131301586 HIGH END
DEVELOPMENT
INC. �
January 11, 2016
RE: Main Street Lofts - Grace Waterproofing
South Bay Construction, Inc.
To whom it may concern:
1 3 1 20/'-
FILL
Let this letter serve as verification that as of 01/11/2016, the below areas meet the manufactures system
specifications.
Area Manufacturer System
Below grade walls at Gridline 1, A, 11 Grace SCS System
Elevator pit Grace Preprufe
If you should have any questions or concerns, please contact us at (925) 687-2540.
Th y u,
Shawn Villas or
VP of Construction
5600 Imhoff Dr., Suite E, Concord, CA 94520
Ph: 925-687-2540 / Fax: 925-687-8245
License # 891914
CEL CONSULTING, INC
Product Evaluations - Metallurgy ,
Structural Investigations - Forensics
1/4/2016
City of Cupertino
Albert Salvador
10300 Torre Avenue
Cupertino, CA 95014
RE: Main Street Cupertino Loft Inspection Date: 12/07/15
Residences -Parking Location: Jobsite
19550 Vallco Parkway Inspector: Mike Welter/
Cupertino, CA 95014 Man Huynh
Report #: 151207S -COMP
Permit# 13130158
CEL#: 1030632A
SHOTCRETE PRECONSTRUCTION TEST PANEL COMPRESSION REPORT
On the above date, CEL Consulting's representatives reported to the subject project for the purpose of obtaining
core samples from shotcrete preconstruction test panels for evaluation of reinforcing steel encasement.
The report for visual grading was submitted previously under report #151207S. A copy of the technicians report
for visual grading of the cores has been attached for you convenience.
See attached table #1 for shotcrete core compression results. These tests were requested in addition to testing at
the design strength age.
Please contact the undersigned should you have any questions. --
REVIEWING ENGINEER: Anil Nethisinghe
cy
CC: N0. m m
Sandhill (E) sandhm (E) yr. EXP. 09/30/2016
DNA Design and Architecture (E) South Bay Construction (E)
Cupertino (E) Cupertino (E) �q CIVIL
South Bay Construction, Inc. (E) South Bay Construction (E) �F 4�
Sand Hill Construction Management, LLC. (E) DCI Engineers (E) 0 CALF- ,
All reports are submitted as the confidential property of our clients. Publication of statements, conclusions, or extracts is reserved pending our written approval.
JAN 13 2016
534 23rd Ave. • Oakland, CA 94606-3507 • Tel. 510 436-7626 • FAX 510 434-7719
www.CELConsulting.com
AF
CEL CONSULTING, INC
Shotcrete Nozzleman Qualification
Compression Test Data
Project Name: Main Street Cupertino /Loft Residences Parking
CEL #: 14944,-44, 0 loGY2 -.A
Report #: 151207S -COMP
—2~���wr•'= ���
Sampled By: Mike Welter / Man
Design Strength: 4,000 psi at 28 days Mix #: 8012FSC
Date Cast: 11/30/2015
Date Sampled: 12/7/2015
Date Tested:
Test Age:
Table #1 - Nozzleman Qualifications - Shotcrete Core Compression Data Sheet (ASTM C42)
Core ID
Name of Nozzleman
Average
Diameter
(in)
Average
Capped
Length (in)
Corrected
Compressive
Strength (psi)
Average
Compressive
Strength (psi)
la
Jesus Gonzalez
2.95
5.59
5,310
5,337
1b,
2.96
5.50
5,410
1 c
2.95
5.56
5,290
2a
Alex Gamboa
2.96
5.86
5,440
4,853
2b
2.96
5.39
4,430
2c
2.95
5.39
4,690
3a
Jessis Chavez
2.95
5.62
5,320
5,180
31b
2.96
5.59
4,850
3c
2.95
5.40
5,370
4a
4b
4c
5a
5b
5c
6a
6b
6c
7a
7b
7c
8a
8b
8c
'Testing in accordance with ASTM C 42 and ACI 318.
2AC1 318 requires the average strength of three cores to be at least 85% of the specified strength and no single core strength
less than 75% of the specified strength.
CEL CONSULTING, INC
Product Evaluations - Met a,rgy
Structural Investigations - Forensi,
Shotcrete Nozzleman Qualification
Project Name: Main Street Cupertino Loft Residences Parking
CEL Project #: 10-30632-A Report #: 151207S
Location: 19550 Vallco Parkway, Cupertino, CA IR #:
Date: 12/7/2015 Day: Monday
n Reported to Joe miller with South Bay
0 Qualification panels are 16
thick and representative of the Wall/ Pilaster
Shotcrete mix number 8012FSC with design strength of 4,000 psi at
was shot on 11/30/2015
condition.
28 days
Q Qualification panels were cored to obtain samples for compression testing. Compression test specimens were
returned to the lab and are scheudled for testing on 12/28/2015
0 Cores were graded considering surface areas in excess of the 50 sq/in basis in ACI 506.2 with the following
results. Individual and average core grades must not exceed 3 and 2.5 respectively.
Nozzleman Name
Core "1" Grade
Core "2" Grade
Core "3" Grade
Average Grade
Jesus Gonzalez
1
2
1
1.33
Alex Gamboa
1
1
1
1.00
Jessis Chavez
1
1
1
1.00
0 Based on the evaluation of the cores, the following nozzlemen have demonstrated acceptable workmanship:
Jesus Gonzalez. Alex Gamboa , Jessis Chavez
❑ Based on the evaluation of the cores, the following nozzlemen DO NOT have acceptable workmanship:
❑ Additional Comments:
Signature of Inspector:
Print Name/Title: Mike Welter / Man Huynh
Date: 12/7/2015
534 23rd Ave Oakland CA 94606-3507 • Tel 510 436-7626 • FAX 510 4'4-7-11-j
www. C E LConsulting. corn
k
2001 Crow Canyon Road, Suite 100
San Ramon, CA 94583-5387
CONSOLIDATED ENGINEERING Tel. 925 314-7100 Fax. 925 855-7140
L A B O R A T O R I E S www_ce-labs_com
INSPECTION/TESTING REPORT
Date Of Issue: 1/6/2016
RE: Main Street Cupertino Loft Residences -Parking
Rpt City of Cupertino
To: 10300 Torre Avenue Permit 13130158
Cupertino, CA 95014
CEL# 1030632A
Attn: Albert Salvador
Inspection Date(s): 12/29/2015
Location: Jobsite
Report # 160101Field
Inspector(s): Roger Savedra
On the above date, our representative inspected the referenced project.
Please refer to the attached reports for details and locations of our testing and/or inspection services for the above noted date.
Work inspected was in compliance with approved plans and specifications.
CC: Enclosures (1) Reviewing Engineer: Damon A. Armstrong,
City of Cupertino (P)
DNA Design and Architecture (ER)
South Bay Construction (ER)
Sandhill (ER)
Cupertino (ER)
1
Cupertino (ER)
South Bay Construction, Inc. (ER)
South Bay Construction (ER)
Sand Hill Construction Management, LLC. (ER)
DCI Engineers (ER)
All reports are submitted as the confidential property of our clients. Publications of statements, conclusions, or extracts is revised pending written approval
Lq
G
CONSOLIDATED ENGINEERING
L A B O R A T O R 1 E S
Concrete, Precast and
Reinforcing
Project Name Main Street Cupertino Loft Residences -Parking
CEL Project # 10306A
Project Location 19550 Vallco Parkway, Cupertino, CA 95014
Contractor Largo,South Bay Construction
Date 12/29/2015 Day Tuesday
Reported to: Joe Miller
Inspected rebar placement at:
Form ID 007 Rev.O
DSA File #
DSA Appi #
LEA #
OSHPD # _)
IR # Permit/Appl # 13130158
Company Name: South Bay Construction
Drawing No. S1P2a,S1P2b Detail No. Other
Inspected placement of: ❑ Anchor bolts ❑ Hold-downs ❑ Tie -downs Inspected: ® Cast -in-place ❑ Precast Operations
® Monitored loads for correct mix and proper slump. ❑ Fresh concrete properties report left with IOR
Inspected placing and vibrating of 9 cubic yards of concrete Inspected placing of cubic feet of grout
Performed slump ❑ air entrainment Elunit weight tests
Cast 1 set(s) of ® cylinders ❑ grout cubes Cast ( set(s) of shrinkage beams
Concrete Mix Number: (6512FWRP0 Slumps in tolerance? (`Yes ;No ( N/
Work inspected was: ® Completed ElIn Progress ❑ Pending Approval
WIP Punchlist dated: ID' Non-compliance report dated: ,
❑ was left with contractor ❑ Items were reinspected and: ❑ accepted ❑ See attached ❑ remain in progress
Issues/Problems? ;CYes (*No (Describe below) Notified:
Notes/
Comments:
Rahnr r.nnrrata Plaramant Tvne Structure Bldo./Level Location (Grid Linesl
❑
®
columns
P2 LVL
B/4,6,&7. C/2&6. D/6. F/3
❑
❑
E/6&7
This Work Was INSPECTED IN ACCORDANCE WITH THE REQUIREMENTS OF THE CITY APPROVED DOCUMENTS
The Work Inspected Met THE REQUIREMENTS OF THE �C ITY APPROVED DOCUMENTS
Material Sampling Was PERFORMED IN ACCORDANCE WITH THE (CITY APPROVED DOCUMENTS
Signature of Special Inspector IL Signature 12/29/2015 1:57:09 PM.png Date (12/29/2015 j
Print Name/Title (Roger Savedra
Certification #: 1126697
534 23rd Avenue
Oakland, CA 94606-5307
FED Eh1GWEEF�11`rl �� (510) 436-7626
A.T 6 t a, 6 COMPRESSION TEST REPORT 1--, ,.A_1.h, --
RE: Main Street Cupertino Loft Residences -Parking
Test
Age
Test
Date
City of Cupertino
Dimensions (in)
Diameter X Height
Area
(inz)
Attn: Albert Salvador
i Corr
Factor
Strength
(psi)
10300 Torre Avenue
Cupertino, CA 95014
Permit#
CEL#
13 0 58
11 30632A
08/20/2016
Lab#OCY31462
PLACEMENT DATA
12.57
58940
Placement rXLE;/20Z_6 =
Admixture Type
Cone one end
Sample Date 08/-1 l6``µ
Mix Number
6S12FWRPO
Material Type Concrete Compression Cyl. ASTM C 39
Strength Spec
600 iM@;28 days
Material Supplier STAR
Agg• Size
1/2
Slump Req (in)
Cement Factor
6.5 SK
Placement Location : LevelA to 2-C-olumns yVifh Glosure_Strp
Lab
4,00 X 8.00
SAMPLE DATA
82910
1.00
Set Number i Of 1
Slump Actual (in)
6.5 CASTMrC143
Sample Time 08:10
Air Temp (deg F)
65
Sampled By Aaron Mast
Mix Temp (deg F)
78 CAST1VhClU6:4
Ticket/Truck 5945/24
6480
Cone one end
Mold Type Cylinder
H
Sample Location same as above
4.00 X 8.00
12.57
Comments
Unless otherwise noted, sampled per ASTM C31, capped per`ASTM C R—,,- tested:persASTM-C3
Samples MEET specified 28 DAY strength requirement at 28 DAYS._Ayg 653
Respectfully Submitted:. Wilson Ye, P.E., Laboratory Director
CC:
City of Cupertino (P)
Cupertino (ER)
DCI Engineers (ER)
DNA Design and Architecture (ER)
Placeholder(ER)
South Bay Construction (ER)
Sand Hill Construction Management (ER)
South Bay Construction, Inc. (ER)
SHCM (ER)
CBRE (ER)
All reports are submitted as the confidential property of clients. Publications of statements, conclusions, or extracts is reserved pending our written approval.
Test
Age
Test
Date
Cure
Type
Dimensions (in)
Diameter X Height
Area
(inz)
Max
Load(lb)
i Corr
Factor
Strength
(psi)
Fracture
Type -
1
7
08/20/2016
Lab
4.00 X 8.00
12.57
58940
1.00
4690
Cone one end
2
28
09/10/2016
Lab
4.00 X 8.00
12.57
81770
1.00
6510
Cone one end
3
28
09/10/2016
Lab
4,00 X 8.00
12.57
82910
1.00
6600
Side fracture at end
4
28
09/10/2016
Lab
4.00 X 8.00
12.57
81410
1.00
6480
Cone one end
5
H
Lab
4.00 X 8.00
12.57
Unless otherwise noted, sampled per ASTM C31, capped per`ASTM C R—,,- tested:persASTM-C3
Samples MEET specified 28 DAY strength requirement at 28 DAYS._Ayg 653
Respectfully Submitted:. Wilson Ye, P.E., Laboratory Director
CC:
City of Cupertino (P)
Cupertino (ER)
DCI Engineers (ER)
DNA Design and Architecture (ER)
Placeholder(ER)
South Bay Construction (ER)
Sand Hill Construction Management (ER)
South Bay Construction, Inc. (ER)
SHCM (ER)
CBRE (ER)
All reports are submitted as the confidential property of clients. Publications of statements, conclusions, or extracts is reserved pending our written approval.
G
COMPRESSION TEST REPORT
Date Of Issue: -9/14/2016 _.--
RE: Main Street Cupeftin Loft Residences -Parking
City of Cupertino
Attn All, rt Sal d
FILE 534 23rd Avenue
Oakland, CA 94606-5307
(510) 436-7626
/ www nm
ce-la s.
e va or
10300 Torre Avenue
Permit# 1a 120158j
CEL# 1 6 1A
Cupertino, CA 95014
Cure
Type
Dimensions (in)
Diameter X Height
Lab#10C 29`%
PLACEMENT DATA
Corr
Factor
Placement 68%13%2`016_
Admixture Type
Sample Date L0`8/13129W
Mix Number 6Sl2FWRPO
Material Type yp Concrete Compression Cyl. ASTM C 39
Strength. Spec 600.0 sp @2$ days
Material Supplier STAR
Agg. Size 1"
Slump Req (in) 3-5
Cement Factor 6.5 SK
Placement Location Level 2 Podium A to H 7 to 11 Elevated Deck
Side fracture at end
SAMPLE DATA
3
Set Number 1 Of 1
Slump Actual (in) 5 IASTM.C_L43 -
Sample Time 11:12
Air Temp (deg F) 72
Sampled By Aaron Mast
Mix Temp (deg F) 80 XS -TM: -C-1064
Ticket/Truck 532039/35
.Side fracture at end
Mold Type Cylinder
9
Sample Location Level 2-podum_elevatecLdeck_@_K-8..5'
Lab
Comments
12.57
Unless otherwise noted, sampled per A� STM C3-1, capped per ASTM C1231, tested per ASTM C39
Samples MEET specified 28 DAY strength requirement At'2'8-13AYS.-Avg 7780;
Respectfully Submitted: Wilson Ye, P.E., Laboratory Director
CC:
City of Cupertino (P)
Cupertino (ER)
DCI Engineers (ER)
DNA Design and Architecture (ER)
Placeholder(ER)
South Bay Construction (ER)
Sand Hill Construction Management (ER)
South Bay Construction, Inc. (ER)
SHCM (ER)
CBRE (ER)
All reports are submitted as the confidential property of clients. Publications of statements, conclusions, or extracts is reserved pending our written approval..
Test
Age
Test
Date `
Cure
Type
Dimensions (in)
Diameter X Height
Area
(W)
Max
Load(lb)
Corr
Factor
Strength
(psi)
Fracture
Type
1
3
08/16/2016
Lab
4.00 X 8.00
12.57
64720
1.00
5150
Side fracture at end
2
3
08/16/2016
Lab
4.00 X 8.00
12.57
65280
1.00
5190
.Side fracture at end
3
9
08/22/2016
Lab
4.00 X 8.00
12.57
82440
1.00
6560
Cone one end
4
28
09/10/2016
Lab
4.00 X 8.00
12.57
97850
1.00
7780
Side fracture at end
5
28
09/10/2016
Lab
4.00 X 8.00
12.57
98320
1.00
7820
Columnar
6
28
09/10/2016
Lab
4.00 X 8.00
12.57
97180
1.00
7730
Cone one end
7
H
Lab
4.00 X 8.00
12.57
Unless otherwise noted, sampled per A� STM C3-1, capped per ASTM C1231, tested per ASTM C39
Samples MEET specified 28 DAY strength requirement At'2'8-13AYS.-Avg 7780;
Respectfully Submitted: Wilson Ye, P.E., Laboratory Director
CC:
City of Cupertino (P)
Cupertino (ER)
DCI Engineers (ER)
DNA Design and Architecture (ER)
Placeholder(ER)
South Bay Construction (ER)
Sand Hill Construction Management (ER)
South Bay Construction, Inc. (ER)
SHCM (ER)
CBRE (ER)
All reports are submitted as the confidential property of clients. Publications of statements, conclusions, or extracts is reserved pending our written approval..
All reports are submitted as the confidential property of our clients. Publication of statements, conclusions, or extracts is reserved pending our written approval.
534 23rd Avenue
Oakland, CA 94606-5307
CONSOLIDATED ENGINEERING
(510) 436-7626
L A B O R A T O R I E S
COMPRESSION
TEST REPORT
DATE OF ISSUE: WOr
RPT TO: City of Cupertino
RE: Main Street Cupertino Loft Residences -Parking
10300 Torre Avenue
19550 Vallco Parkway
Cupertino, CA 95014
Cupertino, CA 95014
ATTN: Albert Salvador
Permit#: 13130158
tional#:
Lab #: 020685
PLACEMENT DATA
Placement #: 4
Admixture type: poly997
Placement date: � . -';
Mix Number 6512FWRPO
Sample date: 1- @9T, 5
Strength Spec:
Total sets: 1
Agg. Size/Src: 1/2" /
Material type: Concrete Compression Cyl. ASTM C 39
Cement factor: 6.50 sack
Material Supplier: STAR
Slump spec: 6.00 in
SET DATA
Set number: 1 of I.
Slump: 7.50 in ASTM C143
Sample time: 14:02
Air temp: 70 deg F
Sampled by: Art Farnsworth
Mix temp: 75 deg F ASTM C1064
Ticket/Truck
Mold type.: CYL.
Placement Location Columns, P2 to LL lines 2-5, E5, F5
Sample Location: Same as placement location
Comments:
Cylinder
Test
Test
Cure
Dimensions (in)
Area
Max Load
Corr I
Strength
Fracture
#
Age
Date
Type
Diameter X Height
(in')
(lb)
Factor
(psi)
Type
020685A 7 12/16/15 Lab 4.0,0 X 8.00
12.57 51,1.90 1.00 `'de fracture at end
.020685B 28 01/06/16 Lab 4.00 X 8.00
12.57 70,710 1.00 �D�ouble side fracture
020685C 28 01/06/16 Lab 4.00 )(9.00
12.57 74,190 1.00 3�'c�t);:,Columnar
020685D ; 56 02/03/16 Lab 4.00 X 8.00
12.57 0 1.00 0
,020685E, 56 02/03/16 Lab 4.00• X 8.00
12.57 0 1.00 0
specified 28 DAY strength requirement at 28 DAYS. Avg=5770
Unless otherwise noted, samples tested in accordance with ASTM C39
RESPECTFULLY SUBMITTED: Consolidated Engineering, Greg D. LeRoy, PE, LAB MANAGER
CC:City. of Cupertino - Albert Salvador
E -Reports placeholder -
All reports are submitted as the confidential property of our clients. Publication of statements, conclusions, or extracts is reserved pending our written approval.
,_, .,,,, 1cii
2001 Crow Canyon Road,Suite 100
San Ramon,CA 94583-5387
CONSOLIDATED ENCAINEERING Tel.925 314-7100 Fax.925 855-7140
L A 0 0 1 A7011100 www.ce-labs.com
INSPECTION/TESTING REPORT
Date Of Issue: 10/27/2017—
RE. Main Street Cupertino Loft Residences-Parking
Rpt City of Cupertino
To: 10300 Torre Avenue
Cupertino,CA 95014 1 \r 11 O !!! Permit/T312015,8
7
\) (X.'‘ CEL# r1030632A_
Attn.Albert Salvador
Inspection Date(s): 0/19/2017 iff
Location: Jobsite _
_ 12eport# 171020Fiel(
Inspector(s): Robert Bottari 1_ -- _.
SHERA WALL NAILING
On the above date,our representative inspected the referenced project.
Please refer to the attached reports for details and locations of our inspection services for the above noted date.
Work inspected was in compliance with approved plans and specifications.
I
RECEIVE
OCT 0207
BY_A1141—...
CC: Enclosures(2) Reviewing Engineer: Dan Allopenna,PE
CBRE(ER) ? CBRE(ER)
SHCM(ER)
/;; e 419 74411 .\\
DNA Design and Architecture(ER)
City of Cupertino(P)
South Bay Construction(ER) 'f'% --°
Sand Hill Construction Management(ER) r , tia,Ci97442 )
Cupertino(ER)
Cupertino(ER) OA
;
South Bay Construction,Inc.(ER) Ti4, OM ,-41
South Bay Construction(ER) Opp
Sand Hill Construction Management(ER)
DCI Engineers(ER)
All reports are submitted as the confidential property of our clients.Publications of statements,conclusions,or extracts is revised pending written approval.
i1
C t s
m
>
m n
Q 3 sm
T U t) R
O n 8 t r
(pc_
— c c
Z z_ °) m
l c m mc s° H t z
as al a 0 A a id w w co co
MI .� a E `° R W w
L -
Q -o-',,, pm m m m
U Uco a w ... w a.
a Zii L) m and
a a a a p p
,--
0 0 ,--,
O ® El El O O O O v v 0 W W
N N N N .O+ w .O+ O W -i,.
T
0 W N N' N N Cl)
0 m m m
Om N d. m d m O O O CO coa
(I) n CO a a a a o ® oEE aa 0.1- a
oo
VN V V U U cccC �
MIMI MJ N O O O O O'O O O W- W
N NNNN NNNN 2
(..-�`J� � n
T T T P P T T P �--
# z Q m d d m m 0 ® m O O
a W d SZ ~ >� >, T >. >. a A > CO
W Q J g Q 2 2 2 2 2 2 2 2
■� < < Cl) s— �� w w
mimi o co O € v c.E 2 2
r� 0 m m_ W W
CO •
Q- LL Z P T T P P T T P 5-y /3y
a �0 L'.,
Z W W g`:0
0 C
) m W W CO o
isi
W Z n
C a d' 6 6 d' iD m W H 1=- m H
C _ p.l O
rn a) H
`� O N CO
2) ..
C in
O m to fA rn N N CO. CO CO W O. a: #k
a� a 0
L - u) ~T. N N N N N N N N Z n O
r T T P r T P r Q C -
CC C O m Z `�
CDW Y m
L
iD m Z
I—)
CU I i m00O
V V V aW
a ° 13 , , a Voo
Y 0 RC
mF • `d 'm '
ce o m u)
r ® ® ® z'5' g O T
U • Q. a s
p t
Z14a 0 V 0 J - M 0 0 0) a
in 0
in in in
ELI® 5CIli a L o L M + t +
- .'
4 2 2 2 :cs
CO m ,' 0 , r N M 0
tJ C O 2 'Of! co co co co R 06 M CO 1.,.' C
W "16 M O � N N N N
O 01 O AN N. is. O
C1C0 5
c ot-si c4
-5 m , 2 :5 .1 .0 . c c c c z - ..c m
Z O cmi 0 0 In N cO U, .4 D > > > co H _c
•2. O CC.
fp $ a- -' > m
• J U0 m E
o d U O J N. M of 1f)' M e1' of et 0
O
L
Q
U
M C
o Cl)• Cl)
0 Q N.
E C0 co) v Z
0 G Ccs) Cl)
!1 N N c
Cl) •Cl) Z N co
72 Q a z Z
ami .77 c W W
s D D
a)
•c a �,. L U 0
-. ____,_._-"--C---
_ /fie _4a e D_ n D O
ice'"'._ o
■—.
cc rt
— ,, -, o_ a
'V Q Q
ill CD
CO a
Cl/ c }
0o F- }
0
f.1 0 V U
-'
co N N :.W W
kump, ,�.�i _ = 'co rI I
ti
4k * 4k 4k 4t Z N . I- F
a� >. .- OO
LL Q J -� Q .~.. _ co co
•O C.S W W
•r N N
CD c rn CL CL
a O O
R
M CL
Nem v -47,
o_ W W mWZ H H ,'t
CV co . I— m
L (Q
LU re
L •CH N z0 u�i C
o
aCl)
_
CC o
_ — Z ._
0
To _ `•
o U N U
N co
A Z COw
o
c V p
CO W
to C0 co
Lu c
v Z
CC c R a
ICO
UP. 12 c co 1 co
4.
rN
Q
� 0
0. <0 *k., g `o a� N
ti o
o , a
z •o o w
a o H
Z J (J V
04 CL 0