07080153 -77777
CITY OF Cl]'?ERTINO
BUILDING DIVISION p'ERMIT G1N7CJ[ OR Z � MiTION.
PERMIT NO.
BUILD NG ADDRESS:
0260 DE ANZA BLVD ALLIED CONSTRUCTION 07080153
PERMIT ISSUE DATE
OWNER'S NAME:
WELLS FARGO BANK NEAL 2021 LAS POSITAS CT. #143 08116/2007
SANITARY NO. CONTROL NO.
INE:
(925) 729-2324
BUILDING PERMIT INFO
ARCHITECT/ENGINEER: BLDG ELECT PLUMB MECH
M Z LICENSED CONTRACTOR'S DECLARATION Job Description
0
w P I hereby affirm that I am licensed under provisions of Chapter 9(commencing
;ZUW with Section 7000)of Division 3ofthe Business arylProfessions Co andrayfcenscis TEAR OFF' & RE-ROOF SHINGLES AND HOT BUR 2 PER SQ
!may Lfull foreeand tett Lic.g (p W/COATIDIG CLASS 1A
? Li Class
p Date Contractor
F ARCHI ECTS DECLA ATION
i a< I understand my plans shall be used as public records
iaV
U.� Licensed Professional
'a a OWNER-BUILDER DECLARATION
i a 1 hereby affirm that 1 am exempt from the Contractors License Law for the
:a O following reason.(Section 703 1.5,Business and Professions Code:Any city or county
which requires a permit to conswct,alter,improve.demolLch,or
repair any structure
- prior
which.
its issuance,also requires the applicant for such permit to file a signed statement ; ,Ft.Floor Area Valuation
?a that he is licensed pursuant to the provisions of the Contractur's License Law(Chapter 9 q $29000
F=$ (commencing with Section 7000)of Division 3 of the Business and Professions Code)or
a that he is exempt therefrom and the basis for the alleged exemption.Any violation of Occupancy Type
Section 7031.5 by any applicant for a permit subjects the applicant to a civil penalty of A� Number
not more than five hundred dollars(5500). 3 6 9 4 0 0 0 4, U
❑L as owner of the property,or my employees with wages as their salt compensation,
will do the work,and the structure is not intended or offered for sale(Sec.7044,Business Required Inspections
and Professions Code:The Contractor's License Law dots not apply to an owner of
property who builds or improves thereon,and who does such work himself or through his
own employees,provided that such improvements are not intended or offered for sale-If,
however,the building or improvement is sold within one year of completion,the owner-
builder will have the burden of proving that he did not build or improve for purpose of
sale.).
❑1,as owner of the property.am exclusively contracting with licensed contractors to
construct the project(Sec.7044,Business and Professions Code:)The Contractor's Li-
cense Law does not apply to an owner of property who builds or improves thereon.and.
who contracts for such projects with a contractor(s)licensed pursuant to the comracoes
License Law.
❑I am exempt under Sec. B&P C for this reason
Owner Date
WORKER'S COMPENSATION DECLARATION
I hereby affirm under penalty of perjury one of the following declarations:
L]I have and will maintain a Certificate of Consent to self-insure for Workers Compen-
sation,as provided for by Section 3700 of the Labor Code,for the performance of the
work for which this permit is issued.
❑I have and will maintain Workers Compensation Insurance,as required by Section
3700 of the Labor Code,for the performance of the work for which this permit is issued.
My Workers C rep nsati Insura a carticr and Policy number are: ` U
Cartier- e G�Policy No.:-S6 1210 /Q�
CERTIFICATE OF EXEMPTION FROM WORKERS'
COMPENSATION INSURANCE
(This section need not be completed if the permit is for one hundred dollars($100)
or less.)
I certify that in the performance of the work for which this permit is issued.I shall not
employ any person in any manner so as to become subject to the Workcrs'Compensation
Laws of California.Date
. .`i,; Applicant
NOTICE TO APPLICANT:If,after making this Certificate of Exemption,you should
become subject to the Worker's Compensation provisions of the Labor Code you must
Z forthwith comply with such provisions or this permit shall be deemed revoked.
Z O CONSTRUCTION LENDING AGENCY
��. I hereby affirm that there is a construction lending agency for the performance of
�(. the work for which this permit is issued(Sec.3097,Civ.C.)
W QLenders Name
�Z Lender's Address
U O 1 certify that 1 have read this application and state that the above information is
h— correct.1 agree to comply with all city and county ordinances and state laws relating to
Ubuilding construction,and hereby authorize representatives of this city to enter upon the
W ahovc-mentioned property for inspection purposes.
LL (We)agree to save,indemnify and keep harmless the City of Cupertino against
Mf/j liabilities,judgments,casts and expenses which may in any way accrue against said City
f,)Z in consequence of the granting of this permit. Date
P" APPLICANT UNDERSTANDS AND WILL E COMP Y WITH ALL NON-POINT Issued b): _
SOURCE ULATIONS. / r�
�lGZ��� �""'• �1.-.� �5"��"d / Re-roofs `L�
Signature a Applicant/Contractor" Dao T Of Roof
MATERIALS DISCLOSURE Type
Will the applicant or future building occupant store or handle hazardous material
as defined by the Cupertino Municipal Code,Chapter 9.12,and the Health and Safety
Code,Section 25532(a)? two All roofs shall be inspected prior to any roofing material being installed.
C]Yes If a roof is installed without first obtaining an inspection,I agree to remove
Will the applicant or future building occupant use equipment or devices which
:mit hazardous air contaminants as defined by the Bay Area Air Quality Management all new r iaterials for inspection.
District?
❑Yes No
I have read the hazardous materials requirements under Chapter 6.95 of the Califor-
nia Health&Safety Code,Sections 25505,25533 and 25534.1 understand that if the building ��of
Ldoesshnot currently have a tenant,that it' my ponsibility o notify the occupant of the Date
icy 'rcmcntcwhichm riot hssu oCaC�[ti��tr�of—O�u SlgnaturtApplica t
1//r�// S (/!/ r/ All roof coverings to be Class"B' or better
Owner or authorized agent Date
CITY OF
`;UPEkTINO
Community Development
10300 Torre Avenue
Cupertino CA 95014
Telephone (408) 777-3228
Fax (408) 777-3333
Building Department
JOB ADDRESS: PERMIT #
OWNER'S NAME: PHONE # =i5r
GENERAL CONTRACTO ► ,,� , t FAX # oZ
I am not using any subcontractors:
Si anature Date
r, _t_ -1-1.. a_ ,-,+,.. 4-r., o �,-„� ��,,,-..,la+P +he following information:
riease
ULLUCK
app ucauze auLn vi LLL GLL�
SUBCONTRACTOR
- ... L— _---- --- ----
BUSINESS NAME
BUSINESS LICENSE #
Cabinets & Millwork
Cement Finishing
Electrical
Excavation
Fencing
Flooring: Carpeting
Linoleum / Wood
Glass / Glazing
Heating
Insulation
Landscaping
Lathing
Masonry
Ornamental Sheet Metal
Painting / Wallpaper
Paving
Plastering
Plumbing
Roofing
Septic Tank
Sheet Metal
Sheet Rock
Tile
Owner/ Contractor Signature Date
OTo Y 0153
CITY OF C'UPERTINO
%RM REROO
CUPEFtTINO PERMIT APPLICATION FORM
APN # z/0
0 Q 7 °
-
BUILDING
Date:—G
Energy
BUILDING
BSEISMICRE
Building Address:
BUILDING
BSEISMICOM
0 00
Ow ame:
BUILDING
Phone
is
'f,125t
BUILDING
BUSLIC
Jr
Contractor:
BUILDING
L cense
Contact:
J
Cupertino Business License #:
Type of F,00f Covering:
Existi '
Prod•
9 Built -Up roof
Built -Up Roof
Asphalt Shingles
❑ Asphalt Shingles
❑ Wood Shakes
❑ Wood Shakes
❑ Wood Shingles
Other (Specify)
❑ Wood Shingles
❑ Other (Specify) , L
❑ Provide I.C.B.O. Report # `_
Nui er of existing coverings
VTo be Removed
�,
❑ Provide Mfgr. Installation Specs.
I Have Read, Understand and Will Comply With Ci ertino's Tear Off Policy:
Job Description:
/
Residential ❑
Commercial
s fr `� .0
Fire Zone: Yes ❑ No 0
Confirmed with Planning DeDt. if
EJ
there are any restrictions:
Cost of Projecx:
Type of Constn_ction:
Occupancy roup:
Qty. if
Rap T__ TT
T)Pcrrintion
Fee Group
Applicable ren ILF
BPERMFEE
_ .. --- ---r ----
Bldg Permit Fees
-
BUILDING
BENERGY
Energy
BUILDING
BSEISMICRE
Seismic Fee Res
BUILDING
BSEISMICOM
Seismic Commercial
BUILDING
BPLANCHK
Plan Check Fee
BUILDING
BUSLIC
Business License
BUILDING
Community Development Department
Building Division
City of Cupertino
10300 Torre Avenue
Telephone: (408) 777-3228
Fax: (408) 777-3333
Building Department
Subject: Re -roofing policy for the City of Cupertino
1. Prior to permit issuance, you must agree to comply with 1997 UBC Standards
and manufacturers specifications on re -roofing.
2. New roof coverings shall not be applied without first obtaining all inspection
and written approval from the building inspector. A final inspection and
approval shall be obtained from the bu: lding inspector when the re -roofing
is completed.
3. All roofs shall be inspected prior to any roofing installation.
4. To receive a final sign off from the City, the following steps are
required:
1) Pre -inspection and/or tear off apprc,val.
2) In -progress inspection approval.
3) Final inspection approval.
a) Spark arrester installation.
5. If plywood is installed, a plywood nail inspection is required.
6. Any roofing which is applied without f first obtaining an inspection,
will require the removal of all new material down to the sheathing,
so a proper City inspection can be performed.
7. NOTE: If you call for a plywood nail inspection and the job is not ready,
you will be charged a re -inspection fee of $176.18. The re -inspection fee must
be paid before another inspection can be scheduled.
IMPORTANT:
1. Flat roofs must have a minimum of 1/4 " per foot slope and demonstrate
that there is no ponding.
2. An I.C.B.O. report is required to be on he job site at the time on inspection.
I understand and will comply with the above stated policy on re -roofing.
Homeowner's Name:
job Site Address: oqic�if
Roofing Company Name: l il/I Ao4 (Z 4 �J'f 1/4
Applicant's Signature: _ Date:" --67
Greg Casteel
Building Official
Revis(d 11/2/04
3 ITEMS OF 3
CITY OF CUPERTINO
PERMIT RECEIPT
Sec: Twp: Rng: Sub: B1}:: Lot:
APN ........: 36940004.00
DATE ISSUED.......: 08'16/2007
RECEIPT #......... BS000002399
REFERENCE ID # ...: 07080153
SITE ADDRESS .....: 10260 DE ANZA BLVD
SUBDIVISION ......
CITY CUPERTINO
IMPACT AREA ......
OPERATOR: patg
COPY # : 1
OWNER WE:JLS FARGO BANK NEAL
ADDRESS ..........
CITY/STATE/ZIP ...: SAN FRANCISCO CA, 94163
RECEIVED FROM CS:2W INC.
CONTRACTOR DONAVON RITTENBACH LIC # 23449
COMPANY ALLIED CONSTRUCTION SERVICES
ADDRESS 2021 LAS POSITAS CT. #143
CITY/STATE/ZIP ...: LIVERMORE, CA 94550
TELEPHONE (925)724-2324
FEE ID UNIT
QUANTITY
AMOUNT PD -TO
----------
-DT
THIS REC
--
NEW BAL
-----------------------
BPERMFEE VALUATION
--------------------
29,000.00
358.56
0.00
358.56
0.00
BSEISMICRE VALUATION
29,000.00
2.90
0.00
2.90
0.00
BUSLIC FLAT RATE
1.00
107.00
----------
0.00
107.00
----------
0.00
----------
TOTAL PERMIT
----------
468.46
0.00
468.46
0.00
METHOD OF PAYMENT
AMOUNT
REFERENCE
-------------------
NUMBER
----------------- ---------------
CHECK
468.46
#1520
---------------
TOTAL RECEIPT
468.46
Aug 16 2007 10:58AM Oakland Office 510-638-8404 p•2
D7000153
January 24, 2002
Mr. Randy Norman
Wells Fargo Bank
Corporate Properties Group
85 Cleaveland Road
Pleasant Hill, CA 94523
Re: Limited Asbestos Survey for The Planned HVAC and Carpet Replacement Projects
Wells Fargo Bank Cupertino Branch (AU# 99478)
10260 South De Anza Boulevard, Cupertino, California
ACC Project No. 1041-182.72
Dear Mr. Norman:
Per your request, ACC Environmental Consultants, Inc. (ACC), performed a limited asbestos
survey of the property located at the above refers nced site on January 18, 2002. The survey of the
branch was performed to identify suspect asbestos -containing materials that maybe impacted .
during the planned HVAC and carpet replacement projects. Common suspect asbestos -containing
building materials that may be impacted by typical HVAC and carpet replacement projects may
include but are not limited to, the following materials:
HVAC Replacement Suspect Asbestos Mater: al List
• Boiler Insulation
• Pipe Insulation, Elbows & Fittings
• Duct Insulation
• Mudded Duct Joints
• Vibration/ Expansion Joints
• Asbestos -cement Piping/Flues
• Wall Materials
• Roofing Materials 44t
i
Carpeting Replacement Project Suspect Asbestos Material List
• Flooring and Associated Adhesive
• Baseboard and Baseboard Adhesive
• Carpet Adhesive
• Leveling Compound
Building components not associated with the pl«nned HVAC and carpet replacement projects
were not sampled.
Bulk Sarlple Results
ACC performed limited bulk sampling of suspect ast estos-containing materials on January 18, 2002.
Twenty-nine samples of suspect materials were subrr fitted for analysis. Copies of the laboratory results are
enclosed.
R
Aug 16 2007 10:58AM Oakland Office 510-638-8404 p•3
W. Randy Norman
January 24, 2002
Page 2
The samples were delivered to Forensic Analytical Sp,:cialties, Inc. of Hayward, California, an independent
laboratory that participates in the bulk sample proficie:icy analysis program conducted by the United States
Environmental Protection Agency (EPA) and is accredited by the National Voluntary Laboratory
Accreditation Program (NVLAP). The samples were analyzed using Polarized Light Microscopy with
dispersion staining to estimate percent composition by volume. Samples with less than 1% (<l%) asbestos
are designated as "Trace Asbestos." Samples with no observable asbestiform minerals are designated as "no
asbestos detected."
Summar, of Results
C?C�,yyy: - � _� � 'v'ii _:
�p{.+
Y_.-� - �� LF1' ,a-} LPiilf.�..
•�.-
_
PE -01-01, Pipe Elbows
Mechanical Roor-t Above the
No Asbestos Detected
N/Q
02
DI -02-01, Duct Insulation
Attic
Mechanical Roora and Above
No Asbestos Detected
N/Q
02,03
JC -03-01, Drywall and Joint
the Attic
Interior Walls ani Ceiling
3% Chrysotile Asbestos in
1800 SF
02, 03, 04 Compound
Joint Compound; No Asbestos
(Mechanical
Detected in Paint; No Drywall
Room Only)
in Sample
PI -04-01 4" TSI Pipe Insulation
Above the Attic and
10% Chrysotile Asbestos; 5%
80 LF
Mechanical Room
Amosite Asbestos
CM -05-01 Brown Ceiling Tile
Janitorial Closet behind V x 1'
No Asbestos Detected
N/Q
Adhesive
Ceiling Tile, Corridor Hallway
Rooms and Cus :omen Area
CT -06-01 V x V Gray Ceiling Tile
Janitorial Closet: Corridor
No Asbestos Detected
N/Q
(Painted White)
Hallway Rooms, and
Customer Area
GM -07-01 Gasket Material
On Su 1 Air I►uct
90% Chrysotile Asbestos
160 LF
N/Q
SV -08-01 Gray Sheet Vinyl Flooring
Men's and Worr en's
No Asbestos Detected
with Fibrous Backing
BA -09-01 Gray Baseboard with
Restroom Floor.,
Janitorial Closet, Corridor
No Asbestos Detected
N/Q
Baseboard Adhesive
Hallway, Lunchroom, and
Customer Area
FA -10-01 12" x 12" Gray Floor Tile
Top Layer at Janitorial Closet
No Asbestos Detected
N/Q
and Adhesive
FA -11-01 12" x 12" Tan Floor Tile
and Lunchroom
Bottom Layer a,: Janitorial
No Asbestos Detected
N/Q
and Adhesive
FA -12-01 12" x 12" Gray Floor Tile
Closet Area
Bottom Hallwa,, under Carpet
No Asbestos Detected
N/Q
Land Adhesive
CA -13-01, Yellow -Brown Carpet
Throughout, Underneath the
No Asbestos Detected
N/Q
02 Adhesive
DT -14-01 Gray Duct Tape
Ca et
Above the Attic and
70% Chrysotile Asbestos
25 SF
Mechanical Ro-mm Area
LC -15-01,
Off -White Leveling
Underneath the Carpet at
No Asbestos Detected
N/Q
02
CR -16-01,
Compound
Composite Roofing
Various Locations
Roof Canopy Area
No Asbestos Detected
N/Q
02 03
RF -17-01
Material
Black Roofing Felt
Underneath the Transite
75% Chrysotile Asbestos
7800 SF
Shingles Throughout the Main
TS -18-01
Gray Transite Shingles,...
Room
I Main Roof Area
20% Chrysotile Asbestos
7800 SF
Aug 16 2007 10:58RM Oakland Office 510-638-8404 p-4
Mr. Randy Norman
January 24, 2002
Page 3
Based on the sample results, the planned HVAC and c arpet replacement projects may impact asbestos -
containing materials. The final scope of work should be reviewed against the asbestos survey information.
If asbestos -containing materials will be disturbed during the projects, all work should be performed by
licensed asbestos abatement contractors working under standard Wells Fargo asbestos program requirements.
Please contact me at (510) 638-8400 ext. 107 if you hive any questions.
Tim Fallin
Program Manager
Cal -OSHA Certified Asbestos Consultant (CAC #95-1690)
cc: Lahn Horton
lgs:tf