Loading...
10110016CITY OF CUPERTINO BUILDING PERMIT BUILDING ADDRESS: 20330 STEVENS CREEK BLVD CONTRACTOR: DEVCON CONSTRUCTION PERMIT NO: 10110016 INC OWNER'S NAME: APPLE INC 690 GIBRALTAR DR DATE ISSUED: 01/24/2011 OWNER'S PHONE: 4089744876 MILPITAS, CA 95035 PHONE NO: (408)942-8200 ❑ LICENSED CONTRACTOR'S DECLARATION BUILDING PERMIT INFO: BLDG r ELECT r PLUMB License Class S ( Lic. # -39 t y - r MECH RESIDENTIAL r COMMERCIAL Contractor as�J YSS Date JOB DESCRIPTION: 1 ST FLOOR - COMPLETE REMODEL OF EXISTING I hereby affirm that I am licensed under the provisions of Chapter 9 KITCHEN & (commencing with Section 7000) of Division,3 of the Business & Professions EATING AREA(6620SQ). EXISTING CAFE.ALL NEW Code and that my license is in full force and effect. EQUIPMENT BEING INSTALLED,NO STRUCTURAL WORK.DEMO. I hereby affirm under penalty of perjury one of the following two declarations: I have and will maintain a certificate of consent to self-insure for Worker's Compensation, as provided for by Section 3700 of the Labor Code, for the performance of the work for which this permit is issued. I have and will maintain Worker's Compensation Insurance, as provided for by Section 3700 of the Labor Code, for the performance of the work for which this Valuation: $2200000 permit is issued. Sq. Ft Floor Area: APPLICANT CERTIFICATION C'— I certify that I have read this application and state that the above inf ation is APN Number: 36901020.00 Occupancy Type: correct. I agree to comply with all city and county ordinances and state laws relating to building construction, and hereby authorize representatives of this city to enter upon the above mentioned property for inspection purposes. (We) agree to save indemnify and keep harmless the City of Cupertino against liabilities, judgments, PERMIT EXPIRES IF WORK IS NOT STARTED costs, and expenses which may accrue against said City in consequence of the WITHIN 180 DAYS OF PERMIT ISSUANCE OR granting of this permit. Additionally, the applicant understands and will comply with all non-point source regulations per the Cupertino Municipal Code, Section 180 DAYS FROM LAST CALLED INSPECTION. 9.18. Sign Date Issus�' / Dat �'0000 atur ❑ OWNER-BUILDER DECLARATION I hereby affirm that I am exempt from the Contractor's License Law for one of RE-ROOFS: All roofs shall be inspected prior to any roofing material being installed. If a roof is the following two reasons: 1, as owner of the property, or my employees with wages as their sole compensation, installed without first obtaining an inspection, I agree to remove all new materials for will do the work, and the structure is not intended or offered for sale (Sec.7044, inspection. Business & Professions Code) I, as owner. of the property, am exclusively contracting with licensed contractors to Signature of Applicant: Date: construct the project (Sec.7044, Business &Professions Code). ALL ROOF COVERINGS TO BE CLASS "A" OR BETTER I hereby affirm under penalty of perjury one of the following three HAZARDOUS MATERIALS DISCLOSURE declarations: I have and will maintain a Certificate of Consent to self-insure for Worker's Compensation, as provided for by Section 3700 of the Labor Code, for the I have read the hazardous materials requirements under Chapter 6.95 of the performance of the work for which this permit is issued. California Health &Safety Code, Sections 25505, 25533, and 25534. I will maintain I have and will maintain Worker's Compensation Insurance, as provided for by compliance with the Cupertino Municipal Code, Chapter 9.12 and the Health & Section 3700 of the Labor Code, for the performance of the work for which this Safety Code, Section 25532(a) should I store or handle hazardous material. permit is issued. V Additionally, should I use equipment or devices which emit hazardous air I certify that in the performance of the work for which this permit is issued, I shall ' contaminants as defined by the Bay Area Air Quality Management District I will compliance with the Cupertino Municipal Code, Chapter 9.12 and the not employ any person in any manner so as to become subject to the Worker's Compensation laws of California. If, after making this certificate of exemption, I maintain Health & Safety Code, Sections 25505, 25533, and 25534. become subject to the Worker's Compensation provisions of the Labor Code, I must deemed er or forthwith comply with such provisions or this permit shall be revoked. Date: APPLICANT CERTIFICATION CONSTRUCTION LENDING AGENCY I certify that I have read this application and state that the above information is correct. I agree to comply with all city and county ordinances and state laws relating I hereby affirm that there is a construction lending agency for the performance of work's to building construction, and hereby authorize representatives of this city to enter for which this permit is issued (Sec. 3097; Civ C.) upon the above mentioned property for inspection purposes. (We) agree to save Lender's Name indemnify and keep harmless the City of Cupertino against liabilities, judgments, and expenses which may accrue against said City in consequence of the Lender's Address costs, granting of this permit. Additionally, the applicant understands and will comply with all non-point source regulations per the Cupertino Municipal Code, Section ARCHITECT'S DECLARATION 9.18. I understand my plans shall be used as public records. Signature Date Licensed Professional CITY OF CITY OF CUPERTINO TENANT IMPROVEMENT CUPERTINO PERMIT APPLICATION FORM APN #> � r, Date: l t Building Address: Mailing Address (if different from building address): Tenant ff (If tenant please provide a letter from the building owner approving the tenant improvement.) Building Owner ❑ Are Hazardous Materials being used as part of this project? Yes ❑ No Tenant/Building Owner's Name: e_tlll Phone #: I Contra tor- Phone #: qzj Z.. — �, v Fax #: /. 2 -L Cupertino Business License: State Contractor Licen e #: Contact:�` ° � Phone #:,`� 1 ✓tr"vic. c �,� . Fax #: IM s- 2- Z Landscape Ordina ce Compliance: Landscape area in sq. ft. (includes all irrigated areas): �! If 2,500 sq. ft. or less, compliance with the Landscape Water -Efficiency Checklist is required. If more than 2,500 sq. ft., a complete Landscape Project Submittal is required. Compliance Method: ❑ Plant Tye ❑ Water Budget Job Description (be specific): 6UAct �� J V' C;.n �+ L..� ,P" ,a,u.;irt2...,✓� _.. �' tom, e v"'. F_,> dw b` g --i L,,., 3 'L, kj- /��,1'.w 1�°�vr �_�-.rq'"" .�„a„11t...,-9 � $-_J1✓,�l`�o�?r�`� � /�5 Tenant Improvement Includes Re -Roof: Yes ❑ No ❑ If yes, number of squares Tenant Improvement Includes Structural Yes ❑ No ❑ Type of Construction (Usage Class): Occupancy Type: 1-A, 1-B lUIIUV-A ❑ ❑ II/III B, IV -HT, V -B ❑ Valuation: 7-0(11 600 Project Size: Express ❑ Standard K Large ❑ Major ❑ Green Building: Please complete Leed for commercial interiors checklist & attach it to the application or if applicable, include in plans & sheet index LEED Points Achieved *** For Office Use Only*** Over The Counter ❑ Revised 05/18/10 %1--',1ounty of Santa Claw Department of Environmental Health 1555 Berger Drive, Suite 300 San Jose, California 96112-271 e (408) 918-3400 www.EHinfo.org January 5, 2011 Devcon Construction Attention: Darcy Narduzzi 639 Gibraltar `Drive Milpitas, CA 95035 Dear Ms. Narduzzi: /0//)eq`�2 PROJECT NUMBER: SR0835508 PROJECT NAME: APPLE CITY CENTER II CAFETERIA PROJECT ADDRESS: 20330 STEVENS CREEK BLVD CUPERTINO Drawings for the above project have been reviewed and approved by this department. This approval shall expire by limitation and will become null and void if the construction, reconstruction, alteration, or other work authorized by this approval is not commenced within 180 days from the date of approval. Please notify this office when construction begins. Please retain one copy of the approved drawings on the job site. A FOO® FAC,&r f CON,STRUCTrON CAR® has been attached to the job copy and must be posted with the other building permits. Present at least two (2) copies of the drawings to your local building official for the required permit application and approval. Any change to the drawings as a result of reviews by other jurisdictions must be brought to the attention of this department as soon as possible to avoid construction delays. Please be advised that you are responsible to contact this office to arrange for a construction inspection before rough plumbing signoff, installation of equipment, and again upon completion of the project. . Absolutely no food storage or food .preparation will be allowed onsite until the department issues a Permit to Operate. This permit will be issued upon, the successful conclusion of our final construction inspection. You will also be asked to submit a performance test of the mechanical exhaust system, if one is present, and verification of garbage collection before the issuance of the Permit to Operate. This food establishment will be required to have either the owner or an employee successfully pass an approved and accredited food safety certification examination. This certification must be obtained within sixty (60) days after your Permit to Operate is obtained. Contact this department for more information. If you have any further questions or would like to call for an inspection appointment, please contact the Department at (408) 918-3400, between 8:00 a.m. and 5:00 p.m., Monday through Friday. Very truly yours, 0 Kerry Ann amilton, REHS Senior Environmental Health Specialist Plan Review and Construction Unit cc: City of Cupertino Building Department Board of Supervisors::Mike Wasserman, George Shirakawa, Dave Cortese, Ken }eager, Liz K'niss 9 County Executive: Jeffrey V. Smith 9-001 DISTRICT MANAGER -ENGINEER MARK THOMAS & COMPANY, INC. RICHARD K. TANAKA DISTRICT COUNSEL ATKINSON • FARASYN, LLP, HAROLD S. TOPPEL 20833 STEVENS CREEK BOULEVARD, SUITE 104 CUPERTINO, CALIFORNIA 95014.2154 (408) 253.7071 PHONE • (408) 253-S 173 FAX www. cup ertinosanitarydistrict. com BOARD OF DIRECTORS WILLIAM A. BOSWORTH JOHN M. GATTO STEVE C. ANDREWS WENDELL H. KERR, JR. CHRISTOPHER C. LEE January 24, 2010 File: CSD — MOP Building Dept. — Cupertino City of Cupertino Building Department 10300 Torre Ave. Cupertino, CA 95014-3202 H -J:5 Eli un 11h Subject: Tenant Improvement — APPROVED Name: Apple Computer Cafe Remodel Address: 20330 Stevens Creek Blvd. Floor 1 APN: 369-01-020 Permit No. 10110016 The Cupertino Sanitary District has reviewed the plans for the subject project: ■ Sanitary sewer is available and the existing building is connected to sanitary sewer, see conditions/requirements listed below. The following Conditions/Requirements are made: • Pretreatment facilities to be inspected by the City of Cupertino and the District for the total loading for Interceptor serving subject restaurant. Interceptor to be inspected for serviceability and certified for size when empty and clean. (O.C. 6221) • Proprty Owner shall establish routine cleaning of a grease trap or interceptor. (O. C. 6221) a) Grease traps must be cleaned monthly or more frequently if needed to meet the discharge limit of 150 ppm of grease, oils and/or fats. b) Grease Interceptors must be pumped out every three months, or more frequently if needed to meet the discharge limit of 150 ppm of grease, oils and/or fats. SUPPLYING SANITARY SEWERAGE SERVICES FOR: CITY OF CUPERTINO, PORTIONS OF THE CITIES OF SARATOGA, SUNNYVALE, LOS ALTOS AND SURROUNDING UNINCORPORATED AREAS Page 2 Subject: Tenant Improvement — APPROVED Name: Apple Computer Cafe Remodel Address: 20330 Stevens Creek Blvd. Floor 1 APN: 369-01-020 Permit No. 10110016 • Closed-circuit video of the existing/new property line cleanout, point of connection and District lateral is required prior to clearance for City of Cupertino Final Inspection. Owner to call District at least 48 hours prior to video inspection to schedule a District Inspector. District to provide Building Department with written notification upon completion of inspection. (O.C. 5104) • Property Owner shall maintain a log of grease trap cleaning, and or copies of grease interceptor pumping cleaning and maintenance, on site for at least three (3) years and made available for inspection and/or copies furnished to the District upon request. (O. C. 6221) • Sanitary sewer emergency operation plan and pumping plan for grease interceptor shall be submitted to the District by the Owner. (O. C. 6203) Storm water from surface or roof drains, other general surface runoff water shall not be discharged to the sanitary sewer. All conditions, requirements and recommendations are to be completed at the (owner/developer)'s expense. Yours very truly, MARK THOMAS & COMPANY, INC. District Manager -Engineer for Richard K. Tanaka If you have any questions or need additional information, please call Nichol Bowersox at 408- 253-7071. ti:A\VOIyI)S\C(JSI)U I I`II IZS\I ( J I I I IN i I ) I I I F I I:TII'ItS\II NAiiy",I IN,II'ROVERIIal"IS(I"I IAI_II\AN,I'.SONLl')AILr;I�nn�uNS ?010\10I 10010 / 1) ' ) 0 3 t0 SIc;,k�m C'n'c1, 61vn1 I II l / I I'I:OVI I) 01 1 -1010,(10( SUPPLYING SANITARY SEWERAGE SERVICES FOR: CITY OF CUPERTINO, PORTIONS OF THE CITIES OF SARATOGA, SUNNYVALE, LOS ALTOS AND SURROUNDING UNINCORPORATED AREAS Cn Santa Clara Department of Environmental Health 1555 Berger Drive, Suite 300 San Jose, California 9$112-27 1 G (408) 918-3400 NVMWEHinfo.org January 5, 2011 Devcon Construction Attention: Darcy Narduzzi 639 Gibraltar 'Drive Milpitas, CA 95035 Dear Ms. Narduzzi: PROJECT NUMBER: SR0835508 PROJECT NAME: APPLE CITY CENTER II CAFETERIA PROJECT ADDRESS: 20330 STEVENS CREEK BLVD CUPERTINO Drawings for the above project have been reviewed and approved by this department. This approval shall expire by limitation and will become null and void if the construction, reconstruction, alteration, or other work authorized by this approval is not commenced within 180 days from the date of approval. Please notify this office when construction begins. Please retain one copy of the approved drawings on the job site. A FOO® F.4CILITP✓ CONSTRUCTION CARD has been attached to the job copy and must be posted with the other building permits. Present at least two (2) copies of the drawings to your local building official for the required permit application and approval. Any change to the drawings as a result of reviews by other jurisdictions must be brought to the attention of this department as soon as possible to avoid construction delays. Please be advised that you are responsible to contact this office to arrange for a construction inspection before rough plumbing signoff, installation of equipment, and again upon completion of the project. Absolutely no food stora e or food preparation will be allowed onsite until the department issues a Permit to Eerate. This permit will be issued upon the successful conclusion of our final construction inspection. You will also be asked to submit a performance test of the mechanical exhaust .system, if one is present, and veriUcation of garbage collection before the issuance of the Permit to Operate. This food establishment will be required to have either the owner or an employee successfully pass an approved and accredited food safety certification examination. This certification must be obtained within sixty (60) days after your Permit to Operate is obtained. Contact this department for more . information. If you have any further questions or would like to call for an inspection appointment, please contact the Department at (408) 918-3400, between 8:00 a.m. and 5:00 p.m., Monday through Friday. Very truly yours, { nn Kerry Aamilton, REHS Senior Environmental Health Specialist x-- Plan Review and Construction Unit cc: City of Cupertino Building Department of Supervisors:.Mike \Vassernian, George Shirakawa, Dave Cortese, Ken Yeager, Liz Kniss Co'111' Executive: Jeffrey v. Smith County of Santa Clara Department of Environmental Health 1555 Berger Drive, Suite 300 San Jose, California 95 1 12-27 16 (408) 918-3400 www E- Hinfo.org December 3, 2010 Devcon Construction Attention: Darcy Narduzzi 639 Gibraltar `: Milpitas, CA 95035 Dear Ms. Narduzzi: PROJECT NUMBER: SR0835508 PROJECT NAME: APPLE CITY CENTER II CAFETERIA PROJECT ADDRESS: 20330 STEVEN CREEK BLVD CUPERTINO We have received drawings for the above project. We are unable to complete the review of the drawings until the following information is provided: 1. Submit a copy of the menu or a listing of all of food and beverage items to be offered at this food facility. 2. Are there any openable windows? 3. Submit a sample of the epoxy flooring/base and the manufacturers' specification sheets. 4. Show the finish material for the wall pass shelf (item #48) and accumulator casing/counter (item #125). 5. Show all floor sinks and floor drains on the revised plumbing drawings. 6. All floor sinks must be accessible for cleaning. If the floor sink is located within a self -serve display cabinet, provide a minimum 4 -inch, 3/8 -inch radius continuously coved base surrounding the floor sink. 7. Provide hot water (minimum temperature, 120°F) and cold water to kettle and pot filler assembly (item #71) and to Reel-Kleen Retractable Hose Reel and Spray (item #137) through a mixing faucet equipped with a backflow prevention device. 8. Provide a slope of at lease 1:50 (1/4 -inch per foot) to the floor drain near the item #71 and item #137.: Area depressions are not approved. 9. Provide an additional hand sink with permanently mounted soap and paper towel dispensers, . near item #18 in the "prep area". 10. Submit hot water demand calculations for all fixtures. 11. Show the location of the water heater on the revised drawings. 12. Submit the completed Exhaust Ventilation Systems form for all Type I and Type II hoods. See enclosure. 13. Sneeze guards must intercept a direct line between the consumer's mouth and clean plates and utensils, as well as displayed food. End panels may be required on the sneeze guards. 14. Provide a sneeze guard at the self -serve food display, (item #100). 15. Sheet FS -1 shows a condiment table. How will the condiments be dispensed? 16. What is stored in room 171? Board Of Supervisors: Donald F. Gage, George Shirakawa, Dave Cortese, Ken Yeager, Liz Kniss s County, Executive: Jeffrey V. Smith 8 -NI 17. ,Sheet A5.10 shows B-3, cove base finish, in Locker room 175. Show on the revised room schedule the manufacturer specification for the material finish. 18. Will the soup wells (item # 100) be used for wet or dry hot holding? If used for wet hot holding, show the floor sink on the revised plumbing drawings Until the information requested is received, the drawings are considered to be disapproved. Applications for which no approval is granted within 180 days following the date of application shall expire by limitation, and drawings and other data submitted for review may thereafter be returned to the applicant or destroyed by this department. This department may extend this period for an additional 60 days upon written request by the applicant showing that circumstances beyond the control of the applicant prevented further activity. In the former case, the applicant must resubmit plans and pay a new plan check fee. If we can be of further assistance, please call the undersigned at (408) 918-3440, between 8:00 a.m. and 9:30 a.m., Monday through Friday. Very trul yours, Kerry Ann Hamilton, R HS Senior Environmental Health Specialist Plan Review and Construction Unit Enclosure(s) cc: City of Cupertino Building Department CITY OF CUPERTINO Eft FEE ESTIMATOR — BUILDING DIVISION OCCUPANCY TYPE: TYPE OF CONSTR. DATE: REVIEWED BY: jigADDRESS: APN: BP#: *VALUATION: 1$2,200,000 ,PERMIT TYPE: Building Permit PLAN CHECK TYPE: Tenant Improvement PRIMARY USE: Commercial Building 7'01;1L FLOOR -IRGa; PENTAMATION 1A TI PERMIT TYPE: WORK T.I. Comm. for E Cafe non-structural include m e exterior installation of grease interceptor SCOPE OCCUPANCY TYPE: TYPE OF CONSTR. FLR AREA s.f. PC FEES PC FEE ID BP FEES BP FEE ID A (Tenant Improvements) II-A,111-A,V-A 6,620 $3,104.26 IATIPLNCK $3,846.28 ]ATIINSP Doc. Insp, Fce PME Plan Check: $126.00 Permit Fee: $3,846.28 Suppl. Insp. FeeO Reg. 0 OT 0.0 hrs $0.00 PME Unit Fee: $0.00 PME Permit Fee: TOTALS: 6,620 1 $3,104.26 1 1 $3,846.28 MECH, HOURLY 0 Yes G No PLUMB, HOURLY 0,, Yes 0 No ELEC, HOURLY 0 Yes 0 No itlech. Plena Clack Plumb. Plan Check 1.0 I hrs $126.00 Elec. Plan Check 1 -tech. Per mit Fce. IPLMBLNC Plumb. Permit Fee: IPPERMIT F -/c('. Permit Fec: Other mirth. Insp.E]__L_ Other Plumb Insp. 1.0 1 hrs $42.00 Other Dec. Insp, Lj Hceh, Insp, Fac: Plumb. Insp. Fee: IPLMBINSP $126.00 Doc. Insp, Fce NOTE. These fees are based on the nreliminary information available and are only an estimate. Contact the Dent for addn'1 info. FEE ITEMS (Fee Resolution 09-051 E . 7/1/10 FEE QTY/FEE MISC ITEMS Plan Check Fee: $3,104.26 Select a Misc Bldg/Structure or Element of a Building i Suppl. PC Fee: 0 Reg. 0 OT 1 0.0 1 hrs $0.00 PME Plan Check: $126.00 Permit Fee: $3,846.28 Suppl. Insp. FeeO Reg. 0 OT 0.0 hrs $0.00 PME Unit Fee: $0.00 PME Permit Fee: $168.00 Consiruction Tax Acoustical Fee: 0 Yes 0 No $0.00 0 0 Work Without Permit? 0 Yes 0 No $0.00 Planning Fee: PLLONGRNGC $0.00 Select a Non -Residential Building or Structure 0 0 Thwel Docinnenlotion Fees: Strong>, Motion Fee: 1BSEISMICG $462.00 Select an Administrative Item Bldiz Stds Commission Fee: IBCBSC $88.00 SUBTOTALS: $7,794.54 $0.00 TOTAL FEE:; $7,794.54 Revised: 10/17/2010