08070150CITY OF CUPERTINO
-
BUILDING DIVISIWN PERMIT
Ci1NTRACTOR I
N SNET1RMA�TI
BUILTNQ ADDRESS:
PERMIT NO.
18/S AC.MADEN AVE
T D ROOFING
08070150
OWNER'S NAME:
PERMIT ISSUE DATE
! °RANK LIAO
675 TULLY RD
07/22/2008
opNE:
SANITARY NO. CONTROL NO.
AacHrrECrrFi+cINEER:
RE —RF RMV WDSHK,NO NEW PLYWD
BUILDING
BLDG PERMIT PILUMNe MECH
O O O O
LICENSED CONTRACTOR'S DECLARATION
Job Description
1 hereby Nu 1 am li¢vW under na of 9
"` '"- .• '"' ^ ' . -
oclan !mmmencing
and Proi Code.
rif 3muon 7IX'U3 of Dividon3ofte euti ^r.. arld NOfestiam Code. and! mYlleetsseu
-
name nth ea 9
u�r�tn
LB. ir
Dam umr
c�71I
ARC S DECLARATION
1 undmuanJ my pWU slWl W used ss vomit rte
Licensed Professional
OWNER - BUILDER DECLARATION
I Wmby affirm Nu 1 am exempt from the Contractor, License Law for the
following mason. (Settles 70 I.S. Busimss and Profetiom Code: My city or county
which rcyuirc, a Permit to emrstrte, ahrr. antenna. dcmuluh, or repair any seructum
Prior 0 its bounce, also onto. the applicant for such pemil to It asizoed stmmum
that W la licensed permunt to the Provisions of then Contractor's License Law (Chapter 9
Sq. Ft. Floor Area Valuation
(commemin{ with Section 7000) of Division 3 of the Busi. and Pmfesdom Code) or
that he is exempt Wuefram and the bast, four the alleged exemption. Any violadon of
Section 70313 by any applicants for a Permit subjeeu the applicant m a civil penalty of
APN Number
Occupancy Type
not move Nan five humped "Ina, (Sena'
❑I,wn offtpmpef ly.mm=ploy=w1111MSmudCb Mlee penfadan,
wi l do Professions went. Nde,- he Co a I, MI NI lesson: Law does; to a•s, B nor of
atld sods: The ContracmY, , w_ I,r dent not apps titan owner
Required Inspections
wh aMw is
her
Property proviinspmsach
own s was notimwenthimselfedWmu{h
WlSuCh impmsementa are ns WM oroResed for sale B,
ims
mw emPben
Wilding year compktif the Owrcof
however, the Wilding Wprowrmnt uaold within one you
or
r
builder will haw We burden of waving that W had rot bulb or improve for puspoe of
u
sale.).
❑ 1. m 0wmr of the property. w exclusively contracting with licensed conhacwa to
cmutrvn to wojm (Sec. 70m. Business and Proressiom Code:) Tit Contractors U,
ensure Law does not apply m an owner of property who builds or improve, thereon. and
Who contracts for such pmfeN wIN a cmV,Ltnl(,) licellred purstant us the CtnV cuwrs
License law.
❑ lemmemptundersee ,BAPCfarthumaSun
Owner Date
WORKER'S COMPENSATION DECLARATION
I hereby arum under Penalty of perjury, arc of then following deelwti0ns:
I haw and will maintain •Ceatificau of Co.., se sail-insert for Wudmr,Compen-
on, as Provided for by Secdon 37W of the Labor Code. for dr, Performane, of the
'
�zfor which Nu permit is issued.
ty 1 have and will maintain Workers Compensation Inuumn. u tortured by Sued.
J71� of Nc IAba Code, for the perforromee of the work forwhics this permit Is Issued.
My Workers com5 rsnee carrier tab Policy nu her
latr0�
Carrier. Policy No.:
/ C]
CERTIFICATE OF EXEMPTION FROM WORKERS'
COMPENSATION INSURANCE
(Thu scmlm Cued net W completed Bthe permit is forore hundmd dollars IS I00)
1 wtify that in ten performance of the wart for which this Pemth is issued, I ,hall not
cmpldy any person in any manmr an u b become subject m the Workers' Compensation
Lswa of Ca'ifumia. Dais
Applicant
NOTICE TO APPLICANT: IL after making this Carolina, of Eumption, you should
become Subject b the Workers CamRnution provisions of the labor Code, you most
forthwith comply with such Provisions or this Permit shall W deemed mwked.
CONSTRUCTION LENDING AGENCY
1 IembY affirm that Vert is. co ose ction lending agency for the Performance of
the work for which this permit Is tsued (Sec. 3097. Civ. C.)
finders Name
lenders Address
I curifY that 1 have and Ws applicuim and suer this the above information h
mrtecs- 1 agree m comply with all city and county omimrees and ,ue laws relating m
Wilding construction, and hereby au hotim revrmonutives of thus city m sour upon the
shove- mmnima d prod, for impcNon phrases,
(We) epee to saw, indemnify and keep l uneless the City of Cupertino a {aims
liabilidm.judgmem.eorts and expense, which may In any my acme Maim, said City
us caruequeyffing a(Nu wrmis
APPLICANNDS AND WILL COMPLY WI ALL NO -POINT
SOURCE R.
Issued by: Date -
Q �7 �bg
Re -roofs
Signature nfA111.1ALmo acmr Date
HAZARDOUS MkFtMALS DISCLOSURE
Type of Roof
Will to apptiaut or future building ttmlPNlatm, or land', hamdn, material
M de0red by to Cupenl Municipal Code. Chapter 9.IZ and the Health and Safety
sods. Berman
zss3z(a) +� �-T
❑Yes �C1fja'
All roofs shall be inspected prior to any roofing material being installed.
Will the • licarl or futhm Wilding a.:h m use equipment m derive which
PP {
If a roof is installed without first obtaining n inspection, I agree to remove
g Pe
ins air ronumi u a, dc0md by the Bar Am Air Quality Manag,mml
e
all new materials for inspection.
❑m
I harm mad to haxudms mauriaurcquWnenuumkrCNlut Q93 o(the Califor-
nuHWNd:Saf YC 'ono nS .25533a n534.Iundcmandthatifft building
�I r
does rot cwmn Y Imuns ten it u my rmaomiNlity m notifyttppee ueeupum of the
mrtimm,nt, a IsCvtiBCa'uefOlypury. /O
Signature of Applicant Date
All roof coverings to be Class 'W' or better
Owner or.0.,i,ed apm Die/
n
-92 2 ITEMS OF 4
CITY OF CUPERTINO
PERMIT RECEIPT
Sec: Twp: Rng: Sub: Blk: Lot:
APN ........: 35715019.00
DATE ISSUED.......: 07/22/2008
RECEIPT #.........: BS000005534
REFERENCE ID # ...: 08070150
SITE ADDRESS .....: 21875 ALMADEN AVE
SUBDIVISION .......
CITY .............: CUPERTINO
IMPACT AREA .......
OPERATOR: patg
COPY # : 1
VOICE ID DESCRIPTION
- -- ---------------- -- - - --
601 ROOF TEAR OFF
604 ROOF IN- PROGRESS
171
VOICE ID DESCRIPTION
- -- -------------------- -- - - - - --
602 ROOF PLYWOOD NAIL
605 FINAL REROOF
OWNER ............:
FRANK LIAO
ADDRESS ..........:
21875 ALMADEN
AVE.
CITY /STATE /ZIP ...:
CUPERTINO, CA
95014
RECEIVED FROM ....:
LESLIE A HOANG
CONTRACTOR .......:
LESLIE HOANG
LIC # 23155
COMPANY ..........:
T D ROOFING
ADDRESS ..........:
675 TULLY RD
CITY /STATE /ZIP ...:
SAN JOSE, CA
95111
TELEPHONE ........:
(408)892 -8872
•
FEE ID
- ------
UNIT QUANTITY
- - - - - -- ---- -- - -
AMOUNT PD
-TO -DT THIS REC
NEW BAL
--
IBSEISMICR VALUATION 5,800.00
---- - - - - -- ---
0.60
- - - - - -- ----
0.00
- - -
0.60
- --
--- - -- -
0.00
- --
1REROOFRES SQ
FEET 18.00
234..00
0.00
234.00-
0.00
TOTAL'PERMIT
---- - - - - -- ----
234.60
- - - - -- ----
0.00
- - - -
234.60
--
---- - - -
0.00
- --
VOICE ID DESCRIPTION
- -- ---------------- -- - - --
601 ROOF TEAR OFF
604 ROOF IN- PROGRESS
171
VOICE ID DESCRIPTION
- -- -------------------- -- - - - - --
602 ROOF PLYWOOD NAIL
605 FINAL REROOF
C
CITY OF
.CUPEII;TINO
•
09-0701,50
CITY OF CUPERTINO
REROOF
PERMIT APPLICATION
APN # C)
�.�%
Dat e:
Building TS ess:
Owner's Name:
Phone #:
-f �Ykf4 ck,0
400 3`1 3 10 C�l
Contractor:
Phone #:
o
n �o jp, v, 5
��g g q 9
Fax #:
Cupertino Business License #:
Contractor License #:
9 4 SSG
Type of Roof Covering:
Existing:
Proposed:
• Built -Up Roof
❑ Built -Up roof
• Asphalt Shingles
X Asphalt Shingles
• Wood Shakes
❑ Wood Shakes
• Wood Shingles
❑ Wood Shingles
• Other (Specify)
❑ Other (Specify)
Number of existing coverings
❑ Provide I.C.B.O. Report #
To be Removed
❑ Provide Mfgr. Installation Specs.
Job Description:
I-e,r ov e wood s k13-fas- �
►,� yj e-W Ply w ood
1V1S+6U
1
Residential
Commercial
Green Building: Please complete relevant portion of the Confirmed with Planning Dept. if
Green Building Checklist & attach it to the application or if there are any restrictions: ❑
applicable, include in plan set & the sheet index.
Valuation: S/ go c") --
I Have Read,
Signature
and Will Comply with Cupertino's Tear -Off Policy:
CITY OF CUPERTINO
affla REROOF
CITY OF
CUPERTINO FEE SCHEDULE
Number of
Squares
Fee ID
Fee Description
Fee
Group
Permit Type
1RER00FC0M
Re -roof Commercial
B
1COMMLROOF
1BSEISMICO
Seismic Commercial
B
1RER00FRES
Re -roof Residential
B
1SFDWLROOF
1BSEISMICRE
Seismic Residential
B
1RER00FMRES
Re- roof Multi- Family
B
1MFDWLROOF
1BSEISMICRE
Seismic Residential
B
1BUSLIC
Business License
B
Revised 6/16/08
•
Community Development Department
Building Division
City of Cupertino
10300 Torre Avenue
• Telephone: (408) 777 -3228
Fax: (408) 777 -3333
Building Department
Subject: Re- roofing policy for the City of Cupertino
1. Prior to permit issuance, you must agree to comply with 1997 UBC Standards
and manufacturers specifications on re- roofing.
2. New roof coverings shall not be applied without first obtaining all inspection
and written approval from the building inspector. A final inspection and
approval shall be obtained from the building inspector when the re- roofing
is completed.
3. All roofs shall be inspected prior to any roofing installation.
4. To receive a final sign off from the City, the following steps are
required:
1) Pre - inspection and /or tear off approval.
2) In- progress inspection approval.
3) Final inspection approval.
a) Spark arrester installation.
5. If plywood is installed, a plywood nail inspection is required.
• 6. Any roofing which is applied without first obtaining an inspection,
will require the removal of all new material down to the sheathing,
so a proper City inspection can be performed.
7. NOTE: If you call for a plywood nail inspection and the job is not ready,
you will be charged a re- inspection fee of $176.18. The re- inspection fee must
be paid before another inspection can be scheduled
IMPORTANT:
1. Flat roofs must have a minimum of 1/4 " per foot slope and demonstrate
that there is no ponding.
2. An I.C.B.O. report is required to be on the job site at the time on inspection.
I understand and will comply with the above stated policy on re- roofing.
Homeowner's Name:
Job Site Address: I S' A ' Y)\ CL C(e n -A V e
Roofing Company Name:
Applicant's Signature: Date:
• Greg Casteel
Building Official
Revised 11/2/04
C__
•
•
Plan Review Process Work Book Page -12- Revised 3/25/08
Green Building Plan Check
Index of Green Building
Points /Categories
A.
Category
Example of an Index or Table of Green
Plan Sheet or Page
Points
Building Points Categories that must be
shown and referenced on the Project
Plans See below
0
B.
Site
9.
Install H.E. Irrigation, (details /spec)'
L -1
11.
Permeable Paving, Note
L -1
C.
Foundation
1.
Use 15 % Flyash Concrete, (note)
S -1
72points
D.
Structural
3.
Uses Wood I- Joist, (See Spec.)
S -2
5.
Use Truss with heels, (detail)
S -2
6.
B. OSB Sheathin detail
S -2
E.
Ext. Finish
1.
Composite Decking, (Note /Spec.)
A -3
2 points
4.
B. Fiber Cement Siding, (Note/Spec.
A-4
2 points
F.
Plumbing
1.
Insulate all H.W. pipes, (Note /Spec.)
P -1
2 points
5.
Tankless W.H., (Note /Spec.)
A -2
2 points
11.
A 2500 Gal. Tank, (Note/Spec
L -1
10 oints
G.
Electrical
4.
E. Ceiling Fans, (Note /Spec.)
A -3
4 points
H.
Appliances
1.
Energy Star Dishwasher, (Note /Spec.)
A -3
1 point
3.
Energy Star Refrigerator, (Note/Spec.
A -3
1 2 int
P.
Other
1.
List Green Features on Plans
A -1
1 point
i-TWOM'sami
TOTAL POINTS1
40 points
•
•
Plan Review Process Work Book Page -12- Revised 3/25/08
Green Points Rating System for Remodeling Projects
Due to the diversity of remodeling project types, assigning a'total points' value to a project to be considered environmentally friendly is
not feasible. However, 25 measures have been highlighted to signify that every effort should be made to incorporate them into your
projects. These items have been chosen based upon their impact on the environment and the health of the home in coordination with
ease of implementation and relative low cost. These measures can be used as a starting point for 'greening' your project.
ItAPUT Resources Energy IAO/Heafth
A. Site
1. Recycle Job Site Construction & Demolition Waste
65 % =1 point; 75 %= 2 points; 80 % =4 points
up to 4 Resource pts
2. Salvage Reusable Building Materials
4 Resource pts
y--yes
3. Remodel for Mixed Use, Adaptive Reuse, and
2 Resource pts
y =yes
Historic Preservation
4 Resource pts
y =yes
4. Protect Native Soil
2 Resource pts
y=yes
5. Minimize Disruption of Existing Plants & Trees
1 Resource pt
y =yes
6. Implement Construction Site Stormwaler Practices
2 Resource pts
y =yes
7. Protect Water Quality with Landscape Design
2 Resource pts
y--yes
8: Design Resource - Efficient Landscapes and Gardens
4 Resource pts
y =yes
9. Reuse Materials/Use Recycled Content Materials
3 Energy pts
y =ye
for Landscape Areas
2 Resource pts
y =yes
10. In High - Efficiency Irrigation Systems
2 Resource pts
y =yes
11. Provide for On -Site Water Catchment / Retention
2 Resource pts
y--yes
B. Foundation
1. Incorporate Recycled Ryash in Concrete
25% Recycled Ryash = 2 points; Add 1 point for every 10%
increase of flyash, up to 5 points up to 5 Resource
2. Use Recycled Content Aggregate 2 Resource pts y=
3. Insulate FoundatiordSlab before backfill 3 Energy pts y=
C. Structural Frame
1. Substitute Solid Sawn Lumber with Engineered Lumber" 3 Resource pts y =yes
2. Use FSC Certified Wood for framing
(For every 10% of FSC lumber used = 2 points, up to 10)
up to 10 Resource pts
3. Use Wood I- Joists for Floors and Ceilings
2 Resource pts
y=yw
4. Use Web Floor Trusses
2 Resource pts
y =yes
5. Design Energy Heels on Trusses 6' or more
2 Energy pts
y =yes
6. Use Finger- Jointed Studs for Vertical Applications
2 Resource pts
y =yes
7. Use Engineered Studs for Vertical Applications
2 Resource pts
y =yes
8. Use Recycled Content Steel Studs for Interior Framing
2 Resource pts
y =yes
9. Use Structural Insulated Panels (SIPS)
a. Floors
3 Energy pts
y =ye!
b. Wall
3 Energy pts
y =ye
c. Roof
3 Energy pts
y =ye
10. Apply Advanced Framing Techniques
4 Resource pts
y =ye
11. Use Reclaimed Lumber for Non Structural Applications
3 Resource pts
y =ya
12. Use OSB
a. Subfioors
1 Resource pt
y =ye.
b. Sheathing
1 Resource pt
y =ye
•
•
•
r
0
r
r
r
r
r
0
r
0
r
r
r
r
0
0
•
•
•
1. Install Energy - Efficient Windows
• a. Double -Paned
b. Low - Emissivity (Low -E)
c. Low. Conductivity Frames
2. Install Low Heat Transmission Glazing
J. Heating Ventilation and Air Conditioning
1. Use Duct Mastic on All Duct Joints
2. Install Ductwork within Conditioned Space
3. Vent Range Hood to the Outside
4. Clean all Ducts Before Occupancy
5. Install Solar Attic Fan
6. Install Attic Ventilation Systems
7. Install Whole House Fan
8. Install Sealed Combustion Units
a. Furnaces
b. Water Heaters `
9. Replace Wall - Mounted Electric and Gas Heaters with
Through - the -Wall Heat Pumps
10. Install 13 SEER/11 EER or higher AC with a TXV
11. Install AC with Non -HCFC Refrigerants
12. Install 90% Annual Fuel Utilization Efficiency (AFUE) Furnace
13. Retrofit Wood Burning Fireplaces
• a. Install EPA certified wood stoves/inserts
b. Install/Replace Dampers
c. Install Airtight Doors
14. Install Zoned, Hydronic Radiant Heating
15, Install High Efficiency Filter
16. Install Heat Recovery Ventilation Unit (HRV)
17. Install Separate Garage Exhaust Fan
K. Renewable Energy and Roofing
1. Pre -Plumb for Solar Water Heating
2. Install Solar Water Heating System
3. Pre -Wire for Future Photovoltaic (PV) Installation
4. Install Photovoltaic (PV) System
(1.2 kw = 6 points, 2.4 kw = 12 points, 3.6 kw =18 points)
6. Select Safe and Durable Roofing Materials
7. Install Radiant Barrier
L. Natural Heating and Cooling
1. Incorporate Passive Solar Heating
2, Install Overhangs or Awnings over South Facing Windows
3. Plant Deciduous Trees on the West and South Sides
F_ IL
1 Energy pt
2 Energy pts
2 Energy pts
1 Enerav of
2 Energy pts
3 Energy pts
1 IAQ/Health pt
21A0/Health pts
2 Energy pts
1 Energy pt
4 Energy pts
31AO/Health pts
y--yes
3IA0/Health pts
y--yes
3 Energy pts
y =yes
3 Energy pts
y =yes
2 Resource pts
y =yes
2 Energy pts y =yes
1 IAQ/Health pt
1 Energy pt
1 Energy pt
3 Energy pts
41AQ/Health pts
5 IAQ/Health pts
31A0/Health pts
4 Energy pts
10 Energy pls
4 Energy pts
Y--yes
Up to 18 Energy
1 Resource pt y
3 Energy pts y-
5 Energy pts
3 Energy pts
3 Enerav ots
CITY OF
XPEI�TINO
Community Development
10300 Torre Avenue
Cupertino CA 95014
Telephone(408)777 -3228
Fax (408) 777 -3333
Building Department
JOB ADDRESS:
.z183-S Qlvr,c.aen AvQ-
PERMIT #
0
OWNER'S NAME: co'Y" tL ; c`,3
PHONE # %Az. S 3 4 S t o 6
GENERAL CONTRACTOR:
FAX # o
Cabinets & Millwork
I am not using any subcontractors:
Signature Date
Please check applicable subcontractors and complete the foll ina information:
Owner/ Contractor Signature
Date
SUBCONTRACTOR
BUSINESS NAME
BUSINESS LICENSE #
Cabinets & Millwork
Cement Finishing
Electrical
Excavation
Fencing
Flooring: Carpeting
Linoleum/ Wood
Glass / Glazing
Heating
Insulation
Landscaping
Lathing
Masonry
Ornamental Sheet Metal
Painting / Wallpaper
Paving
Plastering
Plumbing
Roofing
Septic Tank
Sheet Metal
Sheet Rock
Tile
Owner/ Contractor Signature
Date