Press Alt + R to read the document text or Alt + P to download or print.
This document contains no pages.
08080233 CITY OF CUPERTINO >A
BUILDIING rplvlSION PERNIIT CONTRACTOR INFURMAT40N � -
BUILDING ADDRESS: PERMIT NO.
1 '_' 49 RAINTREE SPRING CT PRINCIPLE ROOFING & 08080233
OWNER'S NAME: PERMIT ISSUE DATE
SI!:I'AU J:I.FN HWA AND SITYUE CHIN 10160 STERN AVE 08/29/2008
NE: (408) 898-7298 SANITARY NO. CONTROL NO.
ARCHITECT/ENGINEER: BUILDING PERMIT INPO
BLDG BLECT PLUMB MECH
0 0 0
3C9 LICENSED CONTRACTORS DECLARATION IObDesGn Description
F 1 hmcby alTinn Nal l am li¢vN undo ProvWou of CNpur 9(mmmcncine p
.Z with se Lion7")ofDivision3afihaBusinossudNareWoniCode.wdmylicemcis ROOF OVER-LAY OF 19SQ CLS A, ORG ROOF PERMIT
< in full force end effect. r9 / I-3.fes I S S'D
pwa=Z License Clea (- Lk.A b--I H i/
'ARCHRECTStractor DECLARATHI PREVIOUSLY 2/7/8 #08020046
d I understand in,Plans NNI W u,M as public mc.rW
J
P asci licensed Pmfessiond
5
OWNER-BUILDER.DECLARATION
ContrON
i q 1 hereby affirm that 1am 1. .attempt from the Contractor,License Lew for the
my
O O which ac moon.(Section mom.Business and Pro(euinno Cade:Any city os..my
9 r which acquires a issuance.aim re moment,the due I Applicant for sac demnilll t or mash ed almocal ..
't Priormiunsedpalsu regs due thovisisof far mchpenni't Liceo rile nse
g
't that hehllcrnseJ Punumtuthc Provisions of the Contncmrilicense leve(GaPur9 Sq.Ft.Floor Area Valuation
9 (comm=in,with Section 7000).(Diviiion 3 of the Businessland I'mileaumas Cars)Or l $4200
— dot he u m empt rhemfrem and the bash farthe alleged assumption.My violation of
Section 70713 by any appliam fore permit subjects the applicant to a civil penalty ofNumber Occupancy Type
not mom Wan five hundred dollen(33001 3 6 6 5 4 0 3 8 .
❑1,u owner of the Noperty,a my wplowu with ween u the'v vele emmpensetion.
aid Pr the work,and the he Contractor,
ra rot Intended ora w do(arcate(Sec.]011,Bud r of
and Professional who Wilds Cade:Ton mthur err, nd who Law dos rot apply lt rt owner of Required Inspections
is
Own ertywyesmpro ideal awe thamrovemets doncuchwmk himcelfll forughhf.
awn a sur,me uiprevided that vete improvements am not year
of completion.dfarM for ode o.
hawser We bui the w improvement 4 halt within opl war ofimprofor We owplr-
Wilder will haw the buNen of proving Out he did not build or improve for purpose of
O 1,u owner or the property.an combatively contracting with licensed mntruton he
construct the parallels(See 70M,Business and Pmfosdons CWcJ The Contrumrs U. "
cane,Law does not apply to an owner of property who solids or improves shemom.and.
who mmumma for such p,.Jees wish a eom usio(s)licensed portant as the Contractor,
License Law.
m
0 laasempt under5e. .B is P C ror this mann
Owner Data
WORKER'S COMPENSATION DECLARATION
I barely Oman under pointy of Perjury ono of We following dnolaruimtc
I haw ant will a dnuin acutiRau of Co..,in self-Lucre for Workers Compen•
oation.u provided for by Section 3700 of the Mbar Code,for the Performance of tho
work for which this permit i,issued.
❑1 haw and will maintain Worker,Complication Issuance,as myulmd by Section
7700 of dm Dilor Code,for the perfbar.of she work far which this permit IS cawed. '
My Warksur,C sup ma Insurwce carrier and Policy number am:
Carrier. 90�"`L Poliry No.: �N
CERTIFICATE OP EKEMMON FROM WORKERS'
COMPENSATION INSURANCE
(This seMon pled out be completed if the perm It is fa one hondmd doB,n(e 100)
or lea)
1 certify thus in We perrormmm of due walk for which this permit is issued.I,hN not
employ any person in my mer erm as to become mbject W tis Warlmri CamPewtian
L we of Glifamis Dau
Applicant
NOTICE TO APPLICANT.If,&fur making this Ceelncau of Esemption.You should
become subject in the Waher,Compensation previsions of the Mbar Coda you mus
,J O foMwlth comply with such providom or this permit Milli be deemed revoked.
y
CONSTRUCTION LENDING AGENCY
IMmby am.than them ha lanstararion hndingagene,for she Performance:of
C> she wars sur which this Permit It issued(Sec.3093,Civ.G
W Q Lender,Name ,
z lenders Address
UQ I cadfy that 1 Mw mad N.appllcWon nth sois the ab
u thove Informed.h
U.^ contact.I agreecomply W
m ply wish city and lately cordialness and malaw mall lamission,so
,
Q rV' Wilding construction.and homily sumorlm mprmanuhms alums city us Older upon tie
W above-moManed property for inspection purposes.
p), (We)agme in taw,indemnify and keep harmlw the City of Cupertino against
rn Iiabiliba judgmenu.cosu and expenses which may in any my attne sli add Clry
fJ Z in camequarme of the gnnung of this Pommy y
ti APPLICANT UNDERSTANDS AND WILL COMPLY WITH ALL NON-POINT Issued by: Date
SOURCE R! ULATIONS. o 8/�/�
h � Re-roofs
Signature ofA limon oau
HAZARDOUS MATERIALS DISCLOSURE Type of Roof
Willftto Cape orfutureWildinganmpaptsoreor and
Health and
as dented by We 32(a 0 an Mums I Code.Chapter 9.12,and the Htalth mod Safety
Call. 0you zss3zh)7 All roofs shall be inspected prior to any roofing material being installed.
❑Yas Nu
w 11 the
applicant or ratans building o up,nt use gwpmemt or device which If a roof is installed without first obtaining an inspection,I agree to remove
it havAAow air conuminsns as sued by W Bay Arc,Air Quality Management all new materials for inspection.
atrict7
I--]Y. No
IhawmWCoda Swdcm Z3lWm33&rdnuuMcr Chapur h.93ofde Wilding I
nhXWthdrmilay ave.Sxtivshat iti m"ciM1JdN.l inden ,ft BNe t.fthe bfj 2.9 Ods
dao rot mmenty naw a ural this to h my rcaponsihllity m rotiry de wt.f de
mauimnu u which an=W postaliss
met pdla uveeaf•Ccnine.0 of Occupancy. Slgnatureof Applicant Date
1— 08/W,-,l
Comerw ikatimmecd goal FData All roof coverings to be Class')?"or better
'
CITY OF CUPERTINO
• 2 ITEMS OF 2 PERMIT RECEIPT OPERATOR: pltg
COPY # 1
Sec : Twp: Rng: Sub: Blk: Lot:
APN 36654038 . 00
DATE ISSUED. . . . . . . : 08/29/2008
RECEIPT # . . . . . . . . . : BS000005943
REFERENCE ID # . . . : 08080233
SITE ADDRESS . . . . . : 11549 RAINTREE SPRING CT
SUBDIVISION . . . . . . :
CITY . . . . . . . . . . . . . : CUPERTINO
IMPACT AREA . . . . . . .
OWNER . . . . . . . . . . . . : SHIAU JIIN HWA AND SITYUE CHIN
ADDRESS . . . . . . . . . . : 11549 RAINTREE SPRING CT
CITY/STATE/ZIP . . . : CUPERTINO, CA 95014-5123
RECEIVED FROM . . . . : DERECK LOI
CONTRACTOR . . . . . . . : DERECK LOI - LIC # 27564
COMPANY . . . . . . . . . . : PRINCIPLE ROOFING &
ADDRESS . . . . . . . . . . : 10160 STERN AVE
CITY/STATE/ZIP . . . : CUPERTINO, CA 95014
TELEPHONE . . . . . . . . : (408) 898-7298
FEE ID UNIT QUANTITY AMOUNT PD-TO-DT THIS REC NEW BAL
---------- ------------- ---------- ---------- ---------- ---------- ----------
IBSEISMICR VALUATION 4, 200 . 00 0 . 50 0 . 00 0 . 50 0 . 00
IRGROOFRES SQ FEET 19 . 00 247 . 00 0 . 00 247 . 00 0 . 00
---------- ---------- ------- ------
TOTAL PERMIT 247 . 50 0 . 00 247 . 50 0 . 00
METHOD OF PAYMENT AMOUNT REFERENCE NUMBER
----------------- --------------- --------------------
CREDIT CARD 247 , 50 MC
---------------
'.TOTAL RECEIPT 247 . 50
VOICE ID DESCRIPTION VOICE ID DESCRIPTION
-------- ---------------------------- -------- ----------------------------
601. ROOF TEAR OFF 602 ROOF PLYWOOD NAIL
604 ROOF IN-PROGRESS .. 605 FINAL REROOF
ttan�� -01 I�J6 41cy4
CITY OF CUPERTINO p�OOo?33
` REROOF
®CUPER wO PERMIT APPLICATION
164ab) z�3'y /gam
APN '2
Date:
2& (p5 cj©3� D O ag 2 9 od
Building Address:
/ 15-49
R tiu� S,
Owner's Name: Phone #:
U,VA.)
Contractor: Phone #: L4ay) Sly — ;7TJjj
!a /6o Sfi�er/
i Fax #:
Cupertino Busi ess License #: Contractor License #:
3 �
Type of Roof Covering:
Existing: Proposed:
❑ ilt-Up Roof ❑ B Up roof
d Asphalt Shingles Asphalt Shingles
❑ Wood Shakes ❑ Wood Shakes
❑ Wood Shingles ❑ Wood Shingles
❑ Other(Specify) ❑ Other (Specify)
Number of existing coverings ❑ Provide I.C.B.O. Report#
❑ To be Removed ❑ Provide Mfgr. Installation Specs.
Job Description: agve"
e jr�b`z�.lL N"4/ SA"�-
Residential Commercial
Green Building: Please complete relevant portion of the Confirmed with Planning Dept. if
Green Building Checklist & attach it to the application or if there are any restrictions: ❑
applicable, include in plan set & the sheet index.
Valuation:
I Have Read, Understand and Will Comply.with Cupertino's Tear-Off Policy:
® � r
Signature _
Revised 6/16/08
alo CITY OF CUPERTINO
REROOF
CUPkTINO FEE SCHEDULE
Number of Fee ID Fee Description Fee Permit Type
Squares Group
1RER00FCOM Re-roof Commercial B 1COMMLROOF
1BSEISMICO Seismic Commercial B
/a 1RER00FRES Re-roof Residential B 1SFDWLR00F
r 1BSEISMICRE Seismic Residential B
1RER00FMRES Re-roof Multi-Family B 1MFDWLROOF
1BSEISMICRE Seismic Residential B
IBUSLIC Business License B
Revised 6/16/08
Community Development Department
Building Division
City of Cupertino
• 10300 Torre Avenue
Telephone: (408)777-3228
Fax: (408)777-3333
Building Department
Subject: Re-roofing policy for the City of Cupertino
1. Prior to permit issuance,you must agree to comply with 2007 IBC Standards
and manufacturers specifications on re-roofing.All roofs are Class "A"per Cupertino
municipal code 16.04.080.
2. New roof coverings shall not be applied without first obtaining all inspection
and written approval from the building inspector. A final inspection and
approval shall be obtained from the building inspector when the re-roofing
is completed.
3. All roofs shall be inspected prior to any roofing installation.
4. To receive a final sign off from the City, the following steps are
required:
1) Pre-inspection and/or tear off approval.
2) In-progress inspection approval.
3) Final inspection approval.
ea) Spark arrester installation.
5. If plywood is installed, a plywood nail inspection is required.
6. Any roofing which is applied without first obtaining an inspection,
will require the removal of all new material down to the sheathing,
so a proper City inspection can be performed.
7. NOTE: If you call for a plywood nail inspection and the job is not ready,
you will be charged a re-inspection fee of$176.18. The re-inspection fee must
be paid before another inspection can be scheduled.
IMPORTANT:
1. Flat roofs must have a minimum of I/4 "per foot slope and demonstrate
that there is no ponding.
2. An I.C.B.O. report is required to be on the job site at the time on inspection.
I understand and will comply with the above stated policy on re-roofing.
Homeowner's Name: U/iN
Job Site Address: ircC
Roofing Company Name: �y P22 � / �—
Applicant's Signature: 1 Date:
Greg Casteel
Building Official
Revised 07/30/08
Green Building Plan Check
Index of.Green Building Points/Categories
A. Category Example of an Index or Table of Green Plan Sheet or Page Points
Building Points Categories that must be
shown and referenced on the Project
Plans See below
B. Site 9. Install H.E. Irrigation, (details/spec)' L-1 72points
11. Permeable Paving, Note L-1 C. Foundation 1. Use 15 % Flyash Concrete, (note) S-1 D. Structural 3. Uses Wood I-Joist, (See Spec.) S-2 5. Use Truss with heels, (detail) S-2 6. B. OSB Sheathin detail S-2
E. Ext. Finish 1. Composite Decking, (Note/Spec.) A-3 2 points
4. B. Fiber Cement Siding, (Note/Spec. A-4 2 points
F. Plumbing 1. Insulate all H.W. pipes, (Note/Spec.) P-1 2 points
5. Tankless W.H., (Note/Spec.) A-2 2 points
11. A 2500 Gal. Tank, (Note/Spec L-1 10 points
G. Electrical 4. E. Ceiling Fans, (Note/Spec.) A-3 4 points
H. Appliances 1. Energy Star Dishwasher, (Note/Spec.) A-3 1 point
3. Energy Star Refrigerator, (Note/Spec. A-3 1 point
P. Other 1. List Green Features on Plans A-1 1 point
TOTAL POINTS1 40 points
•
•
Plan Review Process Work Book Page-12-Revised 3/25/08
Green Points Rating System for Remodeling Projects
Due to the diversity of remodeling project types,assigning a"total points'value to a project to be considered environmentally friendly is
not feasible. However,25 measures have been highlighted to signify that every effort should be made to incorporate them into your
projects. These items have been chosen based upon their impact on the environment and the health of the home in coordination with
ease of implementation and relative low cost. These measures can be used as a starting point for"greening'your project.
INPUT ReSDUTCOS Energy 1AWHeafth
Sne
1.Recycle Job Site Construction 8 Demolition Waste' t
65'/°=1 point;75°h= 2 points;60%=4 points up to 4 Resource pts 0
L Salvage Reusable.Building Mate els 4 Resource pts y--yes 0
3.Remodel for Mixed Use,Adaptive Reuse,and
Historic Preservation 4 Resource pts y--yes D
4.Protect Native Soil 2 Resource pts y--yes 0
5.Minimize Disruption of Existing Plants&Trees 1 Resource pt Y--yes 0
B.Implement Construction Site Stormwater Practices 2 Resource pts y=yes 0
7.Protect Water Quality with Landscape Design 2 Resource pts y=yes 0
(6.Design Resource-Ejfcien(Landscapes and Gardens _ 4 Resource pts y=yes 0
9.Reuse Materials/Use Recycled Content Materials
for Landscape Areas 2 Resource pts y=yes 0
10.Install High-Efficiency Irrigation Systems 2 Resource pts y=yes 0
11.Provide for On-Site Water Catchment/Retention 2 Resource pts y=yesi 0
1 1 1
B.Foundation
1.Incorporate Recycled Flyash in Concrete
• 25%Recycled Flyash=2 points;Add 1 point for every 10%
increase of Flyash,up to 5 points up to 5 Resource pts0
2.Use Recycled Content Aggregate 2 Resource pts y=yes D
3,Insulate FDundation/Slab before backfill 3 Energy pts y=yes 0
1 1 1
C.Structural Frame
1.Substitute Solid Sawn Lumberwth Engineefed Lumber J 3 Resource pts' y=yes 0
2 Use FSC Certified Wood for framing
(For every 10%of FSC lumber used=2 points,up to 10) up to 10 Resource pis. 0
3.Use Wood I-Joists for Floors and Ceilings 2 Resource pts y--yes 0
4.Use Web Floor Trusses 2 Resource pts y--yes 0
5.Design Energy Heels on Trusses 6'or more 2 Energy pts y=yes 0
6.Use Finger-Jointed Studs for Vertical Applications 2 Resource pts y--yes 0
7. Use Engineered Studs for Vertical Applications 2 Resource pts y=yes D
B. Use Recycled Content Steel Studs for Interior Framing 2 Resource pts y=yes 0
9.Use Structural insulated Panels(SIPS)
a.Floors 3 Energy pts y=yes 0
b.Wall 3 Energy pts y=yes 0
c.Roof 3 Energy pts y=yes 0
10.Apply Advanced Framing Techniques 4 Resource pts y--yes D
11.Use Reclaimed Lumber for Non Structural Applications 3 Resource pts y--yes 0
12f,Use OSB – —
a.Subfloors 1 Resource pt y=yps 0
• b.Sheathing 1 Resource pi y=yes 0
1 1 1
. xter or m s
1.Use Sustainable Decking Materiels
a.Recycled content 3 Resource pts Y--yes 0 •
b.FSC Certified Wood 3 Resource pis y--yes 0
2.Use Treated Wood That Does Not Contain Chromium/Arsenic 1 IAOMealth pt y--yes 0
3.Install House Wrap under Siding 1 IAO/Health pt y--yes 0
4.Use Flbar-Cement Siding Materials 1 Resource pt y=yss D
1 1 1
E.Plumbing
1.Install Water Heater Jacket 1 Energy pt Y--yes 0
2.Insulate Hot and Cold Water Pipes 2 Energy pis Y_—Yes 0
3.Retrofit all Faucets and Showerheads with Flow Reducers
a.Faucets(1 point each,up to 2 points) Up to 2 Resource pts. 0
b.Showerheads(1 point each,up to 2 points) Up to 2 Resource pts. 0
4.Replace Toilest with Ultra-Low Flush Toilets
(1 point each,up to 3 points) Up to 3 Resource pts. 0
5.Install Chlorine Filter on Showerhead 1 IAO/Health pt y--yes 0
6.Convert Gas to Tankless Water Heater 4 Energy pts Y_—Yes 0
7.Install Water Fill ration Units at Faucets
(2 points each,up to 4 points) Up to 4 IAO/Health pts. 0
B.Install On-Demand Hot Water Circulation Pump 4 Resource pis y--yes 0
1
P.eiecrncar
1.Install Compact Fluorescent Light Bulbs(CFLs)
-(6 bulbs=2 points,10 bulbs--3 points,12 bulbs=4 points) Up to 4 Energy pts. 0 O
2.Install IC-AT Recessed Fixtures with CFLs(1 point each,up to
5 points) Up to 5 Energy pts. 0
3.Install Lighting Controls(1 point per fixture,up to 4 points) Up to 4 Energy pts. D
4.Install High Efficiency Ceiling Fans with CFLs
(1 point each,up to 4 points) Up to 4 Energy pts. D
1 1 1
G.Appliances
1.Install Energy Star Dishwasher 1 Energy pt Y--Yes 0
2.Install Washing Machine with Water and Energy
Conservation Features 1 Energy pt y=yes 0
3.Install Energy Star Refrigerator 1 Energy pt y=yes 0
4.Install Built-In Recycling Center 3 Resource pts y--yes 0
i 1
H.Insulation
1.Upgrade Insulation to Exceed Title 24 Requirements
a.Walls 2 Energy pis Y--yes 0
b.Ceilings 2 Energy pts Y--yes 0
2.Install Floor Insulation over Crawl Space 4 Energy pts Y--yes 0
3,Install Recycled-Contant,Fiberglass Insulation with
No Added Formaldehyde 3 IAO/Haalth pis y--yes 0
4.Use Advanced Infiltration Reduction Practices 2 Energy pts Y_—Yes 0
5.Use Cellulose Insulation
a.Walls 4 Resource pts y--yes 0
It.Ceilings 4 Resource pts y--yes 0
6.Alternative Insulation Products(Cotton,spray-ioam)
a.Walls 4 Resource pts y=yes 0
D.uetlings 4 Resource pts y=yes 0
'INPUT ReSDUMeS Energy
n ows
I1.Install Energy-Efficient Windows -
• a.Double Paned 1 Energy pt y yes 0
b.Low,Emissivity(Low-E) 2 Energy pis y yes D
c.Low.Conductivity Frames _ 2 Energy pts y=yes D
2.Install Low Heat Transmission Glazing - 1 Energy pt y=yes D
1 1 f
J.Heating Ventilation and Air Conditioning
`.Use Ducl Mastic oon All Duct Joints _ _ 2 Energy pts y_yes 0
2.Install Ductwork within Conditioned Space 3 Energy pts Y--yes D
3.Vent Range Hood to the Outside 1 IAQMealth pt y--yes 0
4.Clean all Ducts Before Occupancy 2 IAQ/Health pts y=yes D
5.Install Solar Attic Fan 2 Energy pts Y_—Yes 0
6.Install Attic Ventilation Systems 1 Energy pt y=yes 0
7.Install Whole House Fan 4 Energy pts Y--yes 0
B.Install Sealed Combustion Units
a.Furnaces 31AQ/Health pts y=yes 0
b.Water Heaters 3 IAQ/Health pts y=yes - 0
9.Replace Wall-Mounted Electric and Gas Heaters with
Through-the-Wall Heat Pumps 3 Energy pts y--yes 0
10.Install 13 SEER/11 EER or higher AC with a TXV 3 Energy pts y=yes 0
11.Install AC with Non-HCFC Refrigerants 2 Resource pts y=yes 0
12.Install 90%Annual Fuel Utilization Efficiency(AFUE)Fumace 2 Energy pts yeses 0
13.Retrofit Wood Burning Fireplaces
a.Install EPA certified wood stoves/inserts 1 IAQ/Health pt y=yes 0
b. Install/Replace Dampers 1 Energy pt Y--yes D
c.Inslall'Airtight Doors 1 Energy pt y=yes 0
14.Install Zoned,Hydronic Radiant Heating 3 Energy pts y=yes 0
15,Install High Efficiency Filter 41AQ/Health pts y=yes 0
16.Install Heat Recovery Ventilation Unit(HRV) 5 IAQ/Heallh pts y=yes 0
17.Install Separate Garage Exhaust Fan 3 IAQ/Hsalth pts y--yes 0
1 t 1
K.Renewable Energy and Roofing
1.Pre-Plumb for Solar Water Heating 4 Energy pts yryes 0
2.Install Solar Water Heating System 10 Energy pts y--yes 0
3.Pre-Wire for Future Photovoltaic(PV)Installation 4 Energy pts y=yes D
4.Install Photovoltaic(PV)System
(1.2 kw=6 points,2.4 kw=12 points,3.6 kw=1 B points) Up to 1 B Energy pis 0
6.Select Safe antl Durable Roofing Mater al's_ _ _ 1 Resource pt y=yes 0
7.Install Radiant Barrier 3 Energy pts yryes 0
1 1 1
L.Natural Heating and Cooling
1.Incorporate Passive Solar Heating 5 Energy pts y=yes 0
2.Install Overhangs or Awnings over South Facing,Windows 3 Energy pts y=yes 0
3.Plant Deciduous Trees on the West and South Sides 3 Energy pts y=yes 0
1 1
•
. n oor r ue ty an n s es
1.Use Low/No-VOC Paint 1 IAO/Hsalth pts y=yes 0
2.Use Low VOC,Water-Based Wood Finishes 2 IAO/Health pts y--yes 0
3.Use Low/No VOC Adhesives 3 IAO/Health pts y--yes 0
4.Use Salvaged Materials for Interior Finishes 3 Resource pts y=yes 0
5.Use Engineered Sheet Goods with no added Urea
Formaldehyde 61AO/Health pts yryes 0
6.Use Exterior Grade Plywood for Interior Uses 1 IAO/Health pts y--yes 0
7.Seal all Exposed Particleboard or MDF 4 IAO/Health pts y--yes D
B.Use FSC Certified Materials for Interior Finish 4 Resource pts y--yes D
9.Use Finger-Jointed or Recycled-Content Trim 1 Resource pts
y--yes 0
10.Install Whole House Vacuum System 3 IAO/Health pty--yes 0
1 1 1
N.Flooring
1.Select FSC Ce tified Wood Flooring 8 Resource pts 0
2.Use Rapidly Renewable Flooring Materials 4 Resource pts 0
3.Use Recycled Content Ceramic Tiles 4 Resource pis 0
4.Install Natural Linoleum in Place of Vinyl 5 IAO/Heallh pts D5.Use Exposed Concrete as Finished Floor 4 Resource pts 06.Install Recycled Content Carpet with Low VOCs 4 Resource pts 0
1 1 1
Total Points Available: 1 1401 1301 57
Total Points Project Received: 1 01 01 0
G:detalprogslgmenbulldingguidelineshemodeleNgmenpointsflnal212Mpmisded.ds
Community Development
10300 Torre Avenue
?✓ Cupertino CA 95014
Telephone(408)777-3228
CITY OF Fax(408)777-3333
4UPEkTINO
Building Department
JOB ADDRESS: PERMIT #
l /6-49 s 2-'),3
OWNER'S NAME: i j / l PHONE #
GENERAL CONTRACTOR: err, FAX #
I am not using any subcontractors: _
Signature Date
Please check applicable subcontractors and complete the following information:
SUBCONTRACTOR BUSINESS NAME BUSINESS LICENSE #
Cabinets &Millwork
Cement Finishing
Electrical
Excavation
Fencing
Flooring: Carpeting
• Linoleum/ Wood
Glass / Glazing
Heating
Insulation
Landscaping
Lathing
Masonry
Ornamental Sheet Metal
Painting/ Wallpaper
Paving
Plastering
Plumbing
Roofing
Septic Tank
Sheet Metal
Sheet Rock
Tile
Owner/Contractor Signature Date