09120001 (2) CITY OF CUPERTIN O BUILDING PERMIT
BUILDING ADDRESS: 7803 LILAC CT CONTRACTOR:QUALITY FIRST HOME PERMIT NO:09120001
MPROVEMENTS
C'"NER'S NAME: MCHAN MARTIN A AND MARY L 1545 SUNRISE BLVD STE 202 DATE ISSUED: 12/01/2009
V vvNER'S PHONE: 4082550136 �:ITRUS HEIGHTS,CA 95610 PHONE NO:(916)788-2921
❑ LICENSED CONTRACTOR'S DECLARATION BUILDING PERMIT INFO: BLDG F ELECT f— PLUMB
License Class C Lie.# 5 7y, f—
` MECH RESIDENTIAL COMMERCIAL
Contractorv�/� r '� Date
A rteI JOB DESCRIPTION:RE-ROOF INSTALLING CLASS B SHAKES OVER
I hereby affirm that I am licensed under the provisions of Chapter 9 FIBERGLASS
(commencing with Section 7000)of Division 3 of the Business&Professions 2APSHEET 8SQ
Code and that my license is in full force and effect.
I hereby affirm under penalty of perjury one of the following two declarations:
I have and will maintain a certificate of consent to self-insure for Worker's
Compensation,as provided for by Section 3700 of the Labor Code,for the
performance of the work for which this permit is issued.
I have and will maintain Worker's Compensation Insurance,as provided for by
Section 3700 of the Labor Code,for the performance of the work for which this Sq.Ft Floor Area: Valuation:$6500
permit is issued.
APPLICANT CERTIFICATION APN Number:35903025.00 Occupancy Type:
I certify that I have read this application and state that the above information is
correct.I agree to comply with all city and county ordinances and state laws relating
to building construction,and hereby authorize representatives of this city to enter
upon the above mentioned property for inspection purposes. (We)agree to save PERMIT EXPIRES IF WORK IS NOT STARTED
indemnify and keep harmless the City of Cupertino against liabilities,judgments,
costs,and expenses which may accrue against said City in consequence of the WITHIN 180 DAYS OF PERMIT ISSUANCE OR
granting of this permit. Additionally,the applicant understands and will comply 180 D YS FROM ST CALLED INSPECTION.
with all non-point source regulations per the Cupertino Municipal Code,Section
9.18. l2 / •0
�- Issued by Date:
S: -ture Date /
❑ OWNER-BUILDER DECLARATION
RE-ROOFS:
I hereby affirm that I am exempt from the Contractor's License Law for one of All roofs shall be inspeptog material being installed.If a roof is
the following two reasons: installed without first oI agree move all new materials for
1,as owner of the property,or my employees with wages as their sole compensation, inspection.
will do the work,and the structure is not intended or offered for sale(Sec.7044, rBusiness&Professions Code) Signature of Applicant: Date: f e"-l - 0q
1,as owner of the property,am exclusively contracting with licensed contractors to
construct the project(Sec.7044,Business&Professions Code). ALL ROOBE CLASS"A"OR BETTER
1 hereby affirm under penalty of perjury one of the following three
declarations: HAZARDOUS MATERIALS DISCLOSURE
1 have and will maintain a Certificate of Consent to self-insure for Worker's
Compensation,as provided for by Section 3700 of the Labor Code,for the I have read the hazardous materials requirements under Chapter 6.95 of the
performance of the work for which this permit is issued. California Health&Safety Code,Sections 25505,25533,and 25534. I will maintain
I have and will maintain Worker's Compensation Insurance,as provided for by compliance with the Cupertino Municipal Code,Chapter 9.12 and the Health&
Safety Code,Section 25532(a)should I store or handle hazardous material.
Section 3700 of the Labor Code,for the performance of the work for which this Additionally,should I use equipment or devices which emit hazardous air
permit is issued. contaminants as defined by the Bay Area Air Quality Management District 1 will
I certify that in the performance of the work for which this permit is issued,I shall maintain compliance with the Cupertino Municipal Code,Chapter 9.12 and the
not employ any person in any manner so as to become subject to the Worker's Health&Safety Code,Sections 25505,25533,and 25534.
Compensation laws of California. If,after making this certificate of exemption,I
become subject to the Worker's Compensation provisions of the Labor Code,I must Owe or auth 90 Dater
ent: ,
forthwith comply with such provisions or this permit shall be deemed revoked.
t
t000l
CONSTRUCTION LENDING AGENCY
APPLICANT CERTIFICATION
1 certify that I have read this application and state that the above information is I hereby affirm that there is a construction lending agency for the performance of work's
correct.I agree to comply with all city and county ordinances and state laws relating for which this permit is issued(Sec.3097,Civ C.)
to building construction,and hereby authorize representatives of this city to enter Lender's Name
I he above mentioned property for inspection purposes.(We)agree to save
i:, mify and keep harmless the City of Cupertino against liabilities,judgments, Lender's Address
costs,and expenses which may accrue against said City in consequence of the
granting of this permit.Additionally,the applicant understands and will comply ARCHITECT'S DECLARATION
with all non-point source regulations per the Cupertino Municipal Code,Section
I understand my plans shall be used as public records.
9.18.
Signature Date Licensed Professional
C91 -2_ �
-�, CITY OF CUPERTINO
REROOF
CUPEkT1NO PERMIT APPLICATION
APN # Date:
Building Address: ..
Ci
Ow er's Name: n Phone #:
u�y A-
1
HOA: Yes ❑ No ❑ If yes, provide leiter from HOA
Contractor: Phone
ell
l /[ I Y °Yy' I i.%C'n-� Fax #:
ertino Business License #: Contractor License #:
-el 5:La
Type of hoof Covering:
Existing: Proposed:
❑ Built-Up Roof ❑ Built-Up roof
❑ Asphalt Shingles ❑ Asphalt Shingles
❑ Wood Shakes X Wood Shakes
Wood Shingles ❑ Wood Shingles
❑ Other (Specify) ❑ Other (Specify)
Number of existing coverings ❑ Provide I.C.C.E.S. Report#
❑ To be Removed ❑ Provide Mfgr. Installation Specs.
Job Description: y,h i�T tt'`��S S /ve�`"
��,dVC
A /ty �CW WL'k6 !±n75&_, Atict C6A \YA I P
Residential Commercial
Green Building: Please complete relevant portion of the Confirmed with Planning Dept. if
Green Building Checklist & attach it to the application or if there are any restrictions: ❑
applicable, include in plan set & the sheet index.
Valuation: 0
r
I Have ead, Understand and Will Comply with Cupertino's Tear-Off Policy:
na re
Revised 02/05/09
a
CITY OF CUPERTINO
RER OOF
CUPEkTINO FEE SCHEDULE
Number of Fee ID Fee Description Fee Permit Type
Squares Group
1REROOFCOM Re-roof Commercial B 1COMMLROOF
1BCBSC Cal Bldg Standards B ALL PERMIT TYPES
Commission Fee
1BSEISMICO Seismic Commercial B
Ci IREROOFRES Re-roof Re,idential B 1SFDWLROOF
1 1BCBSC Cal Bldg Standards B ALL PERMIT TYPES
Commission Fee
J 1BSEISMICRE Seismic Residential B
1REROOFMRES Re-roof Multi-Family B 1MFDWLROOF
1BCBSC Cal Bldg Standards B ALL PERMIT TYPES
Commission Fee
1BSEISMICRE Seismic Re;;idential B
1BUSLIC Business License B
Community Development Department
Building Division
City of Cupertino
10300 Torre Avenue
Telephone: (408)777-3228
Fax: (408)777-3333
Building Department
Subject: Re-roofing policy for the City of Cupertino
1. Prior to permit issuance,you must ag.-ee to comply with 2007 IBC Standards
and manufacturers specifications on rz!-roofing.All roofs are Class "A"per Cupertino
municipal code 16.04.080.
2. New roof coverings shall not be appli?d without first obtaining all inspection
and written approval from the building inspector. A final inspection and
approval shall be obtained from the b wilding inspector when the re-roofing
is completed.
3. All roofs shall be inspected prior to any roofing installation.
4. To receive a final sign off from the City,the following steps are
required:
�. 1) Pre-inspection and/or tear off approval.
2) In-progress inspection approval.
3) Final inspection approval.
a) Spark arrester installation.
5. If plywood is installed, a plywood nail inspection is required.
6. Any roofing which is applied without first obtaining an inspection,
will require the removal of all new material down to the sheathing,
so a proper City inspection can be performed.
7. NOTE: If you call for a plywood nail inspection and the job is not ready,
you will be charged a re-inspection fee of$176.18. The re-inspection fee must
be paid before another inspection can be scheduled.
IMPORTANT:
1. Flat roofs must have a minimum of 1/ " per foot slope and demonstrate
that there is no ponding.
2. An I.C.B.O.report is required to be on the job site at the time on inspection.
I understand and will comply with the above stated policy on re-roofing.
Homeowner's Name: MCA " yy-\,--
Job Site Address:
Roofing Company Name:
Applicant's Signature: Date:
Greg Casteel
Building Official
Revi:ed 07/30/08
Community Development
;»'-•;. 10300 Torre Avenue
Cupertino CA 95014
Telephone(408)777-3228
Fax(408)777-3333
CITY OF
�UPEkTINO
Buildi�l De arty
JOB ADDRESS: PERMIT #
L
OWNER'S NAME: Y1 PHONE #
GENERAL CONTRACTOR .+ FAX #
I am not using any subcontractors:
/1 - - vel'
Signature Date
Please check applicable subcontractors and complete the followin information:
SUBCONTRACTOR BUSINESS NAME BUSINESS LICENSE #
Cabinets &Millwork
Cement Finishing
Electrical
Excavation
Fencing
Flooring: Carpeting
Linoleum/ Wood
Glass / Glazing
Heating
Insulation
Landscaping
Lathing
Masonry
Ornamental Sheet Metal
Painting/ Wallpaper
Paving
Plastering
Plumbing
Roofing
Septic Tank
Sheet Metal
Sheet Rock
Tile
owner/Contractor Signature Date