0804169 SI JODY T.TAI,P.E.
30998 HUNTWOOD AVE., STE. 108, HAYWARD CA,94544
Phone 510-477-8833-Fax 510-477-8838
September 18, 2008
To Whom It May Concern
Building Inspection Department
City Of Cupertino
10300 Torre Avenue
Cupertino, CA 95014
SUBJ CET : Site Observation For Structural Framing D
For Addition-T6 The Residence-At -�
7984 Woodlark Way
Cupertino, CA 95014
Dear Sir,
This office has made a site observation for the structural framing per the approved plans for
the above mentioned subject project on September 18, 2008.
At the time of the observation, all the structural framing had been done. The plywood sub
Floor has covered the floor framing and foundation so the areas under the sub floor cannot be
looked at and is not be covered in this letter.
After the observation, we found that the structural framing, including shearwalls and
holdowns, are in general conformance with the approved plans and revisions.
Should you have any �7 contact the undersign.
off' to
Q� Nq
QUO 0�A\`N PUNS f�2
Sincerely Yours, rn
Mo. C04 04
rn
FILE
��,�/ c�
Jody T. a1, PT Ex p.
JTTJtt
Copy To : Chris Chung Jl
OFCIV;I
CAl.1F0
08031INSP3