Loading...
08090139 CITY OF CUPERTINOxa', . BUILDING'DIVISION PERMIT CO,6"T"W' 'ORMATION� BUILDING ADDRESS: PERMIT NO. 20671 RODRIGUES AVE TNT ROOFING CO 08090139 OWNER'S NAME: PERMIT!ISSUE DATE OSBORNE WILLIAM T AND CAROLINE 1610 BLOSSOM HILL RD STE 6C 09/22/2008 NE: SANITARY NO. CONTROL NO. ARCHr1EC71ENGINEER: BUILDING PERMIT INFO RE—RF RMV SHK INSTL 1/2"OSB BLDG ELECT PLUMB MECH 0 0 LICENSED CONTRACTORS DECLARATION O O O O 1 herchY.fir mat 1 atm licensed under provision of Clasher 9(commencing ^----^- ^•^^ Job Description with section 7MIy.fDivisiam3af NC Bushes and Proteasium CadO.md my licensein in full Tand ercect Lu.g p i License Class r Dao: Caru i y VVMFIIIECrs DECLARATION < 1 understand my plans shall he used as public records 3�U g Q� Licensed Prolossmal 3OWNER-BUIIDER DECLARATION I hereby mfOr that 1 am exempt from Ne Conuache's License Law for the 00 following wan.(section 7031.5.Business and Rofestivas Code:Any city or county $ which requires a permit he conswct.atom,improve,demolish.Or mpair any struaum prior th its issuance.also squites the applicant for such Permit to file a signed stanmcnt tic that he is licensed purseant to the provisions of the Convactor'a Uixtmac Law(Chapter 9 Sq.Ft. Floor Area Valuation 4 2 (commencing with suction 7000)or Division 3 of the Business;and Professions Code)at Nat he is exempt therefrom and the but,for IW alleged exemption,Any violation of second 7031.5 by any applicant for a permit mbjccu me applleant to a civil penalty of APNumber Occupancy N NumbType on,marc usd fiva hundred dollars($5M P Y YP 0 1,a caner of the property m my mopnyca with wags u dmh sole compensadon, will do Ihewmis.and thctwctum u not eendCd a oRercd tarsale($ec.]016,Budnm sent ProtestinN Calc:The Comma pr's License Law does net apply in an coma a Required Inspections property who bui Ids or im prom thereon.aM who does such work himsel f or through hu own employee,provided that such irephoemenu art not in¢ndcd maRcred forsale IL however,the building or improvement Is sold within one year of compkileo.We wnm builder will have the burden of proving that he did not Wild or improve for purpose of sale.). El 1,u water of the property em ancrie ivelY command.,with ilansed conB.mas to co"slmct the project(Set 7W6,Business and mofadans Codc:)TW Contractos's U. ceoe law does not apply m an owner of proWny who builds or improve macer,and who convects for such projects with s cumranas(s)licensed pursuant b the Coroacmts License law. O lamuempsundm See ,BAPCfarmismason Owner Date WORKERS COMPENSATION DECLARATION I hereby affirm under penalty of penjur,oro of the fallowing decimation: 1 have and will maintain a Certificate orCmus m in teff-insure far WorkdsCompea- sadom,as pmvkkcd for by Section 3700 of the labor Code,for the perfarana of the work for which this permit is issued. 0 1 have aM will maintain Worker's Compensation Insurance,as Inquired by Section 3700 oftm labor Code, a Ne pchforance of the wart for which this permit is issued. My CarriWeor.rker's /� ra and Policynmber rt:Policy No.: 0 e'?✓wO CERTIFICATE OF EXEMPTION FROM WORKERS COMPENSATION INSURANCE rlhu section need out be completed Ilt&permit is imone hundred dollen(SI00) of teal) I codify that in the paforume of use,work for which this perms is issued;l shall ata employ any person in any ma umisa as In become subject on the Workerd Compensator Laws of California.Dam Applicant NOTICE TO APPLICANT:If,after making this Ceni0can of Exemption,you should become subject In the Woftes Compensation provisions of the tabor Cade,you most .,O foMwith comply with such provicans a r this peil mallW Gamel Gamed reveled. .zi "" CONsrRucnoN LENDING AGENCY F-hr IhembYaRr that there it.conairoctien lending agency for to perfwmena of thr wart fur which tons permit Is issued(Sec.3097,Civ,C.) W�Q Undoes Name . Z)z t<nd es Address U Q 1 curtify that I have mW this application and run that the above information is 17. correct 1 agree in comply with all city cord county ohNnatmef and some laws rcu umg in Wilding coniWttidn,an0 hereby suthorire reprommad ve of Nu city to ems upon the W .1owe-mentioned property for impcaion purposes (We)agree n sane,indemnify add k=P harmless Oe City of Cupcnino against (ZI Iiab"himjudgmene,Coss and espenues which may n any way aura apinsl said Cry U Z in earmommen of Lou graining of this permit. c APPLICANT' DERS7AND5 AND WILL COMPLY WITH ALL NON POINT Issued by: Date / SOURCE U2ONS. I Re-roofs or. h_HAZARDOUS MATERIALS DISCLOSURE Dan Type of Roof Will ton appliam or future building acupanlstoro or hand to material u dcfmM by the Cupertino Municipal Code.Chapter 9.11,and IW Health and Safe,, Cade,section 25532(.)7 ❑Yon p All roofs shall be inspected prior to any roofing material being installed. Will me amliant ter r building Occupant use equipment or devices which If a roof is installed without first obtaining an inspection,I agree to remove t i�ha menus air conorrommu an de0red by the Bay Area Air Quality Management all new materials for inspection. Dyes ON I have road ton lasmadlommamrials requirements under Chshorb.95ofton Caltfor. nitHahh ASafay Cada.SOeec s25505,M333a a255N.1 urdcmand Natifthc Wilding `1 dao set cum have a sant this itjs my responsibility m notify ton oco ma of the �i requiremcn hihmaslWmetpri Wino mora OalppfOcCupaney. Signature of Applicant Date C L �i 1 owner d,,amanzodagent Dan IAll roof coverings to be Class'9 tr'or better CITY OF CUPERTINO • 2 ITEMS OF 4 PERMIT RECEIPT OPERATOR: patg COPY # 1 Sec: Twp: Rng: Sub: Blk: Lot: APN . . . . . . . . : 35910055 . 00 DATE ISSUED. . . . . . . : 09/22/2008 RECEIPT #. . . . . . . . . : BS000006146 REFERENCE ID # . . . : 08090139 SITE ADDRESS . . . . . : 20671 RODRIGUES AVE SUBDIVISION . . . . . . . CITY . . . . . . . . . . . . . : CUPERTINO IMPACT AREA . . . . . . . OWNER . . . . . . . . . . . . : OSBORNE WILLIAM T AND CAROLINE ADDRESS . . . . . . . . . . : 20671 RODRIGUES AVE CITY/STATE/ZIP . . . : CUPERTINO CA, 95014-2964 RECEIVED FROM . . . . : MICHAEL D WILLIAMS CONTRACTOR . . . . . . . : WILLIAM TYLER LIC # 22988 COMPANY . . . . . . . . . . : TNT ROOFING CO ADDRESS . . . . . . . . . . : 1610 BLOSSOM HILL RD STE 6C CITY/STATE/ZIP . . . : SAN JOSE, CA 95124 TELEPHONE, . . . . . . . . : (408) 277-0800 - • FEE ID UNIT QUANTITY AMOUNT PD-TO-DT THIS REC NEW BAL ---------- ------------- ---------- ---------- ---------- ---------- ---------- 1BSEISMICR VALUATION 8, 000 . 00 0 . 80 0 . 00 0 . 80 0 . 00 1REROOFRES SQ FEET 26 . 00 338 . 00 0 . 00 338 . 00 0 . 00 ---------- ---------- ---------- ---------- TOTAL PERMIT 338 . 80 0 . 00 338 . 80 0 . 00 VOICE ID DESCRIPTION VOICE ID DESCRIPTION -------- ---------------------------- -------- ---------------------------- 601 ROOF TEAR OFF' 602 ROOF PLYWOOD NAIL 604 ROOF IN-PROGRESS 605 FINAL REROOF • CITY OF CUPERTINO %s�Qd`.:, REROOF OEUPErli°T`INO PERMIT APPLICATION APN # 591 Date: v �55 � �� u Building Address: O PJ Owner's Name: Phone #: Contractor: Phone #: g�7,7— (, Civ -�7ovT Fax#: F_6� Zs-63 Cupertino Business License #: Contractor Liceg��e #: Type of Roof Covering: Existing: Proposed: ❑ Built-Up Roof ❑ B t=Up roof ❑ phalt Shingles Asphalt Shingles ,ate Wood Shakes ❑ Wood Shakes ❑ Wood Shingles ❑ Wood Shingles ❑ Other (Specify) ❑ Other(Specify) Number of existing coverings ❑ Provide I.C.B.O. Report # ❑ To be Removed ❑ Provide Mfgr. Installation Specs. Job Description: Rek�v c C�Ce 12zu r—, 47,- ,S f lyl 6 c_fas f Residential Commercial ❑ Green Building: Please complete relevant portion of the Confirmed with Planning Dept. if Green Building Checklist & attach it to the application or if there are any restrictions: ❑ applicable, include in plan set & the sheet index. Valuation: I Have Read, Underst n and Will Comply with Cupertino's Tear-Off Policy: S' ature Revised 6/16/08 �, CITY OF CUPERTINO I MCREROOF CUPER,TINO FEE SCHEDULE Number of Fee ID Fee Description Fee Permit Type Squares Group 1RER00FC0M Re-roof Commercial B 1COMMLROOF 1BSEISMICO Seismic Commercial B 2 C 1REROOFRES Re-roof Residential B 1SFDWLROOF / IBSEISMICRE Seismic Residential B 1RER00FMRES Re-roof Multi-Family B 1MFDWLROOF 1BSEISMICRE Seismic Residential B 1BUSLIC Business License B Revised 6/16/08 • Community Development Department Building Division City of Cupertino • 10300 Torre Avenue Telephone: (408)777-3228 Fax: (408)777-3333 Building Department Subject: Re-roofing policy for the City of Cupertino 1. Prior to permit issuance,you must agree to comply with 2007 IBC Standards and manufacturers specifications on re-roofing.All roofs are Class "A"per Cupertino municipal code 16.04.080. 2. New roof coverings shall not be applied without first obtaining all inspection and written approval from the building inspector. A final inspection and approval shall be obtained from the building inspector when the re-roofing is completed. 3. All roofs shall be inspected prior to any roofing installation. 4. To receive a final sign off from the City, the following steps are required: 1) Pre-inspection and/or tear off approval. 2) In-progress inspection approval. 3) Final inspection approval. • a) Spark arrester installation. 5. If plywood is installed,a plywood nail inspection is required. 6. Any roofing which is applied without first obtaining an inspection, will require the removal of all new material down to the sheathing, so a proper City inspection can be performed. 7. NOTE: If you call for a plywood nail inspection and the job is not ready, you will be charged a re-inspection fee of$176.18. The re-inspection fee must be Paid before another inspection can be scheduled IMPORTANT: 1. Flat roofs must have a minimum of 1/a "per foot slope and demonstrate that there is no ponding. 2. An I.C.B.O.report is required to be on the job site at the time on inspection. I understand and will comply /with y�the above stated policy on re-roofing. Homeowner's Name: 4�lz w7 JJk4C Job Site Address: z0g / 'I �vd/7�wej Roofing Company Name: glel' '� Applicant's Signature Date:444 • Greg Casteel Building Official Revised 07/30/08 Community Development Department Building Division City of Cupertino • 10300 Torre Avenue Telephone: (408)777-3228 Fax: (408)777-3333 Building Department REROOF TEAR OFF POLICY 1. You must schedule an inspection for the tear off the day before you wish the inspection to be made. The procedure is to call the Building Division (408) 777-3228 between the hours of 7:30 a.m. and 3:30 p.m. to request a next-day inspection. • 2. When the roof is torn off, the nails have been removed or driven in, and all of the dry-rotted wood has been replaced, you must call the City Building Division. An inspector will be there within one hour. There are special hours for this service: from 7:30 a.m. to 10:30 a.m. and 1:00p.m. to 3:30 p.m., Monday through Thursday and from 7.30 a.m. to 10:30 a.m. and 1:00 p.m. to 2:30 p.m. on Friday. (Note: Building inspectors are on lunch break from 11:30 a.m. to 12:30 p.m. and will not be called during that time. City Hall is closed between 12:00 and 1:00 p.m. daily.) 3. If you call for a tear-off inspection and the job is not ready, you will be charged a re-inspection fee of $176.18. The re-inspection fee must be paid before another inspection can be scheduled • Greg Casteel Building Official Revised 8/13/04 Green Building Plan Check Index of Green Building Points/Categories A. Category Example of an Index or Table of Green Plan Sheet or Page Points Building Points Categories that must be shown and referenced on the Project Plans See below B. Site 9. Install H.E. Irrigation, (details/spec)' L-1 2 points 11. Permeable Paving, Note L-1 2 points C. Foundation 1. Use 15 % Flyash Concrete, (note) S-1 5 points D. Structural 3. Uses Wood I-Joist, (See Spec.) S-2 2 points 5. Use Truss with heels, (detail) S-2 2 points 6. B. OSB Sheathing, detail S-2 2 points E. Ext. Finish 1. Composite Decking, (Note/Spec.) A-3 2 points 4. B. Fiber Cement Siding, (Note/Spec. A-4 2 points F. Plumbing 1. Insulate all H.W. pipes, (Note/Spec.) P-1 2 points 5. Tankless W.H., (Note/Spec.) A-2 2 points 11. A 2500 Gal. Tank, (Note/Spec L-1 10 points G. Electrical 4. E. Ceiling Fans, (Note/Spec.) A-3 4 points H. Appliances 1. Energy Star Dishwasher, (Note/Spec.) A-3 1 point 3. Energy Star Refrigerator, (Note/Spec. A-3 1oint P. Other 1. List Green Features on Plans A-1 1 point 4_0 IMMAMMMI TOTAL POINTS 40 points • • Plan Review Process Work Book Page-12-Revised 3/25/08 Green Points Rating System for Remodeling Projects Due to the diversity of remodeling project types,assigning a"total points°value to a project to be considered environmentally friendly is • not feasible. However,25 measures have been highlighted to signify that every effort should be made to incorporate them into your projects. These items have been chosen based upon their impact on the environment and the health of the home in coordination with ease of implementation and relative low cost. These measures can be used as a starting point for"greening"your project. INPUT Resources Energy D _ A.Site 1.Recycle Job Site Construction&Demolition Waste 65%=1 point;75%= 2 points;80%=4 points up to 4 Resource pts 0 �2.Salvage Reusable Building Materials _ 4 Resource pis y=yes 0 3.Remodel for Mixed Use,Adaptive Reuse,and Historic Preservation 4 Resource pts y--yes 0 4.Protect Native Soil 2 Resource pts y=yes 0 5.Minimize Disruption of Existing Plants 6 Trees 1 Resource pt y=yes 0 6.Implement Construction Site Stormwater Practices 2 Resource pts y=yes 0 7.Protect Water Quality with Landscape Design 2 Resource pts y=yes 0 '8.Design Resource-Efficient Landscapes and Gardens _ 4 Resource pts y=yes p 9. Reuse Matedals/Use Recycled Content Materials for Landscape Areas 2 Resource pts y=yes 0 10.Install High-Efficiency Irrigation Systems 2 Resource pts y=yes 0 11.Provide for On-Site Water Catchment/Retention 2 Resource pts y=yes p 1 1 1 B.Foundation 1.Incorporate Recycled Flyash in Concrete • 25%Recycled Flyash=2 points;Add 1 point for every 10% increase of flyash,up to 5 points up to 5 Resource pts0 2.Use Recycled Content Aggregate 2 Resource pts y=yes 0 3.Insulate Foundation/Slab before backfill 3 Energy pts y=yes p 1 1 1 C.Structural Frame ;1.Substitute Solid Sawn Lumber with Engineered Lumber 3 Resource pts y--yes p 2.Use FSC Certified Wood for framing (For every 0%of FSC lumber used=2 points,up to 10) up to 10 Resource pts. 0 3.Use Wood I-Joists for Floors and Ceilings 2 Resource pts y=yes 0 4.Use Web Floor Trusses 2 Resource pts y=yes 0 5.Design Energy Heels on Trusses 6"or more 2 Energy pts y=yes 0 6.Use Finger-Jointed Studs for Vertical Applications 2 Resource pts y=yes 0 7.Use Engineered Studs for Vertical Applications 2 Resource pts y=yes 0 B.Use Recycled Content Steel Studs for Interior Framing 2 Resource pts y=yes 0 9.Use Structural Insulated Panels(SIPS) a.Floors 3 Ener is 9Y P Y=Yes b.Wall 0 3 Energy pts y--yes 0 c.Roof 3 Energy pts y=yes p 10.Apply Advanced Framing Techniques 4 Resource pts y=yes p 11.Use Reclaimed Lumber for Non Structural Applications 3 Resource pts y=yes 0 12.Use OSB -- -- " a.Subfloors - 1 Resource pt y=yes 0 • b.Sheathing 1 Resource pt y=yes 0 611 1 0 f INPUT Resources Energy [ADIHealth n .EXterlof rmsh 1.Use Sustainable Decking Materials a.Recycled content 3.Resource pts y=yes 0 • b.FSC Certified Wood 3 Resource pts y--yes 0 2.Use Treated Wood That Does Not Contain ChromiumlArsenic 1 IAQ/Health pt y--yes 0 i3.Install House Wrap under Siding 1 IAQ/Health pt y=yes 0 14.Use Fiber-Cement Siding Materials 1 Resource pt y=yes 0 E.Plumbing �L Install Water Heater Jacket _ 1 Energy pt y=yes 0 2.Insulate Hot and Cold Water Pipes 2 Energy pts y=yes 0 F3.Rkrdlt all Faucets and Showerheads with Flow Reducers a.Faucets(1 point each,up to 2 points) Up to 2 Resource pts. D b.Showerheads(1 point each,up to 2 points) Up to 2 Resource pts. 0 4.Replace Toilest with Ultra-Low Flush Toilets (1 point each,up to 3 points) _ _ Up to 3 Resource pts. 0 5.Install Chlorine Filter on Showerhead 1 IAQ/Health pt y=yas 0 6.Convert Gas to Tankless Water Heater 4 Energy pts y=yes D 7.Install Water Filtration Units at Faucets (2 points each,up to 4 points) Up to 41AQ/Health pts. 0 8.Install On-Demand Hot Water Circulation Pump 4 Resource pts y--yes D 1 1 1 r.erectncai 11.Install Compact Fluorescent Light Bulbs(CFLs) '(L6 bulbs=2 points,10 bulbs=3 points,12 bulbs=4 points) _ Up to 4 Energy pts. 0 • 2.Install IC-AT Recessed Fixtures with CFLs(1 point each,up to 5 points) Up to 5 Energy pts. 0 3.Install Lighting Controls(1 point per fixture,up to 4 points) Up to 4 Energy pts. 0 4.Install High Efficiency Ceiling Fans with CFLs (1 point each,up to 4 points) Up to 4 Energy pts. D 1 1 1 G.Appliances 1.Install Energy Star Dishwasher 1 Energy pt y=yes D 12.Install Washing Machine with Water and Energy Conservation Features 1 Energy pt y=yes 0 '3.lnstall Energy Star Refrigerator 1 Energy pt y=yes D 4.Install Built-In Recycling Center 3 Resource pts y--yes 0 I` . - - — -— - —_ _. . .. . 1 1 1 H.Insulation 1.Upgrade Insulation to Exceed Title 24 Requirements a.Walls 2 Energy pts Y--yes 0 b.Ceilings 2 Energy pts Y--yes 0 2.Install Floor Insulation over Crawl Space 4 Energy pts y--yes 0 3.Install Recycled-Content,Fiberglass Insulation with . �No Added Formaldehyde 31AQ/Heahh pts y=yes 0 4.Use Advanced Infiltration Reduction Practices 2 Energy pts y=yes . D 5.Use Cellulose Insulation a.Walls 4 Resource pts y--yes 0 b.Ceilings 4 Resource pts y=yes 0 • 6.Alternative Insulation Products(Cotton,spray-foam) a.Walls 4 Resource pts y=yes 0 o.uewngs 4 Resource pts y=yes D 1 1 I I.Windows INPUT Resources Energy 1ADIKealth 0.Install Energy-Efficient Windows • a.Double-Paned 1 Energy pt y=yes D b.Low-Emissivity(Low-E) - 2 Energy pts Y--yes D c.Low.Conductivity Frames 2 Energy pts y=yes 0 2.Install Low Heat Transmission Glazing 1 Energy pt y--yes D 1 1 1 J.Heating Ventilation and Air Conditioning ft.Use buct Mastic on All Duct'Joints _ 2 Energy pts y=yes 0 2.Install Ductwork within Conditioned Space 3 Energy pts y=yes 0 3.Vent Range Hood to the Outside 1 IAQ/Health pt y=yes D 4.Clean all Ducts Before Occupancy 2 IAQ/Health pts y=yes 0 5.Install Solar Attic Fan 2 Energy pts y=yes 7 0 6.Install Attic Ventilation Systems 1 Energy pt y=yes 0 7.Install Whole House Fan 4 Energy pts y=yes 0 B.Install Sealed Combustion Units a.Furnaces 3 IAQ/Health pts y=yes 0 b.Water Heaters 3 IAQ/Health pts y=yes D 9.Replace Wall-Mounted Electric and Gas Heaters with Through-the-Wall Heat Pumps 3 Energy pts y=yes 0 10.Install 13 SEER/11 EER or higher AC with a TXV 3 Energy pts y=yes 0 11.Install AC with Non-HCFC Refrigerants 2 Resource pts y=yes D 12.Install 90%Annual Fuel Utilization Efficiency(AFUE)Furnace 2 Energy pts y=yes 0 13.Retrofit Wood Burning Fireplaces Oa.Install EPA certified wood stovesfnserts 1 IAQ/Health pt y=yes p b. Install/Replace Dampers 1 Energy pt y=yes 0 c,Install Airtight Doors 1 Energy pt y=yes 0 14.Install Zoned,Hydronic Radiant Heating 3 Energy pts y=yes D 15.Install High Efficiency Filter 4 IAQ/Health pts y--yes 0 16.Install Heat Recovery Ventilation Unit(HRV) 5 IAQ/Health pts y=yes 0 17.Install Separate Garage Exhaust Fan 3 IAQ/Health pts y=yes 0 1 1 1 K.Renewable Energy and Roofing 1.Pre-Plumb for Solar Water Heating 4 Energy pts y=yes 0 2.Install Solar Water Heating System 10 Energy pts Y--yes 0 3.Pre-Wire for Future Photovoltaic(PV)Installation 4 Energy pts y=yes 0 4. Install Photovoltaic(PV)System (1.2 kw=6 points,2.4 kw=12 points,3.6 kw=1 B points) Up to 16 Energy pts 0 6.Select Safe and Durable Roofing Materials 1 Resource pt y=yes 0 7.Install Radiant Barrier 3 Energy pts y=yes p i 1 1 L.Natural Heating and Cooling 1.Incorporate Passive Solar Heating 5 Energy pts y=yes p 2. Install Overhangs or Awnings over South Facing Windows 3 Energy pts yqy s p 3.Plant Deciduous Trees on the West and South Sides 3 Energy pts y=yes p 1 1 1 • INPUT ReMurces Energy ]AD/Health -W.7r.ODr Atr Quabty and inrshes 5.Use Lo AoA OC Paint' 1 IAQ/Health pts y--yes 0 2.Use Low VOC.Water-Based Wood Finishes 21AQ/Health pts y=yes 0 • 3.Use LowMo VOC Adhesives 3 IAQ/Health pts y=yes 0 4.Use Salvaged Materials for Interior Finishes 3 Resource pts y=yes 0 5.Use Engineered Sheet Goods with no added Urea Formaldehyde 61A0/Health pts y=yes 0 6.Use Exterior Grade Plywood for Interior Uses 1 IAQ/Health pts y--yes 0 .7.Seal all Exposed Padicleboard or MDF 4 IAQ/Health pts y=yes 0 B.Use FSC Certified Materials for Interior Finish 4 Resource pis y--yes 0 9.Use Finger-Jointed or Recycled-Content Trim 1 Resource pts y--yes 0 10.Install Whole House Vacuum System 31AQ/Health pts y--yes 1 0 t 1 1 N.Flooring 1.Select FSC Certified Wood Flooding B Resource pts y=yes 0 12.Use Rapidly Renewable Flooring Materials - 4 Resource pts y=yes 0 3.Use Recycled Content Ceramic Tiles 4 Resource pts y=yes 0 4.Install Natural Linoleum in Place of Vinyl 5 IAQ/Health pts y=yes - 0 5.Use Exposed Concrete as Finished Floor 4 Resource pts y—yes 0 6.Install Recycled Content Carpet with Low VOCs 4 Resource pts y=yes 0 1 1 Total Points A 1 1401 130 57 Total Points Project Received: 0 0 0 • G: talprogslgreenhuildmgguitlelineslremodelaNgreanpmnisfnal2.12.04pr�feped.xls • Community Development t 10300 Torre Avenue * ✓ Cupertino CA 95014 Telephone(408) 777-3228 CITY OF Fax(408)777-3333 IWUPEkTINO Building De artment JOB ADDRESS: PERMIT # Z� /Ce6�pgi-013 z OWNER'S NAME: PHONE # Z GENERAL CONTRACTOR: U FAX # 2_,(SF_ I am not using any subcontracto s: ll ` �— Signature Date Please check applicable subcontractors and complete the following information: SUBCONTRACTOR BUSINESS NAME BUSINESS LICENSE # Cabinets & Millwork Cement Finishing Electrical Excavation Fencing Flooring: Carpeting • Linoleum/ Wood Glass/ Glazing Heating Insulation Landscaping Lathing Masonry Ornamental Sheet Metal Painting/ Wallpaper Paving Plastering Plumbing Roofing Septic Tank Sheet Metal Sheet Rock T Owner/Contractor Signature Date