Loading...
10010168 CITY OF CUPERTINO BUILDING PERMIT BUILDING ADDRESS: 10213 MILLER AVE CONTRACTOR:VALLEY HEATING& PERMIT NO: 10010168 COOLING "NER'S NAME: BOB SHERRY&STEPHEN THOMAS 1171 N 4 TH ST DATE ISSUED:01/28/2010 OWNER'S PHONE: 4082036286 SAN JOSE,CA 95112 PHONE NO:(408)294-6290 ❑ LICENSED CONTRACTOR'S DECLARATION BUILDING PERMIT INFO: BLDG ELECT PLUMB License Class Lic.# _; y I— MECH RESIDENTIAL COMMERCIAL Contractor Date F` j!� I hereby affirm that I am licensed under the provisions of Chapter 9 JOB DESCRIPTION:REPLACE FURNACE,ADD A/C**SEE NOTES** (commencing with Section 7000)of Division 3 of the Business&Professions Code and that my license is in full force and effect. I hereby affirm under penalty of perjury one of the following two declarations: I have and will maintain a certificate of consent to self-insure for Worker's Compensation,as provided for by Section 3700 of the Labor Code,for the performance of the work for which this permit is issued. Sq.Ft Floor Area: Valuation:$6709 1 have and will maintain Worker's Compensation Insurance,as provided for by Section 3700 of the Labor Code,for the performance of the work for which this APN Number:36914020.00 Occupancy Type: permit is issued. APPLICANT CERTIFICATION I certify that I have read this application and state that the above information is correct.I agree to comply with all city and county ordinances and state laws relating PERMIT EXPIRES IF WORK IS NOT STARTED to building construction,and hereby authorize representatives of this city to enter upon the above mentioned property for inspection purposes. (We)agree to save WITHIN 180 DAYS OF PERMIT ISSUANCE OR indemnify and keep harmless the City of Cupertino against liabilities,judgments, 180 DAYS FROM LAST CALLED INSPECTION. costs,and expenses which may accrue against said City in consequence of the granting of this permit. Additionally, the applicant understands and will comply with all r r non-point souegulatio sper the Cupertino Municipal Code,Section Issued by;,--- Date: j 9.18. op -natur Date 1" 1d RE-ROOFS: ❑ OWNER-BUILDER DECLARATION All roofs shall be inspected prior to any roofing material being installed.If a roof is installed without first obtaining an inspection,I agree to remove all new materials for I hereby affirm that I am exempt from the Contractor's License Law for one of inspection. the following two reasons: 1,as owner of the property,or my employees with wages as their sole compensation, Signature of Applicant: Date: will do the work,and the structure is not intended or offered for sale(Sec.7044, Business&Professions Code) I,as owner of the property,am exclusively contracting with licensed contractors to ALL ROOF COVERINGS TO BE CLASS"A"OR BETTER construct the project(Sec.7044,Business&Professions Code). I hereby affirm under penalty of perjury one of the following three HAZARDOUS MATERIALS DISCLOSURE declarations: I have read the hazardous materials requirements under Chapter 6.95 of the I have and will maintain a Certificate of Consent to self-insure for Worker's California Health&Safety Code,Sections 25505,25533,and 25534. I will maintain Compensation,as provided for by Section 3700 of the Labor Code,for the compliance with the Cupertino Municipal Code,Chapter 9.12 and the Health& performance of the work for which this permit is issued. Safety Code,Section 25532(a)should I store or handle hazardous material. I have and will maintain Worker's Compensation Insurance,as provided for by Additionally,should I use equipment or devices which emit hazardous air Section 3700 of the Labor Code,for the performance of the work for which this contaminants as defined by the Bay Area Air Quality Management District I will maintain compliance with the Cupertino Municipal Code,Chapter 9.12 and the permit is issued. Health&Safety Code,Sections 25505,25533,and 25534. 1 certify that in the performance of the work for which this permit is issued,I shall not employ any person in any manner so as to become subject to the Worker's Owner t ed agent: Compensation laws of California. If,after making this certificate of exemption,I Date: become subject to the Worker's Compensation provisions of the Labor Code,I must forthwith comply with such provisions or this permit shall be deemed revoked. V7 CONSTRUCTION LENDING AGENCY I hereby affirm that there is a construction lending agency for the performance of work's APPLICANT CERTIFICATION for which this permit is issued(Sec.3097,Civ C.) I certify that I have read this application and state that the above information is Lender's Name correct.I agree to comply with all city and county ordinances and state laws relating to building construction,and hereby authorize representatives of this city to enter Lender's Address n the above mentioned property for inspection purposes.(We)agree to save ,mnify and keep harmless the City of Cupertino against liabilities,judgments, ARCHITECT'S DECLARATION costs,and expenses which may accrue against said City in consequence of the granting of this permit.Additionally,the applicant understands and will comply I understand my plans shall be used as public records. with all non-point source ulati s pe e Cupertino Municipal Code,Section 9.18. . Licensed Professional Signature Date f CITY OF CUPERTINO 8 ITEMS OF 22 PERMIT RECEIPT OPERATOR: patg COPY # 1 Sec: Twp: Rng: Sub: Blk: Lot: APN . . . . . . . . : 36914020 . 00 DATE ISSUED. . . . . . . : 01/28/2010 RECEIPT #. . . . . . . . . : BS000009643 REFERENCE ID # . . . : 10010168 SITE ADDRESS 10213 MILLER AVE SUBDIVISION . . . . . . . CITY . . . . . . . . . . . . . . CUPERTINO IMPACT AREA OWNER BOB SHERRY & STEPHEN THOMAS ADDRESS 10213 MILLER AVE CITY/STATE/ZIP CUPERTINO CA, CA 95014 RECEIVED FROM . . . . : VALLEY HEATING & CO CONTRACTOR . . . . . . . : ATKINSON, THOMAS LIC # 141 COMPANY . . . . . . . . . . : VALLEY HEATING & COOLING ADDRESS . . . . . . . . . . : 1171 N 4 TH ST CITY/STATE/ZIP . . . : SAN JOSE, CA 95112 TELEPHONE . . . . . . . . : (408) 294-6290 FEE ID UNIT QUANTITY AMOUNT PD-TO-DT THIS REC NEW BAL ----- ---------- ---------- ---------- ---------- ---------- 1BCBSC VALUATION 61709 . 00 1. 00 0 .00 1 . 00 0 . 00 1BREMAIRHA NO.UNITS 1. 00 63 . 00 0 .00 63 . 00 0 . 00 1BSEISMICR VALUATION 61709. 00 0 . 70 0 . 00 0 . 70 0 . 00 lEPERMITFE FLAT RATE 1. 00 42 . 00 0 . 00 42 . 00 0 . 00 1MPERMITFE FLAT RATE 1.00 42 . 00 0 . 00 42 . 00 0 . 00 1MRRAA UNITS 1.00 63 . 00 0 . 00 63 . 00 0 . 00 1PPERMITFE FLAT RATE 1. 00 42 . 00 0 . 00 42 . 00 0 . 00 1TRAVDOC FLAT RATE 1 . 00 42 . 00 0 . 00 42 . 00 0 . 00 ---------- ---------- ---------- ---------- TOTAL PERMIT 295 . 70 0 . 00 295 . 70 0 . 00 VOICE ID DESCRIPTION VOICE ID DESCRIPTION ---------------- -------- ---------------------------- 505 FINAL ELECTRICAL 507 FINAL PLUMBING 508 FINAL MECHANICAL t r CITY OF CUPERTINO FURNACE/AC `M OFPLICATION FORM Cl�PE1�TiN0 PERMIT AP APN# Date: C-� (,0C Building Address: c� 12) �ey- vt, Owner's Name: Phone #: 4160 Contractor: Phone#: 4 Fax#: Contractor license#: Cupertino Business License#: e_�!5�z Contact: Phone#: LIDS Fax#: Building Permit Info: Elect PlumbEl Mech Residential Commercial ❑. Job Description: For Re idential Installations: Attic ❑ 1St floor [ 2nd floor 1:1 Adhere to minimum setback requirement L For Commercial Installations: Replacemcnt same weight ❑ Additional weigrit (Str't�Cttir ai calcS) 71 Structural Calculations required for new installation ❑ New installation Planning Approval Required El Cost of Project: Type of Construction (Usage Class): v Strapped ❑ On Platform El Bonded New Location Pr Replacement Valuation: Green Building: Must attach Green Building Check list to this application CITY OF CUPERTINO FURNACE/AC CUFF OF FEE SCHEDULE Quantity Fee ID Fee Description Fee Permit Type Group FURNACE FURN/AC -1PGASRE-S Residential-of r ea gas piping systein of-- P -- -- 1-4 Outlets IBPGAS For each gas piping system of 5 or P more per outlet. 1 B SEISMICR Residential Seismic B 1 MECPLNCK Mechanical Plan Check M 1MFR=<100 Furnace Syst<=100k BTU install or M relocate ea forced-air/gravity typef ' fumace/burner, incl ducts/vents L� attached to such appliance up to and include 100,000 Btu/h 1MFRN>100 Furnace Syst> 100k BTU install or M relocate ea forced-air/gravity type furnace/burner, incl ducts/vents attached to such appliance over 100,000 Btu/h 1 EPERMITFEE Electric Permit Fee E 1MPERMITFEE Mechanical Permit Fee M 1PPERMITFEE Plumbing Permit P 1 r 1 TRAVDOC Travel Documentation B 1BUSLIC Business License B CITY OF CUPERTINO FURNACE/AC P T �U R�1NO FEE SCHEDULE Quantity Fee ID Fee Description Fee Permit Type Group AIR FURN/AC CONDITIONING IBCAIRHAN Commercial A/C Units<= 1 O CFM B 1MCRAA Commercial Mech Repair/alt/add M 1BSEISMIC0 Seismic Commercial B 1PGASCOM Commerical for ea gas piping System P 1-4 outlets 1PGASRES Residential for ea gas piping system P of 1-4 Outlets 1BPGAS For each gas piping system of 5 or P more per outlet. Comm/Resid 1BRE Residential A/C units <= 1 O CFM B 1 Residential Mech Repair/alt/add M 1BSEISMICR Seismic Residential B 1 EPERMITFEE Electric Permit E 1MPERMITFEE Mechanical Permit M 1PPERMITFEE Plumbing Permit P 1 TRAVDOC Travel Documentation B 1BUSLIC Business License B - 1 U CD U 0 0 ❑ Enter description here,and enter points available for measure in appropriate categories to the right -_ -_ — -----.-------_--_---_-�-• 0 �- Enter description here,and enter points available for measure in appropriatL categories to the right __,___.___.._ _—.__- ❑ _Enter description here,and enter points available for measure in appropriate categories to the right __ _ __ —y _ _____.______ 0 D - _ D` 0_— _- ❑ Enter description here,and enter points available for measure in appropriate cateoories to the right 0— -0 0 D D Build It Green Chec0ists and 4.Innovation:List innovative measures that meet the green building objectives of the Guidelines.Enter up to a ` uidelines maximum combined total of 20 pts.See Innovation Checklist for suggested measures,using the link to the eight. ____i_ _^— — Innovation in Community:Enter description here,and enter points available for-measure in appropriate categories to the right 0 D _0 -_�—D- 0 0 ❑ Innovation in Energy:Enter description here,and enter points available for measure in appropriate categories to the right. 0 D o points available for measure in appropriate categories to the right. D 0 - D _ D_ __0.— 0 ❑ Innovation in lAQ/Health:Enter description here, enter p a ` ❑ Innovation in Resources:Enter description here,and enter points available for measure in appropriate categories to the right D - 0 D 0 0 _ -0 _ o r 'n ro nate Categories to the ri hi _ D D 0 _�-0 D D ❑ Innovation in Water.Enter description here,and enter points available for measu e i app p g 9 ___.-_ -- Total Avallable-Points in-Other=43 0 Total Available Points in Specific Categories` 4+ 196+ , 42+ 166+ 143+ Minimum Points Required in Specific Categories 0 30 6 J 6 I 9 7ect has not yet met the following recommended minimum requiirements: , f` -Total Project Score of At Least 50 Points -Required measures: �j r -A3a: 50% i4laste diversion by weight ( _ -JZ-X15°:o-abo��e—Title-24 -td1:Incorporate GreenPoint Rated Checkdist into blueprints -Minimum points in specific categories: -Energy(30 points) -1A01Health(5 points) -Resources(6 points) -Vater(9 points) 02007 Build It Green Single Family GreenPoint Checklist 2D07 Version Page 4 of 4 K Community Development f>. 10300 Torre Avenue Cupertino CA 95014 Telephone(408)777-3228 CITY OF Fax(408)777-3333 7UPEkTINO Building Depart ent JOB ADDRESS: PERMIT # Z Lo XA 1; Z 06/9 lt,�l-7 OWNER'S NAME: PHONE # Agety 2�D GENERAL CONTRA TOR: FAX # I am not using any subcontractors: Signature Date Please check applicable subcontractos an complete the following information: F- -a SUBCONTRACTOR BUSINESS NAME BUSINESS LICENSE # Cabinets &Millwork Cement Finishing Electrical Excavation Fencing Flooring: Carpeting Linoleum/ Wood Glass/ Glazing Heating Insulation Landscaping Lathing Masonry Ornamental Sheet Metal Painting/ Wallpaper Paving Plastering Plumbing Roofing Septic Tank Sheet Metal Sheet Rock Tile ne zctor Signature Date