Loading...
08070205Yp� -moo p�3 �yc G tDt �yIN- Gc ase c 02 z- ai GC U C UC OE Fo ULI 2 CITY OF CUPERTINO BUFLDING DIVISION PERMIT s lJ�l\`11�LiV�QA jEl1Y�IQ."' BuaTgcMDT6'RKSHIRE DR A-1 ELECTRIC PERMR NO. 08070205 OWNER'S NAME: PERMIT ISSUE DATE ROBERT WHITTEN 421 E HEDDING ST 07/29/2008 NE SANITARY NO, CONTROL NO. (408)975-9171 ARCHITECf1ENGINEER: BUILDING PERMIT INFO BLDG ELECT PLUMB MECH LICENSED CONfRACIVR'S DECLARATION Chapter 9 lb Description y affirm I am licensed under previsions of (commencing 1 borebffirm N with Section 70f ) of0hision 3 afore Business and Professions Code. and my license is UPGRD SVC FRM 100 TO 200AMP in full force and efre[h L J License Class C Dam "7-29—oV Contractor —1 aft ARCHrfECfS DECLARATION 1 understand my plans shall he used as public accords Licensed Professional OWNER -BUILDER DECLARATION I hereby alTime Not 1 am exempt from the Convectors License Lew for the following reahan. (Section 7031.5, Busircss and Professions Calc: My city or county which rtquimn a Permit to consmct, alta, improve, demolish, or repair any muttum ! prior at its issuance. also requires the applicant for such permit w file a signed atsemem to the of Ne Committers Liana<Law (chapter 9 Sq. Ft. Floor Area Valuation that In, is licensed pursuant proviskns Section 7000) Division 3ofth, Business and Profession&Codi) or $2600 1 (commencing wild Of thal W in attempt thed. and tbo basis for the alleged crampoon. Any violation of 36207014 Number Occas Occupancy T'Pe Section 7071.5 by arty applicant fore pewit subjects the applicant m a civil penalty of oat ream Nan livelivehundred dollars (seem. ❑ I. as owner oflbe Property Ormy cmployas with wages u their role compensation, Required Inspections will , License aw faro n0a4,Businm Ncwens andan- do TW O omesta Law does rot apply lf rt owner prop Pr cede TW apply ve beemrs and is property who improves Nmeonandwho doermmass himueedououghhie propertywW awn res, provided that such imps in not inmnded for role If. ,pmol ver. da id within m leered builder. Ne Wilding mimprowmantahalt withinoneyear of wmplefa, theowe of builder will have the When of proving out W did not bNld or improv far Puryou o! serest. ❑ 1, as Owner of the property, am exclusively conoaming with licensed contractors to cmutrocl the project (see. 7044. Business and Professions Cedc) The Coomarwrs U. ave Law docs nut apply in an owner of property who Wilds or irepmves demon, add. who commuss for such projects with a constituents) licensed pmseent m the ConlranoYs License Law. ❑ I and esemps under See , B B P C to, this acason Owner Dau WORKERS COMPENSATION DECLAPU 1ON I hereby affirm under penalty of perjury one of the following decimations: 10 I harm and will maintain a CenRioro of Cement to %If -Wore far Workers Corpse. sation, as provided for by Section 3700 of the labor Code. for the peRornmend of ted work for which this permit is issued have and will maintain Wortrfs Compamadon Insurance, as acquired by Section ' ]BO of oe Labor Coon. for the pcnteran. fNe wort forwhich NU Permit u issued ' My Wmkay[s COmpemN xtion sur.. earn .1 and Policy number ad: Cartier: ` � CraRs�Policy No.L wl to C ACATEE E. IMON FROM WORKERS' COMPENSATION INSURANCE (Thu section need not W campleted VOW Pewit is foram hundred dollen ($100) carless) 1 certify Nut in the performance of the work for which this permit is issued. I shall tort employ anypermn In my mmterse as On becente subject to ft Worsen' L'ompersamen ' Laws of California. Dau Applicant NOME TO APPLICANT: If, after making this Certificate of Exemption, you should became subject in the Warde3 Compensation previsions of the Labor Cade you most ' foMwidt comply with such provisions of this Permit shall W deemed revoked. CONSTRUCTION LENDING AGENCY 1Wr Nermitut Iae(Se.3 Reding.) for Ne PCffOwamCof haRw mac work for which Nu pewit u issued (Sm. 307, Civ. C.) Isndefs Awe ' LendeYS Address 1 1 enify that I haw read this sppliestion sed sou that ted above information u ceweL I agree to comply with all city and county ordinalm and amen laws relating m Wilding conmoction. and hereby auNense representatives of Nu city m enter upon sec aWw-mamiened properly for impaction purposes (We) agree u arm, indemnify and trap harmless the City of Cepcnino a[mad, j ealenseseaft. mryin anY war acrneagaimt said Cry inconsesjedeOfthecoauand in consequence of the granting of this pewit i AP (CANT UNDERSTANDS AND WILL COMPLY WITH ALL NON -POINT U GU�JSIONS�- Issued by: Date. Ira - Re -roofs or Oeu Signmurt of Applinn�ARRDOUS MATERIALS DISCLOSURE Type of Roof will Ne or er handle material Code. Chaptnam CupertinoMunicipalReanlean as defined by see Cupertino Munici WI Coder. Chapter 9.11, and the HuiN and Safely Code. Section 25532(.)7All ❑tam roofs shall be inspected prior to any roofing material being installed. Will mac applicant or future holding occupant tau al Ire [ Pan equipment w devices whim If a roof is installed without first obtaining an inspection, I agree to remove g P itores air conmminanm m dcOncd by mac Bay Ama Air Quality Manegcmcnt all new materials for inspection. Daniel? ❑tam 1 berm read mac ha andom mmerisls requncomm under Chaser 6.95 of the Calif.,. nia Hcalth k Safety Cade, Sections 25505, 25533 and 25574.1 understand that if Ne Wilding des el a Wrtndy have a.4 the it Y my nCapenelhility to Miry the IXLupNI of Ne iremcnts whkn eL Prior u usvmee of a CerefWae of Gaup.nay. Signature of Applicant Date � All roof coverings to be Class'W' g or better Owner or auNerisd agent Date am • 3 ITEMS OF 3 CITY OF CUPERTINO PERMIT RECEIPT Sec: Twp: Rng: Sub: Blk: Lot: APN ........: 36207014.00 DATE ISSUED.......: 07/29/2008 RECEIPT #.........: BS000005619 REFERENCE ID # ...: 08070205 SITE ADDRESS .....: 1117 YORKSHIRE DR SUBDIVISION ......: CITY .............: CUPERTINO IMPACT AREA ....... OPERATOR: patg COPY # : 1 METHOD OF PAYMENT ------------------ CREDIT CARD TOTAL RECEIPT : 0 AMOUNT REFERENCE NUMBER ------ -------------------- 82.08 VISA --------------- 82.08 OWNER............. • ROBERT WHITTEN ADDRESS ..........: 1117 YORKSHIRE DR CITY/STATE/ZIP ...: CUPERTINO CA, 95014-4916 RECEIVED FROM ....: BOB LAMANTIA CONTRACTOR .......: ROBERT LAMANTA LIC # 27061 COMPANY ..........: A-1 ELECTRIC ADDRESS ..........: 421 E HEDDING ST CITY/STATE/ZIP ...: SAN JOSE, CA 95112 TELEPHONE ........: (408)975-9171 • FEE ID - --- UNIT QUANTITY. - ------ AMOUNT.. PD -TO -DT THIS REC NEW BAL 1BSEISMICR ---------- VALUATION 2,600.00 ------- ----------------------- 0.50 0.00 0.50 ---------- 0.00 lEPERMITFE FLAT RATE 1.00 40.79 0.00 40.79 0.00 .1TRAVDOC FLAT RATE 1.00 40.79 0.00 40.79 0.00 TOTAL PERMIT --------- ------------------- 82.08 0.00 82.08 -------- 0.00 METHOD OF PAYMENT ------------------ CREDIT CARD TOTAL RECEIPT : 0 AMOUNT REFERENCE NUMBER ------ -------------------- 82.08 VISA --------------- 82.08 • 0 • CITY OF CUPERTINO CITY of CUPEI�TINO GENERAL BUILDING PERMIT APPLICATION FORM APN # / o'2 c) L/. U Date: Building Address: Mailing Address (if different from building address): Ow((/4eyr'�sName: Phone #: Contractor: Phone: T7L� Fax:d— Contractor License #: (!�72�OI Cupertino Business License #: c� 7 0 / � / Contact: Phone: Fax: Residential Commercial Job Description: . h c_F Building Permit Info: Bldg ❑ Elect Ef-- Plumb ❑ Mech ❑ Type of Construction (Usage Class): Occupancy Type: 1-A, 1-B ❑ II/III/V-A ❑ II/III B, IV -HT, V -B EEJ— Valuation: Square Footage: Project Size: Express ❑L—Standard ❑ Large ❑ Major ❑ Green Building: Please complete relevant portion of the Green Building/LEED Checklist & attach it to the application or if applicable, include in plan set & the sheet index. Points Achieved: g� For help, contact Build it Green at www.builditgreen.org Revised 7/01/08 �o CUPER,TINO CITY OF CUPERTINO GENERAL BUILDING PERMIT APPLICATION FORM Quantity/Sf Fee ID Fee Description Fee Permit Type Group 1GENRES or 1GENCOM 1BBOILERI For the installation or relocation of ea M boiler/compressor to & including 3 horsepower, or ea absorption sys to & incl 100,000 Btu/h 29.3kw 1BBOILER2 Installation /relocation of ea M boiler/compressor over 3 horsepower to & incl 15 horsepower, or ea absorption sys over 100,000 Btu/h 1 BBOILER3 Installation/relocation of ea M boiler/compressor over 15 horsepower to & incl 30 horsepower, or ea absorption sys over 500,000 Btu/h to & incl 1,000,000 Btu/h 1BBOILER4 Installation/relocation of ea M boiler/compressor over 30 hosepower to & incl 50 horsepower, or for ea absorption sys over 1•,000,000 Btu/h to & incl 1,750,000 Btu/h 1BBOILER5 Installation/relocation of ea boiler or M refrigeration compressor over 50 horsepower, or ea absorption sys over 1,750,000 Btu/h 1 BAPPLOTH For ea appliance or piece of equip M regulated by this Code but not classed in other appliance categories, or for which no other fee is listed in this code. 1 ELECINSP Other Electrical Inspections (per hour) E 1MECHINSP Other Mechanical Inspections (per M hour) 1 PLMBINSP Other Plumbing & Gas Inspections P (per hour 1MEETINGIHR Application Meeting B 11 • U a ax CITY OF CUPEkTINO CITY OF CUPERTINO GENERAL BUILDING APPLICATION FEE SCHEDULE Quantity/Sf Fee ID Fee Description Fee Group Permit Type 1GENRES or 1GENCOM ACOUSTICAL REVIEW IACOUSFDW SFDWL/Duplex New B IACOUSRESAD SFDWL/Duplex-Addition/Alteration B 1ACOUSCOM Multi-Family/Commercial B CHIMNEY'S 1CHIMNEY Chimney B 1CHIMNEYR Chimney Repair B FENCES 1FENCE>6FT Non -masonry, over 6 ft in height B 1 FENCEMAS>6 Masonry, over 6 ft in height B FIREPLACES 1FIREPLMAS Fireplace Masonry B 1FIREPLFAB Fireplace Pre-Fabricated/Metal B 1 FLAGPOL>20 Flag pole (over 20 ft in height) B 1MODUSTRU Modular Structures B FOUNDATIONS 1FOUNDREP Foundation Repair B 1PILECAST Pile Foundation Cast in place concrete B 1PILEDRIV Pile Foundation Driven (steel, pre- stressed concrete B 3 of 5 Sm - CITY Or CUPERTINO CITY OF CUPERTINO. GENERAL BUILDING APPLICATION FEESCHEDULE Quantity/Sf Fee ID Fee Description Fee Group Permit Type 1GENRES or 1GENCOM RETAINING WALL(CONCRETE OR MASONRY 1RETSTN Standard (up to 50 ft) B 1RETSP310 Special Design, 3-10' high (up to 50 `) B 1RETSPI0 Special Design, over 10' high (up to 50') B 1RETCRB< Gravity/Crib Wall, 0-1O'high (up to 50 ft B 1RETCRB> Gravity/Crib Wall over 10' high (up to 50 ft B SHED -(EACH) Shed Over 120 sq ft B SIDING ISIDEST/BK Siding, Stone & Brick Veneer interior/exterior B 1 SIDEOTHER Siding all other B. SKYLIGHTS 1 SKYL<l0 SF Skylight less than 10 sf B 1 SKYL>1 OSF Skylight greater than 10 sf or structural B 1STAIRS Stairs -first flight/ea addt'l B' STORAGE RACKS 1 SRACKS<=8 Storage Racks 0-8' high (up to 100 sf) B 1 SRACKS>8 Storage Racks over 8' high (up to 100 st) B 4 of 5 Is • • t ary of CUPEkTINO CITY OF CUPERTINO GENERAL BUILDING APPLICATION FEESCHEDULE Quantity/Sf Fee ID Fee Description Fee Group Permit Type ]GENRES or 1GENCOM 1STUCOAP Stucco Applications (up to 400 sf) additional stucco application B 1 WINREP Replacement windows/sliding glass door (ea 8 windows) B 1WINMEWSTR New Window -structural shear wall/masonry (includes plan ck fee B / 1 EPERMITFEE Electrical Permit Fee E 1MPERMITFEE Mechanical Permit Fee M 1PPERMITFEE Plumbing Permit Fee P 1 ELCPLNCK Stand Alone Electric Pln Ck (hourly) E 1MECPLNCK Stand Alone Mechanical Pln Ck (hrly) M 1PLMBLNCK Stand Alone Plumbing Pln Ck (hrly) P 1 STPLNCK-(3 Hr Min when not over counter) Standard Plan Check (when no EAW) hourly -stand alone B 1BSEISMICR Seismic Residential B 1BSEISMICO Seismic Commercial B 1TRAVD0C Travel & Documentation B 1BUSLIC Business License B 5of5 • Plan Review Process Work Book Page -12-Revised 3/25/08 Green Building Plan Check Index of Green Building Points/Categories A. Category Example of an Index or Table of Green Plan Sheet or Page Points Building Points Categories that must be shown and referenced on the Project Plans See below Q Y: B. Site 9. .Install H.E. Irrigation, (details/spec)' L-1 2 points 11. Permeable Paving, Note L-1 2 points C. Foundation 1. Use 15 % Flyash Concrete, (note) S-1 5 points D. Structural 3. Uses Wood I -Joist, (See Spec.) S-2 2 points 5. Use Truss with heels, (detail) S-2 2 points 6. B. OSB Sheathing, detail S-2 2 points E. Ext. Finish 1. Composite Decking, (Note/Spec.) A-3 2 points 4. B. Fiber Cement Siding, (Note/Spec. A-4 2 points F. Plumbing 1. Insulate all H.W. pipes, (Note/Spec.) P-1 2 points 5. Tankless W.H., (Note/Spec.) A-2 2 points 11. A 2500 Gal. Tank, (Note/Spec L-1 10 oints G. Electrical 4. E. Ceiling Fans, (Note/Spec.) A-3 4 points H. Appliances 1. Energy Star Dishwasher, (Note/Spec.) A-3 1 point 3. Energy Star Refrigerator, (Note/Spec. A-3 1 22int P. Other 1. List Green Features on Plans A-1 1 point TOTAL POINTS 40 points • Plan Review Process Work Book Page -12-Revised 3/25/08 Green Points Rating System for Remodeling Projects Due to the diversity of remodeling project types, assigning a'total points' value to a project to be considered environmentally friendly is not feasible. However, 25 measures have been highlighted to signify that every effort should be made to incorporate them into your projects. These items have been chosen based upon their impact on the environment and the health of the home in coordination with ease of implementation and relative low cost. These measures can be used as a starting point for 'greening' your project. A. Site I1. Recycle Job Site Construction & Demolition Waste 65%=1 point; 75%= 2 points; 60%= 4 points up to 4 Resource pts 0 2. Salvage Reusable Building Materials _ 4 Resource pts y --yes 0 3. Remodel for Mixed Use, Adaptive Reuse, and Historic Preservation 4 Resource pts Y_—Yes 0 4. Protect Native Soil 2 Resource pts y=yes D 5, Minimize Disruption of Existing Plants & Trees 1 Resource pt y=yes 0 6. Implement Construction Site Stonnwater Practices 2 Resource pts y=yes D 7. Protect Water Quality with Landscape Design _ 2 Resource pts y=yes 0 .B. Design Resource -Efficient Landscapes and Gardens 4 Resource pts y --yes 0 9. Reuse Materials/Use Recycled Content Materials for Landscape Areas 2 Resource pts y=yes , 0 10. Install High -Efficiency Irrigation Systems 2 Resource pts y --yes 0 11. Provide for On -Site Water Catchment / Retention 2 Resource pts y=yes D B.Foundation 1. Incorporate Recycled Flyash in Concrete • 25% Recycled Flyash = 2 points; Add 1 point for every 10% increase of flyash, up to 5 points 2. Use Recycled Content Aggregate 3. Insulate Foundation/Slab before backfill C. Structural Frame i1. SSubstitute Solid Sawn Lumber with Engineered Lumber 2. Use FSC Certified Wood for framing (For every 10% of FSC lumber used = 2 points, up to 10) 3. Use Wood I -Joists for Floors and Ceilings 4. Use Web Floor Trusses 5. Design Energy Heels on Trusses 6" or more 6. Use Finger -Jointed Studs for Vertical Applications 7. Use Engineered Studs for Vertical Applications 6. Use Recycled Content Steel Studs for Interior Framing 9. Use Structural Insulated Panels (SIPs) a. Floors b. Wall c. Roof 10. Apply Advanced Framing Techniques 11. Use Reclaimed Lumber for Non Structural Applications 12. Use 0SB a. Subfloors b. Sheathing up to 5 Resource 2 Resource pts y= 3 Energy pts y= 3 Resource pts y=ye up to 10 Resource pts 2 Resource pts y --ye 2 Resource pts y=ye 2 Energy pts y=ye 2 Resource pts y=ye 2 Resource pts y=ye 2 Resource pts y --ye, 3 Energy pts y=ye! 3 Energy pts y=ye: 3 Energy pts y=ye! 4 Resource pts y=yes 3 Resource pts y=yes 1 Resource pt y=yes 1 Resource pt y=yes 6 J 0 i 0 0 0 0 0 0 0 0; It 0. l_ _- 1. Use Sustainable Decking Materials a. Recycled content b. FSC Certified Wood ,2. Use Treated Wood That Does Not Contain Chromium/Arsenic ,3. Install House Wrap under Siding 14. Use Fiber -Cement Siding Materials E. Plumbing �1. Install Water Heater Jacket 2. Insulate Hot and Cold Water Pipes 13. Retrofit all. Faucets. and Showerheads with Flow Reducers a. Faucets (1 point each, up to 2 points) b. Showerheads (1 point each, up to 2 points) I4. Replace Toilest with Ultra -Low Flush Toilets 1(1 point each, up to 3 points) 5. Install Chlo ne Filter on—Shower-head- 6. nShowerhead6. Convert Gas to Tankless Water Heater 7. Install Water Filtration Units at Faucets (2 points each, up to 4 points) 6. Install On -Demand Hot Water Circulation Pump 3 Resource pts y=y 3 Resource pts yryi 1 IAQ/Health pt y--yi 1 IAQ/Health pt y=yi 1 Resource pt y=yes J 1 Energy pt y=yes 2 Energy pts y=ye<- r. oecmcal I1. Install Compact Fluorescent Light Bulbs (CFLs) ,(6 bulbs=2 points, 10 bulbs =3 points, 12 bulbs = 4 points) 2. Install IC -AT Recessed Fixtures with CFLs (1 point each, up to 5 points) 3. Install Lighting Controls (1 point per fixture, up to 4 points) 4. Install High Efficiency Ceiling Fans with CFLs (1 point each, up to 4 points) Up to 2 Resource pts Up to 2 Resource pts Up to 3 Resource pts. 1 IADMealth pt y=yes 4 Energy pts y=yes Up to 4 IAQ/Health pts. 4 Resource pts y=yes Up to 4 Energy pts. Up to 5 Energy pts. Up to 4 Energy pts, UD to 4 Enerov ots G. Appliances r r 0 r r 0 r r 1 Energy pt Y=Yes 2. Install Washing Machine with Water and Energy 2 Energy pts y=yes Conservation Features 1 Energy pt y=yes 13.lnstall Energy Star Refrigerator G. Appliances fT. Install Energy Star Dishwasher v 1 Energy pt Y=Yes 2. Install Washing Machine with Water and Energy 2 Energy pts y=yes Conservation Features 1 Energy pt y=yes 13.lnstall Energy Star Refrigerator 1 Energy pt y=yes 14. Install Built -In Recycling Center 1. ------------- - - 3 Resource pts y=yes H. Insulation 1. Upgrade Insulation to Exceed Title 24 Requirements a. Walls 2 Energy pts y=yes b. Ceilings 2 Energy pts y=yes 2. Install Floor Insulation over Crawl Space 4 Energy pts y=yes [3. Install Recycled -Content, Fiberglass Insulation with (No Added Formaldehyde 3 IAQ/Health pts y=yes 4. Use Advanced Infiltration Reduction Practices 2 Energy pts y=yes S. Use Cellulose Insulation a. Walls 4 Resource pts y=yes b. Ceilings 4 Resource pts y=yes 6. Alternative Insulation Products (Cotton, spray -foam) a. Walls 4 Resource pts y=yes D. uemngs 4 Resource pts y=yes • LJ 1. Install Energy -Efficient Windows a. Double -Paned b. Low -Emissivity (Low -E) c. Low. Conductivity Frames 2. Install Low Hest Transmission Glazing J. Heating Ventilation and Air Conditioning 1. Use Duct Mastic on All Duct Joints 2. Install Ductwork within Conditioned Space 3. Vent Range Hood to the Outside 4. Clean all Ducts Before Occupancy 5. Install Solar Attic Fan 6. Install Attic Ventilation Systems 7. Install Whole House Fan 6. Install Sealed Combustion Units a. Furnaces b. Water Heaters 1 Energy of 2 Energy pts 2 Energy pts 1 Energy pt 2 Energy pts 3 Energy pts 1 AC/Health pt 21AQ/Health pts 2 Energy pts 1 Energy pt 4 Eneray pts 31AQ/Health pts 31AQ/Health pts 9. Replace Wall -Mounted Electric and Gas Heaters with Through -the -Wall Heat Pumps 3 Energy pts 10. Install 13 SEER/11 EER or higher AC with a TXV 3 Energy pts 11. Install AC with Non -HCFC Refrigerants 2 Resource pts 12. Install 90% Annual Fuel Utilization Efficiency (AFUE) Furnace 2 Energy pts 13. Retrofit Wood Buming Fireplaces 1. Pre -Plumb for Solar Water Heating • a. Install EPA certified wood stoves/inserts 1 IAQ/Health pt It. Install/Replace Dampers 1 Energy pt c. Install Airtight Doors 1 Energy pt 14. Install Zoned, Hydronic Radiant Heating 3 Energy pts 15. Install High Efficiency Filter 41AQ/Health pts 16. Install Heat Recovery Ventilation Unit (HRV) 5 IAQ/Health pts 17. Install Separate Garage Exhaust Fan 3 IAQ/Health ots K. Renewable Energy and Roofing . 1. Pre -Plumb for Solar Water Heating 4 Energy pts Y --yes 2. Install Solar Water Heating System 10 Energy pts y=yes 3. Pre -Wire for Future Photovoltaic (PV) Installation 4 Energy pts y=yes 4. Install Photovoltaic (PV) System (1.2 kw = 6 points, 2.4 kw = 12 points, 3.6 kw = 16 points) Up to 16 Energy pts 6. Select Safe and Durable Roofing Materials_ 1 Resource pt y=yes _ _ _ 7. Install Radiant Barrier 3 Energy pts y=yes L Natural Heating and Cooling 1. Incorporate Passive Solar Heating 5 Energy pts y=yes 2. Install Overhangs or Awnings over South Facing Windows 3 Energy pts y --yes 3. Plant Deciduous Trees on the West and South Sides - 3 Energy pts y=yes E 1. Use Low/No-VOC Paint 2. Use Low VOID, Water -Based Wood Finishes '3: Use Low/No VOC Adhesives 4. Use Salvaged Materials for Interior Finishes 5. Use Engineered Sheet Goods with no added Urea Formaldehyde 6. Use Exterior Grade Plywood for Interior Uses 7. Seal all Exposed Particleboard or MDF B. Use FSC Certified Materials for Interior Finish 9. Use Finger -Jointed or Recycled -Content Trim 10. Install Whole House Vacuum System N. Flooring 1. Select FSC Certified Wood Flooring �2. Use Rapidly Renewable Flooring Materials 3. Use Recycled Content Ceramic Tiles 4. Install Natural Linoleum in Place of Vinyl 5. Use Exposed Concrete as Finished Floor 6. Install Recycled Content Carpet with Low VOCs Total Points Available: Total Points Project Received: 1 IAQ/Health pts y=yes D 21A0/Health pts y=yes D 31AQMealth pts y=yes 0 3 Resource pts y=yesH D 1 1 61AQMealth pts 1 IAQ/Health pts 41AQ/Health. pts 4 Resource pts 1 Resource pts 3 IAQ/Health pts 6 Resource pts 4 Resource pts 4 Resource pts 5 IAQ/Health pts 4 Resource pts 4 Resource pts 1401 130 57 01 0 0 G:datalpmgs�gmenbuildmoouldelines4emodelersrgreenpoints8nal212gaprolecfed.ds ilf CITY OF 10CUPEkTINO 0 n JOB ADDRESS: OWNER'S NAME: GENERAL CONTRACTOR: Community Development 10300 Torre Avenue Cupertino CA 95014 Telephone (408) 777-3228 Fax (468)`791=33'33 Building Dep cutment PERMIT # U l/ l� PHONE # FAX # I am not using any subcontractors: Signature Date Please check applicable subcontractors and complete the following information: Owner/ Contractor Signature Date SUBCONTRACTOR BUSINESS NAME BUSINESS LICENSE # Cabinets & Millwork Cement Finishing f/ Electrical - c- Excavation Fencing Flooring: Carpeting Linoleum / Wood Glass / Glazing Heating Insulation Landscaping Lathing Masonry Ornamental Sheet Metal Painting / Wallpaper Paving Plastering Plumbing Roofing Septic Tank Sheet Metal Sheet Rock Tile Owner/ Contractor Signature Date