07120087 - Soils oFFilcE Con SOIL AND FOUNDATION INVESTIGATION FOR: PROPOSED.SINGLE FAMILY RESIDENTIAL RECEIVH 1. 10484 BYRNE AVENUE DEC 1 @1007• CUPERTINO,CALIFORNIA SUBMITTAE T --- #1 • PREPARED FOR: MR.REZA RAFU ' 1729 MARICH WAY MOUNTAINNIEW,CA 94040 MIKCWAVTED DEC 1 { 2007 BY: ADCO ENGINEERING 99 NORTH FIRST STREET SUITE 203 SAN JOSE,CA 95113 _ • 11) C 0 , rill ENVIRONMENTAL, CIVIL & GEOTECHNICAL CONSULTANT File No. 07-1370-S1 _ July 6, 2007 Mr. Reza Rafii • ' 1729 Marich Way Mountain View, CA 94040i ' • Subject: Proposed Single FamilY Resident 10484 Byrne Avenue ' Cupertino, CA SOIL AND FOUNDATIONINVESTIGATION Gentlemen: ' We are pleased to transmit hereivith the result of our soil and foundation investigation performed on the Proposed addition located at 10484 Byrne Avenue in Cupertino, California. Our finding indicate that the subject property is suitable for the proposed residential, provided the recommendations contained in this report are carefully followed. This report shows our findings in the substuface inVestigation, laboratory analysis, and our conclusions and recommendations based on these findings. If you have any quesiions or require additional information, please feel free to contact our office at your convenience. Very truly yours, , . 'Y ADCO ENGINEERING JOE B. BIDABADL P.E.' -ri?IS? . / aist - N0. 32817 0 Exp ":6-1:4 • " OF CAO • , . • 99 North First Street • Suite 203 • San Jose, Ca 95113 •TEL: (408)263-2500 • FAX: (408)2£48•888e • File No. 07-1370-S1 TABLE•OF CONTENTS Geotechnical Investigation , Page No. Introduction 2 Location and Description-of the'Site 2 Field Investigation 2 Laboratory Investigation ' . 2 Liquefaction 3 Soil Suitability of Site 3 Recommendations • Grading Specifications. - 4 Drainage and Erosion . 5 Foundation Design Criteria 5,6 Basement Retaining Wall 6 General Recommendations_ 7 Concrete Slabs-on-grade Construction. 7 General Construction Requirement • 8 Limitation and Uniformity of Conditions . 9 • Appendix"A" Figure 1 —Location Map, 10 Figure 2—.Site Plan 11 Appendix"B" Figure 3 —Soil Classification 12 Figure 4—Eiploratory Boring Log . 13 Figure 5-Plasticitylndex Chart- 14 • Figure 6—Drain System Detail 15 . • • SOIL INVESTIGATION INTRODUCTION The purpose of the soil investigation.was to gather sufficient data to provide recommendations for foundation Engineering.This report presents an explanation of how we conducted that investigation,the results of the testing program,our conclusions based upon their results,and our recommendations forearthwork and foundation design to best suit the proposed development to the existing natural conditions. LOCATION AND DESCRIPTION•OF THE SITE The investigatedsite isdocated at 10484:Byrne Avenue in Cupertino,California At the time of our investigation the ground surface:was Hat in the area of the proposed residential development and sumunded by the residential area Field Investigation After consideration of the nature of the proposed development,review of available data on the area,and discussion,withthe client,a field investigation was conducted at the project site.It included a surface site renaissance to detect any unusual surface features,and the drilling of one exploratory boring on June 27,2007 to determine subsurface soil characteristics. The approximate boring locations we shown on Appendix A,Figure 1 .The soil encountered was logged continuously in the field.Relatively undisturbed subsurface samples were obtained by pushing or hamiterrog a split tube sampler into the natural ground at various depths.The boring log,Figure 4-.is a graphic representations of the soil profile,showing the depths at which the sample was obtained. LABORATORY INVESTIGATIONS Laboratory testing program was performed to determine the physical and Engineering properties of the soil underlying thesite.Moisture content and dry density tests were performed on the soil samples in order to de.their consistencies,and the moisture variation throughout the explored soil profile.A ie-mold direct shear test was run to obtain strengbt parameters for use in foundation design characteristic;The sample subjected to the direct shear test was allowed access to water for at least 24 houis.prier to.testin and then sheared in an undrained state at loads of 1 , 2,3 ,and 4 kips(.5;:9, 1 A'and-1.8.m is tons).Atterberg limits tests were also performed on the near-surface soil to obtain the expansion potential of the soil. @ 2 • • LIQUEFACTION - Liquefaction is satwation of loose sands and silts with less than 15%clay content(cohesionless material)from a solid state to a semi-liquid state.This occurs under vibratory condition such as those induced by an earthquake.The soils tendency to compact is accompanied by an increase in water pressure within the soil,which results in movement of water from the voids.The resulting upward flow of water will often.turn sand into a liquified condition(loss of density). We consider the ligoifaetion potential at the site to be low due to a gravelly and dense nature of the soil. SOIL SUITABILITYOF SITE The site covered by this investigation is suitable for the proposed construction on either natural ground or Engineered filll,provided the recommendations set forth in this report are incorporated into the design considerations and the project plans and specifications.The design of the structures and foundations shall meet local building code requirements for seismic effects. The native soils are suitable as Engineered fill.All organic material including grass or weeds 2 to 4 inches shall be stripped'prior to any,grading operations and transported away from all areas that are to receive structures or engineered 511. • •3 • • - Recommendations GRADING SPECIFICATIONS: 1. The placement of fill and control of any grading operations at the site shall be done in accordance widt,the recommendations of this report prepared by ADCO ENGINEERING. These recommendations set forth the'minimum standards to satisfy all requirements of this report. 2. All existing surface;and subsurface:structures that will not be incorporated in the final development shall be removed prior to any grading operations.These objects shall be accurately loCated on the grading plans(prepared by the project civil Engineer)to assist the field Engineerin establishing proper control over their removal.This is to include but not limited tn'atrees',basement;utility lines,underground tanks,and any other inmrovements:.A representative of ADCO ENGINEERING shall be present during the demolition operation. 3. The depressions left by the removal of the surface and subsurface structures shall be cleaned of all debris and backfilled'with clean,native, on-site soil. This backfill shall be compacted to not less than 90%relative compaction. This operation shall be conducted under the suPervision of a soil yagineer from ADCO ENGINEERING. - 4. Following the stripping opeiations,.the theniexposed surface shall be scarified to a depth of 8-12 inches,moisture conditioned as necessary and compacted to 90%relative • compaction.'At this point,:the area will be condition to receive compacted structural fill if necessary to attain desired pad elevation. 5. All structural fill whether imported or native soil shall be placed in uniform horizontal lifts of not more than 6;to 9 inches in uncompacted thickness and compacted to not less than 90%relativecompactionusing theASTM D1557-78 procedure.Five feet around the entire perimeter of the:building pad shall also be compacted to not less than 90%relative compaction.Before compaction begins;the fill shall be brought to a water content that will permit proper compaction by_dtber: 1)aerating the material if it is too wet,or 2) spraying the material.with water if it is too dry.Each lift shall be thoroughly mixed before compaction to assure a uniform distribution of water content. When fill material includes rocks, nesting of rooks willnot be permitted, and all voids shall be carefully filled and properly compacted:No rocks larger than 4 inches in diameter shall be used in the construction of the-building pad. 6. The soil Engineershall,be,notified at least 24 hours prior to commencement of any grading operations;so that he may coordinate the work in the field with the contractor. All imported borrow must be;approved bythe soil Engineer before being brought to the site. Import soil must have a plasticity index no greater than(12)and an"R"value greater than (25)- 4 • DRAINAGE AND EROSION Proper surface and/or.subsurface drainage system is recommended in the development of a general drainage plan for:the site,positive surface gradients should be provided to direct surface water nm off from the house in td suitable discharge facilities. FOUNDATION DESIGN CRITERIA 1. The proposed'structlme,.arood frame residential development may be supported by either a perimeter strip and isolated interior spread footings or by friction piers and grade beam type of foundation.Reoonim ndations for these types of foundation are discussed in the following Paragraphs- . . 2. hs- 2. Spread footings may be used where.woilconditions are uniform over the entire building pad. The footings should be founded a minimum of 22-inches below the lowest adjacent pad grade.Paint footing Shall be reinforced with a minimum of four#4 rebars,two at the top and two near the bottom of the footing. 3. The above foundations maybe designed for an allowable bearing pressure of 2,000 ps.f. for dead plus live loads,and can beincreased ased by.one-third for total loads(short term seismic and wind).. 4. All foundation trenches should be flooded with 4-inch of water to reduce their swell potential. • This presoaking should be done at least2 days prior to placement of concrete. , 5.A friction pier type foundation must be embedded minimum of 12 feet below the exterior grade on flat area The depth and spacing of friction piers will depend upon the structure loads transmitted to the piers:The allowable friction value for this type of foundation is 500 p.s.£.All perimeter piers'should be reinforced with a minimum of two#4 bars for its full length with the reinforcem®t of the pier tied to the top reinforcement of the grade beam. - First three feet of soil may be.ignored for calculation. If drilled caissons are to be ntilizM they must be Used rat all interior and exterior eolomn. The soil Engineer has to inspect all the drilled caisson holes prior to concrete pouring. 6.The grade beam shpuld be founded a Minimum depth of 12 inches below adjacent pad grade and should be reinforced.witht mminiimm of four#4 bars,two near the top and two hear the bottom.The grade beamsliould'be kept to the minimum width in order to minimize the effect of uplift pressures created tithe'expansion of the soil beneath the beams. 7. We highly recommendthat a soil-Engineer be present during the drilling of the piers to make any necessary_field adjustments. 5 • • 8. The above bearing values are for dead plus live loads, and may be increased by one-third for short term seismic and wind loads. 9.The final design of the foundation and reinforcing required shall be determined by the Engineer responsible for the foundation design.It is suggested that the foundation design be reviewed by the soil Engineer prior to construction. 10.We do not anticipate•any'appreciable settlements, however slight settlement should be considered in the design of the foundations and the proposed structures. Basement Retaining Wall. 1. All facilities that will main a soil mass shall be designed for a lateral earth pressure(active) equivalent to 50 pounds'emiivalent fluid pressure,plus surcharge loads.If the retaining walls are restrained from free movement at both ends,they shall be designed for the earth pressure resulting from 60•pounds equivalent"thud•pressure,to which shall be added surcharge loads.The retaining wall footing should be sem"at a minimum depth of 24 inches where concrete walls are to be higher than 5 feet,with a level front ground surface or at a minimum of 20 inches with the natural ground surface on the front side. 2.In designing for alloaiable resistive lateral earth pressure(passive), 300 pounds equivalent fluid pressure may be used with',tbe'resuit acting at the third point The top 2 feet of native soil shall be neglected for the computation of passive resistance. • 3. A coefficient of friction of.35 shall be used for retaining wall design. 4.The above values assume a drained condition,and a moisture content compatible with those encountered during our investigation.To promote proper drainage,a layer of at least 1 foot of gravel or drain rock shall be plaSed•between the facility and the retained material. Either weep holes or perforated pipes(perforations down)shall.be included in the design to conduct excess water from behind the retaining"structure. Suitable outfall locations for drainage facilities shall be chosen to minimize inhere erosion. The recommended allowable bearing capacity in native firm material or fill is 2,000 pert Approximate safety factors against overturning and sliding should be incorporated into,the dead"calculation.The basement walls shall be properly waterproof to minimise moisture infiltration through the walls. 5. We recommend a through review.by ADCO ENGINEERING of all design pertaining to facilities retaining-a•soilmass: C General Recommendations In order to relief the hydrostatic pressure and to prevent moisture intrusion through the basement floor and walls,we recommend the following drainage system to be incorporated into the design and construction of the subject project A 4-inch diameter plastic perforated pipe system should be installed(perforation down)around the perimeter of the basement walls.This drain line should be tied to a 4 or 6 inch diameter solid drain pipes to cagy excess water to the nearest manhole sump pit.The basement walls shall be properly waterproof to minimize moisture infiltration through the walls(Figure 6). For the basement floor,the slab should be underlain by a minimum of 6-inches of clean crushed rock Then a 4-inch diameter perforated drain pipe system shall be installed around the perimeter and middle of the slab to carry out excess hydrostatic moisture throughout basement floor.The pipe should be embedded by additional 6-inches of crushed rock Then the designated area shall receive 4-inches of class 11 baserock/crushed rock,then place the miradri or equivalent moisture barrier. If crushed rock is used,it shall be rolled in order to become interlocked and also to minimize the sharp edges which might damage the moisture barrier material. The moisture barrier shall be covered by 2-inches of sand prior to placement of reinforcing bars and forming/pouring of the slab. Special care and attention should be given to protect the moisture barrier material from being damaged. All of the perforated drain pipes (perforation down) shall have a minimum of 2% slope toward the manhole sump pit. Concrete slabs-on-grade construction 1. A minimum of 6 inches(10 cm.) thick of class II baserock, and 2 inches(5.0 cm.) of sand should be used between the finished subgrade and concrete slab. 2.Use of a vapor barrier under the concrete slab is optional depending on the nature of the floor covering to be applied.If a plastic membrane is used,it should be placed between the baserock and the sandy layer. 3.Prior to placing the vapor membrane or pouring concrete,the slab subgrade should be moistened with water to reduce the swell potential if deemed necessary by the soil Engineer at the time of construction. LIMITATIONS AND UNIFORMITY OF CONDITIONS 1.The recommendations presented herin are based on the soil conditions revealed by our test borings and evaluated for the proposed construction planned at the present time. If any unusual soil conditions are encountered during the construction,or if the proposed construction will differ from that planned at the present;time,ADCO ENGINEERING should be notified for supplemental recommendations. 2. This report is issuedwith the understanding that it is the responsibility of the owner, or his representative,to enure that the necessary steps are taken to see that the contractor carries out the recommendations of this report-in.the'field. 3.The findings of this report are-valid as of the present time. However,the passing of time will change the conditions of the existing property due to natural processes,works of man,from legislation or the broadening of knowledge.Therefore,this report is subject to review and should not be relied upon after a Period of one year. 4. This report was ptepared;upon request for our services,in accordance with currently accepted standards of professionalsoil engineering practice.No warrenty based on the contents of this report is intended;and none shall be inferred from the statements or opinions expressed herein. We did not perform neither a geological nor.environmental study on this property. 9 Appendix "A" Figure 1 Location Map Figure 2 - Site Plan u= Ca J. T� 11 1114 F ti I7w 112/1 iL14t � lif �JlL � t7�': N 400, •7+'Y t `1 � rr?'- . e�� A � Y1n � 7 . � l .kt 0 . L / tt u .�� �* al , ---. 1.19.4. 1! . gip' L T N4 r C'%0-41,p ..cur � ' w �'—n 40-1 10500.> . ifigii li.., .! :IC'IltAtli .?".2 11F- . . ' y +rower wo .. `(?,� �..,. . F s ii . 1 un . i.. 1.- , z 11� i /1 t' /i �'le nit �l�l �J T� �� �J p'•9!"� �I'�I( mV O,.,iu.! . . M UPJ IVO ' 1•.• . 1j1� r . ..! ,/ �..=lw.• a• 714 s .4P1 a:` 7•!•Ilk! I— • ,, �`R� _• i m m. f' N 0 4 sg Food troilai3DH . . CM•111142 / .1.'Me • as a ! l 1 t I I • 1 i 1 I . . I 1 Ita IMO I OA i • ice 1 .ar i =1 • I/ - WC sais3 so a "'no asnUral WA 0 ion a I 1 la 1•••11 it..mellt 4. 4 gab a A a • a • • , . File No. 07-1370-81 F SITE PLAN .• . . Appendix"B" , Figure 3 —Soil Classification Figure 4—.Exploratory Boring Log . Figure 5—Plasticity Index • • . :SOIL CLASSIFICATION • • MAJOR DIVISIONS:: SYMBOL - : TYPICAL NABS - • GRAVELS- ._._______.____ RAVSLr 610 Act e.$l atoned 9ts.els or 9tsv.l-sand milord.. little or w tis.. • More than ]/2]/2 of' •1`� lr mon~ �to R onv l-seed m1sns. tato. R r tis. $ g mum ttaction ! - GM : C • ally 9mo.ls. grist-sandatata{eo no. 4 slave side) . 0 - GC rotE Claret gravels. 9tsvel-aand-elar abonroe e • y wSANDS SB C.: Bell 9sadod eaadm a 9ts.sllr e4uds. llttis Moo Urea ° ® - SP +�•.• Poorly waled moods or - — C •ti.. 0ta..ur Bands. little R no lien. . mama .a coarsetraetloa < SM t Silty sande • sead�llt alytptss ... no. 4 sieve else) o X • o - sc. >R mayor Duda. sand-clay wan. -ti o - .HL I sdopahta slits aid o.q tics condi. tank Klee, all 1 ` SILTS & CLAYS lien a al.yer • t. else ellehc waaaiela a or el.y.: 51 n CL isssatals diets k las a teams W..tla14. aravally cloys. e LL < 50 :! sandy wys. silty flays, loan clay. Mj y OL �1�)II) Otaanto anti and sant silty clays or I,. ow Plast.tity `Sqjo 1 O N 9 eji iasrtaalc silts. Macaws or dlataast.ose tins sandy or silty ` SILTS i CLAYS seals.. elastic silts ~i. aossanssmainal LL D.- 50 CH J' lsesyanio clay. R high pleaq tscl , tat cloys • OM !r... orsanls slays madam m4dlse Kies Plasctsi • ,i ter- o79wlc patotr• organic slat tiny. HIGHLY ORGANIC SOIL . Pt �` Peet tad other hlcslr ataanlc molls . CLASSIFICATION CHART • (Unified Soil Classification System) CLASSIFI- OP GRAIN SIZES CATION U.S. Standard Grain Sise 5, 11111111i 1111111111. Siwe else in Millinotore ..MIl. , BOULDERS above • W 12 above 205 n {� COBBLES 12•' to 2• 305 to 76.2 a 3 W ii.a mi ti z ■�■ �� GRAVELS 7° to No. 4 :76.2 to 4.76 . � , Coarse 2° to 2/{• 76.2 to 19.1 hg Fine 2/40 to 3No./4 4 19.1 to 4.76 a ' iii Ian SAND ■M OL . Coarse . °wO. 0 ti••l os w..wlo00 o 4.76 to 0.074 0 10 20 30 40 50 60 70 80 90 1 4.76 to 3.00 • Medium w. is to 00. 40 - 3.00 to 0.430 Li0OID LAY Fine °o. 40 LO as. 100 0.410 tO 0.074 SILT i CLAY Helve Bo. 200 Below 0.074 • PLASTICITY CHART FIg• 3 GRAIN SIZE CHART N1COBngr. 1 • Hole No. Logged BY J.B. ' Exploratory Boring Log B-1 d Direct m ae ••-• ,Eos Shear E Job No. 07-1370—S1 Test 4U 7C 3 '- a O rn � to om. 2.� "' b o a C 0o cm � � ai rn E a a m _4 o a o m° DESCRIPTION • Brown silty clay with some gravel) moist, stiff • 115 15 32 1.221 1-1 5 • • 116 16 41 1-2 10 • • • • 15 • Boring terminated 0 15' • 20 • • • 25 • • • • Remarks: Figure 4 — Logs of 'Test .Borings !J E ADCO NGR. V. Ruin Mn n7 117n Cl • PLASTICITY CHART 60 I • CV / so • • CII HE x 40 1v a HV Y v CI • 0 20 d 0 iBI CL 10 HI 0- 0 10 20 30 40 50 . 60 70 80 90 100 Liquid Limit PLASTICITY DATA Plasti- Unified Y Hole Depth Liquid city Soil Clem- Symbol No. Ft. Limit % Index % sificatioa Symbol* 0 0-1 38 18 CI * Soil type classification based on British suggested revisions to Unified Soils Classification System morn 5 _ 01 ..ai.ar.. 1..J.... - .