Loading...
15070236V CITY OF CUPERTINO BUILDING PERMIT BUILDING ADDRESS: 10421 LANSDALE AVE CONTRACTOR: AIR QUALITY HEATING PERMIT NO: 15070236 & AIR OWNER'S NAME: XU WEN AND FANG HAI 720 NORTHRUP ST DATE ISSUED: 07/31/2015 OWNER'S PHONE: 6502231922 SAN JOSE, CA 95126 PHONE NO: (408)293-7138 LICENSED CONTRACTOR'S DECLARATION JOB DESCRIPTION: RESIDENTIAL E] COMMERCIAL INSTALL (N) A/C UNIT IN REAR YARD AREA License Class Z�ALic.# / Contractor Date 1 hereby a rm t t I am licensed under the provisions of hapter 9 (commencing with Section 7000) of Division 3 of the Business & Professions Code and that my license is in full force and effect. I hereby affirm under penalty of perjury one of the following two declarations: I have and will maintain a certificate of consent to self -insure for Worker's Compensation, as provided for by Section 3700 of the Labor Code, for the Sq. Ft Floor Area: aluation: S4000 -performance of the work for which this permit is issued. I have and will maintain Worker's Compensation Insurance, as provided for by Section 3700 of the Labor Code, for the performance of the work for which this V'N Number: 36911006.00 Occupancc Type: permit is issued. APPLICANT CERTIFICATION I certify that I have read this application and state that the above information is PERMIT EXPIRES IF WORK IS NOT STARTED correct. I agree to comply with all city and county ordinances and state laws relating WITHIN 180 DAY T ISSUANCE OR to building construction, and hereby authorize representatives of this city to enter upon the above mentioned property for inspection purposes. (We) agree to save 180 DA ED INSPECTION. indemnify and keep harmless the City of Cupertino against liabilities, judgments, — - - costs, and expenses which may accrue against said City in consequence of theJ granting of this permit. Additionally, the applicant understands and will comply Issued b _ - llate: with all non -point sou ce regulations per the Cupertino Municipal Cod Section 9.18. RE -ROOFS: Signature Date All roofs shall be inspected prior to any roofing material being installed. If a roof is installed without first obtaining an inspection, I agree to remove all new materials for inspection. ❑ OWNER -BUILDER DECLARATION Signature of Applicant: Date: 1 hereby affirm that I am exempt from the Contractor's License Law for one of - the following two reasons: ALL ROOF COVERINGS TO BE CLASS "A" OR BETTER I, as owner of the property, or my employees with wages as their sole compensation, will do the work, and the structure is not intended or offered for sale (Sec.7044, Business & Professions Code) 1, as owner of the property, am exclusively contracting with licensed contractors to HAZARDOUS MATERIALS DISCLOSURE construct the project (Sec.7044, Business & Professions Code). 1 have read the hazardous materials requirements under Chapter 6.95 of the California Health & Safety Code, Sections 25505, 25533, and 25534. 1 will 1 hereby affirm under penalty of perjury one of the following three maintain compliance with the Cupertino Municipal Code, Chapter 9.12 and the declarations: Health & Safety Code, Section 25532(a) should I store or handle hazardous I have and will maintain a Certificate of Consent to self -insure for Worker's material. Additionally, should I use equipment or devices which emit hazardous Compensation, as provided for by Section 3700 of the Labor Code, for the air contaminants as defined by the Bay Area Air Quality Management District I performance of the work for which this permit is issued. will maintain compliance with the Cupertino Municipal Code, Chapter 9.12 and I have and will maintain Worker's Compensation Insurance, as provided for by the Health & Safety Code, Sections 2. 05, 25533, and 25534. Section 3700 of the Labor Code, for the performance of the work for which this permit is issued. Owner or authorized agent: � Date: I certify that in the performance of the work for which this permit is issued, I shall not employ any person in any manner so as to become subject to the Worker's Compensation laws of California. If, after making this certificate of exemption, I CONSTRUCTION LENDING AGENCY become subject to the Worker's Compensation provisions of the Labor Code, I must I hereby affirm that there is a construction lending agency for the performance of forthwith comply with such provisions or this permit shall be deemed revoked. work's for which this permit is issued (Sec. 3097, Civ C.) Lender's Name APPLICANT CERTIFICATION Lender's Address I certify that I have read this application and state that the above information is correct. I agree to comply with all city and county ordinances and state laws relating to building construction, and hereby authorize representatives of this city to enter upon the above mentioned property for inspection purposes. (We) agree to save indemnify and keep harmless the City of Cupertino against liabilities, judgments, ARCHITECT'S DECLARATION costs, and expenses which may accrue against said City in consequence of the I understand my plans shall be used as public records. granting of this permit. Additionally, the applicant understands and will comply with all non -point source regulations per the Cupertino Municipal Code, Section Licensed Professional 9.18. Signature Date GENERAL PERMIT APPLICATION M E FPA COMMUNITY DEVELOPMENT DEPARTMENT • BUILDING DIVISION 10300 TORRE AVENUE - CUPERTINO, CA 95014-3255 Amok Anah, C 5 CUPERTINO IL IM (408) 777-3228 • FAX (408) 777-3333 • buildino(d)CUDertinO.OrQ l�-0 H02-lz 1 %no ❑ PLUI`m1NG ❑ MECHANICAL ELECTRICAL ❑ AQISC.ELLANEOUS PROTECT ADDRESS% r 1 `N f �/ i �J&ZL- OVJNMRNAME STREET ADDRESS L + ,I / I yaj/ �N � /'' .� P Tv — !n E-WIAIL j ITY, STpTr //_ - � FAX CONTACT NAMEP O E E-14AIL STREET ADDRESS ^ CITY, ST.A ,ZIP FAX ❑ OR?.iR ❑ oAN--R--B/L(JTIIDEER ❑ ONVNERAGiNT ❑ CON-MICTOR ❑ CON7RACTORAGENT ❑ ARC-r'SECT ❑ ENGL'.rER ❑ DEItLOPER ❑ TEKXT CONTRACTORNAMELICENSE NUMBER LICENSE TYPE VM BUS. LIC # COMPANY NAME - _ _ / E-MAIL 4174 PO � Ad; F STREET ADDRESS CITY, STATE IP PHOA / O ARCHITECTFENGIKEER N.A1,4E LICENSENUMBER BUS. LIC n COMPANY NAME E-MAIL FAX STREET ADDRESS CITY, STATE, ZIP PHONE USE OF ❑ SFD or DUPLEX B=N-0: ❑CON4ERCLAL ❑ MULTI -FAMILY I . PROJECT LN WILDLAND ❑ YES PROJECT IN ❑ Yts }JRBANWTE1tFACEAREA ❑ NO FLOOD ZONE ❑ NO IS THE BLDG AN I EICHLERHOmM ❑ YES ❑ NO DESCRIPTION OF WORK TOTAL VALUATION': 12 0 By my signature below, I certify to each of the following: I am the property owner or authorized a application and the information I h ve vided is correct I have read the Description of Work an ve it is accurate. I afire to comply with a ap al ordinances and state laves relating t construction. I authorize representatives of Cupertino to enter the above dentis property for inspection purposes. Signature ofApplicant/Agent: Date: UP MENTAL INFORMATION REQUIRED - - ocE USE ONLY Lj OVER -TE -E -C iI.2 _j F P :E-: "J' SS'�J�hD MEPMiscApp_2011.doc revised 06121/11 CITY OF CUPERTINO Im FEE ESTIMATOR — BUILDING DIVISION ialADDRESS: 10421 LANSDALE AVE DATE: 07/31/2015 REVIEWED BY: MELISSA UNITS APN: 36911006 BP#: `VALUATION: 1$4,000 *PERMIT TYPE: Mechanical Permit PLAN CHECK TYPE: Alteration / Addition / Repair PRIMARY SFD or Duplex USE: # PENTAMATION FURN/AC PERMIT TYPE: WORK INSTALL N A/C UNIT IN REAR YARD AREA SCOPE .Sul,l)[ Irrsp Fee APPLIANCE / EQUIP TYPE FEE ID Plumb. Plan Check QTY UNITS BP FEES Elec. Permit I' A/C Units (<=1 OK cfm) 1BREMAIR Other Elec. Insp. 1 # $72 Permit Fee: .Sul,l)[ Irrsp Fee PME Unit Fee: $72.00 PME Permit Fee: $48.00 Construction Tax: Administrative Fee: ]ADMIN $45.00 Work Without Permit? 0 Yes E) No $0.00 TOTALS: Travel Documentation Fee: ITRA VDOC $72.00 Strong Motion Fee: IBSEISMICR NOTE: This estimate does not include fees due to other Departments (i.e. Planning, Public Works, Fire, Sanitary Sewer District, School Diverirt- etc 1_ Thece fees are haled on the nreliminary information available and are onlv an estimate. Contact the Dept for addn'l info. FEE ITEMS (Fee Resolution 11-053 Eff 711%13) Mech. Plan Check0.0 hrs $0.00 Plumb. Plan Check laec..Plan Check Mech. Permit Fee: 1MPERMIT Plumb. Permit Fee: Elec. Permit I' Other Mech. Insp. 1001hrs $48.00 Other Plumb Insp. Other Elec. Insp. st ., ...t, r`, _ .. r 1;.� t ,'p NOTE: This estimate does not include fees due to other Departments (i.e. Planning, Public Works, Fire, Sanitary Sewer District, School Diverirt- etc 1_ Thece fees are haled on the nreliminary information available and are onlv an estimate. Contact the Dept for addn'l info. FEE ITEMS (Fee Resolution 11-053 Eff 711%13) FEE QTY/FEE MISC ITEMS Plan Check 1,'z . Suppl. PC P'ee PME Plan Check: $0.00 Permit Fee: .Sul,l)[ Irrsp Fee PME Unit Fee: $72.00 PME Permit Fee: $48.00 Construction Tax: Administrative Fee: ]ADMIN $45.00 Work Without Permit? 0 Yes E) No $0.00 Advonced Plarming I CTS. Travel Documentation Fee: ITRA VDOC $48.00 Strong Motion Fee: IBSEISMICR $0.52 Select an Administrative Item 1 Bldg* Stds Commission Fee: IBCBSC $1.001 SUBTOTALS: $214.52 $0.00 TOTAL FEE: $214.52 Revised: 07/02/2015 STATE OF CALIFORNIA ALTERATIONS - HVAC M CEC-CFIR-ALT-03-E Revised 06/14 CALIFORNIA ENERGY COMMISSION CERTIFICATE OF COMPLIANCE CFIR-ALT-03-E Alterations - HVAC CZ 1, 3 to 7 and 16 (formerly CF -IR -ALT -HVAC) (Page 1 of 1) Site Address: 1 ' � 1� Enforcement Agency: Date Prepared: Permit#: Equipment Type o Equipment Efficiency New: Ducting, Plenums, Lineset Conditioned Thermostat rQt �-SL Required R -value Floor Area (sq ft) ❑ Packaged System 'Evaporator Coil AFUE COP ❑ R-6 (CZ 1,3-7) Ducts Served by system XZetback Split System `fCCondensing Unit L` SEER ❑ R-8' (CZ 16) Ducts 1 »s ft q (If not already HSPF ❑ R-6 (all CZ's) Plenums � present must Furnace Lineset EER ❑ R-5 or R7.5 Lineset' Ibe installed) HERS VERIFICATION SUMMARY Installer determines work to be completed and matches to one of the options below. At permit application this form is allowed to be filled out by hand. For final inspection all forms are to be registered (no hand filled forms allowed) and a copy left on site. 1. HVAC Changeout/Repair Required Compliance Documents to be left on site for Final: Can -include new ducting All Equipment, CF1R-ALT-02-E Condenser Unit, Evaporator Coil, CF2R: MECH-01, MECH-20-HERS Air Handler/Furnace CF3R: MECH-20-HERS Installer Requirement: Duct leakage (:5_15% or, < 10% to outside, or seal all accessible leaks) Exempted from duct leakage testing if: ❑ 1. Duct system registered with HERS provider as previously sealed, or ❑ 2. There is less than 40 linear feet of duct in unconditioned space, or ❑ 3. Existing duct systems are constructed, insulated or sealed with asbestos (list manufacture date of building ❑ 2. New HVAC System Required Compliance Documents to be left on site for Final: All new equipment and All New Ducts' CFIR-ALT-02-E CF2R-MECH-01, MECH-20-HERS, MECH-22-HERS, MECH-(23 or 24) -HERS CF3R-MECH-20-HERS, MECH-22-HERS, MECH-(23 or 24) -HERS' Installer Requirement: Duct leakage < 6%, Fan Efficacy (.58W/CFM), Air Flow >_ 350 CFM/ton (or Standards Table 150.0-C / D alternative) ❑ 3. All New Ducts with Replacement Required Compliance Documents to be left on site for Final: Includes replacing or installing All New CFIR-ALT-02-E Ducts' and one or more of the following: CF2R-MECH-01, MECH-20-HERS, MECH-(23 or 24) -HERS Condenser Unit, Evaporator Coil, Furnace CF3R-MECH-20-HERS, MECH-(23 or 24) -HERS Installer Requirement: Duct leakage < 6%, Air Flow_ 350 CFM/ton (or Standards Table 150.0-C / D alternative) ❑ Exempted from duct leakage testing I existing duct systems are constructed, insulated or sealed with asbestos. ❑ 4. New Ducting over 40 feet Required Compliance Documents to be left on site for Final: Adding or replacing ducts in unconditioned CF1R-ALT-02-E space but less than All New Ducts' CF2R: MECH-20-HERS CF3R: MECH-20-HERS Installer Required to: Duct leakage (:S.15% or, < 10% to outside, or seal all accessible leaks) ❑ Exempted from duct leakage testing I existing duct systems are constructed, insulated or sealed with asbestos. ' All new ducting R-8 required when more than 40 ft installed and R-6 when less than 40 ft installed. This includes in walls, between floors etc. ' A New Duct system is when the duct system is constructed of at least 75 percent new duct material, and up to 25 percent may consist of reused parts from the dwelling unit's existing duct system (e.g., registers, grilles, boots, air handler, plenums, duct material. 3 R-5 (1" thick insulation) for linesets 1" and less. R-7.5 (1.5" thick insulation) for linesets over 1 inch. Most mfg will require Suction line Diameter with insulation as the following 1.5-2T-2%", 2.5-3T-2%", 3.5 to 4T-2%", 5T-4%" Contractor (Documentation Author's /Responsible Designer's Declaration Statement) I certify the following under penalty of perjury, under the laws of the State of California: 1. The information provided on this Certificate of Compliance is true and correct. 2. 1 am eligible under Division 3 of the California Business and Professions Code to accept responsibility for the information on this document. B. That the energy features and performance specifications for the design identified on this Certificate of Compliance conform to the requirements of Title 24, Parts 1 and 6 of the California Code of Regulations (CCR). 4. That the energy features and performance specifications, materials, components, and manufactured devices for the building design or system design identified on this Certificate of Compliance conform to the requirements of Title 24, Part 1 and Part 6 of the CCR. 5. The building design features or system design features identified on this Certificate of Compliance are consistent with the information provided on other applicable compliance documents, worksheets, calculations, plans and specificati ns su mitted to the enforcement agency for approval w'th this building permit application. Responsible D i ner Narpe. Resp 'b signer Signature: Date Si ed: License: YY,6 company: Address: V City/State/Zip: Phone: rJ q b*'— ZV- l/ v For assistance or ql1lestions regarding the Energy Standards, ontact the Energy Hotllle at: 1-800-772-3300 C1 -1g26 I V Ak. ((Air Z#A RECEIN D JUL 31 2( t yi BY -)PN1EN-',-,EPARTrMENT ,/isioN - (-LiPERTINO CUPAL APPROVED #� -(I N 0 jns and s:,ec.jjcatjrrs miuST be kept at the 3wilding Department -;urin^ r action. it is to make any -,,iges or �,-,,3rations on same, or to deviate 2015 therefrom, v,,-mout irproval from the Building Official. The Stac,-,�ing -�,s pian and 'HALL NOT REVIIPI-� CODE COMP' ANCE be held to 'c� to the violation n, I r State Law. wed By ct any pro'. 1 BY ATE # r 0 0 E Copy I ("(f 2.1 LAAja t),KI-te- PLOT �L� S HEC ED E�Y r � tv e-n) 10 Coil C C-.!- M DATE PLANNING DEFT CUPERTINO