11110116_INSP REPT D � J, ® TESTING ENGINEERS, INC. FCB °6 3 2011 2811 Teagarden St. 510-835-3142 San Leandro,CA 94577 800-660-3142 By 510=834 3777 fax San Leandro e San Jose Martinez INSPECTION REPORT Week Ending: 1/13/12 PROJECT# 55155 TYPE OF INSPECTION: Proof Load Testing PROJECT: ' Z L PLACE OF INSPECTION: TA4 Install Chambers(Apple Project#F 11084) Jobsite 10600 N.Tantau Blvd. ----Cupertino,CA --- Permit# 11110116; 11110029 DATE 1/13/12 HOURS 4 INSPECTOR M.Ardizzone Reported to Miguel of XL Construction at the jobsite as requested. Applied a torque load of 60 foot lbs. to 5/8" diameter Hilti KB-TZ expansion anchors,located in the floor for EF chambers at room#178. Thirty-two(32)anchors of a total of 64 installed were tested representing 50%without visually apparent distress or failure. The preceding work was,to the best of my knowledge,in compliance with approved plans and specifications,including revisions by engineer,and proof loading values and rate of testing were supplied by manufacture Drawings. Reviewed by: is� --15—aiTippero Special Inspection Division Manager 1cc: Apple Computers Inc./K.Larcher ETS-Lindgren XL Construction City of Cupertino/Bldg.Inspection Dept. This report can be reproduced only in its entirety unless written permission from TEI is obtained. Page 1 of 1 i ® TESTING ENGINEERS, INC. 2811 Teagarden St. 510-835-3142 510-834-3777 fax San Leandro,CA 94577 800-660-3142 San Leandro San Jose Martinez INSPECTION REPORT Week Ending: 2/10/12 PROJECT# 55155 TYPE OF INSPECTION: Proof Load Testing PROJECT: PLACE OF INSPECTION: TA4 Install Chambers(Apple Project#F 11084 v 10600 N.Tantau Blvd. a Cupertino,CA Ae Permit# 11110116; 11110029 -Z, DATE 2/7/12 HOURS 4 INSPECTOR M.Ardizzone Reported to Scott at the jobsite as requested. Applied a torque load of 60 foot lbs.to 5/8"diameter expansion anchors,located in the floor for RF chamber at at screening lab #179. Fifteen(15)anchors of a total of 30 installed were tested representing 50%without visually apparent distress or failure. The preceding work was,to the best of my knowledge,in compliance with approved plans and specifications,including revisions by engineer,and proof loading values and rate of testing were supplied by manufacture's specifications. Reviewed by: avid-CV—ippero Special Inspection Division Manager 1cc: Apple Computers Inc./K. Larcher ETS-Lindgren XL Construction City of Cupertino/Bldg.Inspection Dept. This report can be reproduced only in its entirety unless written permission from TEI is obtained. Page 1 of 1 I