Loading...
198140 • POST THIS CARD NEAR FRONT OF BUILDING CITY OF CUPERTINO INSPECTION DIVIISSION - JOB INSPECTION RECORD JOB ADDRESS I Ic) UNIT # yL`OT 4 OWNER l` � � ? ZUC7OR Dp -: J �%J PERMIT No �� - S'I CATEGORY CONTROLx BUILDING PERMIT INFO INSPECTION DATE JINSPECTOR INSPECTION RECORD NOTE ALL GRADING AND DRAINAGE SHALL BE INSTALLED' TO COMPLY VATH _ THE APPROVEDPLANS ANDCITYOP CUPERTINO STANDARDS. O FOUNDATION/ PIERS UFER GROUND JOB DESCRII'DON , CT /' PAD/SET BACK-CERT GARAGESLABS PREGUNITE POUR NO CONCRETE UNTIL ABOVE HAS BEEN SIGNED INSPECTION DATE INSPECTOR UNDERGROUND /SLAB PLUMBING ELECTRICAL MECHANICAL DO NOT POUR FLOOR UNTIL ABOVE HAS BEEN SIGNED WOOD FLOOR PLUMBING MECHANICAL ELECTRICAL FRAMING VFNIS CLEAR INSULATION PLACE NO SLIBFLOOR UNTIL ABOVE HAS BEEN SIGNED ROUGH PLUMBING TUBS & SHOWER PAN MECHANICAL ELECTRICAL ACUZZ113OND FRAMING STAIRS INSULATION /VENTILATION EMERG. EGRESS SEWER WATER COVER NO WORK UNTIL ABOVE HAS BEEN SIGNED EXTERIOR SHEAR HOLD DOWN INTERIOR SHEAR /HOLD DOWN SHEETROCK /SHEETROCK SHEAR EXTERIOR LATH/ W- SCREEN 51-JOW ER LATH SCRATCH COAT NO TAPE OR PLASTER UNTIL ABOVE HAS BEEN SIGNED NOTE: NO FINAL INSPECTION SHALL BE MADE BEFORE THE CONSTRUCTION TAX IS PAID FINALS • DATE INSPECTOR SAN.# ELECT. ENERGY PLUMBING ENERGY MECH. ENERGY BUILDING ENERGY ELECT. FINAL TEST PLUMBING CAS TEST MECHANICAL HEATING ELECTRICAL RELEASE FIRE DEPT. GRADE OCCUPANCY TEMPORARY APPROVALS ELECTRIC GAS BUILDING ISSUANCE DATE OCCUPANCY OF BUILDING IS NOT PERMITTED UNTIL BUILDING FINAL IS SIGNED BY BUILDING INSPECTOR ARRANGE FOR INSPECTION BY PHONING 252 -4505 BETWEEN 12:30 PM AND 4:30 PM MONDAY THROUGH FRIDAY, 24 HOURS BEFORE REQUIRED INSPECTION. JOB ADDRESS AND PERMIT # ARE NEEDED WHEN PHONING. tit, 0 fl3nntline IMPORTANT! PLEASE READ REVERSE SIDE BEFORE CALLING FOR FINAL INSPECTION ssu �deY: +I APPLICANT'S POSTING COPY Lk.' S NOTICE. 0 . When calling for FINAL INSPECTIONS, the following occurs prior to the release of utilities: The Building Department coordinates the request for final inspection with the following City departments, as required, to assure that the site /building complies with the requirements of these departments. 1. BUILDING: Complies with all building code requirements. 2. ENGINEERING: a. New driveways, sidewalks, curbs, gutters completed. b. Lot fine grading to drain or bond posted. c. New water system in operation. d. New sewer system in operation (Sanitary District). e. New streets paved, with sewer manhole and valve boxes raised to grade. Sewer cleanout at property line to grade. f. New subdivision lot corners set. 3. FIRE: a. Fire hydrants properly installed and operating. b. Fire sprinkler system properly installed and tested. c. Fire alarm systems completed and tested. d. Fire extinguishers installed, dated and tagged. e. No parking signs in required fire lanes. f. Restaurants, hood fire extinguishing systems operating and tested. 4. PLANNING a. Required landscaping and irrigation system installed. b. Paved parking, trash enclosures, exterior light fixtures, etc. c. Documents (CC & Rs, easements, etc.) 5. HEALTH All food handling facilities must meet the requirements of the Santa Clara County Health Department. Upon receipt of approvals in the Inspection Division from all the above departments, gas and electric utilities will be released, and you may then occupy your building. If new owners are attempting to occupy the building for the first time and the utility release has been delayed, check with the contractor who is responsible for meeting all the above requirements of the various departments. BUILDING INSPECTION DIVISION CITY OF CUPERTINO