Loading...
05070135 (2) CITY OF CUPERTINO of « x ,s '� '�"' ?° • ' BUILDING DIVISION PERMIT ,CONTRACTOR INFORMATION BUILDING,ADDRESS: R E ROOFING & CONSTRUCTIO N PMtNO05070135 OWNER'S NAME: PERMIT ISSUE DATE EDITH BARR 15230 CLYDELLF NE: SANITARY NO. CONTROL NO. (408) 626-9320 ARCHITECTIENGINEER: BUILDING PERMIT INFO BLDG ELECT PLUMB MECH 0 0 0 0 nest, LICENSED CONTRACTOR'S DECLARATION e C I hereby affirm Nat I am licensed under provisions of Chaptcr 9(commencing Job Description eiw wOSection7IXgBof Div'sion of sine and ProNc iom Code,andmylicenwis ;« mmurnrteanderrem'12 I° REROOF-REMOVE (E) CO V O� INGLES 5jj= ucen I a C. LT Camrecto INSTALL 1/2" CDX 30L P COMP RCHITECTS DEC wu 1 aoECrsu my p1 s shall be used ¢me =a� LieemedProfessional 2005 Z S OWNER.BUILDER DECLARATION '�<F 1 hereby al'frm that I am exempt from the Contractor's License Law for the p o following reason.(Section 7131.5,Business and Professions Cade:Any city or county m which requires a permit to eonswct,a w,,improve,demolish,or repair any structure no oil mohl"Il —Zy prior m ill issuance.alio aciploe3 the applicant for such permit to file a signed Statement< nw Otis he is licensed pursuant m the iormiomaf NC Co...,',License law(Chaper 9 Sq. Ft. Floor Area sW67s, 3000 Y_G (commencing with Section 7")ofDivision 3 of Ne Business and Pmfssions Code)or i 3$ Nat he is exempt therefrom and the basis for de alleged exemption.Any violation of Section 703 1.5 by arty applicant for a permit subjccas the applieanto a civil penalty of APN Number Occupancy Type not more than five hundred doll.(SS(M). 36933021 . 00 p y yp ❑1.as,ownm of the prepery,or my employees with wages as their sole compensation, will do the work,and the swcture is not intended or offered for sale(Soo.7044,Business and Proreasioas Cade:The Contractors License law doer do,a,],m an owrter or Required Inspections property who builds or improves thereon,and who Eocssuch work himself or through his own employees,provided Nat such improvements are notinended at offered for sale,IL however,the building or improvement is sold within one year of completion,the Craft builder will have the burden of preving that he did not Wild or improve for purpose of sato). ❑1,as owner of the property,am exclusively contracting with licensed Contractors to Construct the project(Sec.7044,Business and Profusions Code:)The Contractor's Li- cense law dots not apply to an owner of property who Wilds or improve fumes.and who contracts for such projects with a contractor(s)licensed pursuant to the Contractor's License Law. Cl I am.aempt under Sec. .B&P C for this reason Owner Date WORKERS COMPENSATION DECLARATION 411 1 hereby affirm under penalty of perjury arc of the following declamfons: U I have and will maintain a Certificate of Consent to self-insure for WorReis Compere .as provided for by Section 3700 or the Later Code.for the peAormaxe of Ne wor for which this permit is issued. 1 have and will maintain Wwkcr's Compensation Insurance,as rryuirtd by Section of the labor Code,for the performance of the work for which this permit is issued. M Worker' Ca a cation In p..carmen and Policy number an, Comer. Policy O V CERTIFICA POF ENS Pr10NFRAN WORKERS' COMPENS, ION INSURANCE . (]This sectors need not he complmed if the Permit is for one hundred doll=($IOD) or less.) 1 certify that in the performance of the work for which this permit a issued,1 shall not employ any person in any mannerso as in become subject to the Workers eomprnunimi Laws of California.Dow Applicant NOTICE TO APPLICANT.IL Our making this Certificate of Exemption,you should become subject m the Worker's Compensation provisions of the labor Code,you must .J Z forthwith comply with such provisions or Nis permit shall the deemed revoked. z n CONSTRUCTION LENDING AGENCY by Cams Phe,which do Natthcrt issed(Sec.3W7nding agency or the perfmmanxe of gL 25 the work fur whish Nts pcmtit is issued(sec.3097,Civ.C.) a. Lender's Name a landcr's Address az V Q 1 certify that 1 Nye read this city and coup v,d sole that rbc above information u 0 U cortex 1 agree m comply with all city and county omimnces and sum laws r upon m V hve-haaing med!poand forhereby auNonartmais. lies of this city menterupon Ote ateve-mentioned property findmnify an keeper C (tes)agrte to save,indemnify and keep formless the City of Cupertino against F'Z incoisegjnce of the gracing ofpensesrinh. may to anyway accrue against said City _ V z mcoLICANTOUNDERSTANDS Aof rND WILL COMPLY WITH A L NO POI Issued by: Date /�' S REGU _ _J signal a f-ApNica Contract Duo Re-roofs AZ US MATERIALS DISCLOSURE Type of Roof Will Ne applicant or future byfaing occupant store or handle ba mous material as defined by f¢Cupertino Mun)))Clpal Cod.,Chapter 9.12,and the Health and Safety creta.se❑ctye.25532(a)? /No All roofs shall be inspected prior to any roofing material being installed. Will me, Tear1( rf re iia�n he u ant uae e t or devices which If a roof is installed without first obtaining an inspection,I agree to remove pp s p vuipmen baa.rdnus air co"' ,.n d Ilm d by the Bay Arca Air Quality Marta cat a ew materials for inspection. Distiict7 ❑Yes X0 NO j Ihavcrudtheharardousmalerialsmquimmcnuundcr Chaper6.95 fthe Califon I^ ( I niaH IO&samtyc.k.scc..IMS.2s533a 255.X.lumcratandlna, alts Wilding of c hate•tenant.Nat it is my responsibility b rwtifY occ t of dre rcyai ton um aarecaracertirmaeor Cr --Si�ature �Applican Date r imhori'r.d agent DOW All roof coverings to be Class"B" or better CITY OF CUPERTINO 1� 2 of 2 PERMIT RECEIPT OPERATOR: suem COPY # 3 Sec: Twp: Rng: Sub: Elk: Lot: APN . . . . . . . . : 36933021.00 DATE ISSUED. . . . . . . : 07/21/2005 RECEIPT #. . . . . . . . . : 30470 REFERENCE ID # . . . : 05070135 SITE ADDRESS . . . . . : 10552 LA RODA DR SUBDIVISION . . . . . . . CITY . . . . . . . . . . . . . : CUPERTINO IMPACT AREA . . . . . . . OWNER . . . . . . . . . . . . : EDITH BARR ADDRESS . . . . . . . . . . : CITY/STATE/ZIP . . . : CUPERTINO CA, CA 95014-4416 RECEIVED FROM . . . . : R E ROOFING/CONST CONTRACTOR . . . . . . . : PROCTOR, PAUL LIC # 20615 COMPANY . . . . . . . . . . : R E ROOFING & CONSTRUCTION INC ADDRESS . . . . . . . . . . : 15230 CLYDELLE AVENUE CITY/STATE/ZIP . . . : SAN JOSE, CA 95124 TELEPHONE . . . . . . . . : (408) 626-9320 FEE ID UNIT QUANTITY AMOUNT PD-TO-DT THIS REC NEW BAL _____ __________ __________ __________ BPERMFEE VALUATION 13, 000.00 201.96 0.00 201.96 0.00 BSEISMICRE VALUATION 13, 000.00 1.30 0.00 1.30 0.00 ---------- ---------- ---------- ---------- TOTAL PERMIT 203.26 0.00 203 .26 0.00 METHOD OF PAYMENT AMOUNT NUMBER ----------------- ------------ --________--_--___ CHECK 471.92 9198 TOTAL RECEIPT 471.92 F - Community Development 10300 Torre Avenue ( Cupertino CA 95014 Telephone(408)777-3228 CITY OF Fax(408)777-3333 OUPEkTINO Building De artment JOB ADDRESS: lOr't�2 Lx a X , PERMIT # U / W ONER'S NAME: 77 l'M PHONE # — 26 -/cl 3Z0 GENERAL CONTRACTOR: FAX # q O — U- l I am not using any subcontractors: Signature Date Please check applicable subcontractors and complete the following information: SUBCONTRACTOR BUSINESS NAME BUSINESS LICENSE # Cabinets &Millwork Cement Finishing Electrical Excavation Fencing Flooring: Carpeting Linoleum/ Wood Glass/ Glazing Heating Insulation Landscaping Lathing Masonry Ornamental Sheet Metal Painting/ Wallpaper Paving Plastering Plumbing Roofing Septic Tank Sheet Metal Sheet Rock i 1 --7 Zl I�7 r/Contractor Signature Date Community Development Department lipBuilding Division City of Cupertino O affl 10300 Torre Avenue CITY OFTelephone: (408) 777-3228 C�^�^_'�� Fax: (408)777-3333 �l ••K"1°° Building Department Subject: Re-roofing policy for the City of Cupertino 1. Prior to permit issuance, you must agree to comply with 1997 UBC Standards and manufacturers specifications on re-roofing. 2. New roof coverings shall not be applied without first obtaining all inspection and written approval from the building inspector. A final inspection and approval shall be obtained from the building inspector when the re-roofing is completed. 3. All roofs shall be inspected prior to any roofing installation. 4. To receive a final sign off from the City, the following steps are required: 1) Pre-inspection and/or tear off approval. 2) In-progress inspection approval. 3) Final inspection approval. a) Spark arrester installation. 5. If plywood is installed, a plywood nail inspection is required. • 6. Any roofing which is applied without first obtaining an inspection, will require the removal of all new material down to the sheathing, so a proper City inspection can be performed. 7. NOTE: If you call for a plywood nail inspection and the job is not ready, you will be charged a re-inspection fee of$176.18. The re-inspection fee must be paid before another inspection can be scheduled. IMPORTANT: 1. Flat roofs must have a minimum of 1/4 " per foot slope and demonstrate that there is no ponding. 2. An I.C.B.O. report is required to be on the job site at the time on inspection. I understand and will comply with the above stated policy on re-roofing. Homeowner's Name: I b I2 1A n lob Site Address: 16"/ 2 L- A �o,)A Roofing Comp e: I \ l �L I Y i(S % ��✓ D I Uv/Ci1 j �1 1 I �� Applicant'sS'gna re: t Date: -7 12-1 IU ® Greg Casteel Building Official Revised 11/2/04 Printed on Recycled Paper CITY OF CUPERTINO REROOF OCUPEkTINO PERMIT APPLICATION FORM X50 "7/3S APN # al Q / - Date: Building Address: IO l( LA 1^ 10PA l Owner's Name: V b I V BLam.� Phone#: 2—r/2 Contract o : Phone#: License #: 7 l 7 �, Rod 1N 40k- b2(- _7276�1 Contact: Phone#: Cupertino Business License#: 406- v Type of Roof Covering: Existing: Proposed: ❑ Built-Up Roof ❑ Built-Up roof XAsphalt Shingles ?< Asphalt Shingles ❑ Wood Shakes ❑ Wood Shakes Wood Shingles /I ❑ Wood Shingles tOther(Specify) {�7?x' El Other(Specify) 'umber of existing coverings ❑ Provide I.C.B.O. Report# ATo be Removed ❑ Provide Mfgr. Installation Specs. jftl Have Read, Understand and Will Comply With Cu ertino's Tear Off Policy: Job Description: 1040& atkrjNk 2- L,"e�5 Cly "RUC7\= C-CvMP v Wvow a gift I tJ 51 A-L,l E\-J (12" CD t hSTM 11.t /`SPNA-LT- com Residential Commercial ❑ Fire Zone: Yes ❑ Confirmed with Planning Det. if there are any restrictions: Ll Cost of Project: I� 12 0� Type of Construction: Occupancy group: U Qty. if Applicable Fee ID Fee Description Fee Group BPERMFEE Bldg Permit Fees BUILDING BENERGY Energy BUILDING 1 BSEISMICRE Seismic Fee Res BUILDING BSEISMICOM Seismic Commercial BUILDING BPLANCHK Plan Check Fee BUILDING BUSLIC Business License BUILDING s