Loading...
09090001 CITY OF CUPERTINO BUILDING PERMIT BUILDING ADDRESS: 10238 CRESTON DR CONTRACTOR:R A CONSTRUCTION PERMIT NO:09090001 OWNER'S NAME: FLAAGAN JOHN K AND YVONNE H 3851 R CHARTER PARK DR DATE ISSUED:09/01/2009 ER'S PHONE: 4086919410 SAN JOSE,CA 95136 PHONE NO:(408)559-1877 ❑ LICENSED CONTRACTOR'S DECLARATION BUILDING PERMIT INFO: BLDG ELECT I- PLUMB License Class Lic.# MECH f— RESIDENTIAL I— COMMERCIAL Contractor Date 1 hereby affirm that I am licensed under the provisions of Chapter 9 JOB DESCRIPTION:RE-ROOF INSTALL OEB TAR PAPER SHINGLES (commencing with Section 7000)of Division 3 of the Business&Professions SIZE 1/2 Code and that my license is in full force and effect. 30LB OF FELT,2SQ ROLL CLASS A 50 SQS I hereby affirm under penalty of perjury one of the following two declarations: I have and will maintain a certificate of consent to self-insure for Worker's Compensation,as provided for by Section 3700 of the Labor Code,for the performance of the work for which this permit is issued. I have and will maintain Worker's Compensation Insurance,as provided for by Sq.Ft Floor Area: Valuation:$6500 Section 3700 of the Labor Code,for the performance of the work for which this permit is issued. APN Number:32637050.00 Occupancy Type: APPLICANT CERTIFICATION 1 certify that I have read this application and state that the above information is correct.I agree to comply with all city and county ordinances and state laws relating to building construction,and hereby authorize representatives of this city to enter PERMIT EXPIRES IF WORK IS NOT STARTED upon the above mentioned property for inspection purposes. (We)agree to save indemnify and keep harmless the City of Cupertino against liabilities,judgments, WITHIN 180 DAYS OF PERMIT ISSUANCE OR costs,and expenses which may accrue against said City in consequence of the 180 DAYS FROM LAST CALLED INSPECTION. granting of this permit. Additionally,the applicant understands and will comply with all non-point source regulations per the Cupertino Municipal Code,Section Date: 9.18. Issued y• Signature Date G OWNER-BUILDER DECLARATION RE-ROOFS: All roofs shall be inspected prior to any roofing material being installed.If a roof is I hereby affirm that I am exempt from the Contractor's License Law for one of installed without first obtaining an inspection,I agree to remove all new materials for the following two reasons: inspection. 1,as owner of the property,or my employees with wages as their sole compensation, will do the work,and the structure is not intended or offered for sale(Sec.7044, Signature of Applicant %" Date: Business&Professions Code) I,as owner of the property,am exclusively contracting with licensed contractors to (1 construct the project(Sec.7044,Business&Professions Code). ALL ROOF COVERINGS TO BE CLASS"A"OR BETTER I hereby affirm under penalty of perjury one of the following three HAZARDOUS MATERIALS DISCLOSURE declarations: I have and will maintain a Certificate of Consent to self-insure for Worker's I have read the hazardous materials requirements under Chapter 6.95 of the Compensation,as provided for by Section 3700 of the Labor Code,for the California Health&Safety Code,Sections 25505,25533,and 25534. I will maintain performance of the work for which this permit is issued. compliance with the Cupertino Municipal Code,Chapter 9.12 and the Health& I have and will maintain Worker's Compensation Insurance,as provided for by Safety Code,Section 25532(a)should I store or handle hazardous material. Section 3700 of the Labor Code,for the performance of the work for which this Additionally,should I use equipment or devices which emit hazardous air contaminants as defined by the Bay Area Air Quality Management District I will permit is issued. maintain compliance with the Cupertino Municipal Code,Chapter 9.12 and the I certify that in the performance of the work for which this permit is issued,I shall Health&Safety Code,Sections 25505,25533,and 25534. not employ any person in any manner so as to become subject to the Worker's Compensation laws of California. If,after making this certificate of exemption,1 O er or authorize C become subject to the Worker's Compensation provisions of the Labor Code,1 must Dater(, l forthwith comply with such provisions or this permit shall be deemed revoked. CONSTRUCTION LENDING AGENCY APPLICANT CERTIFICATION I hereby affirm that there is a constriction lending agency for the performance of work's I certify that I have read this application and state that the above information is for which this permit is issued(Sec.3097,Civ C.) correct.I agree to comply with all city and county ordinances and state laws relating Lender's Name to building construction,and hereby authorize representatives of this city to enter upon the above mentioned property for inspection purposes.(We)agree to save Lender's Address it ify and keep harmless the City of Cupertino against liabilities,judgments, c, ,nd expenses which may accrue against said City in consequence of the ARCHITECT'S DECLARATION granting of this permit.Additionally,the applicant understands and will comply with all non-point source regulations per the Cupertino Municipal Code,Section I understand my plans shall be used as public records. 9.18. , Licensed Professional Signature Date CITY OF CUPERTINO 3 ITEMS OF 3 PERMIT RECEIPT OPERATOR: patg COPY # 1 Sec: Twp: Rng: Sub: Blk: Lot: APN . . . . . . . . : 32637050 . 00 DATE ISSUED. . . . . . . : 09/01/2009 RECEIPT #. . . . . . . . . BS000008572 REFERENCE ID # . . . 09090001 SITE ADDRESS . . . . . : 10238 CRESTON DR SUBDIVISION . . . . . . CITY CUPERTINO IMPACT AREA . . . . . . OWNER FLAAGAN JOHN K AND YVONNE H ADDRESS 10238 CRESTON DR CITY/STATE/ZIP . . . : CUPERTINO CA, 95014-1014 RECEIVED FROM . . . . : YVONNE H FLAAGAN CONTRACTOR . . . . . . . : ANDREWS, RON LIC # 21382 COMPANY R A CONSTRUCTION ADDRESS 3851 R CHARTER PARK DR CITY/STATE/ZIP . . . : SAN JOSE, CA 95136 TELEPHONE . . . . . . . . : (408) 559-1877 FEE ID UNIT QUANTITY AMOUNT PD-TO-DT THIS REC NEW BAL ---------- ------------- ---------- ---------- ---------- ---------- ---------- 1BCBSC VALUATION 6, 500 . 00 1 .00 0 .00 1. 00 0 . 00 1BSEISMICR VALUATION 6, 500. 00 0 .70 0. 00 0.70 0 .00 1REROOFRES SQ FEET 50. 00 650 . 00 0 . 00 650 . 00 0 . 00 ---------- ---------- ---------- ---------- TOTAL PERMIT 651 .70 0 .00 651.70 0 .00 METHOD OF PAYMENT AMOUNT REFERENCE NUMBER ----------------- --------------- -------------------- CREDIT CARD 651.70 MC --------------- TOTAL RECEIPT 651 .70 VOICE ID DESCRIPTION VOICE ID DESCRIPTION -------- ---------------------------- -------- ---------------------------- 601 ROOF TEAR OFF 602 ROOF PLYWOOD NAIL 604 ROOF IN-PROGRESS 605 FINAL REROOF CJ 1 01 CITY --�,, CITY OF CUPERTINO ..eta- REROOF CITYCUPE(�T1NO PERMIT APPLICATION APN # Date: Building Address: _ Ry' 1r� Z Owner's Name: _ Phone #: HOA: Yes ❑ No i�]�f Yes, provide letter from HOA �' `� C1 If Contractor: RN Phone #: S 5 , F) " f ws- . Fax #: t1 a to 5 5 17 Cupertino Business Lice se #: Contractor License #: Type of Roof Covering: Existing: Proposed: ❑ Built-Up Roof ❑ Built-Up roof r�Asphalt Shingles w/Asphalt Shingles ❑ Wood Shakes ❑ Wood Shakes ` ❑ Wood Shingles ❑ Wood Shingles ❑ Other (Specify) ❑ Other (Specify) Number of existing coverings ❑ Provide I.C.C.E.S. Report# ❑ To be Removed ❑ Provide Mfgr. Installation Specs. Job Description: Residential Commercial Green Building: Please complete relevant portion of the Confirmed with Planning Dept. if Green Building Checklist & attach it to the application o there are any restrictions: ❑ applicable, include in plan set & the sheet index. Valuation: 6=s�o c® v 1p I Have Read, Understand and Will Comply with upertino's Tear-Off Policy: Si ture _ Revised 02/05/09 CITY OF CUPERTINO , ;- REROOF CITY CUPEkTINO FEE SCHEDULE Number of Fee ID Fee Description Fee Permit Type Squares Group 1REROOFCOM Re-roof Commercial B ICOMMLROOF 1BCBSC Cal Bldg Standards B ALL PERMIT TYPES Commission Fee 1BSEISMICO Seismic Commercial B 1RER00FRES Re-roof Residential B ISFDWLROOF 1BCBSC Cal Bldg Standards B ALL PERMIT TYPES Commission Fee 1BSEISMICRE Seismic Residential B 1 REROOFMRES Re-roof Multi-Family B IMFDWLROOF 1BCBSC Cal Bldg Standards B ALL PERMIT TYPES Commission Fee 1BSEISMICRE Seismic Residential B 1 BUSLIC Business License B Community Development Department Building Division City of Cupertino 10300 Torre Avenue Telephone: (408)777-3228 Fax: (408)777-3333 Building Department Subject: Re-roofing policy for the City of Cupertino 1. Prior to permit issuance,you must agree to comply with 2007 IBC Standards and manufacturers specifications on re-roofing.All roofs are Class "A"per Cupertino municipal code 16.04.080. 2. New roof coverings shall not be applied without first obtaining all inspection and written approval from the building inspector. A final inspection and approval shall be obtained from the building inspector when the re-roofing is completed. 3. All roofs shall be inspected prior to any roofing installation. 4. To receive a final sign off from the City,the following steps are required: 1) Pre-inspection and/or tear off approval. 2) In-progress inspection approval. 3) Final inspection approval. a) Spark arrester installation. - 5. If plywood is installed,a plywood nail inspection is required. . 6. Any roofing which is applied without first obtaining an inspection, will require the removal of all new material down to the sheathing, so a proper City inspection can be performed. 7. NOTE: If you call for a plywood nail inspection and the job is not ready, you will be charged a re-inspection fee of$176.18. The re-inspection fee must be paid before another inspection can be scheduled. IMPORTANT: 1. Flat roofs must have a minimum of 1/4 "per foot slope and demonstrate that there is no ponding. 2. An I.C.B.O. report is required to be on the job site at the time on inspection. I understand and will comply with the above stated policy on re-roofing. Homeowner's Name: �yp i✓ Af',G A) Job Site Address: X023 C Roofing Company CoName: Applicant's Signature: Date: g'37-d Greg Casteel Building Official Revised 07/30/08 INPUT Resources • 1AWHealth I.Windows 1.Install Energy-Efficient Windows a.Double-Paned 1 Energy pt y=yes 0 b.Low-Enis"(Low-E) 2 Energy pts y=yes 0 c.Low.Conductivity frames 2 Energy pts y=yes 0 2.Install Low Heat Transmission Glazing 1 Energy pt y=yes 1 0 1 i 1 J.Heating Ventilation and Air Conditioning 1.Use Duct Mastic on All Duct Joints 2 Energy pts y=yes 0 2.Install Ductwork within Conditioned Space 3 Energy pts y=yes 0 3.Vent Range Hood to the Outside 1 IAQ/Health pt y=yes 0 4.Clean all Ducts Before Occupancy 2 IAQ/Health pts y=yes 0 5.Install Solar Attic Fan 2 Energy pts y=yes 0 ,6'Install Attic Ventilation Systems M 1 Energy pt y=yes 0 7.Install Whole House Fan 4 Energy pts y=yes 0 B.Install Sealed Combustion Units a.Furnaces 3 IAQ/Health pts y=yes 0 b.Water Heaters 3 IAQ/Health pts y=yes 0 9.Replace Wall-Mounted Electric and Gas Heaters with Through-the-Wall Heat Pumps 3 Energy pts y=yes 0 10.Install 13 SEER/11 EER or higher AC with a TXV 3 Energy pts y=yes 0 11.Install AC with Non-HCFC Refrigerants 2 Resource pts y=yes 0 12.Install 90%Annual Fuel Utilization Efficiency(AFUE)Furnace 2 Energy pts y=yes 0 13.Retrofit Wood Burning Fireplaces a.Install EPA certified wood stovesfinserts 1 IAQ/Health pt y=yes 0 b. Install/Replace Dampers 1 Energy pt y—yes 0 c.Install Airtight Doors 1 Energy pt y=yes 0 14.Install Zoned,Hydronic Radiant Heating 3 Energy pts y=yes 0 15.Install High Efficiency Filter 4 IAQ/Health pts y=yes 0 16.Install Heat Recovery Ventilation Unit(HRV) 5 IAQ/Health pts y=yes 0 17.Install Separate Garage Exhaust Fan 3 IAQ/Health pts y=yes 0 1 1 1 K.Renewable Energy and Roofing 1.Pre-Plumb for Solar Water Heating 4 Energy pts y=yes 0 2.Install Solar Water Heating System 10 Energy pts y=yes 0 3.Pre-Wire for Future Photovoltaic(PV)Installation 4 Energy pts y=yes 0 4.Install Photovoltaic(PV)System (1.2 kw=6 points,2.4 kw=12 points,3.6 kw=18 points) Up to 18 Energy pts 0 elect Safe and Durable Roofing Materials 1 Resource pt y=yes 0 7.In tall Radiant Barrier 3 Energy pts y=yes 0 1 1 1 L.Natural Heating and Cooling 1.Incorporate Passive Solar Heating 5 Energy pts y=yes 0 0 2.Install Overhangs or Awnings over South Facing Windows 3 Energy pts y=yes 3.Plant Deciduous Trees on the West and South Sides 3 Energy pts y=yes 0 1 1 1 INPUT Resources Energy IAO/Health M.Indoor Air Quality and Finishes 1.Use Low/No-VOC Paint 1 IAQ/Health pts y=yes 0 2.Use Low VOC,Water-Based Wood Finishes 2 IAQ/Health pts y=yes 0 3.Use Low/No VOC Adhesives 3 IAQ/Health pts y=yes 0 4.Use Salvaged Materials for Interior Finishes 3 Resource pts y=yes 0 5.Use Engineered Sheet Goods with no added Urea Formaldehyde 61AQ/Health pts y=yes 0 0 6.Use Exterior Grade Plywood for Interior Uses 1 IAQ/Health pts y=yes 7.Seal all Exposed Particleboard or MDF 4 IAQ/Health. pts y=yes 0 8.Use FSC Certified Materials for Interior Finish 4 Resource pts y=yes 0 . 9.Use Finger-Jointed or Recycled-Content Trim 1 Resource pts y=yes 0 10.Install Whole House Vacuum System 3 IAQ/Health pts y=yes 1 miimd N.Flooring 1.Select FSC Certified Wood Flooring 8 Resource pts y=yes 0 2.Use Rapidly Renewable Flooring Materials 4 Resource pts y=yes 0 3.Use Recycled Content Ceramic Tiles 4 Resource pts y=yes 0 4.Install Natural Linoleum in Place of Vinyl 5 IAQ/Health pts y=yes 0 5.Use Exposed Concrete as Finished Floor 4 Resource pts y=yes 0 6.Install Recycled Content Carpet with Low VOCs 4 Resource pts y=yes 0 1 1 ! Total Points Available: L140 130 57 Total Points Project Received: 01 _ 01 0 5 G:data/progs/greenbuilcUngguidefines/remodelers/greenpointsfinal2.12.D4protectedAs f 7 Community Development 10300 Tone Avenue " Cupertino CA 95014 Telephone(408)777-3228 CITY OF Fax(408)777-3333 .:UPEkTiNO Building Department JOB ADDRESS: PERMIT # OWNER'S NAME: �c ;•1 0A0 UP, Q. ,� PHONE # U,, C:�Ci I -6i GENERAL CONTRACTOR!"Q4 4 ��,;;� 2, c-1 ,� FAX # as-e!] 1 3 I am not using any subcontractors: L Signature Date Please check applicable subcontractors and complete the following information: SUBCONTRACTOR BUSINESS NAME BUSINESS LICENSE # Cabinets &Millwork Cement Finishing Electrical Excavation Fencing Flooring: Carpeting Linoleum/ Wood Glass / Glazing Heating Insulation Landscaping Lathing Masonry Ornamental Sheet Metal Painting/ Wallpaper Paving Plastering Plumbing Roofing Septic Tank Sheet Metal Sheet Rock Tile J Owner/Contractor SignatureDate