in the California Energy Code for lighting zones
1 – 4 as defined in Chapter 10 of the California Administrative Code; and
2. Backlight, Uplight and Glare (BUG) ratings as defined in IES TM-15-11; and
3. Allowable BUG rating not exceeding those shown in Table 5.106.8, or
Comply with a local ordinance lawfully enacted pursuant to Section 101.7,
whichever is more stringent.
5.106.10 Grading and paving. The site shall be planned and developed to
keep surface water away from buildings. Construction plans shall indicate how
site grading or a drainage system will manage all surface water flows.
Phuong Devries
04/13/17
Page 3 of 12 CalGreen Non-Res Checklist.doc revised 01/01/2017
Division 5.2 ENERGY EFFICIENCY
Performance Requirements
5.201.1 Scope. The California Energy Commission will continue to adopt
mandatory building standards.
Division 5.3 WATER EFFICIENCY AND CONSERVATION
Indoor Water Use
5.303.1 Meters. Separate meters shall be installed for the uses described in
Sections 503.1.1 and 503.1.2.
5.303.1.1 New building or additions in excess of 50,000 square feet.
Separate submeters shall be installed as follows:
1. For each individual leased, rented or other tenant space within the
building projected to consume more than 100 gal/day.
2. Where separate submeters are unfeasible, for water supplied to the
following systems:
a. Makeup water for cooling towers where flow through is greater
than 500 gpm.
b. Makeup water for evaporative coolers greater than 6 gpm.
c. Steam and hot-water boilers with energy input > 500,000 Btu/h.
5.303.1.2 Excess consumption. A separate submeter shall be provided
for any tenant within a new building or within an addition that is projected
to consume > 1,000 gal/day.
5.303.3 Water conserving plumbing fixtures and fittings. Plumbing fixtures
(water closets and urinals) and fittings (faucets and showerheads) shall comply
with the following:
5.303.3.1. Water closets. The effective flush volume of all water closets
shall not exceed 1.28 gallons per flush. Tank-type water closets shall be
certified to the performance criteria of the U.S. EPA WaterSense
Specification for tank-type toilets.
5.303.3.2 Urinals.
5.303.3.2.1 Wall-mounted urinals. The effective flush volume of wall-
mounted urinals shall not exceed 0.125 gallons per flush.
5.303.3.2.2 Floor-mounted urinals. The effective flush volume of
floor-mounted or other urinal shall not exceed .05 gallons per flush.
5.303.3.3 Showerheads.
5.303.3.3.1 Single showerhead. Showerheads shall have a maximum
flow rate of not more than 2.0 gallons per minute at 80 psi
showerheads shall be certified to the performance criteria of the U.S.
EPA WaterSense Specification for showerheads.
5.303.3.3.2 Multiple showerheads serving one shower. When a
shower is served by more than one showerhead, the combined flow
rate of all showerheads and/or other shower outlets controlled by a
single valve shall not exceed 2.0 gallons per minute at 80 psi, or the
shower shall be designed to allow only one shower outlet to be in
operation at a time.
Phuong Devries
04/13/17
Page 4 of 12 CalGreen Non-Res Checklist.doc revised 01/01/2017
5.303.3.4 Faucets and fountains.
5.303.3.4.1 Nonresidential lavatory faucets. Lavatory faucets shall
have a maximum flow rate of not more than 0.5 gallons per minutes at
60 psi.
5.303.3.4.2 Kitchen faucets. Kitchen faucets shall have a maximum
flow rate of not more than 1.8 gallons per minute at 60 psi. Kitchen
faucet may temporarily increase the flow above the maximum rate, but
not to exceed 2.2 gallons per minutes at 60 psi, and must default to a
maximum flow rate of 1.8 gallons per minutes at 60 psi.
5.303.3.4.3 Wash fountains. Wash fountains shall have a maximum
flow rate of not more than 1.8 gallons per minutes/20 [rim space
(inches) at 60 psi.
5.303.3.4.4 Metering faucets. Metering faucets shall not deliver more
than 0.20 gallons per cycle.
5.303.3.4.5 Metering faucets for wash fountains. Metering faucets
for wash fountains shall have a maximum flow rate of not more than
0.20 gallons per cycle/20 [rim space (inches) at 60 psi.
5.303.4.1 Food waste disposers. Disposers shall either modulate the use of
water to no more than 1 gpm when the disposer is not in use (not actively
grinding food waste/no-load) or shall automatically shut off after no more than
10 minutes of inactivity. Diposers shall use no more than 8 gpm of water.
5.303.5 Areas of additions or alteration. For those occupancies within the
authority of the California Building Standards Commission as specified in
Section 103, the provisions of Section 5.303.3 and 5.303.4 shall apply to new
fixtures in additions or areas of alterations to the building.
5.303.6 Standards for plumbing fixtures and fittings. Plumbing fixtures and
fittings shall be installed in accordance with the California Plumbing Code
(CPC), and shall meet the applicable standards referenced in CPC Table
1401.1 and CalGreen Chapter 6.
Outdoor Water Use
5.304.2 Outdoor use in landscape areas equal to or greater than 500
sg.ft.When water is used for outdoor irrigation for new construction projects,
one of the following shall apply:
1. A local water efficient landscape ordinance that is based on evidence in
the record, at least as effective in conserving water as the updated model
ordinance adopted by the Department of Water Resources (DWR)
2. The California Department of Water Resource Model Water Efficient
Landscape Ordinance (MWELO) commencing with Section 490 of Chapter
2.7, Division 2, Title 23, California Code of Regulation.
5.304.3 Outdoor water use in rehabilitated landscape projects equal to or
greater than 2,500 sq.ft. Rehabilitated landscape projects shall comply with
Section 5.304.2, Item 1 or 2.
5.304.4 Outdoor water use in landscape areas of 2,500 sq.ft. or less. Any
project with an aggregate landscape area of 2,500 sq.ft. or less may comply
with the performance requirements of MWELO or conform to the prescriptive
compliance measure contained in MWELO’s Appendix D.
Phuong Devries
04/13/17
Page 5 of 12 CalGreen Non-Res Checklist.doc revised 01/01/2017
5.304.5 Graywater or rainwater use in landscape areas. For projects using
treated or untreated graywater or rainwater captured on site, any lot or parcel
within the projects that has less than 2,500 sq.ft. of landscape and meters the
lot or parcel’s landscape water requirement (Estimated Total Water Use)
entirely with treated or untreated graywater or through stored rainwater
captured on site is subject only to Appendix D Section (5).
Weather Resistance and Moisture Management
5.407.1 Weather protection. Provide a weather-resistant exterior wall and
foundation envelope as required by California Building Code Section 1403.2
and California Energy Code Section 150, manufacturer’s installation
instructions or local ordinance, whichever is more stringent.1
5.407.2 Moisture control. Employ moisture control measures by the following
methods;
5.407.2.1 Sprinklers. Prevent irrigation spray on structures.
5.407.2.2 Entries and openings. Design exterior entries and/or openings
to prevent water intrusion into buildings.
5.407.2.2.1 Exterior door protection. Primary exterior entries shall be
covered to prevent water intrusion by using nonabsorbent floor and
wall finishes within at least 2 ft around and perpendicular to such
openings plus at least one of the following:
1. An installed awning at least 4 ft in depth.
2. The door is protected by a roof overhang at least 4 ft in depth.
3. The door is recessed at least 4 ft.
4. Other methods which provide equivalent protection.
5.407.2.2.2 Flashing. Install flashings integrated with a drainage
plane.
Construction Waste Reduction, Disposal and Recycling
5.408.1 Construction waste management. Recycle and/or salvage for reuse
a minimum of 65 percent of the nonhazardous construction and demolition
waste in accordance with Section 5.408.1.1, 5.408.1.2, or 5.408.1.3; or meet a
local construction and demolition waste management ordinance, whichever is
more stringent.
5.408.1.1 Construction waste management plan. Submit plan per this
section to enforcement authority.
5.408.1.2 Waste management company. Utilize a waste management
company that can provide verifiable documentation that the percentage of
construction and demolition waste material diverted from the landfill
complies with CalGreen Section 5.408.
5.408.1.3 Waste stream reduction alternative. The combined weight of
new construction disposal that does not exceed two pounds per square
foot of building area may be deemed to meet the 65 percent minimum
requirement as approved by the enforcing agency.
5.408.1.4 Documentation. Provide documentation of the waste
management plan that meets the requirements listed in Section 5.408.1.1
through 5.408.1.3.
Phuong Devries
04/13/17
Page 6 of 12 CalGreen Non-Res Checklist.doc revised 01/01/2017
5.408.2 Universal waste. Addition and alteration to a building or tenant space
that meet the scoping provision in Section 301.3 for nonresidential additions
and alterations, shall require verification that Universal Waste items such as
fluorescent lamps and ballast and mercury containing thermostats as well as
other California prohibited Universal Waste materials are disposed of properly
and are diverted from landfills. A list of prohibited Universal Waste material
shall be included in the construction documents.
5.408.3 Excavated soil and land clearing debris. 100 percent of trees,
stumps, rocks and associated vegetation and soils resulting primarily from land
clearing shall be reused or recycled.
Building Maintenance and Operation
5.410.1 Recycling by occupants. Provide readily accessible areas that serve
the entire building and are identified for the depositing, storage and collection
of nonhazardous materials for recycling.
5.410.2 Commissioning. For new buildings 10,000 square feet and over,
building commissioning shall be included in the design and construction
processes of the building project. All occupancies projects other than I-
occupancies and L-occupancies shall comply with the California Energy Code
as prescribed in California Energy Code Section 120.8. For I-occupancies that
are not regulated by OSHPD or for I-occupancies and L-occupancies that are
not regulated by the California Energy Code Section 100.0 Scope, all
requirements in Sections 5.410.2 through 5.410.2.6 shall apply.
Commissioning requirements shall include items listed in Section 5.410.2.
5.410.2.1 Owner’s Project Requirements (OPR). Documented before the
design phase of the project begins the OPR shall include items listed in
Section 5.410.4.
5.410.2.2 Basis of Design (BOD). A written explanation of how the design
of the building systems meets the OPR shall be completed at the design
phase of the building project and updated periodically to cover the systems
listed in Section 5.410.2.2.
5.410.2.3 Commissioning plan. A commissioning plan describing how the
project will be commissioned shall be started during the design phase of
the building project and shall include items listed in Section 5.410.2.3.
5.410.2.4 Functional performance testing. Functional performance
testing shall demonstrate the correct installation and operation of each
component, system and system-to-system interface in accordance with the
approved plans and specifications.
5.410.2.5 Documentation and training. A Systems manual and systems
operations training are required.
5.410.2.5.1 Systems manual. The systems manual shall be delivered to
the building owner or representative and facilities operator and shall
include the items listed in Section 5.410.2.5.1.
5.410.2.5.2 Systems operations training. The training of the
appropriate maintenance staff for each equipment type and/or system
shall include items listed in Section 5.410.2.5.2.
5.410.2.6 Commissioning report. A complete report of commissioning
process activities undertaken through the design, construction and
reporting recommendations for post-construction phases of the building
project shall be completed and provided to the owner or representative.
4
Phuong Devries
04/13/17
Page 7 of 12 CalGreen Non-Res Checklist.doc revised 01/01/2017
5.410.4 Testing and adjusting. Testing and adjusting of systems shall be
required for buildings less than 10,000 square feet or new systems to serve an
addition or alteration subject to Section 303.1.
5.410.4.2 Systems. Develop a written plan of procedures for testing and
adjusting systems. Systems to be included for testing and adjusting shall
include, as applicable to the project, the systems listed in Section
5.410.3.2.
5.410.4.3 Procedures. Perform testing and adjusting procedures in
accordance with industry best practices and applicable national standards
on each system.
5.410.4.3.1 HVAC balancing. Before a new space-conditioning system
serving a building or space is operated for normal use, the system
should be balanced in accordance with the procedures defined by
national standards listed in Section 5.410.3.3.1.
5.410.4.4 Reporting. After completion of testing, adjusting and balancing,
provide a final report of testing signed by the individual responsible for
performing these services.
5.410.4.5 Operation and maintenance manual. Provide the building
owner with detailed operating and maintenance instructions and copies of
guaranties/warranties for each system prior to final inspection.
5.410.4.5.1 Inspections and reports. Include a copy of all inspection
verifications and reports required by the enforcing agency.
Fireplaces
5.503.1 Install only a direct-vent sealed-combustion gas or sealed wood-
burning fireplace or a sealed woodstove and refer to residential requirements
in the California Energy Code, Title 24, Part 6, Subchapter 7, Section 150.
5.503.1.1 Woodstoves. Woodstoves shall comply with US EPA New
Source Performance Standards (NSPS) emission limits as applicable, and
shall have a permanent label indicating they are certified to meet the
emission limits.
Pollutant Control
5.504.1 Temporary ventilation. The permanent HVAC system shall only be
used during construction if necessary to condition the building or areas of
addition or alteration within the required temperature range for material and
equipment installation. If the HVAC system is used during construction, use
return air filters with a Minimum Efficiency Reporting Value (MERV) of 8,
based on ASHRAE 52.2-1999, or an average efficiency of 30 percent based
on ASHRAE 52.1-1992. Replace all filters immediately prior to occupancy, or,
if the building is occupied during alteration, at the conclusion of construction.
5.504.3 Covering of duct openings and protection of mechanical
equipment during construction. At the time of rough installation or during
storage on the construction site and until final startup of the heating and
cooling equipment, all duct and other related air distribution component
openings shall be covered with tape, plastic, sheet metal or other methods
acceptable to the enforcing agency to reduce the amount of dust or debris
which may collect in the system.
Phuong Devries
04/13/17
Page 8 of 12 CalGreen Non-Res Checklist.doc revised 01/01/2017
5.504.4 Finish material pollutant control. Finish materials shall comply with
Sections 5.504.4.1 through 5.504.4.6.
5.504.4.1 Adhesives, sealants, caulks. Adhesives and sealants used on
the project shall meet the requirements of the following standards.
1. Adhesives, adhesive bonding primers, adhesive primers, sealants,
sealant primers and caulks shall comply with local or regional air pollution
control or air quality management district rules where applicable or
SCAQMD Rule 1168 VOC limits, as shown in Tables 5.504.4.1 and
5.504.4.2.
2. Aerosol adhesives and smaller unit sizes of adhesives and sealant or
caulking compounds (in units of product, less packaging, which do not
weigh more than one pound and do not consist of more than 16 fluid
ounces) shall comply with statewide VOC standards and other
requirements, including prohibitions on use of certain toxic compounds, of
California Code of Regulations, Title 17, commencing with Section 94507.
5.504.4.3 Paints and coatings. Architectural paints and coatings shall
comply with Table 5.504.4.3 unless more stringent local limits apply.
5.504.4.3.1 Aerosol paints and coatings. Aerosol paints and coatings
shall meet the Product-Weighted MIR Limits for ROC in Section
94522(a)(3) and other requirements, including prohibitions on use of
certain toxic compounds and ozone depleting substances (CCR, Title 17,
Section 94520 et seq).
5.504.4.3.2 Verification. Verification of compliance with this section
shall be provided at the request of the enforcing agency.
5.504.4.4 Carpet systems. All carpet installed in the building interior shall
meet the testing and product requirements of at least one of the standards
listed in Section 5.504.4.4.
5.504.4.4.1 Carpet cushion. All carpet cushion installed in the building
interior shall meet the requirements of the Carpet and Rug Institute
Green Label program.
5.504.4.4.2 Carpet adhesive. All carpet adhesive shall meet the
requirements of Table 5.504.4.1.
5.504.4.5 Composite wood products. Hardwood plywood, particleboard
and medium density fiberboard composite wood products used on the
interior or exterior of the building shall meet the requirements for
formaldehyde as specified in Table 5.504.4.5.
5.504.4.5.3 Documentation. Verification of compliance with this section
shall be provided as requested by the enforcing agency. Documentation
shall include at least one of the following standards listed in Section
5.504.5.3.
5.504.4.6 Resilient flooring systems. For 80 percent of floor area
receiving resilient flooring, installed resilient flooring shall meet at least one
of the following standards listed in Section 5.504.4.6.
5.504.5.3 Filters. In mechanically ventilated buildings, provide regularly
occupied areas of the building with air filtration media for outside and
return air prior to occupancy that provides at least a MERV of 8.
Phuong Devries
04/13/17
Page 9 of 12 CalGreen Non-Res Checklist.doc revised 01/01/2017
5.504.7 Environmental tobacco smoke (ETS) control. Prohibit smoking
within 25 feet of building entries, outdoor air intakes and operable windows
where outdoor areas are provided for smoking and in buildings; or as enforced
by ordinances, regulations or policies of any city, county, city and county,
California Community College, campus of the California State University or
campus of the University of California, whichever are more stringent.
Indoor Moisture and Radon Control
5.505.1 Indoor moisture control. Buildings shall meet or exceed the
provisions of California Building Code, CCR, Title 24, Part 2, Sections 1203
and Chapter 14.1.
Air Quality and Exhaust
5.506.1 Outside air delivery. For mechanically or naturally ventilated spaces
in buildings, meet the minimum requirements of Section 121 of the California
Energy Code, CCR, Title 24, Part 6 and Chapter 4 of CCR, Title 8 or the
applicable local code, whichever is more stringent.1
5.506.2 Carbon dioxide (CO2) monitoring. For buildings equipped with
demand control ventilation, CO2 sensors and ventilation controls shall be
specified and installed in accordance with the requirements of the latest edition
of the California Energy Code, CCR, Title 24, Part 6, Section 121(c). 1
Environmental Comfort
5.507.4 Acoustical control. Employ building assemblies and components
with STC values determined in accordance with ASTM E 90 and ASTM E 413.
5.507.4.1. Exterior noise transmission, prescriptive method. Wall and
floor-ceiling assemblies exposed to the noise source making up the
building envelope shall have exterior wall and roof ceiling assemblies
meeting a composite STC rating of at least 50 or a composite OITC rating
of no less than 40 with exterior windows of a minimum STC of 40 or OITC
of 30 in the locations described in Items 1 and 2. Also applies to addition
envelope or altered envelope.
5.507.4.1.1 Noise exposure where noise contours are not readily
available. Buildings exposed to a noise level of 65 dB Leq-1Hr during
any hour of operation shall have exterior wall and roof-ceiling
assemblies exposed to the noise source meeting a composite STC
rating of at least 45 (or OITC 35), with exterior windows of a minimum
STC of 40 (or OITC 30). Also applies to addition or alteration exterior
wall.
5.507.4.2 Performance method. For buildings located as defined in
Sections A5.507.4.1 or A5.507.4.1.1, wall and roof-ceiling assemblies
making up the building envelope shall be constructed to provide an interior
noise environment attributable to exterior sources that does not exceed an
hourly equivalent noise level (Leq-1Hr) of 50 dBA in occupied areas during
any hour of operation. Also applies to addition envelope or altered
envelope.
5.507.4.2.1 Site features. Exterior features such as sound walls or
earth berms may be utilized as appropriate to the project to mitigate
sound migration to the interior. Also applies to addition envelope or
altered envelope.
5.507.4.2.2 Documentation of compliance. An acoustical analysis
documenting complying interior sound levels shall be prepared by
personnel approved by the architect or engineer of record.
Phuong Devries
04/13/17
Page 10 of 12 CalGreen Non-Res Checklist.doc revised 01/01/2017
5.507.4.3 Interior sound. Wall and floor-ceiling assemblies separating
tenant spaces and tenant spaces and public places shall have an STC of
at least 40.
Outdoor Air Quality
5.508.1 Ozone depletion and greenhouse gas reductions. Installations of
HVAC, refrigeration and fire suppression equipment shall comply with Sections
5.508.1.1 and 5.508.1.2.
5.508.1.1 Chlorofluorocarbons (CFCs). Install HVAC and refrigeration
equipment that does not contain CFCs.
5.508.1.2 Halons. Install fire suppression equipment that does not contain
Halons.
5.508.2 Supermarket refrigerant leak reduction. New commercial
refrigeration systems shall comply with the provisions of this section when
installed in retail food stores 8,000 square feet or more conditioned area, and
that utilize either refrigerated display cases, or walk-in coolers or freezers
connected to remote compressor units or condensing units. The leak reduction
measures apply to refrigeration systems containing high-global- warming
potential (high-GWP) refrigerants with a GWP of 150 or greater. New
refrigeration systems include both new facilities and the replacement of
existing refrigeration systems in existing facilities.
5.508.2.1 Refrigerant piping. Piping compliant with the California
Mechanical Code shall be installed to be accessible for leak protection and
repairs. Piping runs using threaded pipe, copper tubing with an outside
diameter (OD) less than 1/4 inch, flared tubing connections and short
radius elbows shall not be used in refrigerant systems except as noted
below.
5.508.2.1.1 Threaded pipe. Threaded connections are permitted at the
compressor rack.
5.508.2.1.2 Copper pipe. Copper tubing with an OD less than ¼ inch
may be used in systems with a refrigerant charge of 5 pounds or less.
5.508.2.1.2.1 Anchorage. One-fourth-inch OD tubing shall be
securely clamped to a rigid base to keep vibration levels below 8 mils.
5.508.2.1.3 Flared tubing connections. Double-flared tubing
connections may be used for pressure controls, valve pilot lines and oil.
5.508.2.1.4 Elbows. Short radius elbows are only permitted where
space limitations prohibited use of long radius elbows.
5.508.2.2. Valves. Valves and fittings shall comply with the California
Mechanical Code and as follows.
5.508.2.2.1 Pressure relief valves. For vessels containing high-GWP
refrigerant, a rupture disc shall be installed between the outlet of the
vessel and the inlet of the pressure relief valve.
5.508.2.2.1.1 Pressure detection. A pressure gauge, pressure
transducer or other device shall be installed in the space between the
rupture disc and the relief valve inlet to indicate a disc rupture or
discharge of the relief valve.
Phuong Devries
04/13/17
Page 11 of 12 CalGreen Non-Res Checklist.doc revised 01/01/2017
5.508.2.2.2 Access valve. Only Schrader access valves with a brass or
steel body are permitted for use.
5.508.2.2.2.1 Valves caps. For system with a refrigerant charge of 5
pounds or more, valve caps shall be brass or steel and not plastic.
5.508.2.2.2.2 Seal caps. If designed for it, the cap shall have a
neoprene O-ring in place.
5.508.2.2.2.2.1 Chain tethers. Chain tethers to fit over the stem
are required for valves designed to have seal caps.
5.508.2.3 Refrigerated service cases. Refrigerated service cases holding
food products containing vinegar and salt shall have evaporator coils of
corrosion-resistant material, such as stainless steel; or be coated to
prevent corrosion from these substances.
5.508.2.3.1 Coil coating. Consideration shall be given to the heat
transfer efficiency of coil coating to maximize energy efficiency.
5.508.2.4 Refrigerated receivers. Refrigerant receivers with capacities
greater than 200 pounds shall be fitted with a device that indicates the
level of refrigerant in the receiver.
5.508.2.5. Pressure testing. The system shall be pressure tested during
installation prior to evacuation and charging.
5.508.2.5.1 Minimum pressure. The system shall be charged with
regulated dry nitrogen and appropriate tracer gas to bring system
pressure up to 300 psig minimum.
5.508.2.5.2 Leaks. Check the system for leaks, repair any leaks, and
retest for pressure using the same gauge.
5.508.2.5.3 Allowable pressure change. The system shall stand,
unaltered, for 24 hours with no more than a +/- one pound pressure
change from 300 psig, measured with the same gauge.
5.508.2.6 Evacuation. The system shall be evacuated after pressure
testing and prior to charging.
5.508.2.6.1 First vacuum. Pull a system vacuum down to at least 1000
microns (+/- 50 microns), and hold for 30 minutes.
5.508.2.6.2 Second vacuum. Pull second system vacuum to a minimum
of 500 microns and hold for 30 minutes.
5.508.2.6.3 Third vacuum. Pull a third vacuum down to a minimum of
300 microns, and hold for 24 hours with a maximum drift of 100 microns
over a 24-hour period.
Phuong Devries
04/13/17
GALGREEN SIGNATURE DEGLARATIONS
Cirrus Logic
Project Name:
Project Address:
Project Descdption:
19419 Stevens Creek Blvd. Suite 200, Gupertino, CA 95014
Commercial office - Tl of existing shell space,4276 sÍ
Own€r's
SECTION 1 - DESIGN N
Complete alllines of Section I -'Design Verification" and submit the completed checklist (Columns 1 and2) with the
plans and building permit application to the Building Department.
The owner and design professional responsible
certify that the items checked above are hereby
for compliance with CalGreen Standards have revised the plans and
incorporated into the project plans and will be implemented into the
forth in the 2016 California Green Building Standards Code aE
project in with the requirements set
adopted by Cupertino-
2Z 2¡t
GS€ Date
11
's Signature
Print)
of License responsible for GalGreen compliance
CtlRts
54b5-3+4
Name of License Professional responsible for CalGreen compliance (Please Print) Phone
?
Email Address for License responsible for CalG reen com pliance
Complete, sign and submit the competed checklíst, including column 3, together with all original signatures on Section
2 to the Building Department prior to Building Department final inspection.
I have inspected the work and have received sufftcient documentation to verify and certify that the project ídentified
above rras constructed in accordance with tlris Green Building Checklist and in accordance with the requirements of
the 2016 California Green Building Standards Code as adopted by the City of Cupertino.
Signature of License ProfEssional responsible for CalGreen compliance
Name of Ucense Professional responsible for CalGreen compliance (Please Print)
TI
Date
Phone
ance
NTAT¡ON RIFI SECTION 2 - IMP
Page 12 of l2 CalGreen Non-Res Checklist.doc revised 0 I/0 I/20 I 7
Phuong Devries
04/13/17
HasMat_2011.doc revised 03/07/11
PURPOSE
To minimize possible delays that would result for the Fire Department plan review, please complete the
following checklist to determine if an additional level of Hazardous Materials plan review will be
required.
MARK ‘YES’ IF THE PROPOSED SCOPE OF WORK INCLUDE ANY OF THE FOLLOWING?
PLEASE MARK YOUR ANSWER WITH AN ‘X’ IN THE YES OR NO BOX ON THE SIDE
BELOW.
YES NO
1. Use, dispensing, mixing or storage of flammable or combustible liquids or gases,
hazardous materials, etc.
2. Battery back-up rooms or racks.
3. Propane tanks.
4. Gasoline stations with underground tanks.
5. Installation or replacement above ground or underground storage of liquid petroleum
products, liquefied petroleum gases, compressed natural gas, explosives or other
regulated hazardous materials.
6. Gas rooms for dentist, doctors or veterinarians.
7. Generators with back-up diesel or other fuels.
8. Large refrigeration systems.
9. Fuel cell systems.
10. Commercial pool systems.
11. Chemical Storage areas.
12. Flammable liquid storage.
13. Compressed Gases.
14. Dry cleaners.
15. Print Shops.
16. Auto Repair and Auto Body Shops.
17. Research and Development.
For any additional information regarding this checklist, please contact Hazardous Materials Specialist, Santa
Clara County Fire Department, at (408) 378-4010.
HAZARDOUS MATERIALS CHECKLIST
COMMUNITY DEVELOPMENT DEPARTMENT • BUILDING DIVISION
ALBERT SALVADOR, P.E., C.B.O., BUILDING OFFICIAL
10300 TORRE AVENUE • CUPERTINO, CA 95014-3255
(408) 777-3228 • FAX (408) 777-3333 • building@cupertino.org