Loading...
10070063 CITY OF CUPERTIr 0 BUILDING PERMIT BUILDING ADDRESS: 821 STENDHAL LN CONTRACTOR:COSMOS ROOFING PERMIT NO: 10070063 OWNER'S NAME: LISA BRADRICK 1901 OLD MIDDLEFIELD WAY STE 22 DATE ISSUED:07/08/2010 JER'S PHONE: 6508882711 MOUNTAIN VIEW,CA 94043 PHONE NO:(650)969-7663 T LICENSED CONTRACTOR'S DECLARATION BUILDING PERMIT INFO: BLDG I— ELECT r— PLUMB License Class C 3 Lic.# 7 5 4 U F r- MECH" RESIDENTIAL COMMERCIAL Contractor Date � r the provisions of Chapter 9 JOB DESCRIPTION:RE-ROOF TEAR OFF EXISTING TAR&GRAVEL.NO I hereby m li unde RESHEET.INSTALL 4PLY TAR&GRAVEL CLASS A 25SQ (Comm4, wit ction 7000)of Division 3 of the Business&Professions Code d that my license is in full force and effect. I hereby affirm under penalty of perjury one of the following two declarations: I have and will maintain a certificate of consent to self-insure for Worker's Compensation,as provided for by Section 3700 of the Labor Code,for the performance of the work for which this permit is issued. I have and will maintain Worker's Compensation Insurance,as provided for by Sq.Ft Floor Area: Valuation:$11745 Section 3700 of the Labor Code,for the performance of the work for which this permit is issued. APN Number:37542044.00 Occupancy Type: APPLICANT CERTIFICATION I certify that I have read this application and state that the above information is correct.I agree to comply with all city and county ordinances and state laws relating to building construction,and hereby authorize representatives of this city to enter PERMIT EXPIRES IF WORK IS NOT STARTED upon the above mentioned property for inspection purposes. (We)agree to save indemnify and keep harmless the City of Cupertino against liabilities,judgments, WITHIN 180 DAYS OF PERMIT ISSUANCE OR costs,and expenses which may accrue against said City in consequence of the 180 DAYS FROM LAST CALLED INSPECTION. granting of this permit. Additionally,the applicant understands and will comply with all non-point source regu t' ns per the Cupertino Municipal Code,Section 9.18. Issued by• Date: - 6 Signature Date �6 RE-ROOFS: V OWNER-BUILDER DECLARATION All roofs shall be inspected prior to any roofing material being installed.If a roof is I hereby affirm that I am exempt from the Contractor's License Law for one of installed without first obtaining an inspection,I agree to remove all new materials for the following two reasons: inspection. I,as owner of the property,or my employees with wages as their sole compensation, will do the work,and the structure is not intended or offered for sale(Sec.7044, Signature of Applicant: Date: 7/ /to Business&Professions Code) I,as owner of the property,am exclusively contracting with licensed contractors to ALL ROOF COVERINGS TO BE CLASS"A"OR BETTER construct the project(Sec.7044,Business&Professions Code). I hereby affirm under penalty of perjury one of the following three HAZARDOUS MATERIALS DISCLOSURE declarations: I have and will maintain a Certificate of Consent to self-insure for Worker's I have read the hazardous materials requirements under Chapter 6.95 of the Compensation,as provided for by Section 3700 of the Labor Code,for the California Health&Safety Code,Sections 25505,25533,and 25534. I will maintain performance of the work for which this permit is issued. compliance with the Cupertino Municipal Code,Chapter 9.12 and the Health& I have and will maintain Worker's Compensation Insurance, Additionally,should I use equipment or devices which emit hazardous air as provided for by Safety Code,Section 25532(a)should I store or handle hazardous material. Section 3700 of the Labor Code,for the performance of the work for which this contaminants as defined by the Bay Area Air Quality Management District I will permit is issued. maintain compliance with the Cupertino Municipal Code,Chapter 9.12 and the I certify that in the performance of the work for which this permit is issued,I shall Health&Safety Code,Sections 25505,25533,and 25534. not employ any person in any manner so as to become subject to the Worker's Compensation laws of California. If,after making this certificate of exemption,I Owne or auth d gent: _=� become subject to the Worker's Compensation provisions of the Labor Code,I must Da I-Ii0 forthwith comply with such provisions or this permit shall be deemed revoked. C STRUCTION LENDING AGENCY APPLICANT CERTIFICATION I hereby affirm that there is a constriction lending agency for the performance of work's I certify that I have read this application and state that the above information is for which this permit is issued(Sec.3097,Civ C.) correct.I agree to comply with all city and county ordinances and state laws relating Lender's Name to building construction,and hereby authorize representatives of this city to enter upon the above mentioned property for inspection purposes.(We)agree to save Lender's Address -inify and keep harmless the City of Cupertino against liabilities,judgments, ,and expenses which may accrue against said City in consequence of the ARCHITECT'S DECLARATION granting of this permit.Additionally,the applicant understands and will comply with all non-point source regulations per the Cupertino Municipal Code,Section I understand my plans shall be used as public records. 9.18. Licensed Professional Signature e f CITY OF CUPERTINO FEE ESTIMATOR--BUILDING DIVISION ADDRESS: DATE: REVIEWED BY: APN: BP#: *VALUATION: $11,745 PERMIT TYPE: Minor Building Permit PLAN CHECK TYPE: Re-roof PRIMARY SFD or Duplex S TOTAL APPLICATION USE: ROOF AF.EA: 2,500 f TYPE: xW as C � 3 � FIE ID 1 RERC)OFFRES 7EJ NOTE: These fees are based on the preliminairTy in ormation available and are only an estimate. Contact the Dept for addn'l info. FEE ITEMS 0-'ee Resolution 09-05I Lk ?/U091 FE]41� QTY/FEE MISC ITEMS 1 f_ fit Permit Fee: $325.00 7l , Work Without Permit? Q Yes (F) No 10.00 6 Strom Motion Fee: IBSEISMICR $1.17 Select an Administrative Item Bldg Stds Commission Fee: IBCBSC 51.00 SUBTOTALS: $3':7.17 $0.00 TOTAL FEE: $327.17 Revised: 6/30/2010 CITY OF CUPERTINO 3 ITEMS OF 3 PERMIP RECEIPT OPERATOR: patg COPY # 1 Sec: Twp: Rng: Sub: B1K: Lot: APN . . . . . . . . : 37542044 . 00 DATE ISSUED. . . . . . . : 07/08/2010 RECEIPT #. . . . . . . . . BS000010813 REFERENCE ID # . . . : 10070063 SITE ADDRESS 821 STENDHAL LN SUBDIVISION . . . . . . . CITY CUPERTINO IMPACT AREA . . . . . . OWNER LISA BRADRICK ADDRESS 821 STENDHAL LN CITY/STATE/ZIP . . . : CUPERTINO, CA 95014 RECEIVED FROM . . . . : JEFF RAINEY CONTRACTOR CCSMOS, RICHARD LIC # 18844 COMPANY CCSMOS ROOFING ADDRESS 1501 OLD MIDDLEFIELD WAY STE 2 CITY/STATE/ZIP . . . : MCUNTAIN VIEW, CA 94043 TELEPHONE (E50) 969-7663 FEE ID UNIT QUANTITY AMOUNT PD-TO-DT THIS REC NEW BAL ---------- ------------- ---------- - --------- ---------- ---------- --------- 1BCBSC VALUATION 11, 745. 00 1 .00 0 .00 1. 00 0 . 00 1BSEISMICR VALUATION 11, 745. 00 1 .20 0 . 00 1.20 0 . 00 1REROOFRES SQ FEET 25 . 00 325 .00 0 . 00 325 . 00 0 .00 - --------- ---------- ---------- ---------- TOTAL PERMIT 327 .20 0. 00 327 .20 0 . 00 METHOD OF PAYMENT AMOUNT REFERENCE NUMBER ----------------- --------------- -------------------- CREDIT CARD 327 .20 VISA --------------- TOTAL RECEIPT 327 .20 VOICE ID DESCRIPTION VOICE ID DESCRIPTION -------- --------------------------- ------ ---------------------------- 601 ROOF TEAR OFF 602 ROOF PLYWOOD NAIL 604 ROOF IN-PROGRESS 605 FINAL REROOF I (1)C3�� CITY OF CITY OF CUPERTINO its RE ROOF CUPE TING PERMIT APPLICATION APN# .-, Date: / / to Building Address: 821 STENDHAL LANE Owner's Name: LISA BRADRICK Phone#: 650-888-2711 HOA: Yes ❑ No El If Yes, provide lei ter from HOA Contractor: Phone#: 650-793-5012 COSMOS ROOFING 1901 OLD MIDDLEFIELD WY #22, MENLO PARK, CA 9:043 Fax#: 650-969-9905 Cupertino Business License #: Contractor License #: 785441 Type of Itoof Covering: Existing: Proposed: Built-Up Roof ® Built-Up roof ❑ Asphalt Shingles ❑ Asphalt Shingles ❑ Wood Shakes ❑ Wood Shakes ❑ Wood Shingles ❑ Wood Shingles ❑ Other(Specify) ❑ Other(Specify) Number of existing coverings ❑ Provide I.C.C.E.S. Report# ❑ To be Removed ❑ Provide Mfgr. Installation Specs. Job Description: REROOF - TEAR OFF EXISTING TPR & GRAVEL. NO RESHEET. INSTALL 4PLY TAR AND GRAVEL. CLASS A. 25 SQUARES. Residential 0 Commercial ❑ Green Building: Please complete relevant portion of the Confirmed with Planning Dept. if Green Building Checklist & attach it to the application or if there are any restrictions: ❑ applicable, include in plan set & the sheet index. Valuation: $11, 745 1 Have Read, Understand and Will Comply wit.i Cupertino's Tear-Off Policy: Signa e Revised 02/05/09 REROOF TEAR-OFF POLICY COMMUNITY DEVELOPMENT DEPAR'-MENT•BUILDING DIVISION ALBERT SALVADOR, P.E.,C.B.O., BUI-DING OFFICIAL 10300 TORRE AVENUE•CUPERTINO CA 95014-3255 CUPERTINO (408)777-3228•FAX(408)777-3333•i>uildinq(aDcupertino.orq PROJECT ADDRESS I 7,1PN# OWNER NAME PH 1IE E-MAIL STREET ADDRESS -J ' H� I�- CITY, -IZ'/,Jv CA v/ FAX CONTRACTOR NAME GTE,ZIP - LICENSE NUMB[ LICENCSE�TYP BUS.LIC.# I _H SSCOMPANY NAME 711 FAX STREET ADDRESS -TE,ZIPInd o�.D ►v►ifll�1� lrl� I - viL-0 e 0 969 I UNDERSTAND AND A 3REE TO THE FOLLOWING: 1. The re-roof project shall comply with all applica)le provisions of the 2007 California Building Code. 2. You must schedule all needed inspections a minimum of one day before the requested inspection date. Please schedule inspections online or call (408)777-3228 between 7:30-3:30 (Mon-Fri). 3. Tear-off roof inspection is required. Please call for tear-off inspection after the roof is torn off and all the nails/fasteners have been removed. Any a id all dry-rotted wood shall be replaced prior to this inspection. A building inspector will be available within one hour. There are special hours for this service: 7:30 - 10:30am and 1:00—3:30pm (Mon—Thurs); 7:30 - 10:30am and 1:00—2:30pm (Friday). 4. If plywood is installed, a plywood nailing inspection is required. 5. In-Progress roof inspection is required. Call for an in-progress roof inspection to verify building is weather tight after installation of approximately 25% of the roofing material. 6. New roof coverings shall not be applied without first obtaining all inspections and written approvals from the building inspector. Any roofing which is applied without first obtaining an approved inspection will require the removal of all new material down to the sheathing so a proper inspection can be performed. 7. A final inspection and approval shall be obtained from the building inspector when the re-roofing is complete. To receive a final sign-off, the follo A ing items will be verified: a. Flat roofs shall have a minimum of 1/4"per i oot of slope and must demonstrate there is no ponding. b. Listings from approved testing agencies for all pre-manufactured products used shall be available on-site to review at the time of the inspectic n. c. Proper spark arrestor installation. 8. NOTE: If you call for a tear-off or plywood na ling inspection and the work is not complete, you will be charged a re-inspection fee of$126.00. The -e-inspection fee shall be paid before another inspection can be scheduled. By my signing below, I certify each of the following i:;true: I am the property owner or authorized agent to act on the property owner's behal . I understand and agre.- to comply with the re-roof policy stat d above. Signature of Applicant/Agent: Date: Lh ReroofPolicy_2010.doc revised 05/17/10 M.1ndODr Air Quality and Finishes 1.Use Low/NQ-VOC Paint 1 IAQ/Health pts y--yes 0 2.Use Low VOC,Water-Based Wood Finishes 2 IAQ/Health pts y=yes 0 3.Use Low/No VOC Adhesives 3 IAQ/Health pts y--yes 0 4.Use Salvaged Materials for Interior Finishes 3 Resource pts y--yes 0 5.Use Engineered Sheet Goods with no added Urea Formaldehyde 61AQ/Health pts y=yes D 6.Use Exterior Grade Plywood for Interior Uses 1 IAQ/Health pts y=yes 0 7.Seal all Exposed Particleboard or MDF 4 IAQ/Health. pts y=yes 0 8.Use FSC Certified Materials for Interior Finish 4 Resource pts y=yes 0 9.Use Finger-Jointed or Recycled-Content Trim 1 Resource pts y=yes 1 0 10.Install Whole House Vacuum System 3 IAQ/Health pts y=yes 0 i ism N.Flooring 1.Select FSC Certified Wood Flooring 3 Resource pts y=yes 0 2.Use Rapidly Renewable Flooring Materials t Resource pts y=yes 0 3.Use Recycled Content Ceramic Tiles 1 Resource pts y=yes 0 4.Install Natural Linoleum in Place of Vinyl 5 IAQ/Health pts y=yes 0 5.Use Exposed Concrete as Finished Floor 4 Resource pts y=yes 0 6.Install Recycled Content Carpet with Low VOCs 4 Resource pts y=yes 0 Total Points Available: 1 1401 1301 57 Total Points Project Received: 0 01 0 G:data/progslgrei:nbuildngguidelineslremodelerslgreenpointsfinal2.12.D r ed.xls �v Jul 07 10 01 : 02p Cosmos Roofing (650) 969-9905 p. 3 Co�otpq►Drwle�art 1030 Tam Aw Cation CA 93014 Talgh oe(4W 7"--3W Foa(4M 777.3333 CU1N0 Building De artment COs ADDRESS: PERMaT# 1,112-1 SrENDw4L L4,),C-- 0 ..3--1 3 OINNEWS NAILS: USA b R.I.C4-- PHONE# 6S2) -q4,9--7 G�3 GF34E AL CONlRACMP,- I1n o5 , FAX# &E72 --9 9 - 920 S I ant not using any e A rn. D 7 l d Date Please clerkavvucswesuboontrictocs tete the SUBCOM AC MR BUSINESS NAME BUSUMS LICENSE# Cabal do hffiwork Cmcros�t ' IIectawl Excavadm H Uaoleaaa/wood ' gas/gazing Healing Irdwation Landscaping . MMSOTT iathang Sheet Metal Phying Pain�g�W Pt Roo6:wg Tank Sheet MW Sheet Rock , T' actor Si Date i