08010021 (2) CITY OF CUPERTINO
RUILIANG DIVISION PERMIT 036 [TA-A"(�g FORMIATi
BUILDING ADDRESS: PERMIT NO.
644 STENDHAL LN RAPID PLUMBING INC. 08010021
OWNER'S NAME: PERMIT ISSUE DAM
DAVID G LANTZ PO BOX 5144 01/03/2008
49 ONE: SANITARY NO. CONTROL NO.
(408) 866-1417
ARCHITECT/ENGINEER: BUILDING PERMIT INFO
BLDO ELECT PLUMS MRCH
moo LICENSED CONPRACTOR'S DECLARATION
I haroby Mans Mat I aun liecresell.'ah"gravitates of chapter 9(carantencle, Job Description
with Section 70011)mfDi,iskm 3 of Mat Buments sand Faulted..Code,and.1 he..is INSTL A SEWER CLEANOUT ON PROPERTY
In full then and affatt.
DR2', LI...an Com-Lic.0
Date.Contractor
O ARCHITECT'S DECLARATION
dj I understand my Plants shall be,stand a public records
Dyu
Licensed Professional
OWNER-BUTUER,DECLARATION
M I thereby afflan Mat I am exempt faun Me Contractors Uccnw Law for the
C 0 following moon.(Section 703 1.5,Business and Professions Co
Any city or county
z$Pi which mquireat a camil to construct.altar.imparres.demolish,or repair any structure
z prior In its issuance.she reaNiall don,applicant for such Permit to file a signed stmenumn
Met he as licensed pursuent to Man provisions of the Contractor's License Law(Chapter 9 Sq.Ft. Floor Area Valuation
'c
5 (commencing with section 7000)of Division 3 or the B usiness,and Professions Code)or $2800
Nat he is courapt therefrom sued the basis re,the Wlctd esem,Uon.Any violation of
Section 7031.5 by any applicum,for a permit subjects the applicant to a civil Penalty ofOccupancy Type
no,.. the e hundred MoRms($50]), 37540034 V64 Number
Cl 1,an awaso of am Property,or my employees with.8sa as their sole compensate.,
will do Mat work.and the structure is no,intended or offered for sale(Sec.7044,Business
and Profession;Coal.The Cmarsecton's License Law Mass our apply an..Manor of Required Inspections
Property who Wild,uninnismwa mareent.4ml who dosamuch vank hisnalforthurough his
own employes,provided that such improvements are not intended oraffemal for asts,If.
lubwaver.the Wilding or hapat.t I.mid withie mus year ofmarn,letion,ded owner.
Wilder will have the hualm of Mends,that he did not Wild or improve for purpose of
ZX.1.1 Me y,am exclusively contracting with licensed contractors to
construct the project(Sec.70y..
044.Business ad Professions Code:)The Controester's U.
caren Law does not apply at an maer of property who Wild,or Improwc,themen,and.
who contains her,unch projects with a licensed pursuing to the Contractor's
LicensoLaw. SAN TARY
olandeamnsm B&PCfarthisnesson
,)Want, Date 1—'3
WORKERS COMPENSATION DECLARATION
I hereby Lf[imm under penalty at perjury man of Man following dosimeters:
Wusw and will ateirsdid.Cercillcm,of Common to self-manne far Worker,Compact.
.as provided for by Section 3700 of the Labor Code,far thes perfammumcan of ft
warts,for which this Permit is issued.
[]I have and will maintain Workers Compensation Imermcc,as required by Section
3700 of the Labor Coca.far me performance of the work for which this Permit is issued.
My Worker.Compammim Insurance carrier and Policy number
cammul—Policy N';
CERTIFICATE OF EXEMPTION FROM WORKERS'
COMPENSATION INSURANCE
mus orneed am,be completed it be Permit is far one hundred mallars(SIM)
or I..)
I certify that in Me performance of Me wad for which this parraft is lethed,I shall nos
employ my Name 1.my manIn ft Workers'Compensation
Laws of
alirmni at, 0 - T" -
Appli i W� W_g
NOTICE TO APPLICANT:.If.eller making Mis Continue of Exemption.you should
Weems Subject to me Woulauej Compensation Pervisamas Of the Ljuhor cons,you a"
wJ z forthwith comply wit each provision or this permit mail Ise domed rmaduad.
z 0
E M CONSTRUCTION LENDING AGENCY
I hereby Iffirm dout thost is a construction lending agency far Me performance of
the work for which UM,permit is intend(Sec.3097,Civ.C.)
Undoes Name
Z Lenders Addreas
U 0 1 mnify the,I have actal this application and soon thas the show information is
I agree to comply with all city ad cowry oblintraces and same Is"misting as
Cbuilding construction.and hereby intended representatives,ofthis city to macrame Man
E carcorrintru
W above-memmunted Property far inspection PUr[KML
CL (Wo)agree to saw,indemnify and keep hannaless the City of Cupertino against
rr IA ihmilims.judgments.costs and expenses which may In any my accese alLi said City
Z in conabluence of Ma&aumm&of this permit,
APPLICANT UNDERSTANDS AND WILL COMPLY WITH ALL NON-POINT Issued by: Date
soui�"/"'Ite 1-3-09 Re-roofs (�;7
Signature ofAipplicauslComrsector Dam
HAZARDOUS MATERIALS DISCLOSURE Type of Roof
will the applicant carfuture Wildirtgoactmantshom tolusbeffeloandualtrm,material
as,defiroul by the Cupertino Municipal Code,Chapter 9.12,and the Health and Safety
Code,Section 25532(.)7All roofs shall be inspected prior to any roofing material being installed.
Ely. 4/'
Will the apil amt f W tatild occupant fmcm or davices which If a roof is installed without first obtaining an inspection,I agree to remove
c Mat to uVl,,,u —'qu'l
hasoutimm;air comarrinseas a ed he Bay Area Air Quality management all new materials for inspection.
cyas M4.
I have read the hmamommsmrialamqulmmrntsunder Chspmr A.95 of Um Callim.
-I.Hatfuh&SfcayCads,Smucaus,25515,25533 and 25534.1 understand Mouirthe building
does ma.umemly he...4 that I,is my act,musubility to roory mc accasons,or the
Qu`uktatctf Clear. Signature of Applicant Date
- .1
. - .0i
.Owner at authori7.cd agent Dam - I All roof coverings to be Class"B"or better
0eC)
CITY OF CUPERTINO
REPIPE/SEWER/MAIN SERVICE
® CUPERwO PERMIT APPLICATION FORM
AP1V# 2-25- i Datl:_ �� 0 �
Building Address: (0'-1q } et4 In a L a n e
CnaCA fGlv-
Owner's Name: I�L�i A (y Lir" +-z Phone#: 40 —
G re-7 -71 -3367
Contractor: (�a p; j p 1 N ... 6; „cJ Phone#: 6 S-C�-C16 q 4`i 35'
f�'•v 17,0x 5- 141
Sa►Ia Clara CA `1 fGS(, Fax #:
Contact: Phone#:
Fax #:
Contractor License#: r z 1 A vi Z
Cupertino Business License#:
Job Description: Zh : }y11imq A Sew-e C &L4- 0, prapev ��
Residential Commercial 0
Valuation: �id� d0
Green Building Check list must be completed and attached to this application.
Green Building Points:
Quantity Fee ID Fee Description Fee Permit Type
Group
1PCSEWER Commercial building P 1CPSS '
sewer/sanitary sewer
1BPREPIPE Commercial re-pipe per fixture P 1CPRP
1PGASCOM Commercial Gas Piping System P
1-4 Outlets
1BSEISMICOM Seismic Commercial P
/ 1BSEISMICR Seismic Residential P ,
/ 1PRSEWER Residential building P 1RPSS
sewer/sanitary sewer 7
CITY OF CUPERTINO
` REPIPE/SEWER/MAIN SERVICE
CUPEkTINO FEE SCHEDULE •
Quantity Fee ID Fee Description Fee Permit Type
Group
IPRREPIPE Residential re-pipe per fixture P 1RPRP
1BPWSVCS Water Service P 1CPWS or
1RPWS
1PPRSEWG o° Private Sewage Disposal System P
IPCESS Cesspool P
1BPWATER Install/alter Water Pipe P
1BPFIXTURE Plumbing Fixture P
1PGASRES Residential Gas Piping System P
1-4 Outlets
1BPGAS Gas Piping System 5+ Outlets P
IPPERMITFEE Plumbing Permit Fee Issuance P
1PLMBLNCK Plumbing Plan Check P
1PLMBINSP Other Plumbing/gas Insp. P
/ 1TRAVDOC Travel &Documentation Fee B
1BUSLIC Business License B
•
Single Family GreenPoint Checklist date, gh Build It Greeri
The GreenPoint Checklist is based on the various green features incorporated Into the home and is the Smart Solutions from The Ground Up
basis tar the GreenPoint Rated program.A home can be considered green If it fulfills the prerequishes,
Hams at least 50 poems,and meets the minimum points per category:Energy(30),Indoor Air nesePQuality/ I I
Health(G),Resources(6),and Water(9).Please contact Build g Green for a list of qualified GreenPoint L
® Raters If you are interested In pursuing third-parry verification.
The green building practices listed below are described in the New Home Construction Green Building
Guidelines,available at www.builditoreeribro.
s
ENTER
• .O 4 0 '„ 3
w 5
U
A iPoints Available Per Measure
1.Protea Topsail and Minimum Disruption of Existing Plants A Tran
❑ a.Protect Topsoil hard Erosion and Rouse alter Construction 0 1 1 1 _ I 1
❑ b.Limb and Delineate Construction Footprint la Maximum Protection 0
2.Deoonstruct instead a Demolishing Existing Buildings On Site 0 I 1 3 1
J.Recycle Job Site Commuction Waste(Including Green Waste)
❑ a.Minimum 50%Waste Diversion by Weight(Recytding or Rouse) Required 0 1 A L_
❑ b.Minimum 65%Diversion by Weight(Recycling or Rouse) D_
❑ c.Minimum BD%Diversion by Weight(Recycling or Rouse) 0 2
4.Use Recycled Content Aggregate(Minimum 25%)
❑ a.Walkway and Driveway 0 II 1
❑ oRoadway Base 0 1 1 1 1
Total Points Available in Site 12 0
B.FOUNDATION Points Avallade Per Measure
1.Replace Portend Cement in Concrete with Recycled Flyesh or Slag
❑ e.Minimum 20%Flynn a Slag 0 1
❑ b.Minimum 25%Flimho a Slag 0 I 1
E T-
2.Use Frost-Protected Shallow Foundation In Cold Areas(C.E.C.Climate Zone 16) 0 1 1 1 3 1
3.Use Radon Resistant Construction(In At-Risk Locations Only) 0 1 1 1 1
4.Design and Build Structural Peat Controls
❑ a.Install Termna Shields B Separate All Emmor Wood-tar-Concrete Connections by Metal or Plastic FeslensrslDNiders 0
b.All New Plants Have Trunk,Base,or Stem Located At Least 36 inches from Foundation 0
Total Points Available In Foundanon=B 0
C.LANDSCAPING Points Available Per Measure
1,Construct Rmurc l Ef ficin Landscapes
❑ e.No Plant Sp Species Listed by Cal.IPHedging
Are Planted 0 I 1
• ❑ b.No Plant Species WiII Require Hedging 0 I 1 1 1
❑ C.75%of Plants Are DnwghFlderent Celilomia NatNea,Mediterranean,or Other Appropriate Spades 0 i1 1 3
2.Use Firs-Safe Landscaping Techniques 0 1 1
3.Minimize Tud Arm in Landscape Installed by Builder
❑ a.All Tud Will Have a Water Requirement Less than or Equal to Tall Fescue(50.6 plant factor) 0 1 2
❑ b.Tud Shall Na Be Installed on Slopes Exceeding 10%a in Areas Less than 8 Feet Wide 0 2
❑
to Tud is 93%of Landscaped Area(total2 points) 0 2
❑ d.Tud Is<_10%of LandscaPad Arse(total 4 points) 0 2
❑ 4.Plant Shade Trade 0 1 3
LJ 5,Group Plants by WaterH Needs tlrazi nen 0 I 2
6.Insall High-Efficiency Irrigation Systeme
❑ e.System Uses Only Low-Flow Drip,Bubblers,a Low-now Sprinkler 0 2
❑ b.System Has Smarl Coni 0 3
7.Inco"" to Two Inches of coral In the To fi l012Inches of SOLI 0 1 I 3
6 Mulch MI Planting Beds to the Greater o12 Inches or Loral Watar On inane,Requirement D 1 I 2
9.Use 50%Salvaged or Recycled-Conten Materials for 50%of Non-Plant Landscape Elements 0 1 1
10,Radom Light Pollution by Shielding AMmes andfor Directing Light Downward 0 1 1 I
Total Points Available In Landscaping=31 0
D.STRUCTURAL.FRAME R BUILDING ENVELOPE Points Available Per Measure
1.Apply Optimal Value Engineering
❑ a.Place rtn and Studs at 24-Inch On Center Framing 0 1 _
❑ b.Size D0000a
Door end Wntl0w Headers for Load
❑ c.Use Only Jack and Cripple Studs Required for Load
2.Use Engineered Lumber
❑ a.Beams and Headers 0 1 I
❑ b.Insulated Engineered Headers 0 1 I
❑ c.Wood Waists a Web Trusses far Floors 0 1 I
❑ d.Wood Wash;for Root Rafters 0 1
❑ e.Engineered or Finger-Jointed Studs la Vertical Applications 0 1
❑
I.Oriented Stand Board for 34cloor 0 _ 1
❑ g.Oriented Strand Board fa Wall and Rod Sheathing 0 1 T-
3.Use FSCCortified Wood
❑ a.Dimensional Lumber,Studs and Timber.Minimum 4D% 0 2 1
• ❑ b.Dimensional Lumber Studs and Timber.Minimum 70% _O— 1
❑
c.Panel Products:Minimum 40%
❑ tl.Panel Products:Minimum 70%
02007 Build It Green Single Family GreenPoint Checklist 2007 Version Page 1 of 4
ENTER PROJECT NAME
6 Use solitl Wall Systems Qndutles 61Ps,ICFs,6 Arry Nom66ck Frame Assembly)
❑ e.Floors _ 0 __ 2 - 2 _ -
❑ b,Walls 0 - ..__� _ _2
❑ c.Roots 0 2 2
5,Reduce Pollution Entering the Home from the Gerais
❑ a.Tightly Seal the All Barrier bemoan Garage and Living Area —
❑ b.Install Gene Exhaust Fan OR Bulld a Detached Garage 0 a 1
5.Dnl n Energy Hale on Tme (75%Of Adds Insulation Height at Outside Edge of Exterior Well) 0 1
7.Oesi n Roof Truces Is AttOmmOtlate"Corecrk 0 1
Lj 0.Use Racyclea-Contant Stat swam for am or Intadar Well InOnv-0 0 1
LJ g.Thermal Man WMIc 5n-Inch Drywall on All Interior Wales or Walls Weighing mon Nan 401Ncoh. 0 1
10.Install Overhangs and Guars
❑ e.Minimum 164nch Overhangs and Gunn
❑ b.Minimum 24-Inch Overhangs and Gulden 0 1
Total Pants Available in SMxural Bugling Frame and Envelope=36 0
B.EXTERIOR FINISH Points Available Per Measure
1.Uae fls clew-Contant No Vir In Plastic or FSC-0Miged Woatl Deckles 0 2
2.Inatell a Rein Scam Well S atam 0 I 2
3.Ua Durable and Noncombustible sidingMMenats 0 i 1
4.We Durable and Noncombustible Roofing Matallm 0 2
Total Points Available In Exactor Finish=7 0
Paints Avallade Per Measure
F.INSULATION
1.Install Insulation with 75%Recycled Conten
❑ &Watts anNa Flans -� - - -- -4- --
❑ b.Collin a
2.Install llation Nat is Low-Emltdng(Certified Section 01350)
❑ a.Walls andlor Floors _0
❑ b.Collins 0 1
3,Ina ea Quality of Insulation installation before Applying Drywall 0 1
O.PLUMBING Toll Points Available In Insulation=5 0
Points Available Per Measure
1.Distribute Domestic Hot Wates ENciently,(Maximum 7 Points)
❑ e.Insulate HM Water Pipes ham Water Heater to Kitchen
❑ b,Insulate All Ha Water Pipes
Elc.Use Erignared Parallel Pipinp _0
❑ d.Use Engineered Paraflel Piping with Demand Controlled Circulation Loop
❑ e.Use Structured Plumbing with Demand Controlled Gmulatlon Leap --0 2
1-1f.Use Central Cam Plumbing
ET 2lnatatl Only High EfficienToiled DU I.Flush or 9.2E 9PO 0 1 4
Total Pants Available In Plumbin •Total 12 0
H.HEATING VENTILATION R AIR CONDITIONING Points Avellehle Per Measure
rl 1.Design and Install HVAC System l ACCA Manuel J,D,and S Recommendations 0 4
2.Install Sealed Combustion Unita
El a.Furnaces o 174—
F1 —
❑ b.Water Heaters
J.Install Zoned, Items Radiant Heating with Slab Edge Insulation 0 1 1
1.Iestall Hiph Efficiency Air Conomoning wnd Environmentally Responsible Rafrlgerants 0 1 i I
6,Design and Install chosen Ducwon
❑ e.Install HVAC Ung and Dwtwmk within Contlitlonea Some __ 1 3 +-�—
❑ b.Use Dud Masts an All Dae Joints and Seems 0 I
❑ L.Install DacNNrx ander Alto insulation(Buried Ducts) 0 - — - - ---i-- -
❑ d.Pressure Balance the DUCMllrit System
❑ B.Protect DUMB during Construction and Clan All Daae before Occupancy 0 1
e.Install High Efficiency MVAC Filter MERV Bt 0 1 !
❑ 7,Don't Instill Fireplace or Install Sealed Gee Fireplaces with Efficiency Rating Not Less Than 60% 0 1 i
using CSA Standards
B.Install Effadn Exhaust Systems In Bathrooms and Kitchens
❑ a.Install ENERGY STAR Bathroom Fans Vented to the Dud in 0 — __ 1 — - _--
❑ b.All Bathroom Fans Ara onTimer a Humidisch 0
❑ c.Inde Klmhan Range Hood Venadlo the Outside 0
a.Install Mecham Ventlledon Sys tem for Cooling(MaximumI Mn.,
❑ B.Install ENERGY STAR Gaiting Fans 5 Light Kits in Wing Areas 5 Bedroom 0 -
❑ 0 1 `
D.Insall Whole HW50 Fan With Variable Speeds
❑ c.Automatically Controlled Integrated System 0 2T
-r—
❑ d.Automatically Controlled Integrated System with Variable Speed Control 0 3
10.Install Mechanical Fresh Air Ventilation System(Maximum 3 Points)
❑ a.Any Whole House Ventilation System That Meets ASHRAE 52.2 0 2
❑ b.Install Air-4aAir Hest Exchanger that mems ASHRAE B2.2 0
11.Install Carbon Monoxltla Alerm(c) 0 1
Total Pants Available in Hoehn ,Ventllgon and Air Condittomna 301 D
0 2007 Bu lid It Green $Ingle Family Greor Point Checklist 2007 Version Page 2 of 4
H4 L � 5FF Pi
• PROJECT NAME
8 a �
7E] b.
E ENERGY Points Available Per Measure
lumb for Soler Hot Water Heating 0 4 1
l Soler Water Herrin System 0 10 1
• lWminliation6Provida200MofSouth-Facia Roof 0 1 2ll Photovoltaic(PV)Panels0 t 6%of electric needs OR 12 kW(total6 points)%a electric needs OR 2.4kW floral 12 pants) 0 ! 6
%of electric need OR 3.6 kW fraud 18 points)
Total Available Pants in Renewable Energy=20 0
J.BUILDING PERFORMANCE Points Available Per Measure
1.Diagnostic Evaluations
❑ a.House Passes Blower Door Test 0 1
El In.House Passes Combustion Safety Backdraft Test 0 1 —�
2.Design and Build High Performance Homes-%above Title 24-minimum 15%Required 0 no
5 2 1
TT 3.House Obtain ENERGY STAR with Indoor Air Package CeNfication-Pilot Measure(TOW 45 points;read egmment) 0 1 ,l
1
Text Available Points in Buildin Performance 39 0 -
K.FINISHES Text
Available Per Measure
1.Design Entryways to Reduce Tracked in Contaminants 0 I 1
2.Use Low-VOC or Zero-VOC Paint(Maximum 3 Points)
❑ a.Low-VOC Interior WelgCelling Paints(60 get VOCs(Flat and d50 gel VOCs(Non-Flet)) 0 1
❑ b.Zero-VOC:Interior WeIVCellin Paints(<5 gpl VOCs Flat) 0l
❑ 3.Use Low VOC,WeteoBased Wood Finishes(Q50 gpl VOCs) 0 2
❑ 4.Use Low-VOC Caulk and Cane'Wi Adhesives(OO gpl VOCeit for All Adhesives 0 i 1 2 1
❑ 5.Use Recycled-Content Paint 0 I 1 1
6.Use Environmentally Preferable Materiels for Interior Finish:A)FSCCerdfie I Wood,B)Reclaimed,C)Rapidly Renewable,D)Recycled-Content
or E)Finger-Jointed
❑ a.Cabinets(50%Minimum) 0
❑
to.Interior Than(50%Minimum) 0 L_ —
❑ c.Shelving(50%Minimum) 0
❑ d.Doors(50%Minimum)
❑ e.Counton s 50%Minimum 0
7.Reduce Formaldehyde in Interior Finish(CA Section 01350)
❑ a.Subfoor 6Star Treads(50°b Minimum) 0
❑ b.Cabinets 6 Coumamy s(50%Minimum) 0r�-
1—
• ❑ c.Interim Trim(50%Minimum) 0 ! 1 !
❑ J.SheNin (50%Minimum) 0 1 I
❑ B.After Installation of Finishes,Test of Indoor Air Shows Formaldehyde Leval 47ppb 0 3 1
Total Available Pants in Finishes=21 0
L.FLOORING Points Available Per Measure
1.Use Environmentally Preferable Flooring:A)FSC-Certified Wood,B)Reclaimed or Refinished,C)Rapidly Renewable,0)Retycled-Content,E)
Exposed Concrete.Flooring Adhesives Must Have,60 gpl VOCs.
❑ a.Minimum 15%of Floor Area 0 �_ 1
❑ b.Minimum 30%of Floor Area 0 __ 1
❑ c.Minimum 50%of Floor Area 0 1 _
❑ d.Minimum 75%aFloa Area' 0 1 1
❑ 2.Thermal Mass Floors:Floor Covering Omar than Carpet on 50%Of More of Concrete Floors 0 1 1 )
❑ 3.Flooring Meats Section 0135D or CRI Green Label Plus Requirements(5D%Minimum) 0 1 2 I
Total Availble Points in Flooring=7 0
M.APPLIANCES AND LIGHTING Points Available Per Measure
1.Install Water and Energy Efficient Dishwasher
❑ a.ENERGY STAR(hand 1 point 0 1 )
❑ b.Dishwasher Uses No More than 6.5 Calk cls(Maltpoints) 0
L Install ENERGY STAR Clothes Washing Machine with Water Factor of 6 or Less
❑ e.Meets Energy Sw and CEE Tier 2 requirements(modified energy factor 2.0,Water Factor ED)(total 3 points) _0 1 1 2
❑ b.Meets Energy Star and CEE Ter 3 requirements(modfied energy facia 22,Water Factor 4.5 or less) 0
totals Intl
3.Install ENERGY STAR Refrigerator
❑ a.ENERGY STAR Quaffed 6<25 Cubic Feet Cal
❑ b.ENERGY STAR Ouallfied 6<20 Cubic Feet Capacity 0 1
4.instsll Bulli-In Recydln Cantor 0
❑ a.Buifi-In Recycling Center 0 ! 2
❑ b.Bulit4n Composting Center 0 I 1
Total Available Penis in Appliances and G hon =12 0
N,OTHER Points Available Per Measure
❑ 1.Incorporate Grem Polnl Rated Checklist in Blueprints-Required 0 1 R i
❑ 2.Develop Homeowner Manual of Green FeeturewBenefts 0 1 I 1 1 1 1
3.Community Design Measures B Local Priorities:See the Community Planning A Design section in Chapter 4 of the New Home Guidelines for
• measures.Minimum of 20 Points far suggested measures.Local requirements may also be listed here.
0 2007 Build It Green Single Family GreenPolnt Checklist 2007 Version Page 3 of 4
S
ENTER
PROJECT e t>
4
Enter description here,and enter points available ler measure 10 appropriate cat9geries 10 The right. 0 0 0 0 0 0
Enter description here,and enter points available for measure In appropriate emotional to the tight. 0 0 0 11
0
Enter description hare,and enter s available for measure In appropriate categories to the right. 0 0 0 0 0
Orris
Enter description here,and enter points available for measure in appropriate categories to the right. 0 0 0 0 0 0
Gu1id Imes Checklists and
4.Innovation:List Innovative measures that most the Breen building objectives of the Guidelines.Enter up toe Guidelines
masdinum combined total of 20 pts.See Innovation Checklist for suggested measures,using the link to the right. _ __ _
LJ Inmvaaoi In Commun :Enter description hen and enter posts available for mecum In ate cats 'u a men . 0 0 0 0 0 0
.an.in=Enter Enter d on hen,and enter ns wallade to measure In me cote 'N to Nen t. 0 0 0 0 0 0
hmwaaon In IAOMuIth.Enter description here,and enter points avallebts for measure In mate Wa as to the right.
_ 0 0 0 0 0 0
EJ Intimation In BuouroM:Enter description hate,and enter points available is measure In 'ra cat 'as Its Ne right 0 0 0 0 0 0
LJ npwallon In Water:Enter duerplion here,and anlat points available for measure In appropriate colegoflas to the 09116 0 0 0 0 0 0
Teal Available Points In Clh�4 0
Summary
Total Available Points In Specific Categories' 4+ 96+ 42+ 66+ 43+
Minimum Points Required In Specific Cete Odes 0 30 5 6 B
Total Points Achieved e e e e e e
Project has not yet met the following recommended minimum requirements:
- Total Project Score of At Least 50 Points
-Required measures:
43a: 50% waste diversion by weight
-J2: 15%above Title 24
-ii Incorporate Green Point Rated Checklist Into blueprints
-Minimum points in specific categories:
-Energy(30 points)
-IAQ/Health(5 points)
-Resources(6 points)
-Water(9 points)
•
02007 Build It Green Single Family Greei Checklist 2007 Verslon Page 4 of 4
CITY OF CUPERTINO
4 ITEMS OF 4 PERMIT RECEIPT OPERATOR: patg
COPY # 1
Sec: Twp: Rng: Sub: Blk: Lot:
APN . . . . . . . . : 37540034 . 00
DATE ISSUED. . . . . . . : 01/03/2008
RECEIPT # . . . . . . . . . : BS000003613
REFERENCE ID # . . . : 08010021
SITE ADDRESS . . . . . : 644 STENDHAL LN
SUBDIVISION . . . . . . .
CITY . . . . . . . . . . . . . : CUPERTINO
IMPACT AREA . . . . . . :
OWNER . . . . . . . . . . . . : FRATICELLI STEVEN AND KELLY
ADDRESS . . . . . . . . . . :
CITY/STATE/ZIP . . . : CUPERTINO CA, 95014-4656
RECEIVED FROM . . . . : DAVID G LANTZ
CONTRACTOR . . . . . . . : BRIAN PULLAN LIC # 29716
COMPANY . . . . . . . . . . : RAPID PLUMBING INC.
ADDRESS . . . . . . . . . . : PO BOX 5144
CITY/STATE/ZIP . . . : SANTA CLARA, CA 95056
TELEPHONE . . . . . . . . : (408) 866-1417
® FEE ID UNIT QUANTITY AMOUNT PD-TO-DT THIS REC NEW BAL
---------- ------------- ---------- ---------- ---------- ---------- ----------
1BSEISMICR VALUATION 2, 800. 00 0 .50 0. 00 0. 50 0. 00
1PPERMITFE FLAT RATE 1. 00 40 .79 0 . 00 40.79 0. 00
1PRSEWER UNITS 1. 00 20 .40 0 . 00 20.40 0. 00
1TRAVDOC FLAT RATE 1. 00 40 .79 0. 00 40.79 0. 00
---------- ---------- ---------- ----------
TOTAL PERMIT 102 .48 0. 00 102 .48 0. 00
METHOD OF PAYMENT AMOUNTREFERENCE NUMBER
-----------------
CREDIT CARD 102 .48 VISA
---------------
TOTAL RECEIPT 102 .48
VOICE ID DESCRIPTION VOICE ID DESCRIPTION
-------- ---------------------------- -------- ----------------------------
106 SEWER & WATER 202 UNDERFLOOR PLUMBING
301 ROUGH PLUMBING 507 FINAL PLUMBING
•