Loading...
13070156 CITY OF CUPERTINO BUILDING PERMIT BUILDING ADDRESS: 10349 AINSWORTH DR CONTRACTOR:WINTER ROOFING INC PERMIT NO: 13070156 OWNER'S NAME: LIN RYAN AND STEPHANIE 151 WYANDOTTE DR DATE ISSUED:07/24/2013 OWNER'S PHONE: 4089643472 SAN JOSE,CA 95123 PHONE NO:(408)363-8052 ❑ LICENSED CONTRACTOR'S DECLARATION JOB DESCRIPTION: RESIDENTIAL 11 COMMERCIALE] License Class r Lic.#—.J2JDq'—) RE-ROOF 24 SQ REMOVE SHAKES INSTALL LANDMARK PRO Contractor Date SHINGLES,CLASS A I hereby affirm that I am licensed under the provisions of Chapter 9 (commencing with Section 7000)of Division 3 of the Business&Professions Code and that my license is in full force,and effect. I hereby affirm under penalty of perjury one of the following two declarations: I have and will maintain a certificate of consent to self-insure for Worker's Compensation,as provided for by Section 3700 of the Labor Code,for the performance of the work for which this permit is issued. Sq.Ft Floor Area: Valuation:$8750 __I�have and will maintain Worker's Compensation Insurance,as provided for by Jl Section 3700 of the Labor Code,for the performance of the work for which this APN Number:32613113.00 Occupancy Type: permit is issued. APPLICANT CERTIFICATION I certify that I have read this application and state that the above information is PERMIT EXPIRES IF WORK IS NOT STARTED correct.I agree to comply with all city and county ordinances and state laws relating WITBIIN 180 DAYS OF PERMIT ISSUANCE OR to building construction,and hereby authorize representatives of this city to enter upon the above mentioned property for inspection purposes. (We)agree to save 180 DAY FROM LAST CALLED INSPECTION. indemnify and keep harmless the City of Cupertino against liabilities,judgments, costs,and expenses which may accrue against said City in consequence of the 7 granting of this permit. Additionally,the applicant understands and will comply Issued by: Date: 12y 11 with all non-point source regulations per the Cupertino Municipal Code,Section 9.18. ROOFS: any r Signature Date All roofs shall be inspected prior to y roofing material being installed.If a roof is installed without first obtaining an inspection,I agree to remove all new materials for inspection. ❑ OWNER-BUILDER DECLARATION (}0�y� Signature of Applicant: l 1 Date: I hereby affirm that I am exempt from the Contractor's License Law for one of the following two reasons: ALL ROOF COVERINGS TO BE CLASS"A"OR BETTER 1,as owner of the property,or my employees with wages as their sole compensation, will do the work,and the structure is not intended or offered for sale(Sec.7044, Business&Professions Code) I,as owner of the property,am exclusively contracting with licensed contractors to HAZARDOUS MATERIALS DISCLOSURE construct the project(Sec.7044,Business&Professions Code). I have read the hazardous materials requirements under Chapter 6.95 of the California Health&Safety Code,Sections 25505,25533,and 25534. 1 will I hereby affirm under penalty of perjury one of the following three maintain compliance with the Cupertino Municipal Code,Chapter 9.12 and the declarations: Health&Safety Code,Section 25532(a)should I store or handle hazardous I have and will maintain a Certificate of Consent to self-insure for Worker's material. Additionally,should I use equipment or devices which emit hazardous Compensation,as provided for by Section 3700 of the Labor Code,for the air contaminants as defined by the Bay Area Air Quality Management District I performance of the work for which this permit is issued. will maintain compliance with the Cupertino Municipal Code,Chapter 9.12 and I have and will maintain Worker's Compensation Insurance,as provided for by the Health&Safety Code,Sections 25505,25533,and 25534. Section 3700 of the Labor Code,for the performance of the work for which this 1_. - q �� permit is issued. Owner or authorized agent: Date: _ . I certify that in the performance of the work for which this permit is issued,I shall not employ any person in any manner so as to become subject to the Worker's Compensation laws of California. If,after making this certificate of exemption,I CONSTRUCTION LENDING AGENCY become subject to the Worker's Compensation provisions of the Labor Code,I must I hereby affirm that there is a construction lending agency for the performance of forthwith comply with such provisions or this permit shall be deemed revoked. work's for which this permit is issued(Sec.3097,Civ C.) Lender's Name APPLICANT CERTIFICATION Lender's Address I certify that I have read this application and state that the above information is correct.I agree to comply with all city and county ordinances and state laws relating to building construction,and hereby authorize representatives of this city to enter upon the above mentioned property for inspection purposes.(We)agree to save ARCHITECT'S DECLARATION indemnify and keep harmless the City of Cupertino against liabilities,judgments, costs,and expenses which may accrue against said City in consequence of the I understand my plans shall be used as public records. granting of this permit.Additionally,the applicant understands and will comply with all non-point source regulations per the Cupertino Municipal Code,Section Licensed Professional 9.18. Signature Date REROOF PERMIT APPLICATION COMMUNITY DEVELOPMENT DEPARTMENT•BUILDING DIVISION 10300 TORRE AVENUE•CUPERTINO, CA 95014-3255 CUPERTW4 {408)777-3228•FAX(408)777-3333-buildina(ftwertino.ora, np� PROJECT ADDRESS` q 1A 1/ILL 1 '1 Av t I APN# 2 Zr^ 13 1 ' OWNER NAME J CY • _ _yiw� PHONE1 fw�_ 9�'�: MAIL STREET ADDRESS CITY, STATE,ZIP I FAX CONTACT NAME I C n� I PHONE y C6 3 f� V I E- IIt-I C] `1`j IJ,J ✓b STREET ADDRESS ITY,STATE,ZIP FAX ❑OWNER ❑ OWNER-BUII.DER ❑ OWNER AGENT )2fCONTRACrOR ❑CONTRACTOR AGENT ❑ ARCHITECT ❑ENGINEER ❑ DEVELOPER ❑TENANT CONTRACTOR NAME LICENSE NUMBER LIC $E TYPE BUS.LIC.# COMPANY NAME J E-MAIL FAX W n n-I--c?r�rnc , � STREET ADDRESS CITY TE,ZIP rr�� 1 363 J ARCHITECT/ENGINEERNRME I LICENSE NUMBER BUS.LIC.# . COMPANY NAME E-MAIL FAX STREET ADDRESS CITY,STATE,ZIP PHONE USE OF ❑ SFD or Duplex XMulti-Family I ROOFAREA: I VALUATION. STRUCTURE: ❑ Commercial 1! � EXISTING ROOF TYPE: El BUILT-UP ROOF ❑ASPHALT SHINGLES ,td-WOOD SHAKES l ❑WOOD SHINGLES ❑OTHER(SPECIFY) REM FNO,' : I frar�?t .cc. ❑ q I I TYPE: CDX OOY PLYWOOD PLYWD OSB PITCH: II ROOF Nn # AYERS CLASS: PROPOSED ROOF TYPE: ❑BMT-UP ROOF PKASPHALT SHINGLES ❑WOOD SHAKES ❑WOOD SHINGLES ❑OTHER I ICC-ES REPORT# DESCRIPTION OF WORK: ��t�� t�rr.Gr{'��� �(��C� ,. t\�I�SL �r'�79(YYJ(LK i i(lI S fs • By my signature below,I certify.to each of the following: I am the property owner or authorized agent to act on the property owner's behalf I have read this application and the information I have provided is correct. I have read the Description of Work and verify it is accurate. I agree to comply with all applicable local ordinances and state laws relating ilding col ction. I a orize representatives of Cupertino to enter the above-identified property for inspection purposes. Signature of Applicant/Agent: _ Date: 7— SUPPLEMENTAL INFORMATION REQUIRED 9MM9011011 O �.-i� _If building is associated With a Home Owner's Association,provide letter _ of approval from HOA. z 4 Provide Planning approval to verify if there any restrictions. da s G Provide copy of Manufacturer's Installation Specifications. rb _Provide signed copy of Cupertino's Tear-Off Policy. o Reroof,4pp 2011.doe revised 03/16111 CITY OF CUPERTINO FEE ESTIMATOR-BUILDING DIVISION ADDRESS: 10349 AINSWORTH DATE: 07/24/2013 REVIEWED BY: MENDEZ is APN: I BP#: *VALUATION: 1$8,750 1 *PERMIT TYPE: Minor Building Permit I PLAN CHECK TYPE: Re-roof PRIMARY SFD or Duplex PENTAMATION 1SFDWLR00F USE: I I PERMIT TYPE: WORK I RE-ROOF 24 SQ- REMOVE SHAKES, CLASS A SCOPEI FEE ID ROOF AREA (S-0 1REROOFFRES 2,400 N� PN 41--l', 71t:;1M ' Mech. Plan Check Plumb.Plan Check Elec. Plan Chock IjWo-:h. Permit Fee: I Plumb.Permit Fee: I Elec. Permit tee: OtherAlech.Imp_ Other Plumb Insp. I Other Ek,(,.Imp, zllech. Insp. Fee: Plumb. Insp.Fee: Elec.Insp. Fee: NOTE:This estimate does not include fees due to other Departments(Le.Planning,Public Works,Fire,Sanitary Sewer District,School District,eta). These fees are based on the preliminary information available and are only an estimate. Contact the Dept for addnl info. FEE ITEMS(Fee Resolution 11-053 Eff 711112) FEE QTY/FEE I MISC ITEMS Plan Check Pee: Suppl. P(.'Fee A Pluinb.lillfech./El ec Permit Fee: $384.00 Suppl, Insp Fee Plum b.131fec A/Blec, Plumb./Mech.lElec Permit F'ee: Conso-tiction Tax: Administrative Fee: Work Without Permit? 0 Yes No $0.00 ,I dvanced Planning' Fees: Truvel Documentation Fees: Strong Motion Fee: lBSEISMCR $0.88 Select an Administrative Item Blda Stds Commission Fee: IBCBSC $1.00 0 $385.88 00 $385.88 $ Revised: 07/01/2013 i REROOF TEAR-OFF POLICY COMMUNITY DEVELOPMENT DEPARTMENT•BUILDING DIVISION ALBERT SALVADOR, P.E.,C.B.O., BUILDING OFFICIAL 10300 TORRE AVENUE•CUPERTINO,CA 95014-3255 CUPERTINO (408)777-3228•FAX(408)777-3333•building aC�cupertino.orq 1 PROJECT ADDRESS I � j q �C ^ � ,' q ] /�t q I APN# OWNER NAME 2 (•i �\II v wLJ K \ V I P~H �P�C/��^3 1 �-�I E-MAIL STREET ADDRESS ^^c„f,��y I CrFY,STATE,ZIP FAX CONTRACTOR NAM ( r j� LICENSE NUMBER LICENSE TYPE BUS.LIC.# COMPANY N FAX In r r STREET ADDRESS CITY,STATE,ZIP HO I UNDERSTAND AND AGREE TO THE FOLLOWING: 1. The re-roof project shall comply with all applicable provisions of the 2010 California Codes. 2. An inspection request can be scheduled up to one business day before the requested inspection date. Please call(408) 777-3228 from 7:30-3:30pm(Mon-Thurs) or 7:30-2:30pm(Friday)to schedule inspection. For Tear-Off and Nailing Inspections,you must also call on the day of the inspection only after that phase of the work is completed. The building inspector will be available within one hour. Final Inspections will be given a two hour window. 3. Tear-Off Inspection is required., Any and all dry-rotted wood shall be replaced prior to this inspection. Unless new plywood roof sheathing is proposed throughout, all the nails/fasteners shall be either completely knocked-down or removed prior to this inspection. 4. If plywood is installed, a plywood Nailing Inspection is required. 5. Roofing shall not be applied without first obtaining all prior inspection and written approvals from the building inspector. Any roofing which is applied without first obtaining an approved inspection will require the removal of all new material down to the sheathing so a proper inspection can be performed. 6. A Final Inspection and approval shall be obtained from the building inspector when the re-roofing is completed. To receive a final sign-off,the following items will be verified: a. Flat roofs shall have a minimum of I/4"per foot of slope and demonstrate there is no ponding. b- Listings from approved testing agencies for all pre-manufactured products used shall be available on-site to review at the time of the inspection. c. Proper spark arrestor installation, vents painted, gutter/downspouts installed, debris removed. 7. NOTE: If you call.for a tear-off or plywood nailing inspection and the work is not complete,you will be charged a re-inspection fee. The re-inspection fee shall be paid before another inspection can be scheduled. By my signing below,I certify each of the following is true: 1 am the property owner or authorized agent to act on the property owner's behalf. I understand and agree to comply with the re-roof policy stated above. I also understand that - smoke detectors and caibon.monoxide detectors are required to be installed in accordance with Sections R314 and R315 of the 2010 California Residential Cod de�w �� - _—?_1 I �7 Signature of Applicant/Agent: �w Date: I � RerooJPolicy_2012.doc revised 1017112