11110116_INSP REPT D � J,
® TESTING ENGINEERS, INC. FCB °6 3 2011
2811 Teagarden St. 510-835-3142
San Leandro,CA 94577 800-660-3142 By 510=834 3777 fax
San Leandro e San Jose Martinez
INSPECTION REPORT Week Ending: 1/13/12
PROJECT# 55155 TYPE OF INSPECTION:
Proof Load Testing
PROJECT: ' Z L PLACE OF INSPECTION:
TA4 Install Chambers(Apple Project#F 11084) Jobsite
10600 N.Tantau Blvd.
----Cupertino,CA ---
Permit# 11110116; 11110029
DATE 1/13/12
HOURS 4
INSPECTOR M.Ardizzone
Reported to Miguel of XL Construction at the jobsite as requested.
Applied a torque load of 60 foot lbs. to 5/8" diameter Hilti KB-TZ expansion anchors,located in the floor for EF chambers at
room#178. Thirty-two(32)anchors of a total of 64 installed were tested representing 50%without visually apparent distress
or failure.
The preceding work was,to the best of my knowledge,in compliance with approved plans and specifications,including
revisions by engineer,and proof loading values and rate of testing were supplied by manufacture Drawings.
Reviewed by: is�
--15—aiTippero
Special Inspection Division Manager
1cc: Apple Computers Inc./K.Larcher
ETS-Lindgren
XL Construction
City of Cupertino/Bldg.Inspection Dept.
This report can be reproduced only in its entirety unless written permission from TEI is obtained.
Page 1 of 1
i
® TESTING ENGINEERS, INC.
2811 Teagarden St. 510-835-3142 510-834-3777 fax
San Leandro,CA 94577 800-660-3142
San Leandro San Jose Martinez
INSPECTION REPORT Week Ending: 2/10/12
PROJECT# 55155 TYPE OF INSPECTION:
Proof Load Testing
PROJECT: PLACE OF INSPECTION:
TA4 Install Chambers(Apple Project#F 11084 v
10600 N.Tantau Blvd. a
Cupertino,CA
Ae
Permit# 11110116; 11110029 -Z,
DATE 2/7/12
HOURS 4
INSPECTOR M.Ardizzone
Reported to Scott at the jobsite as requested.
Applied a torque load of 60 foot lbs.to 5/8"diameter expansion anchors,located in the floor for RF chamber at at screening lab
#179. Fifteen(15)anchors of a total of 30 installed were tested representing 50%without visually apparent distress or failure.
The preceding work was,to the best of my knowledge,in compliance with approved plans and specifications,including
revisions by engineer,and proof loading values and rate of testing were supplied by manufacture's specifications.
Reviewed by:
avid-CV—ippero
Special Inspection Division Manager
1cc: Apple Computers Inc./K. Larcher
ETS-Lindgren
XL Construction
City of Cupertino/Bldg.Inspection Dept.
This report can be reproduced only in its entirety unless written permission from TEI is obtained.
Page 1 of 1