07120237 Plan Check Divisibn
_ 10300 ygrrq Avenue
Cupertino CA 95014
CITY OF Telephone(408)777.3228
CUTE__ IN® Fax(408)777-3333
Building Department
tot35s tJ. smut ec. 4PS P&L*.A
Project Address Praje ETitle
SPECIAL INSPECTION AND TESTING
To owner of projects requiring Special Inspection or Testing per Chapter 17 of the 1996 CaIifnmia.Building
Code,please acknowledge and return to the City.
BEFORE A PERMrl'CAN BE ISSUED:The Owner or his reQresentative,on the advice of the responsible
Project Engineer or Architect,shall complete,sign and submit the attached form"Structural Tests and
Inspection Schedule"to this Department for review and approval.
The owner and his general contractor,where applicable,sball also acknowledge the following conditions
applicable to Special Inspection and/or testing.
1. Contractor is responsible for proper notification to the Inspecting or Testing agency for items listed.
2. Testing laboratory only should take samples and transport them to their laboratory.
3. Copies of all laboratory reports and inspections are to be sent directly to the City by the Testing agency.
4. Inspection agency to submit names and qualifications of on-site special inspectors to the Building
Department for approval
5. The Special Inspector is under.the authdrity and is responmble to the Building Official All inspection
concerns and/or problems encountered are to be brought to his attention immediately.
6. Specialinspectars may be required,as a minimum,to provide weekly reports to this department of all
inspection activity.
7. It is the responability of the contractor to review City approved plans for additional inspeciion or testing
requirements that may be noted.
13. BEFORE AN OCCUPANCY PERMIT CAN BE ISSUED.The inspection agency shall submit a statement
thattutting
all items requiring and inspection were fulfilled and reported.Those items not tested and/or
inspected shall be note in this statement Copy of statement to be maimed at the job site for Citys
Building Inspector's review prior to final inspections.
pp ACKNOWLEDGMENT BY ALL PARTIES CONCERNED
.Y�-iUiY,f I✓lh/ off' Cya,K.p� s«
i tore
A- STRVCiV4&L,
ojectEngineer Signature
Tes ' g/ eciion f fuse
�ON11QZjG-
Contractor's Si tore OCit'Plan Cherkh 'e-er Signature
113
Revised 12/17101
Plan Check Division
AL 10300 ToneAvenue
Cupmtino CA 95014
Telephone(408)777-3228
Fax(408)777-3333
STRUCTURAL TESTS AND INSPECTIONS SCHEDULE
Prior to issuance of a bruldinly pemvt,the Owner,on the advice of the•Architect or Engineer,shall complete,
sign and submit this form to the Building OffidaL
Lks ppst,N,AS
ProjecWame Z (e
Date
tofys5 N. sstz�tauw moo. %j
Project Address Testing/Inspection ry
1frM rA& aw »ea rp
Owner's Name Signature&, itle
hereby certifies that the Testing/Inspection Agency named above has been engaged to'perfonn structural tests
and inspection during construction,as checked below,to satisfy all applicable portions of Elie Building Code.
Prior to issuance of an occupancy permit the Inspection Agency shall submit a statement that all items of
designated work performed were reported.Any items checked.butnot tested or inspected will be noted and
explained.
Whenever any designated iWno on this list are ready for sampling,testing,or inspection,it shall be the
responsibility of the Contractor to give timely notice to the Inspection Agency so that the required services may
be performed.
REINFORCING STEEL; STRUCTURAL STEEL:
Tensile&Bond,one set per heat par---tons Sample&Test(list spedfic members below)
Inspection of Placement -Shop Identification&Welding Inspection
Inspection of Welding _Shop Mt asonic Inspection
Shop Radiography
MASONRY. v Field Welding Inspection
_Preliminary Acceptance Tests(MaconryUnits,WoUprisms) _Field Bolting Inspection
_SubsequentTests(Mortar,Grout,Fivid WaB Prisms)
Inspection of Grouting _Field Ultrasonic Inspection
_Field Mhmsomphy
�
_Inspection of Placement&Grouting _Metol Deck Welding Inspection
CONCRETE,SHOTCRIM GROUT&MORTAR• ASPHALTIC CONCRETE:
Conc. I Shot Groat Mortar —�&x Designs
_Impaction of Batch Plant
Aggregate Tests for Designs _•Core/Test
SuitabiytyofAggregetes _Field&tspection
MixDesigas _Suitability Tests
Test Papal _Specific Gravity
BatchPlatttInspectim —Aspladtcmitent
Cement Grab Sampla —Sieve Analysis
Inspe�Placing _K Pastors
_Stabilometer Value
Com mssion.Tests _Swell
Cast specimens
Pick-up Samples LNSULAnNG CONC r:
Shdnhge Bats _Sample&Test
Yield Check
__Unit Weights j
Air Check
Dry Unit Weight
2)3
Revised 12/17/01
Plan Check Division
1030 Torre Avenue
Cupertino CA 95014
Telephone(408)777-3228
Fax(408)777-3333
PRECAST/POSLTFNSIONED CONCRETE FIIZEPROOI,'NG:
_.Reinforcing Tests _Inspection of Placement
_Inspection ofReinforcing PIE Ment _Density Tests
_Tendon Tests . _ThicknesTests
_Inspi!dtitm of Tendon Plamment _Inspect Batching
Inspection of Concrete Placement
Inspection of Cur=ate Baiehing FILL MATERIAL
_In:pe=tion of Panel Attachments&Inserts ^Acceptance Tests
_Iacpection of Penal Installation _Moisture-De city Determination
_Compression Test, _Field Density
Inspection of Stressing/Transfer
PILING,CAISSONS,CAP3,TTfFq ROOFING:
_Inspeclion of Reinforcing Placement _Inspection ofPlacemmt
_Inspection of Concrete Placement _Sample&-Test
_Inspection of Concrete Batching
UNDERPINNIING: STRUCTURAL WOOD:
Inspection of Steel Fabrimfion _Inspection of Pabriration
_Inspection of Reinforcing&Forms _Inspection of Truss jolst Nbrimtion
_Inspection of Concrete Placement _Sample&Test Components
—Inspection of Tieback _Inspection of Glu Lam Fabrication
_Shear D'•aphragms
ADDITIONAL INSTRUCTIONS OR OTIM TESTS&INS'ECTIONS:
tsPox4 tessT�•RON ot= t�wcttoe. 6otTs/}Iot,paaN F,on�
i
1
3/3
Revised 12/17/01