08050182CITY OF CUPERTINO
CONTRAC'.�'QR�INEURMA.TIt)N ':
BUILDING9IVISIONI PERMIT
aull.Y16ciAflR ALHAMBRA AVE
KEVIN SULLIVAN ROOFING
08050182
NER'S NAME:
PERMIT ISSUE DATE
KEYS W R AND ERIE L
1696 VALLEY OAKS DR
05/23/2008
ONE:
SANITARY NO, CONTROL NO.
(408)842 -1057
ARCHITECl/ENGINEEe:
BUILDING PERMITINFO
BLDG ELECT PLUMB MECH
0
LICENSED CONTRACTOR'S DECLARATION
Job DEiSCrI hOn
p
1 hemby affirm dw 1 tin lio:nud under pmvi tiou of Chal. 9 (rommetming
with Section 70(10) oftivision 3 ofthe Business aM PrfcuamsC "my Banc is
RE -RF 17SQ T/O EXTNG' CMPSHNGL& CAPSHTRFNG CLS A
Li¢lr`avnd`
30YR COMPSHNGLS& ADD MDFD BITUMENCPSHT ON
Dak ARCHrrECr'S DEDcwR
LOW —SLOP AREAS
I u d my Plans shall be used as public moards
Lkoncd Pouingdonal
OWNER - BUILDER DECLARATION
1 hereby affirm That I am exempt from the Contractor's Lkenw Law for Om
--
following mason. (Section 7031.5. Business; and Profaaions Codc: Any city or county
which mquiru a Permit to construct, alley, imprw, demolish, or m,Cr any shumure
prior to its IatuarKe. Can RQulma the applicant for Such permil to file a Signed s1ammsm
be is licensed to NC ofdk Contot Ueeme Law (chancr9
Sq. Ft. Floor Area
Valuation
that puranam provisions
(commencing with Smtion 7") of Division 3 of the Business and Professions Code) or
$8000
that he is exempt ticorfrm and the Trans for the allcgad casurnod n. Any A.lmlon of
32623027.E Number
Occupancy Type
Section 7031.5 by any applicant fW a Perot subjcau the applicant ro a civil Actually of
out mom Nan IT. hundmd dmW.(5500).
❑ 1, u owner of the pmpersy. m my moployca with wages u their sole campcmdon.
Required Inspections
WIa da thewmlL and NC msuc1YR is.minknded maBmed for Ask (Sec. 7W. BLLGoetl
and Prfaslons Cade: The cony es Lieu¢ taw doss not apply To an owner N
Misery who builds m impruw Nmcon, and who does such work himcl f or thrugh his
awn emIdAyces. Provided that such imprwmau tie not imerded or olfencd for W. U.
hawewr, the building Or imprvemmu iswld within one year of compledon, the ownrr-
builder, will have the burden of Arvin, That M did not build or immune for puryoc of
ask.).
1, u Owner of the prpm , am exclusively cenuaning with ]I ... d ronummm m
cansuuct the project (See. 1010. Business and PNfcwions Cade:) The Coatranor's U-
cense Law dory not apply to an ownrr of prolcny wha build. or W rocs thereon, and,
who contracts for such projects with a conuanrkr(s) licensed pursuant k the ContranloYS
Lk.. Law.
❑ Iamamoptundm See ,BkPCfor Nismuon
rcr Dak
WORKER'S COMPENSATION DECLARATION
1 herby allinn under Penalty of perjury ox of the following declarations:
IhaK Wldien m.by amirm31[akof Thermr fmserf..'.CampCn-
'
work,• provided (m by Section 37000( the labor Cade. for Ne peROrmanro of the
Cod..
,
r
wart for which Nis permit is issuN.
❑ 1 have and will maintain WmIam's Comperatirkn Insursna• u inquired by Section
3700 of the tabor Code. fm The parformmce ofthe work for which NU permit u issed.
'
My Worker's ompematirkn huuran¢ Trim and Policy number amp -
Curler. Policy No.: Z`�.�— l
CE IF ATE O' PION FROM WORKERS'
COMPENSATION INSURANCE
(Ihu=I. need not To campiekd if the permit is for. hummol dollar (SIM)
or kw)
I comfy Not in dm pmformana Of the work fur which This Permit Is Issrcd.1 shall not
Comfier any Mount In my mmmcr An ax to b ccoom subject To Ble WadrerS L'ompmmalk,
Laws of utf.ot DAM
ApPlicmt
NOTICE TO APPLICANT. If. alter making This Ccniriak of Exemption, you should
bamme subject N the Worker. Comp[nsadon Provisions Of the LAW, Code, you muss
forthwith comply with such provisions or his permit shall be deemM invoked.
CONSIRUC ION LENDING AGENCY
1herby.M. that NOm A. Constroction krulin, agency for oc pmfm mccof
UM work for which this permit k issued (Sec. 3091• Civ. C.)
Lenders Name
Lender. Addsas
I certify That I haw Tad this application aM stsk Nu the .bow: inforutiun u
COMM I agme to amply with all city and county ordinances and suk laws miming to
Wilding construction, and hemby authorim mmewnuom of this city in mom upon the
above- meMOrcd progeny for inspeeoon purposes
(We) since to saw, indemnify and kap bardeu The City of Cupertino against
ihbilido, jmigments, tests and expnum which may N any way ccme agalmt said City
in c."C"An a of the janun is permit
APPLICANT UNDERST S ?N W PLY WITH A L NO -POINT
Issued by: Date
UR GULATIONS
Re -roofs
mas camoCon un DIM
HAZA OUS MATERIALS DIS.Su1 E
Type of Roof ,
Million., karlor tort Wilding=uMtmomormMkhawrdommimAM
;cmit
defined by the Cu Municipal COCA. Chapter 9.13. and the Health and Safety
le. Section y. 25530(0)7
�Ya fro
All roofs shall be inspected prior to any roofing material being installed.
Will Nc.pplicmt rkr mm Wilding acco...I tie cyvipmat or d"i. which
If a roof is installed without first obtaining an inspection, I agree to remove
hanNons air comamimnts w dcrinM by the Bay Arta Air Quality Management
all new materials f pection.
DisuicA 1t /�
I raw mad the huandow muerials"bommentsundmCTbmw,6.95ofNeCalifm-
nuHaiNk50ruyCodA. 505. n533 amt 25534. I understand dm ifde building
dots of Carmody haw n4 Nel it u my ms tip
'n `C
omiIdity to rcofy oc[upant nr Ne
ncq meu tpoarlmi a rk mlrm.krkIQa .y.
L
Signatu e o App 'cal Dale
All roof coverings to be Class'W' or better
ownmmaathrkrfs agent
ate
0 2 ITEMS OF 2
•
•
CITY OF CUPERTINO
PERMIT RECEIPT
Sec: Twp: Rng: Sub: Blk: Lot:
APN .......... 32623027.00
DATE ISSUED.......: 05/23/2008
RECEIPT #.........: BS000004885
REFERENCE ID # ...: 08050182
SITE ADDRESS .....: 10131 ALHAMBRA AVE
SUBDIVISION .......
CITY .............: CUPERTINO
IMPACT AREA .......
OPERATOR: patg
COPY # : 1
OWNER ............:
KEYS W R AND ERIE L
ADDRESS ..........:
10131 ALHAMBRA AVE
CITY /STATE /ZIP ...:
CUPERTINO CA, 95014
-1203
RECEIVED FROM ....:
ROOFSERV ROOFING
CONTRACTOR .......:
KEVIN E. SULLIVAN LIC
# 23810
COMPANY ..........:
KEVIN SULLIVAN ROOFING
ADDRESS ..........:
1696 VALLEY OAKS DR
CITY /STATE /ZIP ...:
GILROY, CA 95020
TELEPHONE ........:
(408)842 -1057
FEE ID UNIT QUANTITY
-- -- ---
AMOUNT PD -TO -DT
THIS REC
NEW BAL
-- --- - - - - -
1REROOFRES SQ FEET 17.00
-- - -- - -- --
221.00 0.00
---- - - ----
221.00
---- - -- - --
0.00
BSEISMICRE VALUATION 8,000.00
0.80 0.00
0.80
0.00
TOTAL PERMIT
- - -- - --- - - -- --
221.80 0.00
- - --
221.80
- --- - - - - --
0.00
METHOD OF PAYMENT
--------------- --
CHECK
TOTAL RECEIPT :
AMOUNT
---------------
221.80
---------------
221.80
VOICE ID DESCRIPTION
-- - - - --- ------------------- --- - -- - --
601 ROOF TEAR OFF
603 ROOF BATTENS
605 FINAL REROOF
REFERENCE NUMBER
--------------- - - - --
#4570
VOICE ID DESCRIPTION
`- - - -- - -- ----------------- ----- -- -- --
602 ROOF PLYWOOD NAIL
604 ROOF IN- PROGRESS
r'
CITY of
CUPERTINO
CITY OF CUPERTINO
REROOF
PERMIT APPLICATION
0, ?0_"25 0/ ,Po,9
APN # � 6a 3 G0,2? 7
2
Date:
Building Address:
1013 R l
Owner's Name:
Phone #:
1 V
Il- ! 731Q-
Contractor: Vlh o
Phone #:
Fax #:4 �Y*7- !cPS ( 9
Cupertino Business License #:
Contractor License #:
Type of Roof Covering:
Existing:
Proposed:
❑ Built -Up Roof
❑ Built -Up roof
A Asphalt Shingles
'jj� Asphalt Shingles
• Wood Shakes
❑ Wood Shakes
• Wood Shingles
❑ Wood Shingles
❑ Other (Specify)
❑ Other (Specify)
Number of existing coverings
❑ Provide I.C.B.O. Report #
❑ To be Removed
❑ Provide Mfgr. Installation Specs.
Job Description: i�Pri( =� �S�tt\ (+r,Wq -3 hcr,�
� - SA t`e'ar�'t'C� Sternal `CLq�n' os, _� ,"0`1 S ' l
� Cs:--f S7, Q '
ayN lQ�Skp2 -afqeZ6 Ci�ss,s� 5
Residential
Commercial ❑
Green Building: Please complete relevant portion of the Confirmed with Planning Dept. if
Green Building Checklist & attach it to the there are any restrictions: ❑
application or if applicable, include
in plan
set & the sheet index.
Valuation
• I Have Read, > nk stanc gill Comply with Cupertino's Tear -Off Policy:
F,
CITY OF CUPERTINO
8' `d' REROOF
CUPERTINO FEE SCHEDULE
Number of
Squares
Fee ID
Fee Description
Fee
Group
Permit Type
IREROOFCOM
Re -roof Commercial
B
1COMMLROOF
IBSEISMICO
Seismic Commercial
B
1-7
1REROOFRES
Re -roof Residential
B
ISFDWLROOF
`
1BSEISMICRE
Seismic Residential
B
1
1RER00FMRES
Re-roof Multi-Family
B
1MFDWLROOF
1BSEISMICRE
Seismic Residential
B
IBUSLIC
Business License
B
n
Community Development Department
Building Division
City of Cupertino
• 10300 Torre Avenue
Telephone: (408) 777 -3228
Fax: (408) 777 -3333
Building Department
Subject: Re- roofing policy for the City of Cupertino
1 Prior to ge?tnit issuance you must agree to comply with 1997 UBC Standards
and manufacturers specifications on re- roofing.
2. New roof coverings shall not be applied without first obtaining all inspection
and written approval from the building inspector. A final inspection and
approval shall be obtained from the building inspector when the re- roofing
is completed.
3. All roofs shall be inspected prior to any roofing installation.
4. To receive a final sign off from the City, the following steps are
required:
1) Pre - inspection and /or tear off approval.
2) In- progress inspection approval.
3) Final inspection approval.
a) Spark arrester installation.
• 5. If plywood is installed, a plywood nail inspection is required.
6. Any roofing which is applied without first obtaining an inspection,
will require the removal of all new material down to the sheathing,
•
so a proper City inspection can be performed.
7. NOTE: If you call for a plywood nail inspection and the job is not ready,
you will be charged a re- inspection fee of $176.18. The re- inspection fee must
be paid before another inspection can be scheduled.
IMPORTANT:
1. Flat roofs must have a minimum of 1/4 " per foot slope and demonstrate
that there is no ponding.
2. An I.C.B.O. report is required to be on the job site at the time on inspection.
I understand and will comply with the above stated policy on re- roofing.
Homeowner's Name:
Job Site Address: t d 1 �s \ X01 h 1D ye
Roofing Company Na
Applicant's Signature
Greg Casteel
Building Official
Revised 11/2/04
a
0
0
Plan Review Process Work Book Page -l2- Revised 3/25/08
0
C%'
It-
ME
Green Building Plan Check
Index of Green Building
Points /Categories
A.
- Category
Example of an Index or Table of Green
Plan Sheet or Page
Points
Building Points Categories that must be
shown and referenced on the Project
Plans See below
B.
Site
9.
Install H.E. Irrigation, (details /spec)'
L -1
2 points
11. Permeable Paving, Note
L -1
2 oints
C.
Foundation
1.
Use 15 % Flyash Concrete, (note)
S -1
5 points
D.
Structural
3.
Uses Wood I- Joist, (See Spec.)
S -2
2 points
5.
Use Truss with heels, (detail)
S -2
2 points
6.
B. OSB Sheathing, detail
S -2
2 oints
E.
Ext. Finish
1.
Composite Decking, (Note /Spec.)
A -3
2 points
4.
B. Fiber Cement Siding, (Note/Spec.
A-4
2 points
F.
Plumbing
1.
Insulate all H.W. pipes, (Note /Spec.)
P -1
2 points
5.
Tankless W.H., (Note /Spec.)
A -2
2 points
11. A 2500 Gal. Tank, (Note/Spec
L -1
10 points
G.
Electrical
4.
E. Ceiling Fans, (Note /Spec.)
A -3
4 points
H.
Appliances
1.
Energy Star Dishwasher, (Note /Spec.)
A -3
1 point
3.
Energy Star Refrigerator, (Note/Spec.
A -3
1 point
P.
Other
1.
List Green Features on Plans
A -1
1 point
„
TOTAL POINTS1
40 points
0
0
Plan Review Process Work Book Page -l2- Revised 3/25/08
0
C%'
It-
ME
Green Points Rating System for Remodeling Projects
iDue to the diversity of remodeling project types, assigning a "total points" value to a project to be considered environmentally friendly is
not feasible. However, 25 measures have been highlighted to signlly that every effort should be made to incorporate them into your
projects. These items have been chosen based upon their impact on the environment and the health of the home in coordination with
ease of implementation and relative low cost. These measures can be used as a starting point for "greening" your project.
•
1. Recycle Job Site Construction & Demolition Waste
0 0 0
65% = 1 point; 75% = 2 points; BO /o = 4 points
2 Energy pts
up to 4 Resource pts
2. Salvage Reusable Building Materials
2 Resource pts
4 Resource pts
y =yes
3. Remodel for Mixed Use, Adaptive Reuse, and
y =yes
B. Use Recycled Content Steel Studs for Interior Framing
2 Resource pts
Historic Preservation
9. Use Structural Insulated Panels (SIPS)
4 Resource pts
y =yes
4. Protect Native Soil
3 Energy pts
2 Resource pts
y =yes
5. Minimize Disruption of Existing Plants & Trees
y =yes
1 Resource pt
y =yes
6. Implement Construction Site Stonnwater Practices
10. Apply Advanced Framing Techniques
2 Resource pts
y =yes
7. Protect Water Quality with Landscape Design
3 Resource pts
2 Resource pts
y =yes
B. Design Resource - Efficient Landscapes and Gardens
4 Resource pts
y =yes
9. Reuse Matenals/Use Recycled Content Materials
b_ Sheathing
1 Resource pt
y =yes
for Landscape Areas
2 Resource pts
y =yes
10. Install High- Efficiency Irrigation Systems
2 Resource pts
y =yes
11. Provide for On -Site Water Catchment / Retention
2 Resource pts
y =ye=.
B. Foundation
1. Incorporate Recycled Flyash in Concrete
25% Recycled Flyash = 2 points; Add 1 point for every 10%
increase of Flyash, up to 5 points
2. Use Recycled Content Aggregate
3. Insulate Foundation/Slab before backfill
C. Structural Frame
1. Substitute Solid Sawn Lumber with Engineered Lumber
2. Use FSC Certified Wood for framing
(For every 10% of FSC lumber used= 2 points, up to 10)
3. Use Wood I- Joists for Floors and Ceilings
4. Use Web Floor Trusses
3 Resource pts y =yeE
up to 10 Resource pts.
2 Resource pis y =yes
2 Resource pis y =yes
5. Design Energy Heels on Trusses 6" or more
2 Energy pts
y =yes
6. Use Finger - Jointed Studs for Vertical Applications
2 Resource pts
y =yes
7. Use Engineered Studs for Vertical Applications
2 Resource pts
y =yes
B. Use Recycled Content Steel Studs for Interior Framing
2 Resource pts
y =yes
9. Use Structural Insulated Panels (SIPS)
.
a. Floors
3 Energy pts
y =yes
b. Wall
3 Energy pts
y =yes
c. Roof
3 Energy pts
y =yes
10. Apply Advanced Framing Techniques
4 Resource pts
y =yes
11. Use Reclaimed Lumber for Non Structural Applications
-- — - - -- -
3 Resource pts
y =yes
- - - - -- ---
i12.Use0SB
a. Subtloors
1 Resource pt
y =yes
b_ Sheathing
1 Resource pt
y =yes
r
r
r
r
r
r
r
r
r
r
0
r
r
r
r
0
0
_—
j 11. Use Sustainable Decking Materials
2 Energy pis y =yes
!3. Retrofit all Faucets and Showerheads with Flow Reducers
a. Recycled content
3 Resource pts
y =yE
J. FSC Certified Wood
3 Resource pis
y =yE
2. Use Treated Wood That Does Not Contain Chromium /Arsenic
1 IAQ/Health pt
y =yE
3. Install House Wrap under Siding
1 IAQ/Health pt
y =yE
4. Use Fiber - Cement Siding Materials
1 Resource pt
y =yes
E. Plumbing
1 Install Water Heater Jacket 1 Energy pt y =yes
2. Insulate Hot and Cold Water Pipes
2 Energy pis y =yes
!3. Retrofit all Faucets and Showerheads with Flow Reducers
i
a. Faucets (1 point each, up to 2 points)
Up to 2 Resource pts.
b. Showerheads (1 point each, up to 2 points)
Up to 2 Resource pts.
4. Replace Toilest with Ultra -Low Flush Toilets
Up to 4 Energy pis
I(1 point each, up to 3 points)
Up to 3 Resource pts.
_
5. Install Chlorine Filter on Showerhead
_�
1 IAQ/Health pt y =yes
6. Convert Gas to Tankless Water Heater
4 Energy pis y =yes
7. Install Water Filtration Units at Faucets
1 Energy pt y =ye.
(2 points each, up to 4 points)
Up to 4 IAQ/Health pis.
6. Install On- Demand Hot Water Circulation Pump
4 Resource pts y =yes
r. eieancai
1 Energy pt y =ye
1. Install Compact Fluorescent L ght Bulbs (CFCs) j
r
r
r
r
�
(6 bulbs =2 points, l0 bulbs =3 points, l2 bulbs = 4 points) —
Up to 4 Energy pts
2. Install IC -AT Recessed Fixtures with CFLs (1 point each, up to
5 points)
Up to 5 Energy pts
3. Install Lighting Controls (1 point per fixture, up to 4 points)
Up to 4 Energy pis
4. Install High Efficiency Ceiling Fans with CFLs
(1 point each, up to 4 points)
Up to 4 Energy pis
G. Appliances
;1. Install Energy Star Dishwasher
1 Energy pt y =ye.
12. Install Washing Machine with Water and Energy
jConservation Features
1 Energy pt y =ye
3.Install Energy Star Refrigerator
1 Energy pt y =ye
4. Install Built -In Recycling Cecter
3 Resource pis y =ye
H. Insulation
1. Upgrade Insulation to Exceed Title 24 Requirements
a. Wens
b. Ceilings
2. Install Floor Insulation over Crawl Space
3. Install Recycled- Content, Fiberglass Insulation with
IS. No Added Formaldehyde
4. Use Advanced Infiltration Reduction Practices
5. Use Cellulose Insulation
a. Walls
b. Ceilings
6. Alternative Insulation Products (Cotton, spray -foam)
a. Walls
c.cenmgs
2 Energy pts y =yes
2 Energy pis y =yes
4 Energy pis y =yes
J 31AQ/Health pis
2 Energy pts
4 Resource pts y =yes
4 Resource pts y =yes
4 Resource pts
4 Resource pts
•
r 1
I�
r
r
r
r
�
r
r
r
�
r
0
2 Energy pts y =yes
2 Energy pis y =yes
4 Energy pis y =yes
J 31AQ/Health pis
2 Energy pts
4 Resource pts y =yes
4 Resource pts y =yes
4 Resource pts
4 Resource pts
•
r 1
I�
r
r
r
r
2 Energy pts y =yes
2 Energy pis y =yes
4 Energy pis y =yes
J 31AQ/Health pis
2 Energy pts
4 Resource pts y =yes
4 Resource pts y =yes
4 Resource pts
4 Resource pts
•
r 1
I�
• 1. Install Energy - Efficient Windows
K. Renewable Energy and Roofing
1. Pre -Plumb for Solar Water Heating 4 Energy pis
2. Install Solar Water Heating System 10 Energy pts
3. Pre -Wire for Future Photovoltaic (PV) Installation 4 Energy pis
a. Double- Paned 1 Energy pt y =yes
b. Low- Emissivity (Low -E) 2 Energy pts y =yes
c. Low. Conductivity Frames 2 Energy pts y =yes
-2 Install Law Heat Traasmission Glazing a 1 Energy of y =yes
J. Heating Ventilation and Air Conditioning
�1_Use Duct Mastic on All Dact Joints J; 2 Energy pts
Y--Yes
2. Install Ductwork within Conditioned Space 3 Energy pts y =yes
3. Vent Range Hood to the Outside 1 IAOMeallh pt y=yes
4. Clean all Ducts Before Occupancy 2 IAO Health pis y =yes
5. Install Solar Attic Fan 2 Energy pis y =yes
6. Install Attic Ventilation Systems 1 Energy pt y =yes
7. Install Whole House Fan 4 Energy pts
Y--yes
6. Install Sealed Combustion Units
a. Furnaces 3 IAO/Health pts y =yes
b. Water Heaters 3 IAOMealth pts y =yes
9. Replace Wall- Mounted Electric and Gas Heaters with
Through- the -Wall Heat Pumps 3 Energy pis y =yes
10. Install 13 SEERl11 EER or higher AC with a TXV 3 Energy pts y =yes
1. Install AC with Non -HCFC Refrigerants 2 Resource pts y =yes
12. Install 90 %Annual Fuel Utilization Efficiency (AFUE) Furnace 2 Energy pts y =yes
• 13. Retrofit Wood Burning Fireplaces .
a. Install EPA certified wood stovenserts 1 IAQMealth pt y =yes
b. Install /Replace Dampers Energy pt y =yes
c. Install Airtight Doors 1 Energy pt y =yes
14. Install Zoned, Hydronic Radiant Heating 3 Energy pts y =yes
15. Install High Efficiency Filter 41A0/Health pts y =yes
16. Install Heat Recovery
4. Install Photovoltaic (PV) System
(1.2 kw = 6 points, 2.4 kw = 12 points, 3.6 kw = 18 points) Up to 18 Energy
V6 1Select Safe and Durable Roofing Materials _ 1 Resource pt y =:
7. Install Radiant Barrier 3 Energy pts y ='
L. Natural Heating and Cooling
1. Incorporate Passive Solar Heating 5 Energy pts
2. Install Overhangs or Awnings over South Facing Windows 3 Energy pts
3. Plant Deciduous Trees on the West and South Sides 3 Energy pis
E
Ventilation Unit (HRV)
5 IAO Health pts
y =yes
17. Install Separate Garage Exhaust Fan
3 IAQMealth pts
y =yes
4. Install Photovoltaic (PV) System
(1.2 kw = 6 points, 2.4 kw = 12 points, 3.6 kw = 18 points) Up to 18 Energy
V6 1Select Safe and Durable Roofing Materials _ 1 Resource pt y =:
7. Install Radiant Barrier 3 Energy pts y ='
L. Natural Heating and Cooling
1. Incorporate Passive Solar Heating 5 Energy pts
2. Install Overhangs or Awnings over South Facing Windows 3 Energy pts
3. Plant Deciduous Trees on the West and South Sides 3 Energy pis
E
'1. Use Low /Wv—bc Paint
P. Use Low VOC, Water -Based Wood Finishes
13. Use Low /No VOC Adhesives
"- — -- - -- --
4. Use Salvaged Materials for Interior Finishes
5. Use Engineered Sheet Goods with no added Urea
Formaldehyde
6. Use Exterior Grade Plywood for Interior Uses
r7.Seal all Exposed Particleboard or MDF
8. Use F S C Cert ified Materials for Interior Finish
9. Use Finger - Jointed or Recycled- Content Trim
10. Install Whole House Vacuum System
N. Flooring
1. Select FSC Certified Wood Flooring
2. Use Rapidly Renewable Flooring Materials
3. Use Recycled Content Ceramic Tiles
4. Install Natural Linoleum in Place of Vinyl
5. Use Exposed Concrete as Finished Floor
6. Install Recycled Content Carpet with Low VOCs
Total Points Aval a le:
Total Points Project Received:
1 IAQ/Health pts
21AQ/Health pts
31AQ/Health pts
3 Resource pts
61AQ /Health pts
1 IAQ/Health pts
41AQ/Health pts
4 Resource pts
1 Resource pts
3 IAQ/Health pts
8 Resource pts
y =yes
4 Resource pts
y =yes
4 Resource pts
y =yes
5 IAQ/Health pts
y =yes
4 Resource pts
y =yes
4 Resource pts
y =yes
r1
LJ
1401 1301 57 •
0 0 0
G: datalprogslgreenbuildingguidelineslremodelerslgreenpointsf nal2.l2.e4protecied.xls
P
, am
CITY OF
OCUPERTINO
•
Community Development
10300 Torre Avenue
Cupertino CA 95014
Telephone (408) 777 -3228
Fax(408)777 -3333
Building Department
T 1 0A SESySc 11 _ C� �
�-j `� `
PERMTT #
S6l � "�-
OWNER'S NAME:
PHONE # Z— -7
GENERAL CONTRACTOR: 1(�l
FAX #
Cabinets & Millwork
I am not using any subcontractors: gnature Date
Please check applicable subcontractors an d olete the followinu infer rtAfinn-
we gnature
..
as
Date
SUBCONTRACTOR
BUSINESS NAME
BUSINESS LICENSE #
Cabinets & Millwork
Cement Finishing
Electrical
Excavation
Fencing
Flooring: Carpeting
Linoleum / Wood
Glass / Glazing
Heating
Insulation
Landscaping
Lathing
Masonry
Ornamental Sheet Metal
Painting / Wallpaper
Paving
Plastering
Plumbing
Roofing
Septic Tank
Sheet Metal
Sheet Rock
Til
we gnature
..
as
Date