No preview available
09110158BUILDING ADDRESS: 10120 N DE ANZA B OWNER'S NAME: ST. JOSEPH OF CUPERTINO SCHOOL NNER'S PHONE: 4082526441 CITY OF CUPERTP.vO BUILDING PERMIT LVD CONTRACTOR: TBD - TO BE DETERMINED 11 LICENSED CONTRACTOR'S DECLARATION License Class Lic.# b z�. Contractor) /' C Date 0 I hereby affirm that I am licensed under the provisions of Chapter 9 (commencing with Section 7000) of Division 3 of the Business & Professions Code and that my license is in full force and effect. I hereby affirm under penalty of perjury one of the following two declarations: I have and will maintain a certificate of consent to self -insure for Worker's Compensation, as provided for by Section 3700 of the Labor Code, for the performance of the work for which this permit is issued. I have and will maintain Worker's Compensation Insurance, as provided for by Section 3700 of the Labor Code, for the performance of the work for which this permit is issued. APPLICANT CERTIFICATION I certify that I have read this application and state that the above information is correct. I agree to comply with all city and county ordinances and state laws relating to building construction, and hereby authorize representatives of this city to enter upon the above mentioned property for inspection purposes. (We) agree to save indemnify and keep harmless the City of Cupertino against liabilities, judgments, costs, and expenses which may accrue against said City in consequence of the granting of this permit. Additionally, the applicant understands and will comply with all non -point source regulations per the Cupertino Municipal Code, Section 9.18. Signatur Date a OWNER -BUILDER DECLARATION I hereby affirm that I am exempt from the Contractor's License Law for one of the following two reasons: I, as owner of the property, or my employees with wages as their sole compensation, will do the work, and the structure is not intended or offered for sale (Sec.7044, Business & Professions Code) I, as owner of the property, am exclusively contracting with licensed contractors to) construct the project (Sec.7044, Business & Professions Code). I hereby affirm under penalty of perjury one of the following three declarations: 1 have and will maintain a Certificate of Consent to self -insure for Worker's Compensation, as provided for by Section 3700 of the Labor Code, for the performance of the work for which this permit is issued. I have and will maintain Worker's Compensation Insurance, as provided for by Section 3700 of the Labor Code, for the performance of the work for which this permit is issued. I certify that in the performance of the work for which this permit is issued, I shal. not employ any person in any manner so as to become subject to the Worker's Compensation laws of California. If, after making this certificate of exemption, I become subject to the Worker's Compensation provisions of the Labor Code, I mist forthwith comply with such provisions or this permit shall be deemed revoked. APPLICANT CERTIFICATION I certify that I have read this application and state that the above information is correct. I agree to comply with all city and county ordinances and state laws relat ng to building construction, and hereby authorize representatives of this city to enter upon the above mentioned property for inspection purposes. (We) agree to save 'emnify and keep harmless the City of Cupertino against liabilities, judgments, sts, and expenses which may accrue against said City in consequence of the granting of this permit. Additionally, the applicant understands and will comply with all non -point source regulations per the Cupertino Municipal Code, Section 9.18. Signature ate PERMIT NO: 09110158 DATE ISSUED: 02/19/2010 PHONE NO: JOB DESCRIPTION: RESIDENTIAL LJ COMMERCIAL TENANT IMPROVEMENT OF EXISTING BUILDING FOR A PRESCHOOL & HOMEOWRK ROOM(2880SQFT) 2/16/10 SEE TEMP PERMIT #10020093 FOR SOME OF THE Sq. Ft Floor Area: I Valuation: $298000 APN Number: 31626091.00 Occupancy Type: PERMIT EXPIRES IF WORK IS NOT STARTED WITHIN 180 DAYS OF PERMIT ISSUANCE OR 180 DAYS FROM LAST CALLED INSPECTION. Issued by. - e- %� Date: 2 —/ � LU RE -ROOFS: All roofs shall be inspected prior to any roofing material being installed. If a roof is installed without first obtaining an inspection, I agree to remove all new materials for inspection. Signature of Applicant: Date: ALL ROOF COVERINGS TO BE CLASS "A" OR BETTER HAZARDOUS MATERIALS DISCLOSURE I have read the hazardous materials requirements under Chapter 6.95 of the California Health & Safety Code, Sections 25505, 25533, and 25534. I will maintain compliance with the Cupertino Municipal Code, Chapter 9.12 and the Health & Safety Code, Section 25532(a) should I store or handle hazardous material. Additionally, should I use equipment or devices which emit hazardous air contaminants as defined by the Bay Area Air Quality Management District I will maintain compliance with the Cupertino Municipal Code, Chapter 9.12 and the Health & Safety Code, Sections 25505, 25533, a 25534. Owner or authorized agent te: a CONSTRUCTION LENDING AGENCY I hereby affirm that there is a construction lending agency for the performance of work's for which this permit is issued (Sec. 3097, Civ C.) Lender's Name Lender's ARCHITECT'S DECLARATION I understand my plans shall be used as public records. Licensed Professional REVISION / DEFERRED PROJECT DESCRIPTION:`) `���=gym C DATE: �(� 11-� ����✓S 5��� z��x'a.��,� .. �1Yoow� ,-v� or�,��_ ��A�..( . �.,Mwvww m m-, 2 115 ff, I, OVA I=, is im m I r, m m PUBLIC WORKS 'SriM,I M� IMI Pq � VALUATION: CONTACT: NOTES: SO. FT. PHONE: 6.1-a--Fol0-OSd z FAX: 6-20`�O ISSUED BY. DATE: � � 7` -,/6 PERMIT #_ t l DATE PROJECT ADDRESS 19/2, 0 ll A n, 4 APPLICANTydaA t OWNER _� `T'. \J c m! 1 � 1► .ii mm-- mmmm mm� mmmmommmmmmmo Ji�M �NZ11A WIN" m WORKS Ago OEM- owM lm�0 PN# 31 D C % RES. (L` NO) (GARAGE) OMM. SQ. FE (NEW) T.I. SORT. �'b RES. REMODEL ONTACT FE CA PHONE# 2(2 Z 2 FAX ALUATION (Cost of Project) % UU REQD. PAID OTES: I f .f 4kxt_ei' CONSTRUCTION TAX (Y) SCHOOL FEES (Y) HOUSING MMG (Y) OF THE CITY (Y) ED IR N. IU )of is As for he d the D rdous �rict 1 'and SUED B DATE TOTAL FEES ? 2 7 I CITY OF CUPERTINO BUILDING PERMIT I BUILDING ADDRESS: 10120 N DE ANZA BLVD I CONTRACTOR: TBD - TO BE I PERMIT NO: 09110158 j DETER OWNER'S NAME: ST. JOSEPH OF CUPERTINO SCHOOL I I DATE ISSUED: 02/19/2010 1 OWNER'S PHONE: 4082526441 1 1 1PHONENO: ❑ LICENSED CONTRACTOR'S DECLARATION I JOB DESCRIPTION: RESIDENTIAL 0 COMMERCIAL License Class_ Lic.# Z.,t . Contractor A S Date d I hereby affirm that 1 am licensed under the provisions of Chapter 9 (commencing with Section 7000) of Division 3 of the Business & Professions Code and that my license is in full force and effect. 1 hereby affirm under penalty of perjury one of the following two declarations: I have and will maintain a certificate of consent to self -insure for Worker's Compensation, as provided for by Section 3700 of the Labor Code, for the performance of the work for which this permit is issued. 1 have and will maintain Worker's Compensation Insurance, as provided for by Section 3700 of the Labor Code, for the performance of the work for which this permit is issued. APPLICANT CERTIFICATION I certify that I have read this application and state that the above information is correct. I agree to comply with all city and county ordinances and state laws relating to building construction, and hereby authorize representatives of this city to enter upon the above mentioned property for inspection purposes. (We) agree to save indemnify and keep harmless the City of Cupertino against liabilities, judgments, costs, and expenses which may accrue against said City in consequence of the granting of this permit. Additionally, the applicant understands and will comply with all non -point source regulations per the Cupertino Municipal Code, Section 9.18. Signatur Date O ❑ OWNER -BUILDER DECLARATION 1 hereby affirm that 1 am exempt from the Contractor's License Law for one of the following two reasons: 1, as owner of the property, or my employees with wages as their sole compensation, will do the work, and the structure is not intended or offered for sale (Sec.7044, Business & Professions Code) I, as owner of the property, am exclusively contracting with licensed contractors to construct the project (Sec.7044, Business & Professions Code). I hereby affirm under penalty of perjury one of the following three declarations: 1 have and will maintain a Certificate of Consent to self -insure for Worker's Compensation, as provided for by Section 3700 of the Labor Code, for the performance of the work for which this permit is issued. 1 have and will maintain Worker's Compensation Insurance, as provided for by Section 3700 of the Labor Code, for the performance of the work for which this permit is issued. I certify that in the performance of the work for which this permit is issued, I shall not employ any person in any manner so as to become subject to the Worker's Compensation laws of California. If, after making this certificate of exemption, I become subject to the Worker's Compensation provisions of the Labor Code, I must forthwith comply with such provisions or this permit shall be deemed revoked. APPLICANT CERTIFICATION I certify that I have read this application and state that the above information is correct. I agree to comply with all city and county ordinances and state laws relating to building construction, and hereby authorize representatives of this city to enter upon the above mentioned property for inspection purposes. (We) agree to save indemnify and keep harmless the City of Cupertino against liabilities, judgments, costs, and expenses which may accrue against said City in consequence of the granting of this permit. Additionally, the applicant understands and will comply with all non -point source regulations per the Cupertino Municipal Code, Section 9.18. , 7 — • TENANT IMPROVEMENT OF EXISTING BUILDING FOR A PRESCHOOL & HOMEOWRK ROOM(2880SQFT) 2/16/10 SEE TEMP PERMIT #10020093 FOR SOME OF THE Sq. Ft Floor Area: I Valuation: $298000 APN Number: 31626091.00 1 Occupancy Type: PERMIT EXPIRES IF WORK IS NOT STARTED WITHIN 180 DAYS OF PERMIT ISSUANCE OR 180 DAYS FROM LAST CALLED INSPECTION. Issued by: Date: RE -ROOFS: All roofs shall be inspected prior to any roofing material being installed. If a roof is installed without first obtaining an inspection, I agree to remove all new materials for inspection. Signature of Applicant: Date: ALL ROOF COVERINGS TO BE CLASS "A" OR BETTER HAZARDOUS MATERIALS DISCLOSURE I have read the hazardous materials requirements under Chapter 6.95 of the California Health & Safety Code, Sections 25505, 25533, and 25534. 1 will maintain compliance with the Cupertino Municipal Code, Chapter 9.12 and the Health & Safety Code, Section 25532(a) should 1 store or handle hazardous material. Additionally, should I use equipment or devices which emit hazardous air contaminants as defined by the Bay Area Air Quality Management District 1 will maintain compliance with the Cupertino Municipal Code, Chapter 9.12 and the Health & Safety Code, Sections 25505, 25533, AN 25534. Owner or authorized agent te:� CONSTRUCTION LENDING AGENCY I hereby affirm that there is a construction lending agency for the performance of work's for which this permit is issued (Sec. 3097, Civ C.) Lender's Name Lender's Address ARCHITECT'S DECLARATION I understand my plans shall be used as public records. Licensed Professional CITY OF CUPERTINO BUILDING P�RMIT BUILDING ADDRESS: 10120 N DE ANZA BLVD CONTRACTOR: SPC CQNTRACTORS, INC. PERMIT NO: 091 10158 OWNER'S NAME: ST. JOSEPH OF CUPERTINO SCHOOL 859 SAVAKER ST i DATE ISSUED: 02/19/2010 OWNER'S PHONE: 4082526441 SAN JOSE, CA 95126 PHONE NO: (408) 298-5759 ❑ LICENSED CONTRACTOR'S DECLARATIQN JOB DESCRIPTION: RESIDENTIAL ❑ COMMERCIAL ❑ TENANT IMPROVEMENT OF EXISTING BUILDING FOR A // License Class/,--,� ic. k (O PRESCHOOL & HOMEOWRK ROOM(2880SQFT) Contractor > C Date G 1 hereby affirm that I am licensed under the provisions of Chapter 9 (commencing with Section 7000) of Division 3 of the Business & Professions Code and that my license is in full force and effect. 1 hereby affirm under penalty of perjury one of the following two declarations: Sq. Ft Floor Area: Valuation: 5298000 t. 1 have and will maintain a certificate of consent to self -insure for Worker's Compensation, as provided for by Section 3700 of the Labor Code, for the APN Number: 31626091.00 Occupancy Type: performance of the work for which this permit is issued. 2. I have and will maintain Worker's Compensation Insurance, as provided for by Section 3700 of the Labor Code, for the performance of the work for which this permit is issued. PERMIT EXPIRES IF WORK IS NOT STARTED APPLICANT CERTIFICATION 1 certify that l have read this application and state that the above information is WITHIN 180 DAYS OF PERMIT ISSUANCE OR correct. 1 agree to comply with all city and county ordinances and state laws relating 180 DAYS FROM LAST CALLED INSPECTION. to building construction, and hereby authorize representatives of this city to enter upon the above mentioned property for inspection purposes. (We) agree to save indemnify and keep harmless the City of Cupertino against liabilities, judgments, Issued by: Date: costs, and expenses which may accrue against said City in consequence of the granting of this permit. Additionally, the applicant understands and will comply with all non -point sour regulat p Cupe 'o Municip e, Sect' n 9.18. RE -ROOFS: Signature Dat 0 All roofs shall be inspected'; prior to any roofing material being installed. If a roof is installed without first obtaining an inspection, I agree to remove all new materials for inspection. ❑OWNER -BUILDER DEC&ATION Signature of Applicant:_, Date: I hereby affirm that 1 am exempt from the Contractor's License Law for one of the following two reasons: ALL ROOF COVERINGS TO BE CLASS "A" OR BETTER 1. 1, as owner of the property, or my employees with wages as their sole HAZARDOUS MATERIALS DISCLOSURE compensation, will do the work, and the structure is not intended or offered for sale (Sec.7044, Business & Professions Code) 2. 1, as owner of the property, am exclusively contracting with licensed contractors to I have read the hazardous materials requirements under Chapter 6.95 of the construct the project (Sec.7044, Business & Professions Code). California Health & Safety Code, Sections 25505, 25533, and 25534. 1 will maintain compliance with the Cupertino Municipal Code, Chapter 9.12 and the Health & I hereby affirm under penalty of perjury one of the following three declarations: Safety Code, Section 2553�(a) should 1 store or handle hazardous material. t. I have and will maintain a Certificate of Consent to self -insure for Worker's Additionally, should 1 use equipment or devices which emit hazardous air Compensation, as provided for by Section 3700 of the Labor Code, for the contaminants as defined by the Bay Area Air Quality Management District I will maintain compliance withl the Cupertino Municipal Code, Chapter9.12 and the performance of the work for which this permit is issued. Health & Safety ode, Sections 25505, 25533, and 25534. 2. 1 have and will maintain Worker's Compensation Insurance, as provided for by Section 3700 of the Labor Code, for the performance of the work for which this Own o u z gent: p permit is issued. Date: 3. I certify that in the performance of the work for which this permit is issued, I shall not employ any person in any manner so as to become subject to the Worker's CONSTRUCTION LENDING AGENCY Compensation laws of California. If, after making this certificate of exemption, I I hereby affirm that there is l� construction lending agency for the performance of work's become subject to the Worker's Compensation provisions of the Labor Code, I for which this permit is issued (Sec. 3097, Civ C.) must forthwith comply with such provisions or this permit shall be deemed Lender's Name revoked. Lender's Address APPLICANT CERTIFICATION I certify that I have read this application and state that the above information is ARCHITECT'S DECLARATION correct. I agree to comply with all city and county ordinances and state laws relating I understand my plans shall !be used as public records. to building construction, and hereby authorize representatives of this city to enter upon the above mentioned property for inspection purposes. (We) agree to save Licensed Professional indemnify and keep harmless the City of Cupertino against liabilities, judgments, costs, and expenses which may accrue against said City in consequence of the granting of this permit. Additionally, the applicant understands and will comply with all non -point source regulations per the Cupertino Municipal Code, Section 9.18. Signature Date I CITY OF CUPERTINO BUILDING PERMIT SION 0- 'j-Z z- BUILDING ADDRESS: 10120 N DE ANZA BLVD CONTRACTOR: SPC CONTRACTORS, INC. PERMIT NO: 09110158 OWNER'S NAME: ST. JOSEPH OF CUPERTINO SCHOOL 859 SAVAKER ST DATE ISSUED: 02119,12010 OWNER'S PHONE: 4082526441 SAN JOSE, CA 95126 PHONE NO: (408) 29&5759 ❑ LICENSED CONTRACTOR'S DECLARATION License Class Uc. # L1?? l 5 / Contractor - PC C rj{^�YGC7,0>�Date -7 " &?A hereby affirm that 1 am licensed under the provisions of Chapter 9 (commencing with Section 70M) of Division 3 of the Business & Professions Code and that my license is in NO force and effect. I hereby affirm under penalty of perjury one of the following two declarations: 1 have and will maintain a certificate ofconsent to self -insure for Worker's Compensation, as provided for by Section 3700 of the labor Code, for the performance of the work for which this permit is issued. I have and will maintain Worker's Compensation Insurance, as provided for by Section 3700 of the Labor Code, for the performance of the work for which this permit is issued. APPLICANT CERTIFICATION 1 certify that 1 have read this application and state that the above information is correct. 1 agree to comply with all city and county ordinances and state laws relating to building construction, and hereby authorize representatives of this city to enter upon the above mentioned property for inspection purposes. (We) agree to save indemnify and keep harmless the City of Cupertino against liabilities, judgments, costs, and expenses which may accrue against said City in consequence of the granting of this permit. Additionally, the applicant understands and will comply with all non -point source regulations per the Cupertino Municipal Code, Section 9.18. Signa►ur1��� Date �d ❑ OWNER -BUILDER DECLARATION I hereby affirm that I am exempt from the Contractor's License Law for one of the following two reasons: 1, as owner of the property, or my employees with wages as their sole compensation, will do the work, and the structure is not intended or offered for sale (Sec.7044, Business & Professions Code) 1, as owner of the property, am exclusively contracting with licensed contractors to construct the project (Sec.7044, Business & Professions Code). I hereby affirm under penalty of perjury one of the following three declarations: 1 have and will maintain a Certificate of Consent to self -insure for Worker's Compensation, as provided for by Section 3700 of the Labor Code, for the performance of the work for which this permit is issued. I have and will maintain Worker's Compensation insurance, as provided for by Section 3700 of the Labor Code, for the performance of the work for which this permit is issued. I certify that in the performance of the work for which this permit is issued, I shall not employ any person in any manner so as to become subject to the Worker's Compensation laws of California. If, after making this certificate of exemption, 1 become subject to the Worker's Compensation provisions of the Labor Code, I must forthwith comply with such provisions or this permit shall be deemed revoked APPLICANT CERTIFICATION 1 certify that I have read this application and state that the above information is correct. 1 agree to comply with all city and county ordinances and state laws relating to building construction, and hereby authorize representatives of this city to enter upon the above mentioned property for inspection purposes. (We) agree to save indemnify and keep harmless the City of Cupertino against liabilities, judgments, costs, and expenses which may accrue against said City in consequence of the granting of this permit. Additionally, the applicant understands and will comply with all non -point source regulations per the Cupertino Municipal Code, Section 9.18. BUILDING PERMIT INFO: BLDG r ELECT r PLUMB r MECH r RESIDENTIAL r COMMERCIAL r JOB DESCRIPTION: TENANT IMPROVEMENT OF EXISTING BUILDING FOR A PRESCHOOL & HOMEOWRK ROOM(2880SQFT) 4/23/10 REVISION NI-GLULLAM BEAMS,STRENGTHENING, ALTERNATIVE WINDOW STRENGTHENING & ADA RESTROOM REVSION-APPROVED ON ALTERNATE METHODS & MATERIALS PER ARNOLD & ALBERT 7/W I0. Sq. Ft Floor Area: I Valuation: S298000 APN Number: 31626091.00 1 Occupancy Type: PERMIT EXPIRES IF WORK IS NOT STARTED WITHIN 180 DAYS OF PERMIT ISSUANCE OR 180 DAYS FROM LAST CALLED INSPECTION. Issued by: Date: RE -ROOFS: AU roofs shall be inspected prior to any roofing material being installed. If a roof is installed without first obtaining an inspection, I agree to remove all new materials for inspection - Signature of Applicant: Date: ALL ROOF COVERINGS TO BE CLASS "A" OR BETTER HAZARDOUS MATERIALS DISCLOSURE 1 have read the hazardous materials requirements under Chapter 6.95 of the California Health & Safety Code, Sections 25505, 25533, and 25534. I! will maintain compliance with the Cupertino Municipal Code, Chapter 9.12 and the Health & Safety Code, Section 25532(a) should I store or handle hazardous material. Additionally, should I use equipment or devices which emit hazardous air contaminants as defined by the Bay Area Air Qnallty Management District I will maintain compliance with the Cupertino Municipal Code, Chapter 9.12 and the Health & afety Code, Sections 25505, 25533, and 25534. O�rtn Date:- CO STR TION LENDING AGENCY 1 hereby affirm that there is a construction lending agency for the performance of work's for which this permit is issued (Sec. 3097, Civ C.) Lender's Name Leader's Address ARCHITECT'S DECLARATION Signature Date 1 understand my plans shall be used as public records. Licensed C9(I1�58 CITY OF CUPERTINO TENANT IMPROVEMENT CUPEkTINO PERMIT APPLICATION FORMC , C>T, ^ ,, Sc,40o1 APN # 3/ to - X(O~ b� , C) Date: 11-30--OT Building Address: ) o i jo p ' pe: AN 7-4- Mailing Address (if different from building address): Tenant (If tenant please provide a letter from t building owner approving the tenant improvement.) Building Owner ❑/ � Are Hazardous Materials being used as p of this project? Yes No Tenant/Building Owner's Name: k-Cux P. Phone #: SvL Contractor: Phone #: Fax #: Contractor License #: Cupertino Business License #: Contact: M Phone #: 05a2, v� Fax #: Alternate Contact: Phone #: Fax #: Valuation (cost of project): ✓Z cj �' �� Job Description (be specific): -�N�- ►-'- P2o v� SC K 00 c- f1 e H RV- R.tn Lk Tenant Improvement Includes Re -Roof: Yes ❑ No ❑ If yes, number of squares Tenant Improvement Includes Structural Yes 2 No ❑ Type of Construction (Usage Class): Occupancy Type: 1-A, 1-B ❑ II/III/V-A Z II/III B, IV -HT, V-B ❑ Project Size: Express Standard Large Major Green Building: Please complete Leed for commercial interiors checklist & attach it to the application or if applicable, include in plans & sheet index 00cT- LEED Points Achieved _ tl W —o Cl *** For Office Use Only*** Over The Counter ❑ Revised 07/06/09 CITY OF CUPERTINO TENANT IMPROVEMENT FEE SCHEDULE Quantity Fee ID Fee Description Fee Group Permit Type IATINSP Tenant Improvement B 1A TI Inspection 1 ATIPLNCK Tenant Improvement Plan B Check 1BTIINSP Tenant improvement B 1B TI Inspection 1BTIPLNCK Tenant Improvement Plan B Check �—� IETIINSP Tenant Improvement $ 1E TI Inspection -Preschool 2 �� 1 ETIPLNCK Tenant Improvement Plan B Check -Preschool 1FTIINSP Tenant Improvement B 1F TI Inspection-Factory/Indust 1 FTIPLNCK Tenant Improvement Plan B Check-Factory/Indust 1HTIINSP Tenant Improvement B 1H TI Inspection -Hazardous 1 HTIPLNCK Tenant Improvement Plan B Check -Hazardous I ITIINSP Tenant Improvement B 11 TI Inspection -Institutional IITIPLNCK Tenant Improvement Plan B Check -Institutional 1MTIINSP Tenant Improvement B 1M TI Inspection -Merchandise 1 MTIPLNCK Tenant Improvement Plan B Check -Merchandise 1 STIINSP Tenant Improvement B 1S TI Inspection -Parking Garag 1 STIPLNCK Tenant Improvement Plan B Check -Parking Garage 1 REROOFCOM Re -Roof Commercial B 1BCBSC Cal Bldg Standards B ALL PERMIT TYPES ICommission Fee 1BSEISMICO Seismic Commercial B 1BUS LIC Business License B 2 of 2 �.- aElv CITY OF CUPEIkTINO CITY OF CUPERTINO REVISION/DEFERRED PERMIT APPLICATION FORM APN # Date: Original Permit #: Oq 1 I n 158 Building Address: 1012V N, Of- WzA 1;L1r0. Gu cR-fIoo CA 61Sb1 Mailing Address (if different from building address): SAµ ,fig keoV Owner's Name: Phone #: PIOC.SE of 5A,CUE 405.2521(C1441 Contractor: Phone: 4 0 a• 2 B�, q SSA S P C- INC, Fax: Contractor License #: $q IS(,q Cupertino Business License #: 31551D p, 2/I Contact: iOhN M(LLQ2 ArF-CiiIjEZZS Phone: "0, q 0, OS�D2 F-DuhKI) o KAR-T I NEZ Fax: 6 St7, 14, OSSS Building Permit Info: Bldg X Elect ❑ Plumb ❑ Mech ❑ Residential Commercial Job Description: PQC-K RE-t,�&OpVL . I 6tLkLAM STRr✓NeAJNII,�.6 2• &CTU-9,NA1 WF- W WQow STR�r1c�N11NQ 3• "A RCSIV-WM REVW&N Is the project in the Wildland- Urban Interface Fire Area? Yes ❑ No Type of Construction (Usage Class): * Occupancy Type: 1-A5 1-B ❑ II/IIIN-A II/III B, IV -HT, V-B ❑ f Valuation (cost of project): � Project Size: Express El Standard Z Large Major El Green Building: Please complete relevant portion of the Green Building/LEED Checklist & attach it to the application or if applicable, include in plan set & the sheet index. Points Achieved: For help, contact Build it Green at www.buflditgreen.org Revised 01/07/09 CITY OF CUPERTINO CITY of REVISION/DEFERRED CUPEf�1,�IN0 PERMIT APPLICATION FORM FEE SCHEDULE Quantity Sq Ft Fee ID Fee Description Fee Group Permit Type i 113CBSC Cal Bldg Standards Commission Fee B ALL PERMIT TYPES 1REVCOMNEW Revision Commercial New B 1* 1 REVCOMTI Revision Tenant Improvement B 1 * TI 1REVSFDWL Revision SFDWL B 1R3SFDW 1REVRESADD Revision Addition B 1R3SFDADD 1REVRESREM Revision Remodel B 1R3SFDREM 1DEFINSP Deferred Submittal not R-3 Inspection B 1DS 1DEFPLNCK Deferred Submittal not R-3 Plan Check B 1DS 1DEFR3INSP Deferred Submittal Inspection B 1DSR3 1DEFR3PLNCK Deferred Submittal R-3 Plan Chk B 1DSR3 � SV -,Y�j f- -� /2 � Cin OF CUPERTINO Community Development 10300 Torre Avenue Cupertino CA 95014 Telephone (408) 777-3228 Fax (408) 777-3333 Building Department JOB ADDRESS: 10 A -A zo- PERMIT # OWNER'S NAME: J �, oe Cie �Tr,u P SGFcos PHONE #% 5z — d Q l GENERAL CONTRACTOR -rB o FAX # I am not using any subcontractors: Signature Please check applicable subcontractors and complete the following information: Date 60 SUBCONTRACTOR BUSINESS NAME BUSINESS LICENSE # Cabinets & Millwork Cement Finishing Electrical Excavation Fencing Flooring: Carpeting Linoleum / Wood Glass / Glazing Heating Insulation Landscaping Lathing Masonry Ornamental Sheet Metal Painting / Wallpaper Paving Plastering Plumbing Roofing Septic Tank Sheet Metal Sheet Rock Tile Owner/Contractor Signature Date Nov 29 10 12:07p Scott Hawley Chemists 408-227-7737 p.1 CEIVED NOV 8 9 2010 r;aysb� Inc- Lyons Brothers Plumbing and Design 1020 Chestnut Street San Jose, CA. 95110 Attention: Ray Lyons File No. T2951-P01 Lab No. 001 - 004 August 31, 2010 C� / J 0 J C-";" Subject: Tests on Water for Coliform Bacteria Job Reference: St. Joseph of Cupertino School Address: 10120 N. De Anza Boulevard, Cupertino, CAW5�014� Aqua Chemists' Job # 14410 Date of Samples: August 30, 2010 P.O. # Verba Samples Marked: Sample #01— Staff Restroom Sink — Hot Water Sample #02 — Staff Restroom Sink — Cold Water Sample #03 — Homework Room Sink — Hot Water Sample #04 — Homework Room Sink — Cold Water Test: Water MMO-MUG/Total Coliform. Test Results: Coliform absent— a-coli absent. Conclusion: The water samples meet the Bacteriological Standard for drinking water. Respectfully submitted, Paul Luu AQUA CHEMISTS i CUPERTINO OWNER -BUILDER NOTICE COMMUNITY DEVELOPMENT DEPARTMENT - BUILDING DIVISION 10300 TORRE AVENUE • CUPERTINO, CA 95014-3255 (408) 777-3228 • FAX (408) 777-3333 - build6o5cuBertino.org Effective January, 1, 2009, Assembly Bill 2335 amends California Health and Safety Code, Section 19825, regarding disclosures and verifications required for all applicants seeking Owner - Builder construction permits. These new application requirements provide an enhanced level of consumer awareness and protection for property owners accepting the risks associated with Owner -Builder construction permits. "The Legislature hereby finds and declares that there is an urgent and statewide public interest in assuring that building contractors comply with the Contractors License Law ... and provisions of law relating to Workers' Compensation Insurance for building construction, that property owners are informed about, and protected from, fraudulent representations, liability for worker's injuries, liability for material and labor costs unpaid by contractors, licensing requirements, and employer's tax liabilities when improving their property as owner -builders" . Important information you need to know BEFORE pulling your permit! The term "Owner -Builder" can mean three different things: "Owner as Worker", "Owner as Contractor" or "Owner as Employer" Understand each has Benefits or Risk, and it is possible to combine them! Hiring a California Licensed Contractor means you do not personally perform any of the construction work, the permit is not taken out in your name, you are not personally responsible for the construction and you are not an Owner -Builder. Instead, you become a "Customer" and California law provides you the benefit of protection from poor workmanship, failure to finish the job and financial risk due to worker injury. Benefit/Risk: Hishest Benefits and the Least amount of Risk Owner -as -Worker is a type of Owner -Builder where you personally perform the construction work, the permit is taken out in your name and you are personally responsible for the construction management, knowledge, workmanship, and completion of the job. You benefit by not paying others to perform this work for you and your risk depends on your own ability to complete the job successfully. Benefit/Risk: 7 with Lois Financial Risk Owner -as -Contractor is a type of Owner -Builder where you personally act as your own General Contractor, the permit is taken out in your name and you hire California licensed sub -contractors to perform portions of the construction work. WARNING: The benefit of protection provided by law when you hire only California licensed sub -contractors can turn to serious financial risk if you hire unlicensed contractors to perform any of the work. Benefit/Rlsk: :: and Siggnificant Financial Risk Owner -as -Employer is a type of Owner -Builder where you pay any individual to perform any construction work valued at more than $500.00, the permit is taken out in your name and you are personally responsible for their employment requirements, supervision, performance, safety and welfare while on your property. WARNING: Cost savings benefit can turn to serious financial risk if you fail to deduct payroll taxes or provide workers compensation insurance for each worker. Benefit/Risk: _:'::; ' : r : with Significant Financial Risk Over 20,000 consumer complaints are filed each year. Many complaints relate to owner/builder projects and include workmanship and workers' compensation issues Homeowners suffer financial harm due to defective workmanship and injured employees. OfwrerBuilder 2010.doc revised 06108110 Following are alarming examples of what has occurred with Owner -Builder permits: Example 1: Homeowner received insurance money to rebuild burned -down home. ■ Owner/Builder permit pulled to rebuild structure. ■ Unlicensed contractor built substandard structure — must be torn down and replaced. ■ Estimated financial injury is $225,000. ■ Additional financial injury - IRS threatened to tax insurance payout if house not completed by the end of the year. Example 2: Brother-in-law had active license but filed an exemption from Workers Comp. ■ Owner -Builder hires brother-in-law to install a new roof. ■ Employee falls and sustains multiple spinal and extremity fractures as well as a head injury and remains in a coma to this day. ■ The Owner -Builder, who has sold the home, is now a defendant in a lawsuit for reimbursement for benefits paid to the injured worker. Example 3: Employee of contractor without Workers Comp is hired by Owner -Builder to install septic system and suffers injury that results in permanent disability. ■ The Owner -Builder did not have a homeowner's insurance policy on the house against which to submit a claim. ■ The Owner -Builder is now a defendant in a lawsuit for reimbursement for benefits paid to the injured worker. Did you know — unlicensed persons frequently have the property owner obtain an "Owner - Builder" building permit which erroneously implies that the property owner is providing his or her own labor and material personally? Did you know — your homeowner's insurance may not provide coverage for injuries sustained on your property by an unlicensed contractor and his/her employees? Did you know — if you are considered an "employer" under state and federal law, you must register with the state and federal government, withhold payroll taxes, provide workers compensation and disability insurance and contribute to unemployment compensation for each "employee"? Did you know — that if you fail to abide by these laws you may be subjected to serious financial risk? OWNERS BEWARE AND CONSIDER THE RISK BEFORE ACCEPTING FULL RESPONSIBILITY FOR YOUR CONSTRUCTION PERMIT Ownerftilder 2010.doc revised 04112110 john. miller architects 579 Clyde Avenue, Suite 300 Mountain View, CA 94043 June 4, 2010 Mr. Albert Salvador, P.E. Building Official City of Cupertino 10300Torre Avenue Cupertino, CA 95014 Dear Albert: Thank you once again for your vigilance in helping us find an Alternative Materials and Methods for the non -rated roof construction at St Joseph of Cupertino School. At our meeting in your office on Wednesday June 2, 2010, we agreed upon a fire retardant roof coating product call Firefree SS that has a tested equivalency of 60 minutes as an acceptable alternative materials and methods. All underside of roof 2x6 framing and plywood sheathing will be exposed and coated with this intumescent product. The rated suspended ceiling will be installed but no other rated penetration protection will be required of the ceiling and soffit areas. On a related matter, but not part of the application for alternative means of construction, the exterior 4 x 4 steel column will be exposed and coated with Safecoat TFI, a fire retardant coating for steel with up to a 2-1/2 hour rating or individually wrapped 5/8" type X gypsum board. This will be determined when the plywood is removed. The interior column is non-structural, as confirmed in the letter and detail provided by the structural engineer and attached. As such, it is not required to be protected. Please call me if you have any questions or wish to discuss the application further. It has been a pleasure to work with you in resolving this matter. Resp tfull�,�� Jo` m Miller, AIA, LEEP AP John Miller Architects Attachment Application for Approval of Alternative means of Approval Supplementary Information Firefree Product Literature Safecoat TFI Product Literature Engineer Sketch - Interior Column , RECEIVED .• JUN 0 7 2a10 BY: r3 c L 0 fZ14- ALTERNATE MATERIALS AND METHODS / MODIFICATION FORM COMMUNITY DEVELOPMENT DEPARTMENT • BUILDING DIVISION 10300 TORRE AVENUE • CUPERTINO, CA 95014-3255 (408) 777-3228 • FAX (408) 777-3333 • building65�cupertino.org CUPERTINO ❑ REQUEST FOR MODIFICATION OF CODE (CBC 104.10) 51 REQUEST FOR ALTERNATE MATERIAL, DESIGN OR METHOD OF CONSTRUCTION (CBC 104.11, CFC 111.2.4) To apply for this request, complete sections 1, 2, & 3 (ink or type) SITE 10120 North De Arita Blvd ADDRESS APN 316-26-097 DATE 6 -1-10 Owner t,,.,Joseph.•,ofuper,t,ino•.,.School_ V.A ........ .... PC# :..................................... Type:..................................... Address ...... 1.0.12.0.... Nort.h... De ... Anna ... D.I.v.d.......................................... Permit #:.0 911015 8 ..... Stories: .......1......................... Email..S.t:.j.oc.. per.t;.ino.@.yaho.oF?Ifawn......4O.$.-..252.-.2.441 PLN#:................................... &kp&/Div................................ Occupancy:.E........................ Floor Area: ..2800 John Miller Architec • Architect -of -Re Applicant... ................................................................t�............................................ Address ..... 57.9....Cl.Y.de...Ave........ #300............................................................ Job Status: Construct Orc.Load: ..<50.................. ....... Email ......... M.tr.�......V1.QW....... GP�....$.�k.0.�.3.Phone..6. .0.-.9.6.0.-.4.5.O.Q use of Bld9:.sCktos�� ........ 2 1 REQUEST: For code modifications, please state the applicable code requirement and the extent of relief desired. For alternate requests, slate the type of system proposed and design methods. Submit plans N necessary to illustrate request. Additional sheets or data may be attached. Alternate materials and methods equivalent to one -hour ceiling assembly by use of intumescent white emulsion coating system for fire protection of roof rafters and plywood sheathing in the project area. A rated ceiling sus ension system will be installed as well. Fire retardant coating shall be 'Firefree 88' that provides a tested one -hour rating under identical 3 JUSTIFICATION/FINDINGS OF EQUIVALENCY: For code modifications, applicant shall demonstrate that special, Individual reasons exist that make compliance with the strict letter of the ordinance impractical and that equivalency is provided. For alternate requests, applicant shall demonstrate suitability, strength, effectiveness, fire resistance, durability, safety and sanitation that Isequivalent to the code for a similar use. Code Section(s : ^ vV tl lot - /'' ✓' I I Attach additional sheets if necessary. Firefree 88 has an equivalency rating to a listed gypsum board, 2x10 wood jo roof covering assembly (GA File No. RC 2601) and has been tested by Rolf Jensen Associates for an identical condition. A rated ceiling suspension system will prov'de additional fire protection. Petitioner's . ................ - ...... Signature:...... Position:AYChitect Date:.6 1�1 Reviewed B :................. ... ..... ...... . .......Datel... � sts The Request is: GRANTED ❑ DENIED I Dept. Comments: 1� LI CONDITIONS OF APPROVAL: 105 1�-C U l 0 No. of Items: ............ Fee Due: $........... Date Paid: ........... ............................. Receipt No .:............................... Processed by:/..-....�........................ 1 !,-i at ofY� L o �-r r /� n F'(` /�rtG� lilt 1 �V/ 10 p TI F 41-10N-�_ Buildin Official:... ........ ..... 7� ...............................Print:......................1. n ��J..............................Date:rvJ.... U1.0. Fire Marshal:........ ... Print: ... �i..i.I!P✓....................... Date: .... 6....�....lo....... DEPARTMENT ACWON: ANdetermination, copies to: 1) applicant, 2) permit file Alljorm_2010.doc revised 04106110 Attachment A Request For Approval Of Alternate Methods Of Design And Construction Building Address: Saint Joseph of Cupertino School 10120 N. De Anza Blvd. Cupertino, CA 95014 Project Pre-K and Homework Room Remodel 2,800 sq. ft. remodel to existing building areas. The total school is 13,251 sq. ft. Existing Conditions • The building is one story with CMU classroom separation/bearing walls, each classrooms with two means of egress directly to outside. • The entire building, not just the project area has non -rated roof ceiling assemblies. • There is no new roof structure or building area being added. -The primary structural system is heavy timber construction, equivalent to one -hour construction bearing on CMU walls. • Substantial new construction is already in place creating a hardship to the School to deconstruct and replace building systems. Code Issue: Existing building/ceiling assembly was built using Type V-B construction as it would be classified in the 2007 California Building Code. Requested Request for consideration of an alternate means of construction for Alternative Means the required 1-hour fire resistance rated roof / ceiling assembly Of Construction though application of 2007 CBC Appendix Chapter 1, Section 104.11 Code Sections: 2007 CBC Section 711 — Horizontal Assemblies CBC Table 601 - Fire Resistance Rating of Building Elements Code Intent: Building construction shall be Type VA which requires 1-hour fire - resistance roof/ceiling assembly. The fire -resistance rated roof/ceiling assembly is required to assure containment of a fire during a fire event and to reduce exposure to the remainder of the building and any close adjacent buildings. Alternate Materials and Methods: The existing roof construction includes: tar/gravel built-up roof covering; '/2" plywood deck; 2 x 6 rafters @ 16" o.c. and 6 x 15 main glu-lam girders. We have been unable to find a listed 1-hour fire resistive assembly where 2 x 6 roof rafters were utilized as part of the assembly. The proposed alternate means of construction is to provide protection to the non- complying roof/ceiling assembly is: as follows: 1. Current void space between the 2 x 6 rafters has been filled with thermal insulation, R-30 over the entire project area (Pre-K and Homework Room). It is proposed that all ceiling insulation will be carefully removed, stored and reinstalled. 2. The entire 2 x 6 roof rafters and plywood sheathing will be coated with an approved Intumescent, white emulsion coating for the one -hour fire protection of all rafters and Sheathing. Enclosed soffits shall be opened so that all concealed wood framing will receive a fire resistant coating in accordance with the manufacturer's written instructions. 3. The ceiling below the rafters will be a suspended fire resistance rated lay -in system where the weight of the ceiling tiles will comply with CBC Section 711.3.1 or clips will be provided to prevent vertical displacement 4. Current design provides a new fire alarm system that for the first time will provide central station monitoring for the entire school for early notification of the fire department both during school as well as after school hours. 5. Area of building remodel is separated from the remainder of the existing building by an 8" thick grouted concrete block wall system. 6. Reinstalling insulation within the roof rafters, providing the fire -resistance rated lay - in ceiling system and intumescent paint within the entire remodel area does, in our opinion, provide for an equivalent means of 1-hour roof/ceiling assembly for this building. Attachment B — Firefree 88 product literature. SPECODATA PRODUCT INFORMATION Description FIREFREE 880 ("FF889") is a premium quality water based, nontoxic, thin film intumescent fire retardant, fire resistant product formulated to provide a fire retardant, resistant barrier on a variety of interior substrates, including gypsum board, oriented strand board and other wood products, composite architectural panels, class A polyurethane foam, Icynene® Style Foam, masonry, concrete, thin gauge metals, fiberglass, as well as many other substrates. It is suitable for residential, multifamily, commercial and industrial projects, for both new and reconstruction projects. Color: Standard off-white, but may be custom tinted. FF880 is approved for interior use on certain assemblies only and is not designed for use on structural steel. Please refer to "FIRE SAFETY" below. For exterior use: Please contact the company for more information Composition & Materials Firefree 880 is a nontoxic; water based latex fire retardant, fire resistant coating. Colors Standard off-white. May be custom tinted. Sheen Flat. Limitations FF888 is not designed for use on structural steel. FF888 is approved for interior use (for exterior use, please contact the company). FIREFREE Coatings, Inc. has tested its FF880 product, as a component, in various fire resistant rated assemblies. Contact manufacturer for more information. FIREFREE Coatings, Inc. recommends that the application be performed by a licensed painter experienced in performing the work on projects of similar scope and scale. FIREFREE Coatings, Inc. will provide proper application instructions to the licensed painter contractor selected by the General Contractor or Owner. Building Codes Installation must comply with the requirements of applicable local, state and national building codes. FIREFREE 88" When Time and Safety Matter APPLICATION Surface Preparation All surfaces to be coated must be clean, cured, firm, dry and free of dust, dirt, oil, wax, grease, mildew, loose flaking paint, efflorescence or any other contamination or condition that would adversely affect the performance of the coating. Etch or prime (with a latex primer or fast dry oil base primer/sealer) glossy, glazed or dense surfaces. Always prime oil based finish coatings with an oil based fast dry primer/sealer. Fill holes and surface irregularities with a suitable patching compound to match surface profile. Spot prime all patched areas with appropriate primer. Metal surfaces must be free of rust. Application Conditions & Procedures Do not apply if temperature is below 50°F. All surfaces to which FF888 have been applied should be inspected by a third party special inspection agency, or an ICC certified professional, or a Firefree Coatings QA/QC qualified inspector to verify that FF880 has been properly applied in the required uniform thickness. Do not thin or strain FF888. Apply at can consistency. Use of airless sprayer is recommended (use of a dedicated spray line is required), but FF880 may be applied by brush or roller. For brush application, a fully loaded brush should be used. A laying on technique will reduce the brush marking. A short nap roller can be used but this may result in a slight textured finish. Enamel finish coats: Apply one (1) coat of a latex primer or fast dry oil base primer/sealer over FF88® before applying a latex enamel or oil base enamel finish coat. Wall covering applications: Apply one (1) coat of wall primer over product before applying wall covering. FF88 ® has a flat finish but may be top coated with most paints to achieve the desired texture and finish. For information on approved compatible primers and finish paints, contact manufacturer. Apply additional finish coats only after previously applied coats are thoroughly dry. Precautions: Do not apply any materials that have been frozen or have come into contact with contaminants prior to use. To the best of our knowledge, the technical data contained herein is true and accurate on the date of publication and is subject to change without prior notice. FIREFREE 888 and HMO are registered trademarks of FIREFREE Coatings, Inc. September 2009 replaces March 2008. Spread Rate Application at a rate of 14 mils wet, 10 mils dry has a theoretical spread rate of 114 sq.ft/gal per I coat. Confirm wet film thickness with a wet film thickness gauge. Any consideration for quantity and waste or overspray is the sole responsibility of the end user. Waste factor will depend on the method of application (brush, roll or spray), job site conditions and other factors and should be based on the applicators experience. Thickness During application, the wet film thickness should be checked using a wet film thickness gauge. To use the gauge, insert the teeth into the wet basecoat. The last tooth to be coated indicates the thickness achieved. It is important to ensure that the wet film applied is of sufficient thickness to give the required dry film thickness. During the drying process, FIREFREE 88® will shrink due to evaporation. All surfaces to which FF880 have been applied should be inspected by a third party special inspection agency, or an ICC certified professional, or a Firefree Coatings QA/QC qualified inspector to verify that FF888 has been properly applied in the required uniform thickness. If an independent testing agency is retained, it should ensure that preparation of substrate is in accordance with manufacturer's recommendations. It should randomly obtain and test samples during application to verify that wet film thickness of the intumescent coating complies with manufacturer's requirements. Dry Film Thickness The final dry film thickness of the Firefree 888 will vary according to specific construction assemblies. The dry film thickness required will depend on the specific fire rating and substrates to be protected. Please contact Firefree Coatings Technical Service to assist in determining the appropriate dry film thickness of the coating. Drying Dry time is when the surface is thoroughly dry to the touch. Drying times are dependent upon a number of factors: Temperature - Air movement - Humidity - Thickness of product - Method of application. If unsure, please contact manufacturer. If multiple coats of FF880 are required; FF880 must be thoroughly dry to the touch prior to the application of additional coats. The final dry film thickness required will vary according to specific assemblies. Please contact FIREFREE Coatings for more information. FIREFREE88' When Time and Safety Matter Recommended Equipment Pump: Graco 5900 HD (gas) or Graco Mark V (electric) or larger Tip Size: Graco HDRAC (523 or larger) Spray Gun: Graco Blue Gun (241-705) Hose: Use min of 3/8" airless spray line as first 50' from pump. Packaging 5 gallon bucket, weight per bucket is 60 lbs. Storage & Temperature FF880 cannot be exposed to freezing temperatures. It is important to maintain storage temperatures above the freezing point. FF88® should be stored at recommended temperatures between 40° to 85°. Expected shelf life is one (1) year from the date of purchase. Product must be kept at recommended storage conditions and in original unopened containers. Maintenance Surfaces which have been coated with FF889) should be protected from abuse and abrasion. Damaged surfaces should be repaired and FF88® should be reapplied to the original specified dry film thickness to maintain specific rating. Cleanup & Safety Wash brushes, rollers, spray guns & pumps and other painting tools in COLD clean water promptly after painting. Clean and remove any dried product with the use of Goof Off. Use all products completely or dispose of properly. Local disposal requirements vary; consult your sanitation department or state -designated agency for more information on disposal options. Use only with adequate ventilation. Do not breathe spray mist or sanding dust. Avoid contact with eyes and prolonged or repeated contact with skin. Wear eye protection and or gloves during application or sanding. A dust/particulate respirator approved by NIOSH should be wom when sanding or spraying. Close container after each use. First Aid: If you experience difficulty breathing, leave the area to obtain fresh air. In Case of Spill: Absorb with inert material and dispose of as specified under "CLEANUP". Technical Services A staff of factory personnel offers design assistance and technical support. For technical assistance, contact Firefree Coatings, Inc. To the best of our knowledge, the technical data contained herein is true and accurate on the date of publication and is subject to change without prior notice. FIREFREE 880 and Ff88® are registered trademarks of FIREFREE Coatings, Inc. September 2009 Replaces March 2008. WARRANTY Warranty FIREFREE Coatings, Inc. (FIREFREE) provides the following limited warranty: For a period of ten (10) years FF888 will not crack, peel, or chip if properly applied to a properly prepared and approved surface and if properly maintained under normal interior conditions and not exposed to external weathering. If FF889 fails to meet the terms set forth above, FIREFREE will provide, at no charge, a quantity of FF888 sufficient to repaint the surface affected. This is the exclusive remedy for all warranty claims. In the event of a warranty claim, the claimant must notify FIREFREE in writing of the defect promptly following discovery and must submit proof of purchase, including the date of purchase, and proof of the defect, including the date of discovery. FIREFREE reserves the right to inspect any painted surface to which the warranty claim applies. This warranty will be void if the surface is (a) treated by any abrasive process or material (other than normal sanding before application of FF889), (b) exposed to any biological solvent or caustic chemical or agent, (c) altered or repaired, (d) exposed to exterior weathering. The warranty will also be void if; (i) FF888 is diluted or adulterated, (ii) mixed with any other product, (iii) is not stored, applied, in the required uniform thickness, and inspected in accordance with the manufacturer's recommendations, instructions, and specifications, or (iv) if used after one (1) year from the date of purchase. All surfaces to which FF880 have been applied should be inspected by a third party special inspection agency, or an ICC certified professional, or a Firefree Coatings QA/QC qualified inspector to verify that FF880 has been properly applied in the required uniform thickness. This warranty is made in lieu of any and all other warranties. The manufacturer expressly disclaims any and all warranties, express or implied, of merchantability or fitness for any particular use. For further information, please call 1-888-990-FF88. Refer to Material Safety Data Sheet (MSDS) for further safety and handling information. 0 FIREFREE88' When Time and Safety Mader FIRE SAFETY Fire Safety For various reasons, including (i) the very different circumstances that may exist from one fire to another, (ii) the differences between conditions in an actual fire and laboratory conditions in which testing is conducted, and (iii) the inherent variability of fire tests, passing a laboratory test or certifying/labeling Firefree 889 ("FF889") for use in specific assemblies/systems does not mean that the same application of FF889 will necessarily provide an equivalent protection or the same result in an actual fire or in a new laboratory test. Furthermore, FF888 is to be used only as component of complete fire retardation systems. It will only contribute to slowing fire spread for the area where it has been applied and will not, by itself, prevent a fire from starting or continuing. The amount by which FF888 retards a particular fire will depend, among other things, on (i) the amount of FF889 applied, (ii) the conditions of the other elements of the assembly incorporating FF888, and (iii) the conditions of the actual fire itself. FF888 will not make a fire any less dangerous to persons or property. FIREFREE cannot guarantee that loss or injury will not be suffered by persons or property. It is the sole responsibility of the applicator to ensure that FF889 has been applied in accordance with the application directions. It is the responsibility of the occupier to ensure the paint is not cracked, chipped or peeling. About the Company FIREFREE Coatings, Inc is a privately owned company based in California. FF888 has been tested and listed by Factory Mutual; a division of FM Global and tested a certified third parry IAS fire testing laboratories. 580 Irwin Street, Suite 1 San Rafael, CA 94901 Toll (888) 990-3388 Phone (415) 459-6488 Fax (415)459-6055 Email: info(Uiirefree.com Website: www.firefree.com %I FIREFREE Coedg%Inc To the best of our knowledge, the technical data contained herein is true and accurate on the date of publication and is subject to change without prior notice. FIREFREE 888 and FIN(& are registered trademarks of FIREFREE Coatings, Inc. September 2009 Replaces March 2008. 101 Sefeggail TFl Structural Steel Protection PRODUCT DESCRIPTION SafeCoat TFI is a single component latex, intumescent fire retardant coating ideally suited for exposed Interior structural steel where 2-1/2 hour fire resistance rating is required. It is ideal for interior steel columns, tubes, trusses and other exposed structural members. It limits thermal penetration by expanding to many times the original dry film thickness when exposed to heat. This expanded material forms a char which insulates the substrate against heat, and reduces available oxygen to the surface. It provides a 2-1/2 hour fire rating as tested under ASTM E-119-07A "Floor/Ceiling", NFPA 251 "Small Scale Test" and CAN 4-S101, "No Load". USES • imparts a 2-1/2 hour fire rating to exposed steel structural members including columns, trusses and tubes. • provides an aesthetic, thin, decorative finish to comply with architectural designs. • can be applied as a mandatory upgrade to assist owners and property managers to meet the latest fire and building code requirements. It may also be applied as a voluntary upgrade to lower fire risks. ULC Listing is pending subject to standardization of the manufacturing process regarding viscosity and application after sufficient field testing. FEATURES Is non -toxic. It contains no asbestos or halogens. is fire-resistant. It will not bum in liquid or solid state. Under fire conditions, it forms a char, preventing the spread of flames, and slowing the penetration of heat through the substrate (Fire Endurance). has excellent ahesion and durability when applied to metal. (Suitable primer required.) is easy to use but will need to be built up to proper thickness, typically over 4 applications. TECHNICAL DATA and PROPERTIES Coating Type Latex Finish White, flat finish Color Standard: White (Can be overcoated to achieve desired colour.) Specific Gravity 11.77 Ibs/US Gallon or 1.41g/mL Solids by Weight 69% Solids by Volume 57% VOC 9.375 g/I 0.078 Ibs/USG Dry Time Touch: 30 min. to 1 hour (varies with temperature and humidity) Recoat: 1 to 2 hours Full cure: 48 hours Film Thickness 2-1/2-Hour Rating Dry: 60 mils Coverage 16 ft.I/Gal. Flash Point No Flash Storage Limits Keep from freezing (above 50° F recommended) Shelf Life 24 months Packaging Available in one, five and fifty-five US gallon quantities 1-7 INSTRUCTIONS FOR USE Surface Preparation: All surface preparation should be carried out in accord- ance with good painting practices. Remove all loose, peeling or powdery paint from the surface. All dirt, grease, oil, wax and other foreign material must be removed with a suitable cleaner and allowed to thoroughly dry. ARplication: SafeCoat TFI Coating can be best applied with an airless spray. Airless equipment is most desirable. Use Graco TexSpray Model Mark V or similar units. Use a 17-21 thousand aperture with a 12" fan. SafeCoat TFI Coating Is a heavier body paint requiring reliable and consistent pumping equipment to achieve optimal results. Apply uniformly to entire surface. If thinning is required use clean water only and do not exceed 200 mL per gallon. Surface and ambient temperature must be maintained at greater than 50' F (10° C) during application and must remain so for at least 48 hours following the application. SafeCoat TFI Coating is intended for interior use only. If the coated substrate will be subject to repeated washing or prolonged contact with moisture a finish coat of PRECIDIUM Aqua 90A or suitable latex paint is recommended. More than one additional finishing coat may adversely I affect the flame spread rating and smoke developed classification. Before applying any finishing coat consult the manufacturer or their representative. A wet film thickness gauge can be used at the start of the application to check that sufficient SafeCoat TFI Coating has been applied. At an application rate of 16 sq. ft. per gallon or wet film thickness should be 100 mils and will yield a dry film thickness of 60 mils. Clean UR: All application tools can be easily cleaned with water. If product has dried on, use hot soapy water to soften and remove it. Precautions: SafeCoat TFI Coating is not "WHMIS" regulated nor is it subject to the "Transportation of Dangerous Goods Act and Regulations". See MSDS for detailed precautions. DO NOT FREEZE. TEST RESULTS FIRE RESISTANCE RATING Testing was conducted In accordance with ASTM E-119-07A "Floor/Ceiling, NFPA 251, "Small Scale Test" and CAN4-S101 by Guardian Fire Testing Laboratories Inc. of Buffalo, NY. Following is a summary of the results of those tests. Test System Hour Rating Material Thickness Steel I -Beam 2-1/2 60 mils dry W 10x31 GUARANTEEMARRANTY Recommendations for the use of our products are based on tests carried out at government approved labs. Manufacturer and seller are not responsible for results where the product is used under conditions beyond our control. Under no circumstances will Magna Coatings Technology Inc be liable for consequential damages to anyone in excess of the purchase price of the product or services. 1-8 _ 0 (E) 7 GAGE NGER ;E O X c0 ^ wt QZ w `-' as _ 2I LLJ CD LLJ 2X6©24" C R.R. 2X6�� Im J IX 9 1 IN TS6X6X1/4 ' I NON—STRUCTUR L COLU N � O O I L U � O O � � If ca Z�� OQ co Q- N tn Ds I 16'0' I a� c °) REIN, MASONRY WALL zj-Nl - O #4 ® 16"OC DRILL & EPDXY DOWELS PER DETAIL 6/S4 MATCH TO HOR BARS OF NEW WALL SEE ALSO DETAIL 12/S5 ;2 _ Q cnaU ROOF V,�\N P. B(�2 OATE osizB/ 1 o of scn�e m DRAWN KPB � �I N ") JOB N154 /I SnE s ' K R q� CIVIL .J C� \—V FOF c ►—os Gatos, CA 95032 t a n y a @a t m g a r c h. c o m 4 0 8. 4 5 8. 0 8 5 z Larry Squarcia Cupertino City Hall O Building Department Di z0 tj . 10300 Torre Avenue Cupertino, CA 95014-3202 Z • - o °1 J j O/ S 'moo Mr. Squarcia, I am writing this letter per your request to address an issue, which arose during construction at Saint Joseph of Cupertino Restroom and Rectory Ramp Modernization. The question was brought up by the contractor while laying out the stair to the lowest level. This "alley" is a small walkway existing between the Rectory Offices and the Gymnasium. The Parish Priest told me that on occasion the students at the school sometimes use this alley to get to the church. This is not the recommended accessible path of travel since the existing paving is uneven and there is equipment and other oddly stored items placed in this space. Please refer to the attached site plan showing the accessible path of travel from the school to the church. The recommended accessible path of travel route is equivalent in distance to the alternate route, which is currently under construction. With this in mind, we are providing an accessible stair with a 5-foot level landing. After the landing the paving will be sloped to the existing grades. We cannot make this alternate path accessible and hope we have shown that the recommended path of travel is more than adequate to fulfill accessibility requirements. Please let me know if you have any questions. Tanya Guerrera, AIA Architect m O 1 0 School School Rectory Office 1 11 1n nl Gym School r I I I IJlJ lll1� School OPTIONAL CONST. DINT 2" SAND OVER VAPOR BARRIER 5" CONC. SLAB SEE PLAN FOR REINF.� R A A, GRAVEL BASE —/ n III #4 DOWELS @ 16"o.c. �' J C� 2-#4 T&B�._. _.. . PER PLAN Q EXTERIOR FOOTING SCALE: 1 "=1'-0" Nfl p ism aLu 2X STUD WALL PLYWOOD WHERE OCCURS 5/8" DIAM. BOLTS 48"O/C U.N.O. SEE S.W. SCHEDULE F 8" STEM INFO ® SHEAR WALLS E.N. c Z x: FINISH GRADE 11111= z CONC GRADE BEAM N j ROFESSj�;` JN P.e� �� - 3-q=ice.. O O t U O � o o _a c a Q ►Q z _ � m 0o s Eu 0) fy Z G to 0 -°, Y N a o U DATE 02J23/2010 ALE DRAWN KP6 J05 0154 MEET 5K �E) TUBE STEEL COL PER PLAN _ Is L BA$8�, AL BC (2) #4 EA WAY EXTERIOR GRADE (2) #4 EA SIDE N. .'. 00 Z 5" c� ° ----2' - 6" SQUARE 5 COLUMN BASE DETAIL SCALE: 1" = 1'-0" to F$ 2X STUD WALL WHERE OCCURS 1 /2" CDX PLYWOOD W/ 10D@6 OC EDGE NAIL 5/8" DIAM. BOLTS (2) EA SIDE OPTIONAL `'4 CONST. JNT E.N. 5" CONC. SLAB SEE PLAN F R REI ' D D oD GRAVEL BASE #4 DOWELS ® 24"o.c. 36" 16" (3) #4 EA WAY Co c 6 �1 `;Zv DATE 03/09/2010 5CALE DRAWN Kp5 JOSS #154 5MEET S K-3 SUBMITTAL 40 dohn milli r archiiects #2 kd 0 579 Clydc Avenue. Suir., 300 Mountain View, CA 94043 January 8, 2010 Response to 12-16-09 Plan Check Comments St. Joseph Cupertino School St Joseph Cupertino School 10120 N. De Anza Blvd Cupertino, CA 95014 Permit #: 09110158 - ST JOSEPH OF CUPERTINO Type: 1E TI Parcel I.D.: 3162 6091.00 Architectural Reviewer: Arnold Planning Reviewer: Tracy Fire Dept. Reviewer: Gilery O'Brien Sanitary District Reviewer: Nichol Bowersox Additional Changes a. I Glazing added to doors 01 1 a and 014a. No, 2. Response Architectural Note added showing width of crosswalk striping. Legend added showing Accessible Path as per 113313.7 Occupant load has been added. Panic hardware has been added to Door Hardware for doors 02a and 02b. Panic hardware is already shown for door 011 a. r�i- w 3. Section through sink cabinet added showing knee space requirements and insulated pipes per 1117B.9. ` 4. Mechanical comment. l�U-S A3.1 Location of Response 7 / LS7.1 A2.1 A3.1 F/A5.1 1 of 3 14. 15. 16. �- 17. 18. 19. 20. ` 21. -! 22. 23. 24. 25. Tactile exit signs added at doors 02a, 02b, 01 la and 014a. Seismic restraint for ceiling fan Tactile exit signs added at door 014a. Mechanical comment. Occupant load has been added. Panic hardware is already shown for door 014a. Seismic restraint for pendant light Roof Plan has been added to A2.2 See response to items 2 and 9 regarding panic hardware. Detail for rated soffit has been shown on section. References for fire rated construction has been added to detail. Dimensions have been corrected on cabinet sections. Dimension of desk has been changed to 3'-0" width for accessible counter. Detail reference to sink cabinet section have been added to Interior Elevations. 1-hr Rated suspended ceiling detail. 1 �) c►�7(S ElectricalGhf MEP drawings have been wet -signed on resubmittal. Structural drawings have been wet -signed on resubmittal. Detail has been revised to show a wood frame ceiling. Special inspections form. Structural calcs Structural calcs Structural calcs A2.5 A2.2 A2.2 3 / A2.2 A3.1 4/A4.1 8 / A8.1 A5.1 A5.2 E/A5.1 A5.1 A5.2 3 / A8.1 n%�, 4 / E4.0 2of3 Fire Department Review Comments 1. Fire Alarm design / build is a deferred submittal. 2. See Door Schedule, note #2 for information regarding egress doors. 3 4 5. 6. 7. 8. San 1. 2. 3. 4. Fire extinguishers have been placed adjacent to doors 02a, O l la and 014a. This allows all portions of the building to be with 75'-0" of a fire extinguisher. Note has been added specifying the minimum size of fire extinguisher. Finish Floor Plan Note #1 has been added stating that "Interior wall and ceiling finish shall comply with Chapter 8." Tactile exit signs have been added. Automatic shut-off. Mechanical The photovoltaic system in use at the school has already been installed. We are only modifying the location of the panels to accommodate the new construction. The proposed project is not visible from the street. The school has approved numbers and addresses in place on all existing buildings that are visible and legible from the street. iitary District Review Comment Response Mechanical Mechanical Mechanical Mechanical Respectfully submitted. �SQ JoPer,chitect A2.1 A2.2 A2.5 A2.5 3of3 BAIRD STRUCTURAL DESIGN, INC 79608 Soquel Drive i240 Aptos, CA 95003 Email: kpbengineerOyahoo.com Ph: 831.661.0564 0 Fx:888.785.2822 January 22, 2010 John Miller Architects 579 Clyde Avenue, Ste 300 Mountain View, CA 94043 RE: St Joseph of Cupertino Pre-K Classroom addition/remodel Mr. Martinez: Please see the following responses to plan check comments: 20. Revised plans have been stamped by engineer of record. 22. Special inspection form provided for testing of existing masonry walls. 23. Calculations have been revised, see pages 14 to 28. 24. Calculations have been revised, see pages 14 to 28. 25. Calculations have been revised, note that there is 14ft of shear wall. See revised sheet S2, and calculation pages 14 to 28. Feel free to call should you have any questions. Sincerely, Kevin Baird, PE Excel Engineers 825Orange Ave., Sunnyvale, CA 94087 Phone(408)230-9164 Fax(408)749-9989 Cupertino Sanitary District Plan Check Response for St. Joseph School Project MECHANICAL AND PLUMBING Item 1, General note #1 added on P1.0 to reas as "FIELD LOCATE (E) PROPERTY LINE CLEANOUT AND RAISE IT TO GRADE. CHANGE ORDER WILL BE ISSUED IF (N) PROPERTY LINE CLEANOUT IS REQUIRED". Item 2, General note #2 added on P1.0 to reas as "PROVIDE CLOSED-CIRCUIT VIDEO OF EXISTING/NEW PROPERTY LINE CLEANOUT, POINT OF CONNECTION AND DISTRICT LATERAL PRIOR TO FINAL INSPECTION". Item 3, General note #3 added on P1.0 to reas as "FIELD LOCATE (E) BACKFLOW PREVENTER. CHANGE ORDER WILL BE ISSUED IF (N) BACKFLOW PREVENTER IS REQUIRED". Item 4, The owner's water account is #1575633333. QPo�Ess/o\ �Q yvE XU\ ti ILI No.31 *S'T �FCHAN�G OQ 9r� of CP�-`� December 22, 2009 City of Cupertino — Building Department Building Permit Plan Check Comments Building Permit No.: 09110158 — St. Joseph of Cupertino School Project Address: 10120 N. De Anza Blvd, Cupertino Electrical Plan Check Responses Item Sheet Electrical Plan Review Comments/Responses 18 E3.0 Comment: Clarify note 17. Note 17 not found. Response: Note 17 added to sheet E3.0. 19 All Comment: MEP's (mech , elec, plumbing) drawings were not wet signed. Provide signatures on plans. Response: Electrical drawings wet signed for this submittal. 21 E4.0 Comment: Detail 4: Revise detail, as timber framed roof is provided. Response: New detail added to sheet E4.0 addressing pendant li ht tin/restraint. John miller architecls SUBMIT AL S79 Clyde Avenuc Suite 300 MOUrICaln View. C� 94043 JHI� � 0 W It January 22, 2010 City Of Cupertino Building Department 10300 Torre Avenue Cupertino, Ca 95014 Ref. St Joseph Of Cupertino Pre-K Remodel 10120 North De Anza Blvd. Cupertino, CA 95014 Plan Check Resubmittal Permit Number: 09110158 Parcel Number: 31626091.00 Dear Building Department: Please find attached the Plan Check Resubmittal package for the subject project. This Resubmittal includes: • Written plan check responses from the architect, structural engineer, mechanical engineer and electrical engineer attached to each set of drawings. • 4 stamped and signed sets of the construction documents with all revisions made since the original plan check submittal clouded. • 1 set of revised structural calculations and special inspections form. • I set of addenda I - 4 issued during the bid period. The items that reflect change of scope are clouded and referenced in the revision box. There are only a few items that have been revised that reflect building code issues. Notably, these are the handicap ramp at the curb, the fire alarm system, combustion air at the furnaces and water heater and the transfer grills at the restrooms. All other revisions reflect coordination and clarification issues. Please call if you have any questions. Since y � v Eduardo Martinez, n John Miller Architects 650-960-0502 John miller architects pq579 Clyde Avenue, Swtc 300 t, r1� Mounicaln View, CA 94043 12/8/09 Addendum #1 ST JOSEPH OF CUPERTINO SCHOOL — PRE -KINDERGARTEN Notice to all Bidders Addendum No. 1 — Clarification Subject: Schedule of work not specifically shown or called out in the Contract Documents Description: Certain work is identified as: Not Included in Contract (NIC) Design / Build Owner Furnished Contractor Installed (OFCI) Installed by Owner's Contractor Following is a schedule of this work: Item: Description: Provided by: Asbestos Removal of vinyl asbestos tile By Owner's Contractor removal Fire Alarm Design -Build process By Contractor System Design, Construction documents, Fees, Permits, Installation Kitchen O.F.C.I Owner furnishes kitchen appliances, Appliances Cooktop, Oven, Disposal, Contractor installs Microwave, Range Hood Bells, Clocks, Contractor to coordinate P.O. C. By Owner's Contractor PA, Cable, w/ Owner Internet Relocation of Contractor to coordinate P.O.C. By Owner's Contractor solar panels w/ Owner Please acknowledge receipt of Addendum No. 1 on the Bid Form Issued by: John Miller, AIA John Miller Architects St. Joseph of Cupertino — Pre K 1 of 1 Project # 154 12/ 1 1 /09 Sohn miller archiAia 579 Clyde avc,. Fa'30030Q mountain view. ca 94043 Addendum #2 ST JOSEPH OF CUPERTINO SCHOOL - PRE -KINDERGARTEN Notice to all Bidders Addedum No. 2 - Clarification Subject: Revisions to the Specification The items listed below shall become part of the Contract Documents # Sheet/Spec Item Section 1. Specification Delete: 04 22 00 1.06 A. Concrete Masonry Units - Delete Part 2 - Products and insert: "PART 2 - PRODUCTS 2.01 MASONRY UNIT MATERIALS/MANUFACTURER A. Concrete Masonry Units shall be manufactured by Calstone, Inc. Contact information: 1155 Aster Ave, Sunnyvale, CA 94086, 408-984-8800. B. Concrete Masonry Units: 1. ASTM C90. 2. Sizes and Shapes: 24" wide x 8" high x 8" deep to match existing and as indicated here or on drawings. 3. Color of masonry units: To match existing. 4. Texture of masonry units: To match existing. 5. Strength of masonry units: See structural drawings. 6. Unit weight (pcf) of masonry units: As indicated here or on drawings. 7. Integral Water Repellent: As indicated here or on drawings. C. Concrete block units shall have a tight, smooth face and be mold and moisture resistant, D. Color selection, including custom colors shall be selected by the Architect. St. Joseph of Cupertino — Pre K I of 5 Project # 154 2. Specification 06 40 00 Architectural Woodwork 12/11/09 E. CMU shall be recycled units suited for interior and exterior applications. The structural integrity of the unit shall result in a one-step, single trade installation process. F. Field Constructed Mock-ups: Construct a sample panel, no less than 4' x 4', of units of each color and size to be used in the project. 2.02 CONCRETE GROUT A. Use 2,500 psi concrete grout with 50% fly ash content. 2.03 MASONRY CLEANERS A. Use Burnished Custom Masonry Cleaner by PROSOCO carefully following manufacturer's instructions (dilute 1 part to 3 parts clean water). Do not powerwash. CAUTION! Never use Muriatic Acid solution or any cleaner with an acid base on units." Insert: 3.02 MASONRY ERECTION A. Bonding: 1. Bond pattern shall be Stack Bond to match existing. Insert: 2.01 BASIC MATERIALS AND FABRICATION METHODS A. Base Cabinet and Upper Cabinet Materials: Birch or Maple veneer ply with 1/2" edge banding of solid wood. B. Plastic Laminate: Comply with NEMA LD-3 for type, thickness, color, pattern, and finish as indicated for each application, or if not indicated, as selected by Owner's Representative from manufacturer's standard products. Plastic laminate to be over plywood. Use of particleboard is prohibited. Insert: 2.05 COUNTERTOPS (Kitchen) A. High pressure laminate with integral 4" backsplash and full bull nose edge. St. Joseph of Cupertino — Pre K Project # 154 2 of 12/ 1 1 /09 3. Specification Insert: 0721 00 1.01 DESCRIPTION Insulation A. Furnish and install thermal insulation at the underside of all roof areas, wall insulation at the Homework Room, and acoustical insulation at the new wood frame walls at the Office and Restrooms. 4. Specification Insert: 07 90 00 1.02 QUALITY ASSURANCES Joint Sealants A. Maintain complete manufacturer's installation directions for all products at the job site throughout installation. 5. Specification 2.04 FABRICATED COMPONENTS 08 40 00 Aluminum C. 1. Manufacture: Kawneer in lieu of Blomberg Storefront 5 0851 13 Aluminum Windows 6. Specification 0871 00 Hardware 8. Specification 09 65 00 Linoleum Flooring Insert: 2.01 APPROVED MANUFACTURERS: A. Aluminum window units 1. Kawneer AA3350 Isoport series windows. 2.04 HARDWARE REQUIREMENTS No substitutions will be permitted. Insert: 2.01 RESLIENT TILE (at Music/Homework Room) C. Acceptable Manufacturers: Armstrong Standard Excelon D. See Finish Floor Plan for pattern and colors. Allow for five colors. Insert: 2.04 LINOLEUM TILE FLOORING A. Manufacturer: Forbo Linoleum, Inc., 'Marmoleum Dual' series. B. 5. See Finish Floor Plan for pattern and colors. Allow for five colors. St. Joseph of Cupertino — Pre K Project # 154 3 of 5 12/11/09 2.05 PRODUCT SUBSTITUTIONS A. No substitutions Delete: 3:09 SCHEDULES AND PRODUCT CRITERIA FORMS 9. Specification 09 Insert: 6800 2.02 ACCEPTABLE MANUFACTURERS: Carpet A. J&J Commercial Windfall Broadloom carpet. See Finish Floor Plan for color 10. Specification Insert: 09 90 00 1:05 COLOR AND SAMPLES Painting C. As many as six different interior colors are required. See Finish Floor Plan for color, manufacturer and location of paint finishes. Insert: 2.01 MATERIALS: PAINT B. Insert "Benjamin Moore" in lieu of "ICF Dulux". 11. Specification Insert: 11 41 00 1.01 DESCRIPTION Kitchen B. The Owner will supply all appliances which are to be Appliances installed by the Contractor. The term "install' shall mean uncrated, set -in -place, leveled and ready for plumbing and electric connection as specified in other Sections or on the drawings. Insert: 1.04 MEASUREMENTS A. Verify all measurements on the premises. Verify dimensions of appliances supplied by the Owner and be responsible for the proper fit and location. Where needed dimensions cannot be secured when required, the matter shall be referred to the Architect. All measurements taken on the premises shall take into consideration the work of others and shall provide all necessary clearances to complete this work in connection with the work of others. St. Joseph of Cupertino — Pre K 4 of 5 Project # 154 12/ 1 1 /09 Insert: 2.01 KITCHEN EQUIPMENT SCHEDULE Kitchenette: Cooktop: G.E. 30" Built -In CleanDesign Electric Cooktop, Model JP346, Black Microwave: G.E. Spacemaker II, Model JEM25DM with Under Cabinet Mounting Kit, Black Built -In Oven: Frigadaire 24" Gas Oven, Model JRS068J, Black Garbage Disposal: G.E. 3/4hp, Super Capacity Continuous Feed Disposal: Model No. GFC720V. Range Hood: G.E.30" Delux Range Hood, Model JV347H, Black Please acknowledge receipt of Addendum No. 2 on the Bid Form Issued by: John Miller, AIA John Miller Architects END OF ADDENDA St. Joseph of Cupertino — Pre K 5 of 5 Project # 154 1115 09 j�r!!II III11Ir•I .Its IIII� �'1 I Addendum #3 ST JOSEPH OF CU"PFR`1'INO SCHOOL --- PRE-KINDI',RGARTEN Notice to all Bidders Addendum No. 3 - Revisions and Clarilications Subject: Revisions and Clarifications to Contract Documents Following is a schedule of this work: # Sheet/Spec Item j Section 1. A2.1 I Note a possible conflict between (n) door opening 07a and (e) conduit in wall for PA to the West of the new opening. V.I.F. Existing conduit to remain. Existing PA to be removed and a junction box added. New speaker to be furnished and installed by Owner on the face of the (n) soffit. Patch CMU wall w/ grout where (e) speaker removed. Paint finish. 2. A3.1 Pair of Doors 011 a and 014a: Furnish and install 8" x 24" I glass lites in each door. See Specifications Section 08 21 00 for reference standards. 3. A2.5 Finish Schedule Room 09: (e) Gludam beams to receive P-1 E paint finish. 4. A2.5 I Toilet partitions in Rooms 010 and 012 are shown as: TP-1 Toilet Partition General Partitions Solid Phenolic Core P308-CA Cornsilk Angora 5. EQ.1 Fixture Schedule, Type G, Ceiling fan: Big A-- Isis Ceiling Fan, 8' diameter, finish to be selected by -the Architect. St. Joseph of Cupertino — Pre K I of 4 Project 154 12/15A 9 6. M 2.1 1. Change exhaust fan EF-1 serving Staff Toilet from "COITROLLED BY WALL SWITCH" to "CONTROLLED BY TIMER". 2. Delete undercut door notes for Staff Toilet, Boy's Toilet and Girl's Toilet. 3. Add transfer grille and duct for Staff Toilet. Locate (1) grille in Staff Toilet and (1) grille in Room 4. Run transfer duct over the door of Staff Toilet. Transfer grille shall be "TITUS" 50F and 50E-NT 14x14. Provide full size transfer duct. 4. Add transfer grille and duct for Boy's Toilet and Girl's Toilet. Locate (1) grille in Restroom ceiling and (1) grille at bottom of soffit in Pre-K for each restroom. Transfer grille shall be "TITUS" 50F 14x14. Provide full size transfer duct. 7. Scope of Low-' The Contractor shall furnish and install all low voltage Voltage Work conduit, and extension rings as described below. Owner shall furnish and install the low voltage wiring, jacks and speakers. See Specifications Section 26 05 33 for conduits and fittings. Include low voltage conduit and fittings in Base Bid. • Furnish and install two conduit runs, one from the Storage Room ceiling through the west soffit, terminating in the ceiling space of the Music/Homework Room. Furnish and install the second conduit from the ceiling of the Storage Room through the South soffit to the East soffit, terminating 10-12' from the Girls Restroom, terminating at the communications outlet in the soffit. Do not terminate conduit in front of a window. • The Owner shall furnish and install the communications equipment in the Storage Room adjacent to the Lighting Control Panel. See below. 8. Not Used 9. Not Used 10. Not Used St. Joseph or Cupertino — Pre K 2 or4 Project 4 154 13. E3.0 14. E3.0 15. E3.0 16. E3.0 I2, 15iO9 j Time of Construction from February 1, 2010 to May 15, 2010 (105 days) Add: Sheet note number "4" at column lines "2" and "B" and pointing to the receptacle denoted by circuit 18. Revised: In Storage room 07, change sheet note "6" to number 10". Revised: At column lines "2" and A.1, the 1" min. signal conduit (as noted by Sheet note number "14") shall extend beyond soffit area and into accessible ceiling space of Room 09. i Add: Additional 1" min. signal conduits shall be added from the South drop ceiling area and extending to the Television outlet (Sheet note number "T) and another extending from the south drop ceiling to the north area to reach Room 014. Revised: Move Storage room 07 receptacle denoted by circuit no. 16" on west wall to south wall of same room. Add: Sheet note number "17", "Power connection for gas oven controls. Coordinate requirements with oven installer". 17. E3.0 Add: In storage room 07, receptacle added above area of LCP for network equipment. New receptacle indicated by new Sheet note number 18". Add: Sheet note number "18", "Provide (N) receptacle above LCP for network equipment. Coordinate exact location with network installer". St. Joseph of Cupertino - Pre K 3 of 4 Project 4 154 12/ 15/09 Time and Place of Bid remain unchanged Time of Construction has been modified. See above. Please acknowledge receipt of Addendum No. 3 on the Bid Form Issued by: John Miller, AIA John Miller Architects St. Joseph of Cupertino -- Pre K 4 of 4 Project "; 154 - John miller architects 579 Clyde Avenue Sulu 300 M6L!ntain Vic,,-' CA 94043 1 /4/ 10 Addendum #4 ST JOSEPH OF CUPERTINO SCHOOL — PRE -KINDERGARTEN Notice to all Bidders Addendum No. 4 — Revisions and Clarifications Subject: Documentation of CIarifications and Revisions issued since Addendum #3 Additional Clarifications and Revisions issued herein Following is a schedule of this work: # Sheet/Spec Item Section/ Reference 1. Clarification Fire Alarm System: 12/16/09 Information regarding contact information for existing fire alarm. Delete Clarification response. Information has been revised. See Clarification 12/29/09 below. 2. Clarification Wood Doors and Frames: 12/22/09 Frames and door trim shall be select Douglas fir, painted. Storefront Doors & Frames - Delete response. Information has been revised. See below. Fire Alarm System: Furnish and install a fire alarm system serving the Pre - Kindergarten and Music/Homework Room. This Clarification has been supplemented by additional information. See below. Plan Check Comments: Architectural responses to the City of Cupertino Plan Check Comments were attached. Engineering comments were subsequently sent. See below. St. Joseph of Cupertino — Pre K 1 of 4 Project # 154 1 /4/ 10 3. Clarification 12/23/09 Storefront Doors and Frames: Vista Wall entrance doors and frames equal to Kawneer products specified in Section 08 40 00are acceptable. Vista Wall frame details shall match details shown on Drawing A 7.1. 4. Clarification Electrical Plan check Comments: 12/23/09 The Electrical Engineer's responses to the City of Cupertino's Plan Check comments were attached. 5. Clarification 12/28/09 6. Clarification 12/29/09 Fire Alarm System: • Furnish and install a stand alone Fire Alarm System to serve the project area. • The Fire Alarm Panel shall be located in Storage Room 07 adjacent to the LCP. • The existing telephone line connection to the Fire Department for the adjacent Residence fire alarm shall be utilized for the project. • Upgrades to the existing fire alarm shall not be included in the Bid. • The cost of the Fire Alarm System for -the Pre - Kindergarten spaces and the Music/Homework Room shall be included in the Base Bid. • The Contractor shall provide the Fire Alarm System on a Design -Build Basis, including all City of Cupertino approvals. • Permit fees shall be reimbursed by the Owner at cost. Clarification 12/16/09 still applies. City of Cupertino Plan Check Comments: • The City's Plan Check comments were attached to this Clarification. Water District Requirements: • The Water District is asking for compliance with their standards for a property line cleanout and a back flow device mounted at the proper elevation. These items must be verified in the field and will be addressed as a change order after the close of bids, if work is required. • The requirement of a video of the sewer line should be included in your bid. St. Joseph of Cupertino — Pre K 2 of 4 Project # 154 1 /4/ l 0 Fire Department Requirements: The Fire Marshal's requirements for a fire alarm submittal are in accordance with the Clarification issued 12/28/09. Maximum occupancy or evacuation signage have not been required by the Fire Department. NEW RESPONSES AND REVISIONS 7. Mechanical Mechanical Plan Check Comments are attached. See Item Plan Check 6 above for clarification of Water District requirements and Comments how they will be addressed. 8. Detail 13/S4 Saw cutting of Existing Slab: Detail 13/S4 clearly shows the condition at the depressed slab and the location of the saw cut line. Sheet S6 Columns are read from right to left. Note 21 is continued General from the column to the right of it. Notes 9. Detail 3 & 4 Slope to Drain at Restrooms: A8.2 Follow Detail 3-4/A8.2 mortar bed float. Use 2 x 6 stud wall framing at exterior walls and all interior 10. Detail E A2.2 walls, unless noted otherwise. 11. Detail 1/A7.1 Both plate details are correct and occur at differing Vs. conditions. Detail 5/S4 12. Detail 9/A7.1 Existing Post vs. New Post at Column Line A-1: Vs. There is a new footing with a raised curb required at this Detail 5/S4 location. We shall allow, at the Contractor's option, either means of construction. 13. Drawing Door 02 Hardware Schedule: A3.1 Delete thumb turn deadbolt. Delete push and pull bars. Entrance Furnish and install two exit devices, Von Duprin 3547 with Doors concealed vertical rod device. Series 370L Standard Trim. Schlage D cylinder, master key as directed by the Owner. Stainless steel finish. 14. Drawing Door 011 a — Replace existing pairs of doors and frame and A 3.1 — hardware. See also Hardware Group 7. St. Joseph of Cupertino — Pre K 3 of 4 Project # 154 15. Detail 5/S5 Wall Framina: Detail 5/S5 applies to the new wall condition. • 16. Structural Structural Plan Check Responses are attached. Plan Check Responses 17. Not Used. Please respond if any of the clarifications referenced were not received. • Time and Place of Bid remain unchanged • Time of Construction remains 105 days per earlier Addendum. • Please acknowledge receipt of Addendum No. 4 on the Bid Form Issued by: John Miller, AIA John Miller Architects St. Joseph of Cupertino — Pre K Project # 154 1/4/10 4 of 4 3 61 Project Name: St Josephs of Cupertino Pre-K Code: California Building Code 2007 Site Address: 10120 N. De Anza Blvd. Cupertino, CA Project Number: 090302 By: Kevin Baird, PE 7960B Soquel Drive, #240 Aptos, CA 95003 (831)661-0564 Date: Revised 2/5/10 Materials: Concrete: W := 150 lb fc := 2500 lb c ft3 in2 Reinforcing Steel (A615): fs1 := 40000 lb 2 in Soil Pressure: wsoil 1500 10 weq := 1.33•(osoil ft2 Lumber: Douglas Fir -Larch Joists : 2X5 to 4X16 No. 1 and TJI 230 Beams & Posts: No. 1 and GLB 240OF - V4 Studs : 2x4 8'-9" or less : No. 2 2x4 12'-0" or less : No. 1 2x6 12'-0" to 18'-0" : No. 2 Live Loads: Roof Live Load: Slope = 0/12: wRL:= 20 lb ft2 2"_ CO a_ NIP,-i i4--'�- nr`• C3 z .-, P) < -) Ib fs2 60000 *: := 2 in SU'YMITTAL J\N P. 6 Vyl\ 1 6 0 Dead Loads: Roof Dead Load: Roofing: r1 :_ 4 lb ft2 Ply Sheathing: r2 := 1.5 lb ft2 Framing: r3 .= 2.5 lb ft2 Insulation: r4 := 2 lb ft2 Ceil: r5 := 3 lb ft2 Solar: r6 := 2 Ib ft2 Tar/Gravel Total: cwlm:= rI + r2 + r3 + r4 + r5 + r6 I w1M= 15— ft2 Wall Dead Load: lb Wintwall := 8 2 ft Level 1 Wall Height: 1/2" Drywall Hwl := loft lb Wextwall 70 ft2 Masonry 2 a 2X4 Studs DFL Stud: E := 1400000 lb F := 850 lb .2 c .2 in in d := 3.5in b := 1.5in A := b•d le:= 108in KcE := 0.3 (0.3 for Vis Grade; 0.384 for MEL; 0.418 for MSR)) FcE:- E'KcE FcE = 441 lb ac FcE ac = 0.519 l 2 in Fc Cd� c := 0.8 (For solid sawn members) 1 + ac (1 + ac12 ac Cp :_ 2c l - I J - — Cp = 0.45 2c c pallow Cp• A• Fc pallow = 19941 b 6X6 Post DFL #2 or btr: E := 1600000 lb Fc := 1350 I b in in d := 5.5in b := 5.5in A := b•d le := 144in KcE := 0.3 (0.3 for Vis Grade; 0.384 for MEL; 0.418 for MSR)) &KcE F FcE,- 1 E FcE = 700 l� a c= 0.52 Cd / c2 a c '= F in c := 0.8 (For solid sawn members) 1 + ac 1 + ac)2 ac Cp :_ - 1 - Cp = 0.447 2c 2c c pallow Cp•A•Fc pallow = 18238 lb 3 0 Steel Post d := 3.5in a := 3in TS3x3x1/4 Steel Column As := 2.59in2 I := 3.16in4 r := 1.1in H := 12ft K := 1.0 (Pinned -Pinned) KL := K•H Axial Load: Pmax := 120001b _ Pmax fa As Fa := 8700 lb (From Table C-36) .2 in Bendina: Mmax:= Pmax e Mmax fbx := S Fbx := 0.6Fy S := 2.1in3 fby 0 lb 2 in Fby := 0.6Fy Combined Axial & Bending: Equation (1-11-1) f Fe := fa (From Table A) Equation simplifies to: F = 0.533 Fa Equation (H1-2) fa + fbx + fby = 0.864 OK 0.6Fy Fbx Fby Fy := 42000 lb .2 in KL = 131 r Pmax = 12000 Ib fa = 4633 lb in 2 Fa = 8700 lb— .2 in Mmax= 3000lbft fbx = 17143 Ib .2 in Fbx = 25200 lb .2 in fby_0lb ft2 ib Fby = 25200 — . 2 in OK, Less than 1.0 4 I. Beam Design - mmllll����� �.tttttttt,tt. � titt �t�tO �t j!tlttjtt �tjtN _ 0 lJ 0 bt Fle� / NG Roof Header "H1" 6 X 12 DF-L#1 L := 8ft Properties: b := 5.5in h := 11.25in A := b•h A = 61.875 in Ix := 1 12 b•h3 Ix = 652.6 in sx := 6 —b•h2 sx = 116.016 in3 Fb := 1000 lb Fv := 180 lb E := 1700000 lb 2 2 2 in in in Adjustment Factors: CF := 1.0 CD := 1.0 Allowable: Vallow CD'Fv.A Vallow = 111381b Mallow CF'CD'Fb'sx Mallow = 9668lbft Loadin : WR := 2ft (Tributary Width of Roof on Member) WU := WR•(co RD + (0RL) wU = 70 ft wU•L RI := RI = 2801b 2 wU•L R2 := R2 = 280lb 2 umax := max(R 1 , R2) Vmax = 280 lb coU.L2 Vallow = 11138 lb OK Mmax • 8 Mmax = 560 lb ft Mallow = 9668 lb ft OK SwUL4 Amax 384E•Ix Amax = 5.815 x 10 3 in 360 = 0.267 in OK 7 Roof Rafter "RR" 2x6@24"oc L := 8.5ft Properties: b := 1.Sin h := 5.5in A:= b•h Ix :— 1 12 b h3 sx := 1 —b•h2 6 Fb := 1000 lb Fv := 185 lbE := 1700000 lb .2 2 2 in in in Adjustment Factors: CF := 1.0 CD := 1. l CR := 1.15 Allowable: Vallow := CD'Fv'A Mallow:= CF'CD'CR'Fb'Sx Loading: WR := 2ft WU := WR•(wRD + wRL) wu•L RI :_ 2 wu•L R2 :_ 2 Vmax := max(R 1, R2) au u L2 Mmax := 8 StouL4 Amax 384E•Ix 5•cwuL•L4 AL :_ 384E• Ix A = 8.25 in Ix = 20.8 in Sx = 7.562 in Vallow = 1679lb Mallow = 797 lb ft (Tributary Width of Roof on Member) wuL WR'(wRL) wu = 70 ft Amax = 0.233 in AL = 0.133 in R 1 = 298 lb R2 = 298 lb Vmax = 298 lb Vallow = 1679lb Mmax = 632 lbft Mallow = 797lbft OK OK L = 0.425 in 240 OK L = 0.213 in 480 OK 8 Roof Beam "CBI" 6 X 18 DF-L SS L := 30.5ft Properties: b := 5.5in h := 17.25 in A := b•h A = 94.875 in Ix 1 12 b-h3 Ix = 2.4 x 103 in sx :_ 1 —b•h2 sx = 272.766 in3 6 Fb:= 1500 lb Fv:= 180 lb E:= 1700000 lb 2 2 2 in in in Adjustment Factors: CF := 1.0 CD := 1.0 Cr := 1.15 Allowable: Vallow := CD•Fv-A Vallow = 17078 lb Mallow := CF'CD'Fb'Sx Mallow = 34096 lbft Loading: WR := 8.1ft (Tributary Width of Roof on Member) WU := WR•((0Rw D + RL) wu = 284 ft wu•L R 1 := R 1 = 4323 lb 2 uuu•L R2 := R2 = 4323 lb 2 Vmax := max(R I , R2) Vmax = 4323 lb MmaxCOu•L2 Vallow = 170781b OK 8 Mmax = 329661b ft Mallow = 34096lbft OK SwuL4 Amax— 384E•Ix Amax = 1.38 in L = 2.033 in OK 180 �fl Roof Beam "CB2" 6 X 18 DF-L SS L := 30.5ft Properties: b := 5.5in h := 17.25in A:= b•h Ix 12b.h3 Sx := 1 —b•h2 6 Fb := 1500 lb Fv := 180 lb E := 1700000 lb .2 2 2 in in in Adjustment Factors: CF := 1.0 CD := 1.0 CR := 1.15 Allowable: Val low := CD• FV • A Mallow := CF'CD'CR'Fb'Sx Loadin : WR := 7.5ft Wu := WR•(wRD + wRL) WU'L RI. 2 w u•L R2 2 Vmax := max(R 1, R2) cou L2 Mmax := 8 SwUL4 Amax- 384E•Ix A = 94.875 in Ix = 2.4 x 103 in Sx = 272.766 in Vallow = 17078 lb Mallow = 39210 lb ft (Tributary Width of Roof on Member) co u = 263 ft R I = 40031b R2 = 4003 lb Vmax = 4003 lb Vallow = 17078 lb OK Mmax= 30524lbft Mallow = 39210 lb ft OK Amax = 1.278 in L = 2.033 in OK 180 10 Roof Beam "B3" 6x14 DF-L SS L := 26ft Properties: b := 5.5in h := 13.25in A:= b•h Ix :— 1 12 b h3 sx := t —b•h2 6 Fb := 1500 Ib Fv := 185 lb E := 1700000 lb .2 2 2 in in in Adiustment Factors: CF := 1.0 CD := 1.0 CR := 1.0 Allowable: Vallow CD' Fv' A Mallow := CF'CD'CR'Fb'sx Loading: WR := 6.6ft wU := WR•(wRD + wRL) W U' L Rl :_ 2 WU'L R2 :_ 2 Vmax m (R 1, R2) w u L2 Mmax := 8 SwuL4 Amax 384E•Ix A = 72.875 in Ix = 1.1 x 103 in sx = 160.932 in Vallow = 13482 lb Mallow = 20117 lb ft (Tributary Width of Roof on Member) lb wU=231 ft R 1 = 3003 lb R2 = 3003 lb Vmax = 3003 lb Vallow = 13482 lb OK Mmax = 19520 lb ft Mallow = 20117 Ibft OK Amax = 1.31 in L = 1.733 in OK 180 11 Title : Job # Dsgnr: Date: 10:34AM, 15 OCT 09 Description Scope: Rev: 58(b01 User. KW-0806225, Ver5.8.0. 1-Dec-2003 Masonry Lintel Design Page 1 (c)1983-2003 ENERCALC Engineering Software cales.emCalculations Description General Information Code Ref: ACI 530-02, 1997 LIBC, 2003 IBC, 2003 NFPA 5000 j Pm 1,500.0 psi Clear Span 4.00 tt Rebar Size 4 Fs 24,000.0 psi Lintel Depth 1.33 ft # Bars E/F 1 Em = Pm 900.00 Thickness 8.00 in Top Clear 4.000 in No Special Inspection End Fixity Pin -Pin Btm Clear 4.000 in Seismic Factor 0.300 Bar Spacing 3.000 in # Bar Sets 2 Wall Wt Mull. 1.000 Load Duration Factor 1.330 Block Type Medium Wt Live Loads Not Included with Wind/Seismic Applied Loads 11 #1 0.40 k/ft 0.20 k/ft 0.000 It 4.000 ft Wind Load 25.00 psf Moments & Shears Moment Shear Vertical Loads Actual Allowable Actual Allowable DL Only 1.01 3.48 k-ft 12.51 19.36 psi DL + LL 1.41 3.48 k-ft 17.47 19.36 psi DL + Wind/Seismic + (LL) 4.62 k-ft 25.76 psi Lateral Loads Wind 0.07 2.07 k-ft 0.86 25.76 psi Seismic 0.06 2.07 k-ft 0.80 25.76 psi Equiv. Solid Thick 7.600 in Wall Wt 78.00 psf E 1350,000.0 psi n 21.4815 Lintel O Span= 4.00ft, Depth= 1.33ft, Thick= 8.00inMedium Weight Block, No Special Inspection Using 2 bar sets of 1- #4 bars spaced 3.000in apart, Ends are Pin -Pin Combined Stress Ratios DL + LL (shear governs) 0.9023 . 1.00 DL + Wind (+ LL) (shear governs) 0.5190 1.00 DL + Seismic (+ LL) (shear governs) 0.5168 1.00 Combined Stress Results... Vertical Lateral Combined DL + LL fb/Fb 0.4048 0.4048 ; 1.00 fv/Fv 0.9023 0.9023 1.00 DL + Wind (+ LL) fb/Fb 0.2178 0.0321 0.2499 1.00 fv/Fv 0.4856 0.0334 0.5190 1.00 DL + Seismic (+ LL) fb/Fb 0.2178 0.0300 0.2479 1.00 fv/Fv 0.4856 0,0312 0.5168 1.00 Vertical Strength Allowable Stresses As 0.4000 in2 Masonry Fb... k:(np"2+2np)".5-np 0.35 0.33 Pm (.5 if w/o sp insp) 247.50 psi np 0.0942 Steel 24,000.00 psi j = 1 - k/3 0.883 Masonry Fv A M:mas=Fb k i b d 2/2 ' LDF 3.48 k-ft Pm".5 ' (.5 if w/o sp insp) 19.36 psi M:StI = Fs As j d 8.45 k-ft Lateral Strength As 0.40 in2 k:(np"2+2np)".5-np 0.36 np 0.10 j = 1 - k/3 0.88 M:mas=Fb k i b dA2/2 ' LDF 2.07 k-ft M:StI = FS'As'j'd'LDF 5.16 k-ft 12 Foundation Design: Continuous Foundation: w := 18in Width of Footing h := Bin Height of Footing ws := Bin Width of Stem hs := 18in Height of Stem lb wallow wsoil (Allowable Soil Pressure) wallow = 1500 2 ft `'allow wallow'w - (w''h + w's'hs)'Wc Allowable Uniform Load vallow = 1950 lb ft Pallow wallow'w•[2•(h + hs) + 4-in] - (w•h + ws•hs)•Wc.[2.(h + hs) + 4-in] (Allowable Point Load) Pallow = 91001b Isolated Square Footing: w := 30in Width of Footing h := 12in ( Height of Footing P1 wallow'w'2 - `w'2'h1'Wc Allowable Uniform Load P1 = 84371b 13 Lateral Analysis (Pre-K Room): Seismic Design Criteria - (ASCE7 -191: Fa := 1.0 (ASCE7 Table 11.4-1) Ss := 2.206 (ASCE7 Sec 11.4.1) SMS := Fa -Ss (ASCE7 Sec 11.4.3) 2 SDS:= 3'SMS SDS = 1.471 (ASCE7 Sec 11.4.4) FV := 1.5 (ASCE7 Table 11.4-2) SI := 0.773 1ASCE7 Sec 11 4 1) SMI := Fv•S1 2 SDI 2'SM1 I := 1.25 (Occupancy III) SDI Seismic Design Category E Ts S DS Use Equivalent Lateral Force Analysis Section 12.8 Calculate Seismic Response coefficient: R := 5 (Bearing wall system - Masonry) SDS Cs2:= R 1 N := 1 (Number of Stories) CC= 0.02 x := 0.75 h := 28 T := Ct• hx T = 0.243 TL := 0.12 Cs4 SDYTL Cs4 = 0.391 T` CsS := •• 1 0.5•SI R I CS:= min(Cs2,Cs4) Cs5 = 0.097 (ASCE7 Sec 11.4.3) SDI = 0.773 (ASCE7 Sec 11.4.4) (ASCE7 Sec 11.5.1) TS = 0.526 (ASCE7 Table 12.6-1) Cs2 = 0.368 (ASCE7 Sec 12.8.1.1) (ASCE7 Table 12.2-1) (12.8-2) CS = 0.368 14 Building Depth: D := 32ft Building Length: L := 80ft Effective Seismic Weight: WI := L•D•w1D + 2(L + D)•Wextwall'3ft WI = 85440lb W := WI W = 85440lb Seismic Base Shear: V := CS• W V = 31413 lb (ASCE7 12.8-1) Vertical Distribution of seismic forces (ASCE7 12.8.3) hi := 12ft WI•hI Cv1 - FI := CvI•V FI = 31413lb WI'hl Distribution of Seismic Loads on structure: Front - Back F 1 lb 01 fs := L ,I fs = 393 ft. Side - Side F1 lb u lss D u lss = 982 ft Wind Design (ASCE7 - 6.4.2.1): V3s := 85mph (3 sec Wind Speed - 85MPH - ) (ASCE7 Figure 6-1) (Exposure: C) X 15 1.21 X20 := 1.29 X25 := 1.35 (ASCE7 Figure 6-2) Kzt:= (1 + .17-0.0)2 (3:1 slope max, H/Lh=.35) Kzt = 1 (ASCE7 Section 6.5.7) Ps30 := 14 lb (ASCE7 Section 6-2) 2 ft Iw := 1.0 (Standard Occupancy) (ASCE7 Figure 6-2) lb P15 �15'Kzt Iw'Ps30 P15 = 16.9— ft2 P20 :_ %20'Kzt Iw'Ps30 P20 = 18.1 lb A lb P25 X25'Kzt"w'Ps30 P25 = 18.9 Z ft 15 Lateral Analysis: Building Length: L := 80ft Building Depth: D := 32ft Lower Level Front - Back p := 1.3 = 393 ft u 1 fs ulf,:= 6ft•P15 Ulf :=ma+)1fs'ulfw) Side - Side p := 1.3 lb u lss = 982 ft u lsw:= 6ft-P15 u ls:= ma+lss,u lsw) (ASCE7 Section 12.3.4) u l fw = 102 lbu ifs = 393 lb ft u If = 393 ft = 102 lb u lss = 982 lb u 1 sw ft ft lb u1s=982 ft 16 I i I r r r r -i L J L J i L J i L J i i 1 I I j I I I b i lb Imo' i 5 hk�A —O Shear Wall "Line A" (Line B is unaltered) u is = 982 lb (Line load) ft Ltribl 16ft (Tributary Width of Roof) LSW := 16ft + 18ft (Length of Shear Walls) PI u ls'Ltribl PI = 15707lb Pi Ib v 1 '= Masonry wall: v = 1000 lb v I = 462 ft. OK LSW allow ft P1'Hwl HDI := HDI = 46201b LSW #4@32 vertical bars & #4@32 horiz bars, (1) #4 bars at end. Check Soil Pressure: Length of shortest wall: LSW I := 16ft Ltrib := LSW 1 Ltrib = 16 ft DtribR := 16ft LSW Lateral Force: Peql := .(PI) Pegl = 7391 lb LSW1 Footing Dim.: Wf := 18in d := 24in Lf := LSW I + 2d Wall Dim.: HSW := 9.Oft PD:= (Ltrib'DtribR)'1(0)RD)+ Wextwal I. (Hw I). LSW I + Wf•d•Lf•WC PD= 24040lb PL:= (Ltrib'DtribR)' 1 •(W RL) PL = 5120 lb PDL := PD + PL PDL = 29160 lb wDL _ PDL Dead + Live: wsoil = 1500 lb wDL = 972 lb OK Lf• Wf ft2 ft2 Pegl'HSW'3 = lb 333 w lat := Wf•(Lf)2 w lat Z ft PDL DL _ + wlat Dead + Seismic: weg = 1995 lb wDS . L wDS = 1305 lb OK ft2 ft2 18 Rev: 58WM User. KW-0606225, (c)19M-2= ENER Description 1-Deo2M Ineering Software Shear at line A General Information Seismic Zone Load Duration Factor Shear Pier Data Title : Job # Dsgnr: Date: 1:58PM, 18 DEC 09 Description Scope: Masonry Pier Analysis & Design Page 1 talcs. Bav:Calculations Code Ref: ACI 530-02, 1997 UBC, 2003 IBC, 2003 NFPA 5000 15.71 k Moduli: Em = Pm' 900.00 4 Moduli: Ev = Em ` 0.40 1.33 Pier #1 Pier #2 Pier Height 12.00 it 12.00 It Pier Length 16.50 it 17.50 it Wall Thickness 8 in 8 in "j" : Depth Mult. 0.90 0.90 Pier Fixity Pin -Fix Fix -Fix I'm 1,500psi 1,500psi Fs 24,000 psi 24,000 psi Spinsp No No Grout Spacing 32 in 32 in Analysis Data Pier #1 Pier #2 Height/Length 0.7273 0.6857 (H/L)"3 0.3847 0.3224 Rel. Deft 0.3445 0.2203 Sum Rigidity 7,441.47 Rigidity = .001/Deft 2,902.827 4,538.638 % Force to Pier 0.39 0.61 Shear to Pier 6.128 k 9.582 k Relative DO " 10"5 0.00 in 0.00 in M / (V'Depth) 0.808 0.381 Em 1350,000.0 1350,000.0 psi Ev 540,000.0 540,000.0 psi Shear Reinforcing... Pier #1 Pier #2 fv=V/(12`est jd) 10.53 psi 15.52 psi Fv: w/o Reinf. 27.40 psi 31.07 psi Fv: w/ Reinf. 41.10 psi 46.60 psi Horiz. Shear Av Req'd Not Req'd inA2/ft Not Req'd inA2/ft Bending Reinforcing... Moment @ End 73.54 k-ft 57.49 k-ft "d" to tension As 14.85 ft 15.75 it Bending As Req'd 0.16 in2 0.11 In2 19 Shear Wall "Line 2" (Lines 1,3 are unaltered) vIf=393 ft Ltribl := 40ft Lsw := 14ft PI u lf'Ltribl P1 v I :_ LSW HDI := P1'Hwl LSW (Line load) (Tributary Width of Roof) (Length of Shear Walls) PI = 15707lb !b Masonry wall: vallow := 1350 ft lb (See Enercalc results) v I = 1122 ft OK HDI = 112191b #4@32 vertical bars & #4@32 horiz bars, (2) #4 bar at end. Check Soil Pressure: Length of shortest wall: LSW 1 := 14ft Ltrib := LSW 1 Ltrib = 14 ft DtribR := 16ft LSW Lateral Force: Pegl := I •(PI) Pegl = 15707lb LS Footing Dim.: Wf := 18in d := 24in Lf := LSW 1 + 2d Wall Dim.: HSW := 9.Oft PD:= (Ltrib'DtribR)'1((ORD)+ Wextwall'(Hwl)-LSW1+ Wf'd•Lf•Wc PD= 21260lb PL:= (Ltrib'DtribR)' 1+O L) PL = 44801b PDL := PD + PL PDL = 25740 lb (aDL PDL Dead + Live: wSoil = 1500 lb wDL = 953 lb OK Lf• Wf ft2 ft2 Peq 1' HSW' 3 lb w ]at := 2 w ]at = 873 2 Wf•(Lf) ft _ PDL wDS Lf' Wf +plat Dead +Seismic: co = 1995 lb wDS = 1826 b OK ft2 ft2 20 Title : Job # Dsgnr. Date: 1:57PM, 18 DEC 09 Description Scope: Rev: 580003 User. KW-0606225, Ver5.8.0, 143w,2003 Masonry Pier Analysis &Design Page 1 (c)1983-2003 ENERCALC Engineering Software Masonry Description Shear at line 2 General Information Code Ref: ACI 530-02, 1997 UBC, 2003 IBC, 2003 NFPA 5000 Total Lateral Force 15.71 k Moduli: Em = fm' 900.00 Seismic Zone 4 Moduli: Ev = Em ' 0.40 Load Duration Factor 1.33 Shear Pier Data Pier #1 Pier Height 10.00ft Pier Length 14.00ft Wall Thickness 8 in "j" : Depth Mult. 0.90 Pier Fixity Pin -Fix fm 1,500 psi Fs 24,000 psi Sp Insp No Grout Spacing 32 in Analysis Data Pier #1 Height/Length 0.7143 (H/L)"3 0.3644 Rel. Deft 0.3334 Sum Rigidity 2,999.51 Rigidity = .001/Deft 2,999.514 % Force to Pier 1.00 Shear to Pier 15.710 k Relative DO * 10"5 0.00 in M / (V'Depth) 0.794 Em 1350,000.0 psi Ev 540,000.0 psi Summary Shear Reinforcing... Pier #1 fv=V/(12'est'Jd) 31.81 psi Fv: w/o Reinf. 27.53 psi Fv: w/ Reinf. 41.29 psi Horiz. Shear Av Req'd 0.053 in^2/ft Bending Reinforcing... Moment @ End 157.10 k-ft "d" to tension As 12.60 ft Bending As Req'd 0.39 in2 21 Lateral Analysis (Homework Room): Seismic Design Criteria - (ASCE7 -111: Fa := 1.0 (ASCE7 Table 11.4-1) Ss:= 2.206 (ASCE7 Sec 11.4.1) SMS := Fa -Ss (ASCE7 Sec 11.4.3) 2 SDS '= 3 ' SMS SDS = 1.471 (ASCE7 Sec 11.4.4) Fv := 1.5 (ASCE7 Table 11.4-2) S 1 := 0.773 (ASCE7 Sec 11.4.1) SM 1 := Fv. S 1 (ASCE7 Sec 11.4.3) 2 SDI := 3'SMI SDI = 0.773 (ASCE7 Sec 11.4.4) I := 1.25 (Occupancy 111) (ASCE7 Sec 11.5.1) SDI Seismic Design Category E Ts SDS Ts = 0.526 (ASCE7 Table 12.6-1) Use Equivalent Lateral Force Analysis Section 12.8 Calculate Seismic Response coefficient: (ASCE7 Sec 12.8.1.1) R := 5 (Bearing wall system - Masonry) (ASCE7 Table 12.2-1) Cs2 SDS Cs2 = 0.368 (12.8-2) R I N := 1 (Number of Stories) CC= 0.02 x := 0.75 h := 28 T:= Ct•hx T = 0.243 TL := 0.12 Cs4 SD1'TL CA = 0.391 T`. I 0.5•S1 Cs5 := Cs5 = 0.097 R 1 CS := min(Cs2,Cs4) CS = 0.368 22 Building Depth: D := 22ft Building Length: L := 32ft Effective Seismic Weight: H WI := L•D•wID + 2(L + D)• 15 Ib wl ft2 2 W := W I Seismic Base Shear: V := CS• W V = 6861 lb Vertical Distribution of seismic forces hi := 12ft W1'hl Cvl W1 h1 FI := CvI'V Distribution of Seismic Loads on structure: Front - Back FI u lfs:= L Side - Side FI u l ss D Lateral Analysis: Lower Level Front - Back p := 1.3 lb uIfs =214 ft u i fw := 6ft•P15 ulf := maulfs,ulfw) Side - Side p := 1.3 u lss = 312 lb ft ulsw 6ft-P15 uIs:= ma+Iss°uIsw) W I = 18660 Ib W = 186601b (ASCE7 12.8-1) (ASCE7 12.8.3) F1 = 6861 Ib Ib ulfs=ft 214 ulss=312Ib— ft (ASCE7 Section 12.3.4) u = 102 Ib u 1 fs = 214 Ib 1 fw ft ft u If = 214 lb ft u = 102 Ib u lss = 312 Ib 1 sw ft ft uls=312lb ft 23 PM Fl— Pb 32 5' Y If' 5. 1 6 O - - -0 Shear Wall "Line A" u is = 312lb (Line load) Ltrib I := 11 ft (Tributary Width of Roof) LSW := 5ft + 4ft + 5ft + 4ft (Length of Shear Walls) PI :_ ls'Ltribl PI = 3430lb P1 lb v 1 L Type 2 shear wall: v = 460 ft v I= 191 ft OK SW allow •• For short wall, decrease allowable shear by 2w/h (CBC2305.3.4 Note a.) Use Type "2" wall: vallow := 2' 4ft .460 b vallow = 361 lb— 10.2ft ft ft HD := Pi HwI HD = 19061b LSW Use HDU5 HDallow := 45001b Check Soil Pressure: Length of shortest wall: LSW I := 4ft Ltrib LSW 1 Ltrib = 4 ft DtribR := 16ft Lateral Force: Peg]:= LS l•(PI) Pegl = 7621b Footing Dim.: Wf := 18in d := 24in Lf := LSW i + 2d Wall Dim.: HSW := 9.Oft PD (Ltrib'DtribR)'1(wRD)+ Wextwall'(Hwl)'LSW1 + Wf•d-Lf•Wc PD= 7360lb PL (Ltrib'DtribR)' 1'�wRL) PL = 1280lb PDL := PD + PL PDL = 8640lb wDL PDL Dead + Live: wsoil = 1500 lb wDL = 720 lb OK Lf. Wf ft2 ft2 Pegl'HSW'3 Ib w lat �= 2 w lat = 214 2 Wf•(Lf) ft PDL wDS ' Lf' + wlat Dead + Seismic: (0 = 1995lbb wDS = 934lbb OK ft2 ft2 25 Shear Wall "Line A.1" (Unaltered) u is = 312 lb (Line load) ft Ltribl 35ft (Tributary Width of Roof) LSW := 32ft (Length of Shear Walls) Pi u Is'LtribI Pi = 10915lb P1 lb v 1 '= LSW Masonry wall: vallow 1000 ft v i = 341 ft OK ft #4@16 vertical bars & #4@32 horiz bars, (1) #4 bars at end. Check Soil Pressure: Length of shortest wall: LSW 1 := 32ft Ltrib LSW 1 Ltrib = 32 ft DtribR 16ft LSW Lateral Force: Peq] LSW1'(P1) PegI = 10915lb Footing Dim.: Wf := 18in d := 24in Lf := LSW i + 2d Wall Dim.: HSW := 9.Oft PD'= (Ltrib'DtribR)''((ORD) + Wextwall'(Hwl)'LSW1 + Wf•d•Lf•Wc PD = 46280lb PL (Ltrib'DtribR)' 1•((OiL) PL = 10240 lb PDL:= PD + PL PDL = 56520 lb wDL PDL Dead + Live: COsoil = 1500 lb wDL = 1047 lb OK Lf• Wf ft2 ft2 Pegl'HSW'3 Ib co [at �= 2 CO [at = 152 2 Wf•(Lf) ft PDL CODS Lf'Wf + COlat Dead+Seismic: COeq= 1995 ft2 CODS = 1198 lb OK 26 Shear Wall "Line 4" v If = 214 ft (Line load) Ltribl 16ft (Tributary Width of Roof) LSW := 12ft PI u If'LtribI PI v 1 '= LSW Type 5 shear wall: HD := P1'Hwl LSW (Length of Shear Walls) vallow := 770 lb ft PI = 34301b VI = 286 ft OK HD I = 2859 lb Use HDQ8 Mallow := 80001b Check Soil Pressure: Length of shortest wall: LSW 1 := 12ft Ltrib := LSW 1 Ltrib = 12 ft DtribR 16ft Lateral Force: Pegl := I' (PI) Peg1 = 3430lb LSW Footing Dim.: Wf := 18in d := 24in Lf := LSW 1 + 2d Wall Dim.: HSW := 9.Oft PD:= (Ltrib'DtribR)'I((ORD)+ WextwalIPwl)'LSW1 + Wf•d•Lf•Wc PD= 18480lb PL:= (Ltrib'DtribR)' l+ORL) PL = 38401b PDL := PD + PL PDL = 22320 lb O'DL := PDL Dead + Live: Cosoil = 1500 lb wDL = 930 16 OK Lf• Wf ft2 ft2 Pegl'HSW'3 lb w lat �= 2 w lat = 241 Wf•(Lf) ft 2 PDL u'DS : Lf Wf + wlat Dead + Seismic: weq = 1995 lb wDS = 1171 lb OK ft2 ft2 27 Shear Wall "Line 5" v if = 214 ft (Line load) Ltribl := 16ft (Tributary Width of Roof) LSW := 21ft PI v If'LtribI PI v 1 '= LSW Type 2 shear wall: P1'Hwl HD I :_ LSW (Length of Shear Walls) Ib vallow 460 ft P I = 3430 lb v1=163ft OK HD = 1633lb Use HDU5 Mallow := 45001b Check Soil Pressure: Length of shortest wall: LSW I := 12ft Ltrib := LSW 1 Ltrib = 12 ft DtribR := 16ft LSW Lateral Force: Peg] := 1 •(PI) Pegl = 19601b LSW Footing Dim.: Wf := 18in d := 24in Lf := LSW 1 + 2d Wall Dim.: HSW := 9.Oft PD:= (Ltrib'DtribR)'1(cORD)+ Wextwall'(Hwl)'LSW1 + Wf•d•Lf•Wo PD= 18480lb PL:= (Ltrib'DtribR)' 1+ORL) PL = 3840lb PDL := PD + PL PDL = 22320 Ib wDL;= PDL Dead + Live: wsoil = 1500 lb 10DL = 930 lb OK L f' W f ft2 ft2 Pegl'HSW'3 lb w lat := 2 � lat = 138 2 Wf•(Lf) ft PDL wDS Lf' + wlat Dead + Seismic: weq = 1995 lb ADS = 1068 Ib OK ft2 ft2 28 PC St. Joseph of Cupertino School 10120 N. De Anza Blvd., Cupertino, California 95014 • (408) 252-6441 • www.sjcschool.org November 30, 2009 To whom it may concern; St. Joseph of Cupertino School is undertaking a project to build a preschool. These plans outline the construction. Sincerely, Mary Lyons Principal (5) ASBESTOS HAZARD EMERGENCY RESPONSE ACT (AHERA) STATE nALSERVIC DEPARTMENT OF GENERAL SERVIC GONERAL DATA OFFICE OF LOCAL ASSISTAN (FORM A) MUST BE TYPED AND SUBMITTED WITH EACH SCHOOL MANAGEUENT PLAN OLkV'A•A (NEW 6-8e) + SEE REVERSE FOR CLARIFICATION OF TERMS LOCAL EDUCATION AGENCY COUNTY Diocese of San Jose Santa Clara SCHOOL NAME SCHOOL PHONE NUMBER St. Joseph 'Elementary (408)252-644 1 ADDRESS (Nunba) (Sheet) (City) (ZIpCode) 10120 N. De Anza Blvd., Cupertino 95014 COS CODE • SCHOOL ENROLLMENT • NUMBER OF SC1400L EMPLOYEES • NUMBER OF BUILDINGS AT THE 43 69419 6980460 251 34 SCHOOL 3 LEA AHERA DESIGNEE NAME PHONE NUMBER Charles F. Buckley (408)298-5432 ADDRESS (Namb-) (Shoe) ( 1 k� 920 S. Winchester Blvd., San Jose 7 ILO TRAINS G COURSE(S) AND DATE(S) 1) Building Inspection and Management Planning for Asbestos (June 20-24, 1988) 2) Practices and Procedures in Asbestos Control (April 27-29, TOTAL TRAININ RS August 13-14, 1987) 91ou MANAGEMENT PLANNER NAME PHONE NUMBER Charles T_ Bucicleq (4 08) 29 8-5!� 3 2 ADDRESS (NU-- ) (Sheet) (City) (:a C-* 920 S. I:) incnesi:er Blve., San Jose 95) 2S ACCREDITATION NUMBER TRAINING AGENCY 368 University o California DOCUMEN75ATIACHED jCHECKAPPRCFRLitE.BOXES) Record of Friable and Non- Physical and Hazard Assessment Operations and Maintenance PerlOdlc Survelllance Plan Friable ACBM (Form B) of Friable ACBM or Friable ® Program (Form D) (Form E) Assumed ACBM (Form C) Reinspection Plan (Form F) Parent/Employee Notlficadon Resources Needed (Form H) N Plan (Form G) We certify that the general Local Education Agency (LEA) responsibilities, as stipulated by 4 CFR Part 763, have been met or will be met, and that this submittal includes all buildings at this sc MANAGEM S NATURE ATE PRINTED NAME OF REVIEWER DATE REVIEWER'S SIGNATURE D riy'- 9. IZ' r} U '�Co,_ cr, �L� -� , .__� _ ...'_ �<>•r-�" ; 3Co' - �i1 - C #6 Fr _... _ Ily2[ Ili - Tf\ 3�; � 1 or2pG� ( 5 hr �— _ iM 32�-v° ra G G O _8 i � I I _ >Co vl�frr✓ �b J-1 I r�CoB � I T r 'I- w , yuu+h MIn15hy � 'ST- JOSEPH'S PAROCHIAL SCHOOL 7 DRAWN BY CNK'O• ���ppkpy `� aJ / 1 CUPERTINO„ CALWORNIA ANOUp ° IOLi� M�>=.� N- 5f•Jvi-1 • a TgACIO n s n rsr,m oaw 1001 aaart.,mrt. T BWL vl` II�,1 MATlgIAL CAT6 D"WINO �!I) NUMB" APP•O 3 �"HOOL & ILDING I.Mmogenous I , y4 I: . r in X1 FT whitl �3n floor plan Eunctional- Space !number az-� ky f/ 1 11 v HOMOGENOUS SAMPLING AREAS U 10T. Homonenous Ar 4 on floor pan Functional Space -I?yv-) Rom+" fm q Homogenous Area = 13 I I Uion P, on floor plan Functional Space number 0 P-A v e A In I C+ uJi W M, � PSOM homogenous ea Mlaterial Descr . Aeo(jsl, C. f df Symbol used on floor plan Functional Soa( number or name � 4 cco��;v L),Q OATH FCt%'1 FOR HITR SAMPr Inspector 5'i �,.0 Iw (� aW �S ^ BaUdingS r , OS 1+t5 OF L OPWTitio Date Ftnnctiona]. Space No. 4 Q R,00m V ROOM ... _5IORA 6 E- A v [zoom v TL Oom PI � �M Lti�7 c7na i vi2 Oan I Fort. OIZR.1 lJu2 sample Location Sample No. Type of. Material Type t 3 1 z GY urn A uO 3A FT- 1 C TI L�_ 10 ' 2.1N0 LT_ ...... ._ .�_ .. - 'FLvk II 15 qxq Fr FLV F -r-C 1INTrn Z ( i 1G �rtvcco C.Iv < 1 N'�=1�.Id✓1.. / 11VU �) 010 012 (e) 11'-9" 3 9 4.2 12 11 V Pre-K RCP see A2.3 Pre-K RCP see A2.3 L Legend' Reflected Ceiling Plan Notes: Ceiling height 1. All acoustical ceiling tile shall be suspended in a suspension system manufactured by the acoustical ceiling manufacturer _ and seismically braced. ® Recessed 2' x 4' 2. Coordinate with other trades including Mechanical ,D Fluorescent - - and Electrical. - - '� e Ceiling Mounted 3. Light fixtures are shown for co-ordination purposes. See Exit Sign Electrical drawings for specific information regarding light fixtures, smoke detectors, and other electrical Ceiling mounted equipment, 4. Locations of HVAC grilles and registers are shown for VN supply air diffuser coordination purposes. See Mechanical drawings for Ceiling mounted specific information regarding grilles, registers and other return air register equipment. 5. Equipment exposed in ceiling including electrical fixtures and air grilles shall align and be centered Ceiling fan in rooms unless noted otherwise. 6. Ceiling height is from top of subfloor. M < 6'-0" _ a s� k de c r see larm Drawings 8 separate submittal) Cl) © ° © Compression strut \w\ 7 ..;ti,. .k..... above ceiling Beam above ceiling Area of suspended • 5� `: 2 T-bar ceiling below 1-Hr rated sus ended �x�����/ 8.1 p gyp.bd. ceiling© : `:: ',\. •:.` . :, k, \. ,.�. ... Area of (n) stucco over I (e) framing I ti:•,k ... \4 +� 1 O `'' Are*Pcoibove stucco I I --- - - - - - - - - - - - - - - �t` ` to dL 1- J'� 'r J r :`• ',•.T-bng �T p / Sheet Notes: / r 10 10'-0" 6 p 1. (e) Stucco /� / 7.1 2. Wrap (e) beam in stucco 010� 1" copper 5 3. Trim (e) beam soffit to match adjacent X p , 2 fascia /� 1 G 1 „ N _ J 4. (e) Stucco ceiling o/ (e) 2x6 roof • ' • ' • • ' • ' • ' 4.2 framing to remain above (n) T-bar `�IT- Gas ut r 1 2 %4. <ceiling �-� � r �/. � �� . � off ve Ive 10 - b 2 5. Remove (e) 2x4 surface mounted r 1/4" a�ov c g - 8.2 fluorescent light fixture. "�°" Z' SS J_.-._ 6. (e) Beam above T-bar ceiling to �___________- re ain. 7. Align T-bar grid with beam above W E 0 1 - 14 8. Provide 4x8 WD wl U48 hangers 01a a 9 - Oi l 013 d ' N ........................................................................................................................................................... 14 9. 26 ga min Duct w/ through penetration t 3 2 8 2 fire stop system. 1-Hr F and T rated. --- --� I 3 10. Turn 4x8 sideways to clear ductwork Homework Room w/ A35 ea. side and bottom. i, 1 Homework Room A( 1 4.2 ' .) Project North 11. Type B flue. 012 5 _ © - pI 12. 1-Hr rated shaft to bottom of deck. RCP - Homework Room 4 `, , Scale: 1/4" = V-0" _._ N 12 Roof Plan Notes: I J I I = 3 Paint Legend: P-1 White P-2 i ;i. ; ;fzzx 4;,, (Blue) Accent color P-3 (Yellow) Accent color P-4 E 171 u-i L:1 o E-i (Red) Accent color P-5 r 0 0 0 l (Green) Accent color Floor Plan Notes: 1. All dimensions are to face of plywood or lath, face of concrete; to centerlines of columns and other grid points, and to center lines of doors and other scheduled openings unless otherwise noted. Verify in field all dimensions at existing construction. 2. See sheet A3.1 for Schedules. A2.5 for Finish Schedule. 3. Top of counters and tables to be 28" - 34" AFF. as per CBC 1122B.4. See interior elevations for specific information. M a i. v c 654 sf 20 33 2 1. See mechanical drawings(SMD)or sheet /- - I 4.2 b I- 1 T�p of (3) I �I 4 6 ........... metal vent and other roof flashingdetails. ...... ...... C endow& Sheet Notes: '• I 13 03 � E � 03 03 1. (e) Skylights - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - I 2. (e) Roof penetrations 4'-0" 4'-0" 4'-0" 4'-0" 4'-0" 3. (e) Roof drain & overflow, VIF EQ1 4. (e) Solar panel rack Pre-K Floor Plan see A2.1 5. Plumbing vent 3 6. Combustion air vent ri I ° Legend: Wall Type Schedule ® Remove & relocate (e) solar panels as required (e) Solar panels Interior Exterior E p 7/8" stucco w/ mtl lathing o (2) layers Grade'D' paper C I = Plywood, SSD Project North 0 Roof Plan - Homework Room 3 Scale: 1/4" = V-0" 2x6 Stud @ 16"o.c. Batt insulation: R-19 (Only at "n" type walls) ,1) Layer 5/8" type "x" gypsum board. Applied vertically or horizontally w/ 6d cooler or Nallboard nails at 7" o.c., NI end joints on nailing members. ® 1 Hr - CBC Table 720.1(2) Item # 15-1.3 1 Hr - CBC Table 720.1(2) Item # 15-1.13 2x6 Stud / Stucco Ext. Wall E Scale. 1 1/2 = 1 -0 EQ1 32'-1" VIF Homework Room y4 ti I id I =� I yYd w I w rye 8 ti Typ of (4) 6 I 10 1 4.2 Legend- Project g North 2x Wall (e) CMU Wall Sheet Notes: SR FE Semi -recessed fire extinguisher 1. (n) Aluminum windows Minimum size of 2-A: 10-BC ® 2. Remove and replace concrete slab 3. (n) Base cabinets ®� Accent color, P-5 4. Line of upper cabinet above countertop 5. Stainless steel sink and faucet MT-1, Forbo Marmoleum 6. Remove and reposition rainwater leader tile 20" x 20", "Calico" 7. (e) Rainwater leader to remain t2713 8 (e) Steel column to remain MT-2, Forbo Marmoleum 9. Not used 10. Line of (e) roof overhang above tile 20 x 20", Blue t3030 11. (n) Door _ 12. Forced air heating unit. Enclosure to match MT-3, Forbo Marmoleum adjacent cabinetry. SMD the 20" x 20", "Golden Sunset" 13. Fresh air grille, 24" x 16". SMD t3125 G i 11 MT-4, Forbo Marmoleum the 2 x 20", Red Amaranth I t322MT-5, Forbo Marmoleum tile 20" x 20", "Emerald" t3223 XXX Area XX AL Occupant load X # Occupants 17 Signage: See A2.5 Signage Schedule Floor Plan - Homework Room Scale: 1/4" = V-0" 2 4.2 St Joseph of Cupertino School 10120 N. De Anza Blvd. Cupertino, CA 95014 Pre-K Remodel / Addition Room Number Index 01 (e) Covered Entry 02 Queuing / Parent Waiting Area 03 Director's Office 04 Sign In 05 Staff Toilet 06 Sick Child Area 07 Storage 08 Cubbies 09 Pre -Kindergarten Classroom 010 Boy's Toilet 011 Vestibule 012 Girls Toilet 013 a Covered Walkway 014 Music/Homework Room Alternative means & methods 06-14-10 - Field Change #1 03-24-10 - Plan Check Resubmittal 2 02-08-10 Plan Check Resubmittal 01-08-10 1 Addendum #4 01-04-10 - Plan Check / Bid 11-25-09 - Owner Review 11-19-09 No. Revision Date john miller architects Architecture, Planning, Restoration, Interiors 579 Clyde Avenue, Suite 300 T: 650.960-0500 Mountain View, CA 94043 F: 650.960-0555 Floor Plan & RCP Alternative means & methods ©2010 John Miller, Architect AIA A2n2 Scale: 1/4" = V-0" 1 File: St Jo Sch Cupertino / Job #154 A2 Plan St Jo Cup/2.2 Flr plan Hmwll Metes pipe, conduit or tubing 3M Fire Barrier CP 26S/L Caulk 1/4" (6mm) maw' Relneulate area H Insulation was removed during Installation. 3/4" (19mm) thick Gyperete 3/4" (19mm) thick Plywood Wood Jowe Plywood/Gyporete Gypsum composite floor/caging. )7-777.17 ,. Fire rated Gysum 1/4" (6mm) maxknum annular space board. 3M Fire Barrier CP 26N/$ Caulk Notes: 1. Hole size through the flooring system and Gypsum wallboard ceiling is to be a maximum 1/2" larger than outside diameter of metal pipe/conduit. 2. The metal pipe/conduit should be centered in circular openings such that a maximum 1/2 annular space is present around its perimeter at each through location. 3. Use CP 25S/L (self leveling) Caulk on horizontal sufaceswhen filling gaps from above the penetration. Use CP 25 WS (No Sag) Caulk on vertical surfaces and on horizontal surfaceswhen filling gaps from below. 4. The 3m Fire Barrier CP25 Caulk is to be forced into the annular space to the maximum extent possible, flush with the exterior of the penetration surface. 5. Finish caulking with a 1/4" minimum bead of CP 25 Caulk applied to the perimeter of the pipe at its egress from the floor and ceiling. 6. These recommendatins are based on ASTM E-814 (UL 1479) Fire Test and UL Through -Penetration Firestop System #169 Metal Pipe thru 1-Hr rated floor / cei-I 1 ng 13 �Syste�mNo. F-C-7022 May 19, 2005 F Rating - 1 Hr T Rating - 1/4 Hr A 3 2 0 0 3'-9 1/2" Sawcut to Sawcut 0 0 r 1„ Trim c 42 I= J Caulk 0 0. o: o: is ... a a. Caulk l CMU Cap, THE Door Stop Shim 2x6 Casing Trim Note: See 7/-for additional information Int. Door Head/Jamb Sim @ CMU wall 10 T yp. Mtl track: 16 ga. Sheet mtl coping 1/4 : 12 Slope 26 ga. typ. Cont. cleat SECTION A -A 1. Floor -Ceiling Assembly - The 1 hr fire -rated solid or trussed lumber joist floor -ceiling assembly shall be constructed of the materials and in the manner specified in the individual N L500 Series Floor -Ceiling Designs in the UL Fire Resistance Directory. The general .� construction details of the floor -ceiling assembly are summarized below: A. Flooring System - Lumber or plywood subfloor with finish floor of lumber, plywood or Floor ` Mtl weep screed: I Topping Mixture* as specified in the individual Floor -Ceiling Design. Max diam of opening is 11 Superior SWS038-200 I @ in. (279 mm). I B. Wood Joists - Nom 10 in. (254 mm) deep (or deeper) lumber, steel or combination lumber Run built-up roofing up I @ @ and steel joists, trusses or Structural Wood Members* with bridging as required and with ends wall under weep screed firestopped. C. Gypsum Board* - Nom 4 ft. (122 cm) wide by 5/8 in. (16 mm) thick as specified in the - �� @ I @ individual Floor -Ceiling Design. Max diam of opening is 11 in. (279 mm). - - - - 2. Steel Duct - Nom 10 in. (254 mm) (or smaller) No. 28 gauge (or heavier) steel duct or nom 5 - - in. (127 mm) (or smaller) No. 30 gauge (or heavier) steel duct to be installed either ' concentrically or eccentrically within opening. The annular space between duct and periphery of opening shall be min 0 in. (point contact) to max 1 in. (0 mm to max 25 mm ). Duct to be rigidly supported on both sides of floor assembly. LIT, 1 3. Fill,Void or Cavity Materials* - Caulk or Sealant - Min 3/4 in. (19 mm) thickness of caulk applied within annulus, flush with top surface of floor. Min 5/8 in. (16 mm) thickness of caulk applied within annulus, flush with bottom surface of ceiling. Min 1/4 in. (6 mm) diam bead of caulk applied at point contact locations at duct/floor interface on top surface of floor and at duct/ceiling interface. 3M COMPANY - CP 25WB+, IC 15WB+ caulk or FB-3000 WT sealant Fire caulk around rafter *Bearing the UL Classification Marking (e) Continuous glulam beam Duct thru 1-Hr Floor / Ceiling p 1 Hardipanel o/ (2) layers grade "D" paper Densglass: (2) Layers 5/8" type "x" Mtl studs: 16 ga. @ 16" o.c. Mtl angle bracket: 5" x 12" x 3/16" (6) SDS 1/4 x 3" (4) SDS 1/4 x 3" Cant R & R Rigid insulation as req'd for slope to roof drain (e) 2x6 joist Nailer Run gyp.bd. between (e) 2x6 joist Remove & replace AC tile o/ battens. (e) 2x4 seismic retrofit 2x4 (e) CMU wall Mtl bead ° Fire sealant Pre-K (e) Mud sill Classroom � a @ I Note: O I I 1. See 12a for additional information I.s.wacPzswscauik I @ @II 2. See 15/- for penetration details J @@ �- Notes: 1. The space between the penetrating item and wall board must accommodate at least one wrap (1/4") of Fire Barrier FS-195 Wrap/Strip 2. If the annular space is less than 1/2", one wrap of FS-195 is required. If the annular space is 1/2" or greater, fill with additional wraps of FS-195 until annular space is less than 1/4". Wrap strips way be friction fit into opening, secured with foil tape or 18 ga. steel tie wire. 3. Slide the wrap strips into the opening, leaving a maximum 3/4"exposed wrap beyond the wall surface. 4. Seal teh FS-195 edges and seams with a 1/4" minimum bead of 3M Fire Barrier CP 25N/S Caulk. 5. Install 3M Firestop on both sides of wall. 6. These recommendations are based on product performance per ASTM E-814 (UL 1479) Fire Test and UL Through -Penetration Firestop System #147. Penetration Firestop Mtl Pipe / Conduit Through a 2-hr Wall A _F 0'-0" T.O. conc.- ZV �0'- 2" ecess @ the Int. Door Head/Jamb Sim @ Stud Wall 7 Scale: 6 = 1 -0 (e) 3x joist (e) glulam beam Ceramic tile Sheet vinyl / VCT Thinset mortar slope to Align floor drain See Floor Plan a• - - - - - - - - - - - - - - - Wire reinforcing Waterproofing memb. Conc slab Tile to Marmoleum Tile Scale. 6 =1 -0 Cross Chanel @ 2-0" o.c. (e) 2x6 joist \see RC Px 8, Turn beam sideways to clear (e) ductwork, see RCP - - - - - - - - - - - - - - - - - Compression strut, see 2/A8.1 for spacing Attach compression strut 31 to 4x8 beam, max. 6'-0" from side wall, see RCP ------------- - --+---------- ----------- - - --- ' - Remove & replace stucco as req'd 7/8" Stucco o/ Light fixture: I; (2) layers grade "D" paper Day Brite Surface Decorator Ice Cube o/ 5/8" type "x" gyp.bd. 2SD432-1/4-EB 2x4 Pre-K (e) Covered Walkway v © b Parapet @ 2-Hr Area Sep. Wal 12 Exterior Soffit Light A Scale: 1 1/2" = V-0" Scale: 3" = V-0" 4 (8.1 (e) Roof framing (e) Stucco soffit Surface mounted junction box Surface mounted light fixture Mechanical duct where occurs 2x Spacer ' 1 x Wd trim, S4 select =IN O i s. ,r i censure F.O. lightrk fixture is eve 9 Door @ Conc. Wall Scale: 3" = V-0" ­- `--me: welded frame and screw head )r out solid ..alant m strip: lercer Standard 940 and metal pins 990 T.O. Slab 4 1 Carpet to Marmoleum Tile Scale: 6" = V-0" Insulation (t J Ceiling joist: 3 5/8" 20 ga. @ 2'-0" o.c. Align with suspended ceiling grid below. �\ r (e) glulam beam B.O. e Beam 10-10 0 1-Hr rated ceiling: (2) layers 5/8" type "x" gyp.bd. 0 0 (e) CMU wall a 0 Note: ° See 2/78.1 for additonal information 3 --- 8.1 1-Hr rated Ceiling w/ Suspended T-bar Ceiling Below Scale: 1 1/2" = V-0" w iaoa000 i weep I 6 Floor Drain @ Tile Scale. 6 = 1 -0 St Joseph of Cupertino School 10120 N. De Anza Blvd. Cupertino, CA 95014 Pre-K Remodel / Addition i Alternative means & methods 06-14-10 Plan Check Resubmittal 3 1 Clarification #14 05-27-10 - Plan Check Resubmittal 2 02-08-10 - Plan Check Resubmittal 01-08-10 - Plan Check / Bid 11-25-09 - Owner Review 11-19-09 No. Revision Date 2 Floor drain Silicone sealant Crushed stone Waterproofing memb. over pre -sloped base N7224 en.11-30-11 0,P CA16 john miller architects Architecture, Planning, Restoration, Interiors 579 Clyde Avenue, Suite 300 T: 650.960-0500 Mountain View, CA 94043 F: 650.960-0555 Interior Details Alternative means &methods ©2010 John Miller, Architect AIA Scale: As noted A8.2 3 File: St Jo Sch Cupertino/Wd set 9-2-09/ Job #151 8.1 int Details/ 8.2 int dtls