Loading...
15050004 (3) CITY OF CUPERTINO BUILDING PERMIT BUILDING ADDRESS: 10591 CASTINE AVE CONTRACTOR:PATRICK POWERS PERMIT NO: 15050004 PLUMBING OWNER'S NAME: SHAPIRO LAWRENCE AND MARY E P O BOX 5427 DATE ISSUED:05/01/2015 OWNER'S PHONE: 4087490717 REDWOOD CITY,CA 94063 PHONE NO:(650)537-1263 ❑ LICENSED CONTRACTOR'S DECLARATION JOB DESCRIPTION:RESIDENTIAL ❑ COMMERCIAL ❑ ,LL REMODEL(E)90 S.F.MASTER BATH INCLUDING /r License Class C�'3(,Lic.# S-7(1 REPLACING THE 2(E)WINDOWS,LIKE FOR LIKE Contractor l21 e*-R�� FabDate -5-, / lS I hereby affirm that I am lic ad nder the prlobvisions of Chapter 9 (commencing with Section 7000)of Division 3 of the Business&Professions Code and that my license is in full force and effect. I hereby affirm under penalty of perjury one of the following two declarations: I have and will maintain a certificate of consent to self-insure for Worker's Compensation,as provided for by Section 3700 of the Labor Code,for the performance of the work for which this permit is issued. Sq.Ft Floor Area: Valuation:$28000 I have and will maintain Worker's Compensation Insurance,as provided for by Section 3700 of the Labor Code,for the performance of the work for which this APN Number:32644032.00 Occupancy Type: permit is issued. APPLICANT CERTIFICATION I certify that I have read this application and state that the above information is PERMIT EXPIRES IF WORK IS NOT STARTED correct.I agree to comply with all city and county ordinances and state laws relating WITHIN 180 DAYS OF P IT ISSUANCE OR to building construction,and hereby authorize representatives of this city to enter upon the above mentioned property for inspection purposes. (We)agree to save 180 DAY FRO A.LLED INSPECTION. indemnify and keep harmless the City of Cupertino against liabilities,judgments, costs,and expenses which may accrue against said City in consequence of the granting of this permit. Additionally,the applicant understands and will comply Iss ate: with all non-point source regulations per the Cupertino Municipal Code,Section 918. RE-ROOFS: Signature Date✓� / / All roofs shall be inspected prior to any roofing material being installed.If a roof is installed without first obtaining an inspection,I agree to remove all new materials for inspection. ❑ OWNER-BUILDER DECLARATION I hereby affirm that I am exempt from the Contractor's License Law for one of Signature of Applicant: Date: the following two reasons: ALL ROOF COVERINGS TO BE CLASS"A"OR BETTER I,as owner of the property,or my employees with wages as their sole compensation, will do the work,and the structure is not intended or offered for sale(Sec.7044, Business&Professions Code) I,as owner of the property,am exclusively contracting with licensed contractors to HAZARDOUS MATERIALS DISCLOSURE construct the project(Sec.7044,Business&Professions Code). I have read the hazardous materials requirements under Chapter 6.95 of the California Health&Safety Code,Sections 25505,25533,and 25534. I will I hereby affirm under penalty of perjury one of the following three maintain compliance with the Cupertino Municipal Code,Chapter 9.12 and the declarations: Health&Safety Code,Section 25532(a)should I store or handle hazardous I have and will maintain a Certificate of Consent to self-insure for Worker's material. Additionally,should I use equipment or devices which emit hazardous Compensation,as provided for by Section 3700 of the Labor Code,for the air contaminants as defined by the Bay Area Air Quality Management District I performance of the work for which this permit is issued. will maintain compliance with the Cupertino Municipal Code,Chapter 9.12 and I have and will maintain Worker's Compensation Insurance,as provided for by the Health&Safety Code,Secti 5533,and 25534. Section 3700 of the Labor Code,for the performance of the work for which this �' permit is issued. Owner or authorized agent: t���`� Date:,g)/ I certify that in the performance of the work for which this permit is issued,I shall not employ any person in any manner so as to become subject to the Worker's Compensation laws of California. If,after making this certificate of exemption,I CONSTRUCTION LENDING AGENCY become subject to the Worker's Compensation provisions of the Labor Code,I must I hereby affirm that there is a construction lending agency for the performance of forthwith comply with such provisions or this permit shall be deemed revoked. work's for which this permit is issued(Sec.3097,Civ C.) Lender's Name APPLICANT CERTIFICATION Lender's Address I certify that I have read this application and state that the above information is correct.I agree to comply with all city and county ordinances and state laws relating to building construction,and hereby authorize representatives of this city to enter upon the above mentioned property for inspection purposes.(We)agree to save ARCHITECT'S DECLARATION indemnify and keep harmless the City of Cupertino against liabilities,judgments, costs,and expenses which may accrue against said City in consequence of the I understand my plans shall be used as public records. granting of this permit.Additionally,the applicant understands and will comply with all non-point source regulations per the Cupertino Municipal Code,Section Licensed Professional 9 18. Signature Date CONSTRUCTION PERMIT APPLICATION D00 COMMUNITY DEVELOPMENT DEPARTMENT-BUILDING DIVISION 10300 TORRE AVENUE-CUPERTINO, CA 95014-3255 (408)777-3228-FAX(408)777-3333-building0-cupertino.ora CLIP RT1NO \ ❑NEW CONSTRUCTION ❑ ADDITION ❑ ALTERATION/TI ❑ REVISION/DEFERRED ORIGINAL PERM✓✓IIT# PROJECT ADS / /�,� t/ �� APN# ( I i- c., OWNERN E C PHONE E-MAIL STREE ADDR S CITY, STATE,ZIP FAX CONTACT NAMEPHONE E-MAIL q.r.RI G Se ,5 STRF.T ADDS CIT STA E,ZIP 466 3 FAX ❑OWNER ❑ OWNER-BUILDER ❑ OWNER AGENT CONTRACTOR ❑CONTRACTOR AGENT ❑ ARCHITECT ❑ENGINEER ❑ DEVELOPER ❑TENANT C CTOR N LICENSE NUUMBER_ � LICF�[�E TYPE BUS.LIC# ^2f ea 0 Lc9 b a1D E-MAIL FAX ,�N'�'E STREE, RES �7 C ST © l/©6 }"I��—�3 7 t 17 ✓vv j j fL�� ARCHITECT/ENGINEER NAME LICENSE NUMBER BUS.LIC# COMPANY NAME E-MAIL FAX STREET ADDRESS CITY,STATE,ZIP PHONE DESCRIPTION OF WORK /1_5,, _ SA �Q EXISTING USE PROPOSED USE CONSTR.TYPE #STORIES USE TYPE OCC. SQ.FT. VALUATION($) EXISTG NEW FLOOR DEMO TOTAL AREA AREA AREA NET AREA BATHROOM KITCHEN OTHER REMODEL ARE - /1 S MODEL AREA REMODEL AREA PORCH AREA DECK AREA TOTAL DECK/PORCH AREA GARAGE AREA: Ll❑DETACCHH #DWELLING UNITS: IS A SECOND UN rr ❑YES SECOND STORY ❑YES BEING ADDED? ❑NO ADDITION? []NO PRE-APPLICATION ❑YES IF YES,PROVIDE COPY OF IS THE BLDG AN ❑YES TOTAL VALUATION: PLANNING ADPL# ❑NO PLANNING APPROVAL LETTER EICHLER HOME? ❑N � By my signature below,I certify to each of the following: I am the property owner or authorized agent to act o " h perry owner's behalf. I have read this application and the information I ha provided is correct. I have read the Description of Work and verify it is accurate. I agree to comply with all applicable local ordinances and state laws relating b ild' construction. I authorize representatives of Cupertino to enter the abov Id tified property for inspection purposes. Signature of Applicant/Agent: Date c`7r / / SUPPLEMENTAL INFORMATION REQUIRED t `prrc >�Cit� rE RvuTTNsLr _New SFD or Multifamily dwellings: Apply for demolition permit for © ot�ER4ffIE COI7NTER B>ILDING�"PLAN AVWW existing building(s). Demolition permit is required prior to issuance of building © p A1v11, NG.I'LANI�tiWk permit for new building. _Commercial Bldgs: Provide a completed Hazardous Materials Disclosure ; © C'fIJBLIC WORttS G, form if any Hazardous Materials are being used as part of this project. ,LARGE, ] Wit NO _Copy of Planning Approval Letter or Meeting with Planning prior toy p gj 1N ARY 9Bwi�It"TSrRII x submittal of Building Permit application. w:- LD V$VIRONMENTAL BldgApp_201 Ldoc revised 06/21/11 CITY OF CUPERTINO FEE ESTIMATOR—BUILDING DIVISION ADDRESS: 10591 CASTINE AVE DATE: 05/01/2015 REVIEWED BY: MELISSA APN: 326 44 032 BP#: *VALUATION: 1$28,000 *PERMIT TYPE: Building Permit PLAN CHECK TYPE: Alteration / Repair PRIMARY SFD or Du lex PENTAMATION 1 R3SFDREM USE: p PERMIT TYPE: WORK REMODEL E 90 S.F. MASTER BATH INCLUDING REPLACING THE 2 E WINDOWS LIKE FOR SCOPE LIKE M.- 0 F 111111 -- -T'- ` ;11ech. War?Check FlumE Plan Check Elec, Plan Check iLler.:h. Permit Fee: Flumb.Permit Fee: 1;4lee. Permit Fee (?tf er.Wec h. havi Other Plumb Imp. Li 011WF lsiec.Insp. F1 I _Lleclx.Insp. Fee: Plumb. hasp. Fee: Elec_Inso. Fee: NOTE:This estimate does not include fees due to other Departments(i.e.Planning,Public Works,Fire,Sanitary Sewer District,School District,eta). Theseees are based on the prelimina information available and are only an estimate Contact the Dept-for addn7 info. FEE ITEMS (Fee Resolution 11-053 ff. 7/1/132 FEE QTY/FEE MISC ITEMS Plan Check Fee: $0.00 90 s.f. Remodel,Bath(<=300 sf) Suppl.PC Fee: (E) Reg. 0 OT 0.0 hrs $0.00 $645.00 1REMRESBAT PME Plan Check: $0.00 Permit Fee: $0.00 Suppl. Insp.Fee-.(D Reg. ® OT 0,0 hrs $0.00 PME Unit Fee: $0.00 PME Permit Fee: $0.00 Construction Tax: Administrative Fee: 0 Work Without Permit? ® Yes (F) No $0.00 G Advanced Planning Fee: $0.00 Select a Non-Residential E) Building or Structure 0 Travel 1)c�c�urra�;nlatic>Yr Fees: � Strong Motion Fee: IBSEISMICR $3.64 Select an Administrative Item Bldg Stds Commission Fee: IBCBSC $2.00 4 a $5.64 $645.00 t��� $650.64 ". _.. Revised: 04101/2015 Rev*sed 2/6/15 SCOPE OF JOB Remodel master bath. 0 NOTES (E) = Existing 41* (N) = New �,CO Master Bath o o 1. Demo Bathroom down to studs. WP = Water Proof VIII :2 C11 2. Install blocking for grab bars in shower. 4 o 3. Douglas fir lumber to be used as needed. EXISTING WALL U) U "' 4. Prepare floor to except Tile Redi barrier free shower pan with righ hand drain. C ao 5. R-13 inslulation at erterior walls and R-30 at ceiling, R-19 floor. N0 EW WALL ; o 6. Pressure balance or thermostatic shower valve as per code requirement. .� LO 7 .Shower Enclosure tempeard glass. 0 = OUTLET L 8. Dura sheild board, cement board or mildew gypsum board will be used in tub and shower walls and regular gypsum in all other areas GF� = OUTLET � CO gypsum board in dry area. COMMUNITY DEVELOPMENT DEPARTMENT GOUND FAULT INTERUPTER 9. Tile will be used in Shower walls shower pan and floor. BUILDING DIVI:1&14 - CUPERTINO = LIGHT 10. Install new granite counter top with 2 undermount 17" x 14" bowl . APPROVED This set of plans and specifications NIUST be kept at the = RECESS LIGHT 4" � 11.Install exiting mirror. job site during corstruction. It is unlawful to make any o 12.Install 1 medicine cabinets and 2 mirrors. changes or alteratio o, same, car to deviate - SINGLE POLE SWITCH U 0) 13. Install grab bars. therefrom, without prov am the Building Official. > ti 14. New 2'-8" x 6'-8" interior door to match existing. The Stamping o is plan d -pecificat ons SHALL NOT = EXHAUST FAN a� w Q be held to rmit or t e prova of.the violation ® of any visions a e or State Law. Cl) Co Plumbing BY CARBON MONOXIDE E LO 1.1. Install new1.28 gpf toilet. PERMIT>r oo O CD � a' 2 .Shower heads shall have a water flow not to exceed 2.0 gpm. L °' LO U 3. Lavatory Faucets shall have a water flow not to exceed 1.8 gpm. SD = SMOKE DETECTOR 'Q, 0 0 CU 4.Shower stall shall have a clear interior finish area of 7.1 sq.ft. and be able to acommodate a minimum 30" circle at the threshld level. a 5. The maximum hot water temperature discharging from the bathtub filler, shower 0 shall be limited to 120 degrees Fahernheit. The water heater thermostat shall not be x considered a control for meeting the provision. �F 6. A 30" INDEX,clear width for the water closet and 24" clearance in front of water closet. �, �Fo 414y �,;a�✓,<5 Electrical any ��oF, ®� � O Cn 1. 20 amp breaker dedicated to gfi outlets as per code requirement A - 1 NOTES CIO �� ca m 2. Occupant sensor Light switch for incandescent light fixtures Zi,9 as per code requirement. A - 2 EXISTING LAYOUT 3. Install new light over vanity. A - 3 NEW LAYOUT 4. 4 of aluminum recess light new construction IC-AIR-TITS housing with Led lights. Drawn By: 5. 4" led recess light water proof in shower. A - 4 ELECTRICAL - MECHANICAL Ana Powers 6. Install carbon monoxide in hall and smoke detector in all bedrooms and hall. A - 5 ELEVATION State: 7. Towel warmer to be installed on gfi circuit with programalble timer. 4/30/15 Mechanical 1. Install new Panasonic exhaust fan with 60 minute timer. A-1 Y VI r/�f \V 0 m 0 0 3 4' 8'-311 R 7768 2W ACO N ,- —� j `° N � h z,� N O O O D N U) O CD m rn o0 A 62421 T 62 1RT 62421 N e I I o 0 I � I ese21 —J D s� 31-311--+2'-6" 3'-4" '7 177 ID 2 P ps .�A I 0 Existing Plumbing Studio R �' �' Shapiro Residence CD rn ,� `D2265 Old Middlefield Way D .C° Master Bath Maryelen & Lawrence Mountain View, Ca 94043 10591 Castine Ave Floor Plan 650 938-4502 N Cupertino, Ca 95014 408 -749-0717 Reymsed 2/6/15 (N)3'-6"x 2'-0" XO and OX Milgard White Vinyl-Tempered Glass (+7 Obsucure O (N)Tile tub walls (N)Pressure Balance Valve 2 rows and front f skirt (N)Enclosure Clear Tempered Glass4-0 CV 20'-10" a U LO + 10'-4 1 " (N) ile shower walls to ceiling M (E)Window 9_g + 5' 5'-4 1/2" � O 11 (E)Window 10 E O c}a c� LO CC0 r (E)Closet — _ N G ° 06N M CO ti CO (E)closet Ali = (N)Master Bath - = O 00 (E)Mas r Closet a) 9 9 (E)Hall Bath N �. (N)Door GF ^' V ti 2-8 x 8-8 < O (E)Master Bedroom CO •(/� CU cl I J 4.., (E)Closet CO °ls U o c O a� w 4'-2"�H�7' 3' (N)Tile Floor L � �0 U �� oo CIO CC o (E)Doo (N)Vanity with (E)Hall ( )1.28 gpf Toilet G stone counter top lu oval under mount sinks U CL U /(E) Sliding door T' C _M L L Z U _O f �, T//VO P4 Y ° 'e'7t Drawn By: Ana Powers Scale:_ 1/411 = 1'-011 Date: 2/6/15 Page A - 3 Revised 2/6/15 O CO � N 20'-10" I + 10'-4 1/2" 5'�� � 3 CO N CO 91_911 + 5' 5'-4 1/2.l g > rn r CD E O m (0 (E)Closet �_Rll — (N(Exhaust fan with _ N .1'-0 2" minute timer 1'-0 1/2 Or) (E)Closet Towel warmer to — 3' 9 1/ 31-91 11be on GFI and — _ r11 0 programable timer (poo U (E)Mas r Closet (E)Hall Bath N r 0 11- 1/2" GF CD> ti (L) QCO L (E)Master Bedroom M •Cn 3 C t ^' (E)Closet ° ° M M NW J N GF Of co N O r LO � � CD ® Imo—7' ® iE - � (E)Hall Q U T 06 5 CU — •(� � mvl` N L- •L Rf CUPERTINO U U Building oer p'tment CU C W G '- MAY 01 2015 ':D '=OR CODE CC)MPl_LAINGC Drawn By: 4 'awed By: Ana Powers Scale: 1/411 = 1'-0" Date: 4/30/15 Page A -4 I N ID rr p oBOB � / N 9 I Q2 N w 0 m v m m w w ro m m 3 °: v 0 0 w 0 m v S Ob 1 ' 1 iLl OL o n -c C2 m 0 0 g 7 , ;; m m� go o � N g New Shapiro Residence Plumbing Studio (D Ma elen & Lawrence 2265 Old Middlefield Wa D W Master Bath ry y 10591 Castine Ave Mountain View, Ca 94043 cn "' Elevation Cupertino, Ca 95014 408 -749-0717 650 938-4502