Loading...
13080123 CITY OF CUPERTINO BUILDING PERMIT BUILDING ADDRESS: 10101 N WOLFE RD CONTRA CTOR-TBB Tf,BE- PERMIT NO: 13080123 OWNER'S NAME: SEARS ROEBUCK AND CO oil DATE ISSUED:08/16/2013 OWNER'S PHONE: 9167599966 PHONE NO: LICENSED CONTRACTOR'S DECLARATION JOB DESCRIPTION: RESIDENTIAL 11 COMMERCIALII License Class C^3Ct Lic.# 7 32_777 O SEARS-RE-ROOF 123 SQ-REMOVE EXISTING SINGLY PLY Contractor k06 ak 9,D0fir3 Date b/)13 X)3 MEMBRANE,REPLACE DAMAGES INSULATION,INSTALL I hereby affirm that I am licensed under the provisions of Chapter 9 NEW (commencing with Section 7000)of Division 3 of the Business&Professions 45MIL TPO SINGLE PLY CLASS A Code and that my license is in full force and effect. I hereby affirm under penalty of perjury one of the following two declarations: I have and will maintain a certificate of consent to self-insure for Worker's Compensation,as provided for by Section 3700 of the Labor Code,for the performance of the work for which this permit is issued. Sq.Ft Floor Area: Valuation:$51137 I have and will maintain Worker's Compensation Insurance,as provided for by Section 3700 of the Labor Code,for the performance of the work for which this APN Number:31620080.00 Occupancy Type: permit is issued. APPLICANT CERTIFICATION I certify that I have read this application and state that the above information is PERMIT EXPIRES IF WORK IS NOT STARTED correct.I agree to comply with all city and county ordinances and state laws relating WITHIN 0 DAYS OF PERMIT ISSUANCE OR to building construction,and hereby authorize representatives of this city to enter upon the above mentioned property for inspection purposes. (We)agree to save 180 DA EOM LAST CALLED INSPECTION. indemnify and keep harmless the City of Cupertino against liabilities,judgments, `�r�� costs,and expenses which may accrue against said City in consequence of the granting of this permit. Additionally,the applicant understands and will comply Issued by: Date: with all non-point source regulations per the Cupertino Municipal Code,Section 9.18. RE-ROOFS: Signature Date Sh5/1 3 All roofs shall be inspected prior to any roofing material being installed.If a roof is installed without first obtaining an inspection,I agree to remove all new materials for inspection. ❑ OWNER-BUILDER DECLARATION �p ,,� Date: 6115 2 fl 3/13 I hereby affirm that I am exempt from the Contractor's License Law for one of Signature of Applicant: the following two reasons: ALL ROOF COVERINGS TO BE CLASS"A"OR BETTER I,as owner of the property,or my employees with wages as their sole compensation, will do the work,and the structure is not intended or offered for sale(Sec.7044, Business&Professions Code) I,as owner of the property,am exclusively contracting with licensed contractors to HAZARDOUS MATERIALS DISCLOSURE construct the project(Sec.7044,Business&Professions Code). I have read the hazardous materials requirements under Chapter 6.95 of the California Health&Safety Code,Sections 25505,25533,and 25534. I will I hereby affirm under penalty of perjury one of the following three maintain compliance with the Cupertino Municipal Code,Chapter 9.12 and the declarations: Health&Safety Code,Section 25532(a)should I store or handle hazardous I have and will maintain a Certificate of Consent to self-insure for Worker's material. Additionally,should I use equipment or devices which emit hazardous Compensation,as provided for by Section 3700 of the Labor Code,for the air contaminants as defined by the Bay Area Air Quality Management District I performance of the work for which this permit is issued. will maintain compliance with the Cupertino Municipal Code,Chapter 9.12 and I have and will maintain Worker's Compensation Insurance,as provided for by the Health&Safety Code,Sections 25505,25533,and 25534. Section 3700 of the Labor Code,for the performance of the work for which this Owner or authorized agent: . .t t_ ` OAAA Date: vzx permit is issued. I certify that in the performance of the work for which this permit is issued,I shall not employ any person in any manner so as to become subject to the Worker's Compensation laws of California. If,after making this certificate of exemption,I CONSTRUCTION LENDING AGENCY become subject to the Worker's Compensation provisions of the Labor Code,I must I hereby affirm that there is a construction lending agency for the performance of forthwith comply with such provisions or this permit shall be deemed revoked. work's for which this permit is issued(Sec.3097,Civ C.) Lender's Name APPLICANT CERTIFICATION Lender's Address I certify that I have read this application and state that the above information is correct.I agree to comply with all city and county ordinances and state laws relating to building construction,and hereby authorize representatives of this city to enter upon the above mentioned property for inspection purposes.(We)agree to save ARCHITECT'S DECLARATION indemnify and keep harmless the City of Cupertino against liabilities,judgments, costs,and expenses which may accrue against said City in consequence of the I understand my plans shall be used as public records. granting of this permit.Additionally,the applicant understands and will comply with all non-point source regulations per the Cupertino Municipal Code,Section Licensed Professional 9.18. Signature Date REROOF PERMIT APPLICATION COMMUNITY DEVELOPMENT DEPARTMENT•BUILDING DIVISION 10300 TORRE AVENUE•CUPERTINO,CA 95014-3255 D CUPERTI La. (408)777-3228•FAX(408)777-3333•building aacupertino.org PROJECT ADDRESS APN#�1 /�ry ®X6 10101wa ` LSV U OWNER NAMES � PHO E-MAIL e N �o1ai r rt c � STREET ADDRESS CITY,STATE,ZIP FAX 3 ; vec-1 RaJ A2- r0o V�sAr� CONTACT NAME O E-MA Ib - 1-r1b k co- -co STREET ADDRESS ©S AV\A Ot' g1 V CITY,STATE,ZIP^ C � FA '(� ZS 3- !9D e 9Y4 [I OWNER ❑ OWNERBUILDER ❑ OWNERAGENT ❑ CONTRACTOR Ii CONTRACTOR AGENr J❑ ARCHITECT ❑ENGINEER ❑ DEVELOPER ❑TENANT CONTRACTORNAME ,.��,Q� (� r+,- - LICENSENUMBBERLICENSETY E BUS.LIC.# { COMPANY NAME 1` `�.��F'N� / II O F Rood„ E-MAIL1° U M 16 253-190 STREET ADDRESS CITY,STATE,ZIP P ONE Nos w.LA g v L-inco n c 9564 S —N ARCHITECT/ENGINEER NAME LICENSE NUMBER BUS.LIC.# COMPANY NAME - E-MAIL FAX STREET ADDRESS - CITY,STATE,ZIP PHONE USE OF ❑ SFD or Duplex ❑ Multi-Family ROOF AREA: VALUATION: ^/ STRUCTURE: 0-Commercial 12300 �� -# 5 I 1 1✓Z / EXISTING ROOF TYPE: ❑BUILT-UP ROOF ❑ASPHALT SHINGLES ❑WOOD SHARES ❑WOOD SHINGLES MOTHER(SPECIFY) REMOVE/REPLACE KYES IFNO. PLYWOOD ❑ w, ❑ PLYWD ❑OSB PITCH: II ROOF ❑NO #LAYERS: THICKNESS: ❑5/8" TYPE: ❑CDX x_.12 CLASS: A 006- ICC-ES REPORT# PROPOSED ROOF TYPE: ❑BUILT-UP ROOF ❑ASPHALT SHINGLES ❑WOOD SHAKES ❑WOOD SHINGLES ®OTHER St DESCRIPTION OF WORK: eve 2ki ir; ) e Re ItnC2, c►,n r;}o.rtuc¢a T-n50la, ,60,% 1 lv��,, S i Sl 2 1 to fr-Ae bve:r i 5n O,-V o n By my signature below,I certify to each of the following: I am the property owner or authorized agent to act on the property owner's behalf. I have read this application and the information I have provided is correct. I have read the Description of Work and verify itis accurate. I agree to comply with all applicable local ordinances and state laws relating to building construction. I authorize re resentatives of Cupertino to enter the above-identified property for inspection purposes. Signature of Applicant/Agent: Date: Q?/151 13 SUPPLEMENTAL,INFORMATION REQUIRED OFFICE USE ONLY If building is associated with a Home Owner's Association,provide letter PLAN CHEcx TYPE ROUTING sL>P of approval from HOA. THE-COUNTER ❑ BUILDING PLAN REVIEW _Provide Planning approval to verify if there any restrictions. ❑ EXPRESS ❑ PLANNING PLAN REVIEW N Provide copy of Manufacturer's Installation Specifications. ❑ STANDARD ❑ FIRE DEPT N Provide signed copy of Cupertino's Tear:OffPolicy. ❑ OTHER: ReroofApp 2011.doc revised 03/16/11 CITY OF CUPERTINO FEE ESTIMATOR—BUILDING DIVISION ADDRESS: 10101 n wolfe rd DATE: 08/16/2013 REVIEWED BY: mendez APN: BP#: "VALUATION: 1$51,137 *PERMIT TYPE: Minor Building Permit PLAN CHECK TYPE: Re-roof PRIMARY PENTAMATION USE: Commercial Building PERMIT TYPE: 1 COMMLROO WORK sears- re-roof 123 sq-remove existing sinq1V plVmembrane replace damages insulation install new SCOPE 45mil tpo single ply class a FEE ID ROOF AREA s.f. 1REROOFCOM 12,300 R kfec:h. Plan Check 111zv)rb.Alert('heck Elec. Plan Check L1ech. Permit Fee: Plumb.Permit Fee: 1,lec. Permit Fee: Other Afech.Inst. F1 I I Other-Plumb Insp. El I Other Elec.Insp. Li Ifech. Imp.fee: Plumb. Irtsp.Fee: Elec.Insp.Fee: NOTE:This estimate does not include fees due to other Departments(La Planning,Public Works,Fire,Sanitary Sewer District,School District,etc.). Theseees are based on the prelimina information available and are only an estimate Contact the De t or addn'l info. FEE ITEMS(Fee Resolution 11-053 E . 7/1/12) FEE QTY/FEE MISC ITEMS Plan Check Fee: Supp/. PC Fee Plumh✓11ech./Elec Permit Fee: $905.00 Suppl. Insp Fees Phnnh.i.'vlec:h./Elect Plumh./.tech./Elec Permit Fee: Consowction Tax: .4.dministraiive Fee: Work Without Permit? ®Yes (2) No $0.00 Advanced Planning Fees: Travel Documentation Fees: � Strong Motion Fee: IBSEISMICO $10.74 Select an Administrative Item Bldp-Stds Commission Fee: IBCBSC $3.00 y $918.74 $0.00 __ r. �� � $918.74 Revised: 07/01/2013 REROOF TEAR-OFF POLICY COMMUNITY DEVELOPMENT DEPARTMENT•BUILDING DIVISION ALBERT SALVADOR,P.E.,C.B.O.,BUILDING OFFICIAL CUPERTINO 10300 TORRE AVENUE•CUPERTINO,CA 95014-3255 (408)777-3228•FAX(408)777-3333•buildingalcugertino.ora PROJECT ADDRESS - 7AN 1010 ro) W o1l Rop� OWNER NAME �O\ PHO E-MAIL QgCS a►h Cpt 9` STREET ADDRESS CITY,STATE,ZIP FAX 33 3 ZZW,0 \9,0• -37 1= k+0 ) 7 9� CONTRACTOR NAME /� �. �,", LICENSE NUMBER LICENSE TYPE BUS.LIC.# tfiJ 0 y ` C COMPANY NAME E-MAIL�^\1A� STREET ADDRESS �$�S �; � �'v` CITTA 4� `n C� sb �' - 1 y I UNDERSTAaND AND AGREE TO THE FOLLOWING: 1. The re-roof project shall comply with all applicable provisions of the 2010 California Codes. 2. An inspection request can be scheduled up to one business day before the requested inspection date. Please call (408)777-3228 from 7:30-3:30pm (Mon-Thurs) or 7:30-2:30pm(Friday)to schedule inspection. For Tear-Off and Nailing Inspections,you must also call on the day of the inspection only after that phase of the work is completed. The building inspector will be available within one hour. Final Inspections will be given a two hour window. 3. Tear-Off Inspection is required. Any and all dry-rotted wood shall be replaced prior to this inspection. Unless new plywood roof sheathing is proposed throughout, all the nails/fasteners shall be either completely knocked-down or removed prior to this inspection. 4. If plywood is installed,a plywood Nailing Inspection is required. 5. Roofing shall not be applied without first obtaining all prior inspection and written approvals from the building inspector. Any roofing which is applied without first obtaining an approved inspection will require the removal of all new material down to the sheathing so a proper inspection can be performed. 6. A Final Inspection and approval shall be obtained from the building inspector when the re-roofing is completed. To receive a final sign-off,the following items will be verified: a. Flat roofs shall have a minimum of I/a"per foot of slope and demonstrate there is no ponding. b. Listings from approved testing agencies for all pre-manufactured products used shall be available on-site to review at the time of the inspection. c. Proper spark arrestor installation,vents painted, gutter/downspouts installed, debris removed. 7. NOTE: If you call for a tear-off or plywood nailing inspection and the work is not complete, you will be charged a re-inspection fee. The re-inspection fee shall be paid before another inspection can be scheduled. By my signing below,I certify each of the following is true: I am the property owner or authorized agent to act on the property owner's behalf.. I understand and agree to comply with the re-roof policy stated above. I also understand that smoke detectors and carbon monoxide detectors are required to be installed in accordance with Sections R314 and R315 of the 2010 California Residential Code. Signature of Applicant/Agent: Date: ReroofPo1icy_2012.doc revised 1017/12 FIRESTONE [h SECTION 07500 MEMBRANE ROOFING PART1 GENERAL, 1.01 SUMMARY A. Furnish and install elastomeric sheet roofing system,including: 1: Roofing manufacturer's requirements for the specified warranty. 2. Preparadon,of roofing substrates. 3. Wood nailers fot roofing attachment'.. 4, Insulation:.; 5. Cover boards;: & Elastomeric membrane-roofing. 7: Flashings:; 8: Other roofing-related items specified or indicated on the drawings or otherwise necessary to provide a`complete weatherproof roofing system. B. Disposal of demolition debris and construction waste is the responsibility of Contractor. Perform disposaf in-manner complying with all applicable federal,state,and local regulations. C. Comply with the published recommendations and instructions of the roofing membrane manufacturer;.at http:/Imanual.fsbp.com. D. Commencement of work by the Contractor shall constitute acknowledgement by the Contractor that this specification can, be satisfactorily executed;under the project conditions and with all necessary prerequisites for warranty acceptance by roofing membrane manufacturer. No modification:of tt►a Contract Sum will be made for failure to adequately examine the Contract Documents or the:prolect condltlons. 1.02 DER NfTIONS; A. Roofing Terminology: Refer to ASTM D 1079 for definition of terms related to roofing work not otherwise defined in the,section:. 1.03 SUBM11TALS A. Product Data: 1 Provide membrane manufacturer's printed data sufficient to show that all components of roofing system;Including insulation and fasteners,comply with the specified requirements andlwith.the.membrane manufacturer's req ulrements and recommendations for the system type specified;include data.for each product used in conjunction with roofing membrane. B. Samples;" Submit°sampleis of each product to be used. C. Executed Warranty. 1.04 DELIVERY,STORAGE AND HANDLING A, Delrvor products in manufacturer's:original containers,.dry and undamaged,with seals and labels intact and legible. B. Store materials:clear of ground and moisture with weather protective covering. Ci Keep combustible materials away from ignition sources. 1.05 WARR%fiNTY A. Comply with all warranty:Procedures required by manufacturer,including notifications, schedulipg,.and:inspectione, B. Warranty: Firestone 10,year Reef Shield Limited Warranty covering membrane;roof insulation, j and membrane axessdries. 1 PXX/Sears:TPO MF07500-1 MEMBRANE ROOFING it I i 1:, Limitof Liability:= No dollar limitation. 2-• Scope:of.Coverage, Repair leaks in the roofing system caused by: a. Ordinarywear and tear of the elements. b. Manufacturing defect in firestone brand materials; c. Defective workmanship used to install these materials. d. Damag"be to winds up tq . 3 Not Covered: a: barrage;due to winds in excess of 55 mph. b.. Daniage-due hurricanes or tornadoes. c. Hail. d. rntentidnal dam.,age,. e. Un�ntetonal damage due to normal rooftop inspections;maintenance, or service. PART-2 PRODUCTS 2.01 MANUFACTURERS A A00Ptab(&M#Nf0ctur0r-Roofing System: Firestone Building Products Co.,Carmel, IN. vcuv firestohebpco.com; S Minuf btdttr-otlnstilation and Cover Boards: Same manufactureras roof membrane. 2.02'ROOFINi SYSTEM'DESCRIPTION A; Roofing System;: 1 Memburane: Thermoplastic olefin(TPO). 2; Thickness Ae.specified elsewhere. 3, Membrane Attachment: Mechanically attached with battens in seams. 4 Comply W'iith applicable local'buildng code requirements. 5.. Provide-assembly having'Underwriters Laboratories, Inc.(UL)Class A Fire Hazard Classification: 6 Provide assembly complying with Factory Mutual Corporation(FM) Roof Assembly Classification;FM DS 1-28 and 1-29,and meeting minimum requirements of FM 1-90 wind uplift,ratlng,. B, Deck,Cover Board: 1 ; Type:,.Gypsum-based board, 114,inch thick. Zi. Attachment: Mechanical fastening. C Cr!cke#s:`tl Md.insulation of same type as specified for top layer; slope as indicated. 2.03 TPO;ME_MBRANE MATERIALS A: Membrane:, Flexble;'heat:weldable sheet composed of thermoplastic polyolefin polymer and ethylenes propylene rubber;;complying with ASTM D 6878,with polyester weft inserted reinforcement,,and the following additional characteristics: 1.. Thickness::: 0.045 Inch plus/minus 10 percent,with coating thickness over reinforcement of 0.018-inch plus/minus10 percent. 2- SheetWidth Provide=the widest available sheets to minimize field seaming. 3- Puncture Resistance: 265 lbf, minimum,when tested in accordance FTM 101C Method 2031. 4Solar Reflectance; 0.79,minimum,when tested in accordance with ASTM C 1549. 5 Color White. 6 Acceptable Product;, ULTRAPLY TPO by Firestone. PXXf Sears,TPO i" 07500-2 MEMBRANE ROOFING B Membrana Fasteners; Type and'size as required by roof membrane manufacturer for roofing, systerrl andwarranty#o be provided; use only fasteners furnished by roof membrane rrEanufac#utor. G. Curb and;Parapet Flashing: Same material as membrane,with encapsulated edge which eliminates need for seam sealing the flashing-to-roof splice; precut to 18 inches wide. 1), "Formable Flashing: Non-reinforced,flexible,,heat weldablesheet,composed of thermoplastic polyolefin polymer and ethylene propylene rubber. .1 Thle est 0:060 Inch pluslminus 10 percent. 2.:; Tensile Strength: 1550 psi; minimum;when tested in accordance with ASTM D 638 after heat aging. 3, Elongatldh:afB'reak 650 percent;minimum,when tested in accordance with ASTM D 638 after beat aging. 4'. Tearlmg Strength: 12 lbf, minimum,when tested in accordance with ASTM D 1004 after heat aging, 5:: Colat V1lhito. 6 Acceptable_Product: ULTRAPLY TPO Flashing by Firestone. E Ta j`e Fla"skiing 5=1/2 inch nominal.wide TPO membrane laminated to cured rubber polymer p. seamiing a pe',overaltthickness 0.065 inch nominal;TPO QuickSeam Flashing by Firestone. F. PourableSealer:: Two-part polyurethane;two-color for reliable mixing; Pourable Sealer by FtreOone; G Searrt Ptafes Steel with barbs and Galvalume coating;corrosion-resistance complying with FM 4470: H.. -Termination Bars; Aluminum.bars with integral caulk ledge; 1:3 inches wide by 0.10 inch thick; Flrestone Termination:.Bar by Firestone. 1. Cut Edge Sealant: Synthetic rubber-based,;for use where membrane reinforcement is exposed; tJttraP{y,.TPO Cut;Edge Sealant by Firestone.. J General Purpose Sealant EPDM-based,one part,white general purpose.sealant; UltraPly TPO General Purpose Sealant by Firestone. K Molded Flashing Accessories: Unreinforced TPO membrane pre-molded to suit a variety of flashxig details,including pipe boots, inside corners,outside corners, etc. UltraPly TPO Small and`Lar e:Pipe Flashing by Firestone. 2.04 ROOF=IN$oLAtiAND COVER BOARDS A Gy0sum-8asedC'oVer Board:; Non-combustible,water resistant gypsum core with embedded glass mat:facers,complying with ASTM C 1177LC 1177M,and with the following additional characteristics: 1', $k 48 Inches by 96 inches, nominal. E� a. deption: Board to be attached using adhesive or asphalt may be no larger than 48 inches by 4$Inches, nominal. Thickness As mtlicated elsewhere; 3; Surface Water Absorption: 2.5 g,maximum,when tested in accordance with ASTM C 473. Spanning Capability: Recommended by manufacturer for following minimum flute spans: a Surface Burning Characteristics: Flame spread of 0, smoke developed of 0,when tested in accordance with ASTM E 64. 6;; ComFiustlb�ity Non=combustible,.when tested in accordance with ASTM E 136. 7i Factory.Mutual approved for use with FM 1-60 and 1-90 rated roofing assemblies. 8 Mold;Growth Resistance; Zero growth,when tested in accordance with ASTM D 3273 for minimum:of`4 weeks.. PXX l Sea"rsTP,O.MF 07500-3 MEMBRANE ROOFING: B: Insulation Fasteners::Type and size as required by roof membrane manufacturer for roofing system and warrantyto be.provided; use only fasteners furnished by roof membrane manufacturer:. 2.05 ACCESSORY MATERIALS A Cant Strfps'and Tapered Edge Strips: 45 degree face slope and minimum 5 inch face drrrlensio n; provide,af4U angle changes between vertical and horizontal planes that exceed 45 degrees Install ueing hot asphalt(Type IV), roofing mastic,or mechanically fastened using fasteners and plates approved by roofing manufacturer: PART INSTALLATION 3.01 :GENERAL A Install;rooting,'Insulation;flashings,and accessories in accordance with roofing manufacturer's published`instructions and recommendations for the specified roofing system. Where manufacturer provides no instructions or recommendations,follow good roofing practices and lndustrystandards. Comply with federal,state,and local regulations. B, Obtain-all relevant instructions and maintain copies at project site for duration of installation period: C, Dori startwork until Pre-Installation Notice has been submitted to manufacturer as notification that;thl project requires a manufacturer's warranty. D: Perform Work:usin4 competent and properly equipped personnel. E Temporary'closures,which ensure that moisture does not damage any completed section of the new roofing system,-are,the responsibility of the applicator: Completion of flashings; terminatf`ons&; and temporary closures shall be:completed as required to provide a watertight -condition;; F Install roofing membrane°only when surfaces are clean,dry, smooth and free of snow or ice;do notapply Goofing membrane during inclement weather or when ambient conditions will not allow 000,40-00460;consult manufacturer for recommended procedures during cold weather. Do not work with sealants and adhesives when material temperature is outside the range of 60 to 8ft: egrees F, G Protect adjacent construction,property,vehicles, and persons from damage related to roofing. wank,repaik or restore damage caused by roofing work: Protoct from spiily and overspray from bitumen,.adhesives,sealants and coatings. 2 I articyiary,protect metal, glass, plastic;and painted surfaces from bitumen,adhesives, and sealants within`the range of wind-borne overspray. 3; protect finished areas of the roofing system from roofing related work traffic and traffic by other trades: H. Until ready°for use, keepmaterials in their original containers as labeled by the manufacturer. I Consult;membrarie Mbinufacturer's instructions,container labels, and Material Safety Data Sheets(MSDS)for specific safety instructions. Keep all adhesives,sealants, primers and cleaning=ri at 6 6i..awayfrom all sources of ignition. 3.02 EXAMINATION` A. Examine roof deck to determine that it is sufficiently rigid to support installers and their mechanicalequipmentand that deflection will no strain or rupture roof components or deform deck> . PXX f Segs TPO IVI 017500-4 MEMBRANE ROOFING B Verify,that surfaces and site candtians are ready to receive work. Correct defects in the subsirate'before commencing with roofing work. C Exainin@ :roof substrate to'verify,that itis properly sloped to drains. CG Vert that the speciflcations.and drawing details are workable and not in conflict with the roofing ma un acturer"s recommendations and instructions;start of work constitutes acceptable of project conditions and requirements. 3.0 PREt'AtATIQN'. A Tape appropriate measures to ensure that fumes from adhesive solvents are not drawn into the burtding through air intakes:; B. Prior to proceeding, prepare roof surface so that it is clean, dry, and smooth, and free of sharp edges,fins,roughened surfaces, loose or foreign materials,oil,grease and other materials that may darnage.the membrane. C. Fill:all 6urf6c6voids in the immediate substrate that are greater than 114 inch wide with fill mate rlaf:acceptable=insulation to membrane manufacturer. 0, $eal,grout;or-tape deck joints,where needed,to prevent bitumen seepage into building. 3.04 ,INSUL ITION`AND COVER BOAKD INSTALLATION R: InstaN insufabon lmdb figuration and with attachment method(s)specified in PART 2,under Roofing Sys#em. 8 lnstall,onty;as much insulationas can be covered with the completed roofing system before the errd of the`day's work of before the onset of inclement weather. C. ,Lay roof iinsulation',in courses parallel to roof edges. D Neatly and tightly.fit insulation to all penetrations, projections,and hailers,with gaps not greater than - 4 Inch FOU gaps greater.than 114 inch with acceptable insulation. Do not leave the roofing rrrembrao.unsupported over a space greater than 114 inch. E~ Mechahical Fastening: Using,specified fasteners and insulation plates engage fasteners through insulation'into deck to depth and,in pattern required by membrane manufacturer or :building owner,whichever is more stringent. F; Mechanical Fastening: Using specified fasteners and insulation plates engage fasteners through insulation Into deck to depth and in pattern required by Factory Mutual for FM Class specified in:PART 2 and membrane manufacturer,whichever is more stringent. US= ELAS.T Mr=R11,G.VEM1BRANE INSTALLATION A Beginning;at'low;point of roof,place membrane without stretching over substrate and allow to relax of 1`east 30 minutes before attachment or splicing;in colder weather allow for longer relax trine.• B fray out ti!membrane pieces so that field and flashing splices are installed to shed water. C, Install.membrane without wrinkles and without gaps or fishmouths in seams; bond and test 5Ma,'and` aps inaccordahce with membrane manufacturer's instructions and details. D, Battens 1n°tfie Seam: Install batten strips'continuously,within the side seams,covered by membrane lap. 1, Lay.out fasteners.in compliance with FM Class specified in PART 2 and as recommended by membrane manufacturer,whichever is most stringent. 2', Fastert batten strips.with membrane manufacturer's fasteners,properly engaged in the deck'th head flush with the batten strip surface. PXX'/Sears TPO;MF- 07500-5 MEMBRANE ROOFING E Edge Securement:. Secure membrane at all locations where membrane terminates or goes through awangle change greater than 2 in 12 inches using mechanically fastened reinforced, per meterfastori ft.strips',plates,or metal edging as indicated or as recommended by roofing manufacturer: 1, Exceptions:° Round pipe penetrations less than 18 inches in diameter and square penetrations,tessthan 4 inches square. -2. Metal edging.-is not merely decorative;ensure anchorage of membrane as intended by roofing manufacturer; 3.06 LASH NG.AND ACCESSORIE=S INSTALLATION A, Install flashings,,Including laps,'splices,joints,bonding,adhesion, and attachment, as required by,in, brave manufacturer's recommendations and details. f3. MefatAcCessories install metal edgings,gravel stops,and copings in locations indicated on the drdW.1 gs,with horizontal Ieg;of edge member over membrane and flashing over metal onto membrane. J. Folio H rooflng manufacturer's instructions. 2: Remove protective plastic surface film immediately before installation. Install water,block.sealant'under the membrane anchorage leg. 4.:. Plash with manufacturer's recommended flashing sheet unless otherwise indicated. 5 Where. ingie application of flashing will not completely cover the metal flange, install additional p(ece of flashing to cover the metal ed9e. the mdf edge Includes a gravel stop and sealant is not applied between the laps in the metal edging;'nstal4 an additional piece of self-adhesive flashing membrane,over the metal lap'to;the top of the;gravel stop;apply seam edge treatment at the intersections of the two flashing sections. w When the,roof slope Is,greater than 1:12,apply seam edge treatment along the back edge Of fhe,f[ashfpg. G; Plash mg,,at;Vl/alls,Curbs;and Other Vertical and.Sloped Surfaces: Install weathertight flashing stall walls;'Curbs;.parapets,curbs, skylights,and other vertical and sloped surfaces that the roofing membrane;abuts to;extend flashing at least 8 inches high above membrane surface.. 1., Use the longest practical flashing pieces. 2 Evaluate the substrate and overlay and adjust installation procedure in accordance with membrane manufacturer's recommendations. 3 Complete the spllce between flashing and the main roof sheet with specified splice adhesive before adhering flashing to the vertical surface. 4: Provide4ermination directly to the vertical substrate as shown on roof drawings. Q. Roof Drains ( , Taper;insulation around drain to provide smooth transition from roof surface to drain. Use specified pre-manufactured tapered insulation with facer or suitable bonding surface to achieve slope;slope not to exceed manufacturer's recommendations. fsositIon membrane,then cut a hole for roof drain to allow 1/2 to 3/4 inch of membrane to extend ioside clamping ring past drain bolts. 3 Make round holes In membrane to align with clamping bolts; do not cut membrane back to bolt holes: 4, Apply.sealant on top of drain bowl where clamping ring seats below the membrane 5 Install roof drain clamping ring and clamping bolts;tighten clamping bolts to achieve constant compression. E Plashing at:Penetrations: Flash all penetrations passing through the membrane; make flashing seals directly Wthe penetration. PXX tSears-TPO MP 07500-6 MEMBRANE ROOFING 1, Pipes,,-, Supports,and Similar Items: Flash with specified pre-molded pipe flashings wherever practical;otherwise use specified self-curing elastomeric flashing. 3A 'FIN1�HIW ,ANP UVALKWO 1NS7ALLA7ION A, Install walktivays of access points to the roof,around rooftop equipment that may require maintenance, and where indicated on the drawings. 3.011 FIELD:QUALITY CONTROL A Inspec#io by Manufacturer: Provide final inspection of the roofing system by a Technical Representative employed by roofing system manufacturer specifically to inspect installation for .warranty purposes(i.e not a sales person). B Per all corrections necessary for issuance of warranty. &OW CLEAN.LNG A. Cleamall contaminants generated by roofing work from building and surrounding areas, including bitumen; adhesives,sealants,and coatings. B, Repair or replace building components and finishedsurfaces damaged or defaced due to the work of this section;comply with recommendations of manufacturers of components and surfaces: Q. Remove.leftover materials,,trash,debris,;equipment from project site and surrounding areas. 3.10' PROTECTION A 1Nherb�construction traffic must continue over finished roof membrane,provide durable protectiomand replace or repair damaged roofing to original condition. END OF SECTION PXX/Sears TP0 MF 07500-7 MEMBRANE ROOFING