Loading...
10050112CITY OF CUPERTINO FUILDING PERMIT BUILDING ADDRESS: 18860 LOREE AVE CON'rRACTOR: CASTO ROOFING PERMIT NO: 10050112 OWNER'S NAME: CELIA LA RIVIERE 1938 QLD MIDDLEFIELD WAY DATE ISSUED: 05/12/2010 TR'S PHONE: 4082524609 MOUNTAIN VIEW, CA 94043 PHONE NO: (650)961-8922 LICENSED CONTRACTOR'S DECLARATIONF L_ � � l � L BUILDING PERMIT INFO: BLDG ELECT PLUMB License Class Lic. # ` r— F f— ContractorC : rl•\'}U&JAt',,,X-T-,C- Date 2_1 r b MECH RESIDENTIAL COMMERCIAL I hereby affirm that I am licensed under the provisions of Chapter 9 JOB DESCRIPTION: RE -ROOF REMV EXISTING TAR & GRAVEL & REPLACE (commencing with Section 7000) of Division 3 of the Business & Professions W/SA VIE CLASS A 18SQ Code and that my license is in full force and effect. I hereby affirm under penalty of perjury one of the following two declarations: I have and will maintain a certificate of consent to self -insure for Worker's Compensation, as provided for by Section 3700 of the Labor Code, for the performance of the work for which this permit is issued. Sq. V Floor Area: Valuation: $6100 I have and will maintain Worker's Compensation Insurance, as provided for by Section 3700 of the Labor Code, for the performance of the work for which this permit is issued. APN Yumber: 37515017.00 Occupancy Type: APPLICANT CERTIFICATION I certify that I have read this application and state that the above information is correct. I agree to comply with all city and county ordinances and state laws relating to building construction, and hereby authorize representatives of this city to enter PERMIT EXPIRES IF WORK IS NOT STARTED upon the above mentioned property for inspection purposes. (We) agree to save indemnify and keep harmless the City of Cupertino against liabilities, judgments, `'VITHIN 180 DAYS OF PERMIT ISSUANCE OR costs, and expenses which may accrue against said City in consequence of the granting of this permit. Additionally, the applicant understands and will comply 180 D YS FROM ST CALLED INSPECTION. with all non -point source regulations per the Cupertino Municipal Code, Section 9.18. Issued by. L �� Date: Si ature Date RE -ROOFS: V OWNER -BUILDER DECLARATION All ro >fs shall be inspected prior to any roofing material being installed. If a roof is I hereby affirm that I am exempt from the Contractor's License Law for one of install:d without first obtaining an inspection, I agree to remove all new materials for the following two reasons: inspection. I, as owner of the property, or my employees with wages as their sole compensation, will do the work, and the structure is not intended or offered for sale (Sec.7044, Signal ure of Applicant: Date: Business & Professions Code) I, as owner of the property, am exclusively contracting with licensed contractors to construct the project (Sec.7044, Business & Professions Code). ALL ROOF COVERINGS TO BE CLASS "A" OR BETTER I hereby affirm under penalty of perjury one of the following three declarations: HAZARDOUS MATERIALS DISCLOSURE I have and will maintain a Certificate of Consent to self -insure for Worker's I havi read the hazardous materials requirements under Chapter 6.95 of the Compensation, as provided for by Section 3700 of the Labor Code, for the Calif(rnia Health & Safety Code, Sections 25505, 25533, and 25534. I will maintain performance of the work for which this permit is issued. compliance with the Cupertino Municipal Code, Chapter 9.12 and the Health & I have and will maintain Worker's Compensation Insurance, as provided for by Safety Code, Section 25532(a) should I store or handle hazardous material. Section 3700 of the Labor Code, for the performance of the work for which this Addit onally, should I use equipment or devices which emit hazardous air permit is issued. contaminants as defined by the Bay Area Air Quality Management District I will I certify that in the performance of the work for which this permit is issued, I shall maintain compliance with the Cupertino Municipal Code, Chapter 9.12 and the Health & Safety Code, Sections 25505, 25533, and 25534. not employ any person in any manner so as to become subject to the Worker's Compensation laws of California. If, after making this certificate of exemption, I Own / / �L ) become subject to the Worker's Compensation provisions of the Labor Code, I ust 4 Date: 5` forthwith comply with such provisions or this permit shall be deemed revoked. CONSTRUCTION LENDING AGENCY APPLICANT CERTIFICATION I herel,y affirm that there is a construction lending agency for the performance of work's I certify that 1 have read this application and state that the above information is for which this permit is issued (Sec. 3097, Civ C.) correct. I agree to comply with all city and county ordinances and state laws relating Lend(r's Name to building construction, and hereby authorize representatives of this city to enter upon the above mentioned property for inspection purposes. (We) agree to save Lend(r's Address mnify and keep harmless the City of Cupertino against liabilities, judgments, , and expenses which may accrue against said City in consequence of the granting of this permit. Additionally, the applicant understands and will comply ARCHITECT'S DECLARATION with all non -point source regulations per the Cupertino Municipal Code, Section I unde -stand my plans shall be used as public records. 9.18. Licen: ed Professional Signature Date CITY OF CUPERTINO CITY OF CUPERTINO REROOF PERMIT APPLICATION c, APN # 7 1 Date: Building Address: .-. Al Owner's Name: y, •K&D Phone # �jZ, HOA: Yes ❑ No If es, rovide letter from HOA Phone #: '< Contr(act_on,, �jj"j (,"J ( Fax #: i Cupertino Business License #: `-Z 21 Contractor License #: Se) Z3 Type of Roof Covering: Existing: Proposed: Built -Up Roof Built -Up roof ❑ Asphalt Shingles Asphalt Shingles ❑ Wood Shakes ❑ Wood Shakes ❑ Wood Shingles ❑ Wood Shingles ❑ Other (Specify) ❑ Other (Specify) Number of existing coverings ❑ Provide I.C.C.E.S. Report # ❑ To be Removed ❑ Provide Mfgr. Installation Specs. Job Description: Residential l Commercial ❑ Green Building: Please complete relevant portion ,)f the Confirmed with -Planning Dept. if Green Building Checklist & attach it to the application or if there are any restrictions: applicable, include in plan set & the sheet index. Valuation:; I Have Read, Understand and Will Comply with Cup-_rtino's Tear -Off Policy: Sign e Revised 02/05/09 CITY OF CITY OF CUPERTINO 2 REROOF CUPERTINO FEE SCHEDULE Number of Squares Fee ID Fee Description Fee Group Permit Type 1REROOFCOM Re -roof Commercial B 1COMMLROOF 1BCBSC Cal Bldg Standards Commission Fee B ALL PERMIT TYPES 1BSEISMICO Seismic Commercial B 1RER00FRES 1BCBSC Re -roof Residential Cal Bldg Standarc s Commission Fee B B 1SFDWLROOF ALL PERMIT TYPES 1BSEISMICRE Seismic Residential B 1REROOFMRES Re -roof Multi -Family B 1MFDWLROOF 1BCBSC Cal Bldg Standards Commission Fee B ALL PERMIT TYPES 1BSEISMICRE Seismic Resident:.al B 1BUSLIC Business License B 3 ITEMS OF 3 CITY OF CUPEPTINO PERMIT RECEIPT Sec: Twp: Rng: Sub: Blk: Lo=: APN ........: 37515017.00 DATE ISSUED.......: 05/12/2010 RECEIPT #.........BS000010389 REFERENCE ID # 10050112 SITE ADDRESS 18860 LOREE AVE SUBDIVISION ...... CITY CUPERTINO IMPACT AREA ...... OWNER CELIA IA RIVIERE ADDRESS . 18860 IOREE AVE CITY/STATE/ZIP ...: CUPERTINO, CA 95014 OPERATOR: patg COPY # : 1 RECEIVED FROM LINDSEY D CASTO CONTRACTOR CASTO, LINDSEY LIC # 21324 COMPANY CASTO ROOFING ADDRESS 1938 OLD MIDDLEFIELD WAY CITY/STATE/ZIP ...: MOUNTA::N VIEW, CA 94043 TELEPHONE (650061-8922 FEE ID UNIT QUANTITY AMOU.�TT PD -TO -DT ---------- THIS REC ---- --NEW-BAL ----------------------- 1BCBSC VALUATION 1BSEISMICR VALUATION 1REROOFRES SQ FEET ---------- 6,100.00 6,100.00 18.00 ---------- 1.00 0.70 234.00 0.00 0.00 0.00 ------- --- 1.00 0.70 234.-- ---------- 0• 00 0.00 --- -0_00 TOTAL PERMIT ---------- 235.70 0.00 235.70 0.00 METHOD OF PAYMENT ----------------- CREDIT CARD TOTAL RECEIPT AMOUNT --------------- 235.70 --------------- 235.70 VOICE ID DESCRIPTION -------- --------------------- 601 ROOF TEAR OFF 604 ROOF IN -PROGRESS REFERENCE NUMBER -------------------- VISA VOICE ID DESCRIPTION -------- ------------------------ 602 ROOF PLYWOOD NAIL 605 FINAL REROOF CUPERTINO REROOF TEAR -OFF POLICY COMMUNITY DEVELOPMENT DEPARTMENT • BUILDING DIVISION ALBERT SALVADOR, P.E., C.B.O., BUILDING OFFICIAL 10300 TORRE AVENUE • CUPERTINO, CA 95014-3255 (408) 777-3228 - FAX (408) 777-3333 - buildincCaDcupertino.org PROJECT ADDRESS APN # OWNER NAME d` j r% \ `+ �y� PHi- �& " '7 Z _ L�(sC? V 1 E-MAIL STREET ADDRESS CITY, STATE, ZIP FAX CONTRACTOR NAME LICENSE R BUS. LIC. # COMPANY NAME E-MAIL FAX STREET ADDRESS -5 _. `� (� 'J u� ' .ft I'av �� b CITY, STATES ZIP{�(� e � �� 94 J at PHO I UNDERSTAND AND AGRE`3 TO THE FOLLOWING: 1. The re -roof project shall comply with all applicable provisions of the 2007 California Building Code. 2. An inspection request shall be scheduled the day before the inspection date. Please call (408)777- 3228 between 7:30 - 3:30pm (Mon -Fri) to schedule the next day inspection. 3. After the roof is torn off and the nails/fasteners have been removed and all the dry -rotted wood has been replaced, you must call for a roof inspection. A building inspector will be available with one hour. There are special hours for the service: 7:30 — 10:30 im and 1:00 — 3:30pm (Mon — Thurs); 7:30 — 10:30 im and 1:00 — 2:30pm (Friday). 4. If plywood is installed, a plywood nailing inspection � s required. 5. New roof coverings shall not be applied without first obtaining all inspection and written approvals from the building inspector. Any roofing which is applied without first obtaining an approved inspection will require the removal of all new material down to the sheathing so a proper inspection can be performed. 6. A final inspection and approval shall be obtained from the building inspector when the re -roofing is completed. To receive a final sign -off, the following item will be verified: a. Flat roofs shall have a minimum of/" per foot of slope and demonstrate there is no ponding. b. A listing from an approved testing agency shall be available on-site to review at the time of the inspection. c. Proper spark arrestor installation. 7. NOTE: If you call for a plywood nailing inspection rind the job is not ready, you will be charged to a re- inspection fee of $126.00. The re -inspection fee sha: l be paid before another inspection can be scheduled. By my signature below, I certify to each of the following: I am the property owner or authorized agent to act on .ie property owner's behalf. I underst d agree o cors ply with the re -roof policy stated above. j p ISignature of Applicant/Agent, Date: ReroojPolicy_20 10. doe revised 04114110