Loading...
080802120 z Z ti a>_ lar 0 M UO U. OU U �a U CITY OF CUPERTINO $ _. Rt'. I.t.�l�!k'C?TiMATION BUILDING DIVISION PERMIT CONTA.GTQYT•yd " BUILDING ADDRESS: PERMIT NO. :?0-1.6S FOREST AVE TBD — TO BE DETERMINED 08080212 NAME: FERMTr ISSUE DATE VNEWS ZACHARJAH CHERIAN & MANJU 08/27/2008 PHONE;) I p A I I A M SANITARY NO. CONTROL NO. ARCHITECT/ENGINEER: BUILDING PERMIT INFO PULL GAS LINE TO GAS COOKING BLDG ELECT PLUMBMEC" 0 0 0 0 LICENSED CONTRACTOR'S DECLARATION lob Description 1 Worthy amen that 1 am Bmnwa un ict provisions of aalvr 9 (commencing with Section 70(1()) of Division 3 of the Business and Professions Code. and my license is in full mree and.nm License Class Lk. g Dale DECLARATION DECLARATION As shallE muco 1 undenuaol my plans dull be used As public records Licensed Professional OWNER -BUILDER DECLARATION I hereby aliren asl I am exempt from the Contractor's License Law for the following mason. (Section 1031.5, Business and Pmfcniom Cade: Any chy or rnunty which requ(rns a permit in ctmsmeL aher. Impmwe, demnitsh, or ¢pair any slmmmc prior to its issuance. also Icquires tho applicant fursuch pemnitto Ole a signed statement that k u licensed pursuant to the proaisiam of the contractor's Uenea Law (Chapter 9 Sq. Ft. Floor Area Valuation (commencing with Section 700M of Division 3 of the Business and Profession Crude) or Nat lis is exempt therefrom and ale basis for the alleged exemption. Any violation of APN Number Occupancy Type P y Schon 70315 by Any applicant f« a permil subjects the applicant th a civil penalty, of then Ow hundred dollars (SMYP rat moss then ❑ 1, As awxr of the property, or my employees with wages As their sok campemadon, Required Inspections will do the work, and the structure u not intended o aRcrtd for sale (Sec. 711 Business and Prefessiom Code: The Contractor's License Law does rot apply to An owner of pvpenywhobuilds«ireProwsthermr Anaens aovsuch w«k himself«0waglt his awncm.the es,ofcmoeertd f«sale if. - iprovidedthatsuchimpmvemenuarenot howevv. the Wilding or impmvemmt 4 old within one year of mmpwcfar the rawer builder will hen the Wrdcv of proving that k did not ddk «improve f« purpose of sale.). rsnsenu se. to owr of the property, Am exclusively mmuseeling with Ildi m As e As F the, project (Sec. 70x4. Bnsi. and Professions Code:) The Conuulots U. . cove Law dors not apply to An owner of pmpety who builds or improver th mon. and who contracts for such projects with a cantraoor(s) licensed puremant he the Conlrulofs _ Lkxnu law. I Am exempt under See . B & PPC�for 11,11..a Dau' P. WORKER'S COMPTSATION DECLARATION I hereby ARM under penalty of perjury We of the following declarations ❑ 1 have and WII mainuin • Ccnifiamof Cmnum m self -loam I« WarkNACompen- now. as provided for by Section 3700 of the Labor Code, for the Performance of Ne were for which Nis permit is issued. I norm a1( will common Worker, Compensation Wur . As nexiuired by Schon 3700 of am lab« Code. for the performance of the work f«which this permit is issued. ' My WafkeYs Compensation Nunn. carrier and Policy number art: Carrier. Policy No.: CERTIFICATE OF EXEMPTION FROM WORKERS' COMPENSATION INSURANCE (Thu satire need not M complexed if be permit Is Faxon hundred dollen (SIM) or less) I certify Out in the pvf«mence of the work for which this permit is issued. l shall n« amploy,,nT mnnm mannerp�jpbcp zubject mths Workers' Compensation Calif ice. D KK ��y(� O!!SS laws oECA Appliant NOTICE TO A ANT: If, afar making this Ccr male of Exemption, you should bcome aub' m th Worker's Cmepenfaaan provisions of Ore lab« Cade, you muss forthwith comply wi such provisions or this p«mil AM Is, domed nevmkcd. CONSTRUCTION LENDING AGENCY I hcmby Afrum dol there u. consonsam. lending agency far the Perform. of - Nc wish for which this permit is issued (Sec. 309], Civ. C.) LcoaeYs Nuns - Lender's Adamss 1 anify Nat I A. mad this application and scale this the shove information u cis eo. I Aires As comply with all city and county orainances and soca lava misting to building construction. and hereby authadm rap eecnutiva of this city w cnwr upon the shove -mentioned for inspection puryous (We) agree to HYc, Indemnify and kep hamnlen dK City of Gupenlna Against ros..a Soso and expevnsmnit. may in any wayaara agdnst.uid City in AcPLICANT of the granting of Nis D WILL APPLICANT UNDERSTANDS AND WILL COMPLY WITH ALL NON -POINT Issued by: Date SOURCE REGULATIONS. g12,6f# Re -roofs Signature of ApplicanUConlraclor HAZARDOus MA AIS DISCLOSURE Type of Roof Will Om applicant «future btilding «apart same «handle hanNous msmrud A, defined by the Cupertino Municipal Cade. aapler 9.13. and the Health and safe,, section 25532(,)7 ❑Yen JZ/N,. All roofs shall be inspected prior to any roofing material being installed. Will th. appliantorfuture Wilding occupant use equipmentordcv which If a roof is installed without first obtaining an inspection, I agree to remove .mit harardnus air conumim nts as de0vd by the Bay Ana Air Qvlity Management all new materials for inspection. P Di,WeL7 oyer Ja Nu I have road the bxsandoo mAurials.quim.,m under C%ApW &95 aline C bror. nu HWth&SAfcty Cade,Seaoca2550.5.25533a 25534.1uMcrnandthmifthe building dao rot mene. y have xenav Nat it is my naponsibilily to notify, ac occupant of am Ziremems whichcomet rto issuvmc of. Certificate of Occu Signature of Applicant Date All roof coverings to be Class';}" or better owm.r or aatharixeaa Dim r L. L Q_. CITY OF CU PEkTINO CITY OF CUPERTINO REPIPE/SEWER/MAIN SERVICE PERMIT APPLICATION FORM oe6e6212 APN #Date: 5I (p 33 l�'26o Fee ID s Z6 16 9 Building Address 20 (b5 8 � (� � C bt. ¢� + c a C A Qr Si) l IPCSEWER Owner's Name: // P Phone #: 7 c_ Contractor: 1BPREPIPE Phone #: -T-6p 1CPRP Fax #: Contact: Commercial Gas Piping System 1-4 Outlets Phone #: N/A 1BSEISMICOM Seismic Commercial P Fax #: Contractor License #: 1BSEISMICR Cupertino Business License #: P Job Description: 1PRSEWER Residential building sewer/sanitary sewer Residential Commercial ❑ Valuation: �j Project Size: Express J ' Standard Large ❑ Major F-1 Green Building: Please complete relevant portion of the Green Building Checklist & attach it to the application or if applicable, include in plan set & the sheet index. Green Building Points: Quantity Fee ID Fee Description Fee Grou Permit Type IPCSEWER Commercial building sewer/sanitary sewer P 1CPSS 1BPREPIPE Commercial re -pipe per fixture P 1CPRP IPGASCOM Commercial Gas Piping System 1-4 Outlets P 1BSEISMICOM Seismic Commercial P / 1BSEISMICR Seismic Residential P 1PRSEWER Residential building sewer/sanitary sewer P 1RPSS CITY OF CUPERTINO ` REPIPE/SEWER/MAIN SERVICE CUPEkTiNO FEE SCHEDULE Quantity Fee ID Fee Description Fee Group Permit Type 1PRREPIPE Residential re -pipe per fixture P 1RPRP 1BPWSVCS Water Service P 1CPWS or 1RPWS 1PPRSEWG Private Sewage Disposal System P IPCESS Cesspool P 1BPWATER Install/alter Water Pipe P 1BPFIXTURE Plumbing Fixture P 1PGASRES Residential Gas Piping System 1-4 Outlets P 1BPGAS Gas Piping System 5+ Outlets P 1PPERMITFEE Plumbing Permit Fee Issuance P 1PLMBLNCK Plumbing Plan Check P 1 PLMBINSP Other Plumbing/gas Insp. P 1 TRAVDOC Travel & Documentation Fee B 1BUSLIC Business License B Revised 6-16-08 is • 0 E • • Plan Review Process Work Book Page -12-Revised 3/25/08 Green Building Plan Check Index of Green Building Points/Categories A. Category Example of an Index or Table of Green Plan Sheet or Page Points Building Points Categories that must be shown and referenced on the Project Plans See below B. Site 9. Install H.E. Irrigation, (details/spec)' L-1 2 points 11. Permeable Paving, Note L-1 2 points C. Foundation 1. Use 15 % Flyash Concrete, (note) S-1 5 points D. Structural 3. Uses Wood I -Joist, (See Spec.) S-2 2 points 5. Use Truss with heels, (detail) S-2 2 points 6. B. OSB Sheathing, detail S-2 2 points E. Ext. Finish 1. Composite Decking, (Note/Spec.) A-3 2 points 4. B. Fiber Cement Siding, (Note/Spec. A-4 2 points F. Plumbing 1. Insulate all H.W. pipes, (Note/Spec.) P-1 2 points 5. Tankless W.H., (Note/Spec.) A-2 2 points 11. A 2500 Gal. Tank, (Note/Spec L-1 10 points G. Electrical 4. E. Ceiling Fans, (Note/Spec.) A-3 4 points H. Appliances 1. Energy Star Dishwasher, (Note/Spec.) A-3 1 point 3. Energy Star Refrigerator, (Note/Spec. A-3 1 point P. Other 1. List Green Features on Plans A-1 1 point TOTAL POINTS1 L7 40 points • • Plan Review Process Work Book Page -12-Revised 3/25/08 Green Points Rating System for Remodeling Projects • Due to the diversity of remodeling project types, assigning a'total points' value to a project to be considered environmentally friendly is not feasible. However, 25 measures have been highlighted to signify that every effort should be made to incorporate them into your projects. These items have been chosen based upon their impact on the environment and the health of the home in coordination with ease of implementation and relative low cost. These measures can be used as a starting point for 'greening' your project. 1. Recycle Job Site Cohstruction & Demolition Waste 65%=1 point; 75%= 2 points; BO%= 4 points up to 4 Resource 2. Salvage Reusable Building Materials ' 4 Resource pts y= 3. Remodel for Mixed Use, Adaptive Reuse, and • Historic Preservation 4 Resource pts y= 4. Protect Native Soil 2 Resource pts y= 5. Minimize Disruption of Existing Plants & Trees 1 Resource pt y== 6. Implement Construction Site Stormwater Practices 2 Resource pts y= 7. Protect Water Quality with Landscape Design 2 Resource pts yq 8. Design Resource -Efficient Landscapes and Gardens 4 Resource pts y=, 9. Reuse Materials/Use Recycled Content Materials for Landscape Areas 2 Resource pts y=, 10. Install High -Efficiency Irrigation Systems 2 Resource pts y=, 11. Provide for On -Site Water Catchment / Retention 2 Resource pts y— B. Foundation 1. Incorporate Recycled Flyash in Concrete • 25% Recycled Flyash = 2 points; Add 1 point for every 10% increase of flyssh, up to 5 points up to 5 Resource pts 0 2. Use Recycled Content Aggregate 2 Resource pts y=yes 0 3. Insulate Foundation/Slab before backfill 3 Enerov ots v=ves 0 C. Structural Frame 1. Substitute Solid Sawn Lumber with Engineered Lumber 3 Resource pts y=yes 2. Use FSC Certified Wood for framing (For every 10% of FSC lumber used = 2 points, up to 10) up to 10 Resource pts. 3. Use Wood IJoists for Floors and Ceilings 2 Resource pts y --yes 4. Use Web Floor Trusses 2 Resource pts y=yes 5, Design Energy Heels on Trusses 6' or more 2 Energy pts y=yes 6. Use Finger -Jointed Studs for vertical Applications 2 Resource pts y=yes 7. Use Engineered Studs for Vertical Applications 2 Resource pts y=yes 8. Use Recycled Content Steel Studs for Interior Framing 2 Resource pts y=yes 9. Use Structural Insulated Panels (SIPS) a. Floors 3 Energy pts y=yes b. Wall 3 Energy pts y=yes c. Roof 3 Energy pts y=yes 10. Apply Advanced Framing Techniques 4 Resource pts y=yes 11. Use Reclaimed Lumber for Non Structural Applications 3 Resource pts y=yes 12. Use OSB a. Subfloors 1 Resource pt y=yes b. Sheathing 1 Resource pt y --yes 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 • • 1. Install Energy -Efficient Windows a. Double -Paned b. Low -Emissivity (Low -E) c. Low. Conductivity Frames 2. Install Low Heat Transmission Glazing . J. Heating Ventilation and Air Conditioning 1. Use Duct Mastic on All Duct Joints 2. Install Ductwork within Conditioned Space 3. Vent Range Hood to the Outside 4. Clean all Ducts Before Occupancy 5. Install Solar Attic Fan 6. Install Attic Ventilation Systems 7. Install Whole House Fan 6. Install Sealed Combustion Units a. Furnaces - b. Water Heaters 9. Replace Wall -Mounted Electric and Gas Heaters with Through -the -Wall Heat Pumps 10. Install 13 SEER/11 EER or higher AC with a TXV 11. Install AC with Non -HCFC Refrigerants 12. Install 90% Annual Fuel Utilization Efficiency (AFUE) Furnace • 13. Retrofit Wood Burning Fireplaces a. Install EPA certified wood stoves/inserts J. Install/Replace Dampers c. Install Airtight Doors 14. Install Zoned, Hydronic Radiant Heating 15. Install High Efficiency Filter 16. Install Heat Recovery Ventilation Unit (HRV) 17. Install Separate Garage Exhaust Fan K. Renewable Energy and Roofing 1. Pre -Plumb for Solar Water Heating 2. Install Solar Water Heating System 3. Pre -Wire for Future Photovoltaic (PV) Installation 4. Install Photovoltaic (PV) System (1.2 kw = 6 points, 2.4 kw =12 points, 3.6 kw =18 points) 6. Select Safe and Durable Roofing Materials 7. Install Radiant Banter L. Natural Heating and Cooling 1. Incorporate Passive Solar Heating 2. Install Overhangs or Awnings over South Facing Windows 3. Plant Deciduous Trees on the West and South Sides 0 1 Energy pt 2 Energy pts 2 Energy pts 1 Enerov of 2 Energy pts y=yes 3 Energy pts y=yes 1 IAQ/Health pt y --yes 21AtQ/Hsalth pts y=yes 2 Energy pts y --yes 1 Energy pt y=yes 4 Energy pts y=yes 31AQ/Health pts y --yes 31AQ/Health pts y --yes 3 Energy pts 3 Energy pts 2 Resource pts 2 Energy pts 1 IAQ/Health pt 1 Energy pt 1 Energy pt 3 Energy pts 41A0/Health pts 5 IAQ/Health pts 31AQ/Health pts 4 Energy pts 10 Energy pts 4 Energy pts Up to 18 Energy 1 Resource pt y= 3 Energy pts y= 5 Energy pts y=yes 3 Energy pts y=yes 3 EnereV ots v=ves CITY OF stUPEkTINO Community Development 10300 Torre Avenue Cupertino CA 95014 Telephone (408) 777-3228 Fax (408) 777-3333 Building Department JOB ADDRESS: 20(65, F6 p E ST = CCA PC- RT (NC), C 99-b)4 PERMIT # 0? -0 2 l L OWNER'S NAME: 4Acti AR(AH f+>c21 AnI .PHONE # Dg-213i;--OE-4-- $-2ss-OGENERAL GENERALCONTRACTOR: T6 n FAX # I" I am not using any subcontractors: Signature Date Please check applicable subcontractors and complete the following' ormation: • ki Owner/Contract 5i nature Date SUBCONTRACTOR BUSINESS NAME BUSINESS LICENSE # Cabinets & Millwork Cement Finishing Electrical Excavation Fencing Flooring: Carpeting Linoleum / Wood Glass / Glazing Heating Insulation Landscaping Lathing Masonry Ornamental Sheet Metal Painting / Wallpaper Paving Plastering Plumbing Roofing Septic Tank Sheet Metal Sheet Rock Tile • ki Owner/Contract 5i nature Date !INVOICE INVOICE INVOICE INVOICE INVOICE INVOICE INVOICE INVOICE INVOICE CITY OF CUPERTINO • PERMIT INVOICE OPERATOR: SylviaM Sec: Twp: Rng: Sub: Blk: Lot: APN .......... 31633072.00 INVOICE DATE......: 08/27/2008 REFERENCE ID # ...: 08080212 SITE ADDRESS .....: 20165 FOREST AVE SUBDIVISION ....... CITY .............: CUPERTINO IMPACT AREA ....... OWNER ............: ZACHARIAH CHERIAN & MANJU ABRAHAM ADDRESS ..........: 20165 FOREST AVE CITY/STATE/ZIP ...: CUPERTINO, CA 95014 CONTRACTOR .......: TBD - TO BE DETERMINED LIC # 00096 COMPANY ..........: TBD - TO BE DETERMINED ADDRESS ..........: CITY/STATE/ZIP .... , TELEPHONE ........: :.-EE DESCRIPTION - _, • DUE FOR ------ AMOUNT DUE PAID BALANCE SL.I.SMIC RESIDENTIAL PRINTING -- PERMIT ---------- 0.50 -------------------- 0.50 0.00 RESIDENTIAL GAS PIPING SYS PRINTING PERMIT 61.19 61.19 0.00 PLUMBNG PERMIT ISSUE PRINTING PERMIT 40.79 40.79 0.00 TRAVEL & DOCUMENTATION FEE PRINTING PERMIT 40.79 40.79 0.00 -- -- 143.27 ---------- ---------- 143.27 0.00 VOICE ID DESCRIPTION - ---- VOICE ID DESCRIPTION ------------------ 202 UNDERFLOOR PLUMBING ------ 301 ------------------------- ROUGH PLUMBING 506 GAS TEST 507 FINAL PLUMBING