Loading...
11100170CITY OF CUPERTINO BUILDING PERMIT BUILDING ADDRESS: 10038 DOVE OAK CT CONTRACTOR: SPRIG ELECTRIC PERMIT NO: 11100170 OWNER'S NAME: PRADIP JHA 1860 S IOTH ST DATE ISSUED: 10/24/201 I PHONE: 4084217904 SAN JOSE, CA 95112 PHONE NO: (408)298-3134 'OWNER'S td LICENSED CONTRACTOR'S DECLARATION r r r ^ � n � '- Z Date (0 1 hereby affirm that I am licensed under the provisions of Chapter 9 JOB DESCRIPTION: INSTALL ELECTRIC VEHICLE CHARGING STATION AT (commencing with Section 7000) of Division 3 of the Business & Professions EXISTING GARAGE LOCATION Code and that my license is in full force and effect. I hereby affirm under penalty of perjury one of the following two declarations: ['have and will maintain a certificate of consent to self -insure for Worker's Compensation, as provided for by Section 3700 of the Labor Code, for the performance of the work for which this permit is issued. Sq. Ft Floor Area: Valuation: $1200 I have and will maintain Worker's Compensation Insurance, as provided for by Section 3700 of the Labor Code, for the performance of the work for which this permit is issued. APN Number: 34232089.00 Occupancy Type: APPLICANT CERTIFICATION I certify that I have read this application and state that the above information is correct. I agree to comply with all city and county ordinances and state laws relating to building construction, and hereby authorize representatives of this city to enter PERMIT EXPIRES IF WORK IS NOT STARTED upon the above mentioned property for inspection purposes. (We) agree to save indemnify and keep harmless the City of Cupertino against liabilities, judgments, WITHIN 180 DAYS OF PERMIT ISSUANCE OR costs, and expenses which may accrue against said City in consequence of the 180 DAYS FROM LAST CALLED INSPECTION. granting of this permit. Additionally, the applicant understands and will comply with all non -point source regulations per the Cupertino Municipal Code, Section 9.18. Issued by , Date;,A0,2 Signature_/ Date 2 �( ❑ OWNER -BUILDER DECLARATION RE -ROOFS: All roofs shall be inspected prior to any roofing material being installed. If a roof is 1 hereby affirm that I am exempt from the Contractor's License Law for one of installed without first obtaining an inspection, I agree to remove all new materials for the following two reasons: inspection. I, as owner of the property, or my employees with wages as their sole compensation, will do the work, and the structure is not intended or offered for sale (Sec.7044, Signature of Applicant: Date: Business & Professions Code) I, as owner of the property, am exclusively contracting with licensed contractors to construct the project (Sec.7044, Business & Professions Code). ALL ROOF COVERINGS TO BE CLASS "A" OR BETTER I hereby affirm under penalty of perjury one of the following three declarations: HAZARDOUS MATERIALS DISCLOSURE I have and will maintain a Certificate of Consent to self -insure for Worker's I have read the hazardous materials requirements under Chapter 6.95 of the Compensation, as provided for by Section 3700 of the Labor Code, for the California Health & Safety Code, Sections 25505, 25533, and 25534. I will maintain performance of the work for which this permit is issued. compliance with the Cupertino Municipal Code, Chapter 9.12 and the Health & I have and will maintain Worker's Compensation Insurance, as provided for by Safety Code, Section 25532(a) should 1 store or handle hazardous material. Section 3700 of the Labor Code, for the performance of the work for which this Additionally, should 1 use equipment or devices which emit hazardous air permit is issued. contaminants as defined by the Bay Area Air Quality Management District I will maintain compliance with the Cupertino Municipal Code, Chapter 9.12 and the I certify that in the performance of the work for which this permit is issued, I shall Health & Safety Code, Sections 25505, 25533, and 25534. not employ any person in any manner so as to become subject to the Worker's Compensation laws of California. If, after making this certificate of exemption, I become subject to the Worker's Compensation provisions of the Labor Code, I must Date: V \ 2't ` forthwith comply with such provisions or this permit shall be deemed revoked. CONSTRUCTION LENDING AGENCY APPLICANT CERTIFICATION I hereby affirm that there is a construction lending agency for the performance of Hork's I certify that I have read this application and state that the above information is for which this permit is issued (Sec. 3097, Civ C.) correct. I agree to comply with all city and county ordinances and state laws relating Lender's Name to building construction, and hereby authorize representatives of this city to enter upon the above mentioned property for inspection purposes. (We) agree to save Lender's Address indemnify and keep harmless the City of Cupertino against liabilities, judgments, costs, and expenses which may accrue against said City in consequence of the ARCHITECT'S DECLARATION granting of this permit. Additionally, the applicant understands and will comply with all non -point source regulations per the Cupertino Municipal Code, Section I understand my plans shall be used as public records. 9.18. Licensed Professional Signature Date CITY OF CUPERTINO Fm FEE ESTIMATOR - BUILDING DIVISION ADDRESS: 10038 dove oak ct. DATE: 10/24/2011 REVIEWED BY: bobs. APN: BP#: "VALUATION: 1$1,200 *PERMIT TYPE: Building Permit PLAN CHECK TYPE: Alteration / Repair PRIMARY SFD or Duplex USE: PENTAMATION SOLAR-RES PERMIT TYPE: WORK install EV charging station at existing garage location. SCOPE NOTE: This estimate does not include fees due to other Departments (Le. Planning, Public Works, Fire, Sanitary Sewer District, School District. etc 1. These lees are haced nn the nrelininary information ovdi lahle and are aniv an estimate_ Contact the Dent for addn'l info_ FEE ITEMS (Fee Resolution II-053 L . 7/1/II) FEE QTY/FEE MISC ITEMS Plan Check Fee: $0.00 F-1-1 # $100.00 Alternative Energy System iCHwm I EV Charging Station Suppl. PC Fee: Q Reg. 0 OT 0.0 1 hrs $0.00 PME Plan Check: $0.00 Permit Fee: $0.00 Suppl. Insp. Fee:0 Reg. Q OT 0.0 1 hrs $0.00 PME Unit Fee: $0.00 PME Permit Fee: $0.00 _T7 iifrriin�.str[alil'E' 1't`e Q Work Without Permit? 0 Yes (j) No $0.00 Advanced PlanningFee: $0.00 Select a Non -Residential Building or Structure Q 0 Strong Motion Fee: IBSEISAECR $0.50 Select an Administrative Item Bldg; Stds Commission Fee: IBCBSC $1.00 SUBTOTALS: $1.50 $100.00 TOTAL FEE: $101,50 Revised: 10101 /2011