Loading...
00-053 Mckinley Equip. Corp.~~ CITY f3F CUPETIfl AGREEMENT CITY OF CIJPERTINO 10300 Torre Avenue Cupertino, CA 95014 (408) 777-3200 NO. t,a ~t 4 ~a~,, .. BY THIS AGREEMENT, made and entered into on the 12th day of APRIL , 2000 , by and between the CITY OF CUPERTINO (Hereinafter referred to as CITY) and Name (1) McKINLEY EQUIPMENT CORPORATION _ (2) Address 17611 ARMSTRONG AVENUE City IRVIPfE Zip 92614 Phone (415) 626-9951 (Hereinafter referred as CONTRACTOR), in consideration of their mutual covenants, the parties hereto agree as follows: CONTRACTOR shall provide or furnish the following specified services and/or materials: INSTALL WHEELCHAIR LIFT AT SPORTS CENTER BY JULY 1, 2000 EXHIBITS: TF)~ following attached exhibits hereby are made part of this Agreement: EXHIBIT A' PROPOSAL TERMS: The services and/or materials furnished under this Agreement shall commence on _~PRIL 12 . 2000 and shall be completed before JULY 1, 2000 COMPENSATION: For the full performance of this Agreement, CITY shall pay CONTRACTOR: NOT TO EXCEED $18,157.00 California Labor Code, Section 1771 requires the payment of prevailing wages to all workers employed on a Public Works contract in excess of $1,000.00. GENERAL TERMS AND CONDITIONS Hold Harmless: Contractor agrees to save and hold harmless the City, its officers, agents and employees from any and all damage and liabili including all costs of defending any claim, caused by or arising out of the performance of this Agreement. City shall not b sable for acts of Contractor in performing services described herein. UE TO NEGLIGENCE, ERRORS AND OMISSIONS, Insurance: Should the City require evidence of insurability, Contract~~r shall file with City a Certificate of Insurance before commencing any services under this Agreement. Said Certificate shall be subject to the approval of City's Director of Administrative Services. Non-Discrimination: No discrimination shall be made in the employment of persons under this Agreement because of the race, color, national origin, ancestry, religion or sex of such person. Interest of Contractor: It is understood and agreed that this Agreement is not a contract of employment in the sense that the relationship of master and servant exists between City and undersigned. At all times, Contractor shall be deemed to be an independent contractor and Contractor is not authorized to bind the City to any contracts or other obligations in executing this agreement. Contractor certifies that no one who has or will have any financial interest under this Agreement is an officer or employee of City. Changes: This Agreement shall not be assigned or transferred without the written consent of the City. No changes or variations of any kind are authorized without the written consent of the City. CONTRACT CO-ORDINATOR and representative for CITY shall be: NAME CARMEN LYNAUGH _ DEPARTMENT ptTRLIC WCIF.KS This Agreement shall become effective upon its execution by I:,ITY, in witness thereof, the parties have executed this Agreement the day and year first written above. CONTRA T~ ,'~ ~~~~ C:ITY O UPERTINO: Il~y ~ By W. Michael M ley Ely Title President l'itle PUBLIC WORKS PROJE S A R Soc. Sec. # APPR EXPENDITURE DISTRIBUTION DEPARTME A DA ACCOUNT NUMBER AMOUNT ~ ~ CITY C DATE S~// dOd 420-9206-9300 $18,157.00 White: City Clerk Green: Finance Yellow: Contractor ~ ~ ~ Receiving Gold: Department ~~ 1 l~lcKin ey EQUIPMENT CORPOFIATION • PROPOSAL NO. 572-00 CITY OF CUPERTINO Attention: Carmen Lynaugh 10300 Torre Avenue Cupertino, California 95014 Re: Sports Center DATE April 7, 2000 FOB Jobsite DELIVERY 8 Weeks After Receipt of Approved Shop Dwgs TERMS See Page 2 1 WHEELCHAIR LIFT, MODEL PCDE-108 -Manufactured by NATIONAL WHEEL-O-VATOR COMPANY, INCORPORATED with the following special feature: included in the price: Spacious 12.5 Square Foot Platform 42" x 60" Clear Platform Metal Side Guard Panels Instant Reversing Motor Platform Safety Obstruction Mat Safety Landing Gate (Upper/LowerlMid) Clear or Smoke Plexiglass Panels 90° Tum Platform Grab Rail Shroud With Components Foldable Base for Small Dooways Up/Down Control On Platform Adjustable Upper & Lower Limit Switches Keyed Switch Protection Emergency Manual Operation Floor To Floor 109" Surface Mount With Ramp Electrical: 115 Volts, Single Phase, 20 Amp Circuit Emergency Stop And Alarm with Battery Back Llp Two (2) Station Switches Runway disconnect switch Lift Carries UL #70392 On Entire Assembly for Outdoor Use Baked Polyester Urethane Finish Color Textured Off-White Totally Enclosed Housing Bolted Enclosure Which Can Be Removed for Going Through Small Doorways PRICE INSTALLED, SALES TAX INCLUDED........,. .................................................... $17,932.00 INSTALLATION 1. MECHANICAL General Contractor unloads lift and places it upright at install position (at exact site of installation). We assemble and lag to floor with four (4) 1/2" x 3-1/2" bolts. General Contractor must provide upper landing sill to hold upper gate and railing on wall to anchor latch and hinge posts. We anchor to supports. Load test weights by GC. SUBJECT TO TERMS ON REVERSE SIDE SAN FRANCISCO IRVINE SERVICE SAN DIEGO 555 Fulton St., Ste. 202 17611 Armstrong Avenue For All Locations 8745 Aero Drive, Ste 308 San Francisco, CA 94102 Irvine, California 92614 800/229-7275 San Diego, CA 92123 415/626-9951 FAX 415/626-9954 949/261-9222 FAX 949/250-7301 FAX 949/261-1326 858/560-9882 FAX 858/560-9998 salesCmckequip.com ~?~FiiBIT A 572-00 Page 2 2. ELECTRICAL Electrician brings power to runway disconnect on our lift. Electrician provides fusible, lockable remote disconnect. Electrician runs low voltage wires in conduit for remote call station at mid level as located by owner with pull cords installed by electrician. McKinley makes final connection. Electrician must have lift on his permit and accept low voltage wiring as being in accordance with local codes. McKinley furnishes wiring and conduit diagrams. Remote alarm, if required, by others. NOTE: 1. MANDATORY STATE ELEVATOR DIVISION INSPECTION AND PERMIT ARE INCLUDED; 750# LOAD TEST WEIGHTS BY GENERAL CONTRACTOR. 2. Runway disconnect required by Title 8 is included. 3. Product offered is an alternate/the brand specified. 4. McKinley unloads lift from common carrier and places it upright at install position. 5. A certificate of insurance with a limit of $2 million comprehensive can be furnished. 6. Factory standard finish (baked polyester urethane and color (textured off-white) will be furnished. Custom and special colors are available at extra cost or field paint by others. 7. Shroud (tower) requires back support at upper level. We anchor to supports. 8. Gate posts require side support-all by others. 9. Industrial type hollow metal doors with frame are included. The painting and mounting all by GC. 10. Pricing is based on non-union labor. 11. Prevailing wage requirements per McKinley determination letter from State of California. 12. Terms of payment: 30% with approved submittals; 60% when ready to ship; 10% 30 days after furnishing elevator permit; no retention. 13. Price valid for 30 days, based on material delivery within 270 days. 14. Installation must be scheduled after conduit is in place when we will have clear access to work area and power is available for equipment operation, adjustment and testing. 15. Contractor License #484193. 16. Contract subject to credit approval. 17. There will be a 30% charge if order is cancelled after placement with McKinley Equipment. EXCLUSIONS: 1. Bonds, seismic calculations and local permits. 2. Liquidated damages, if applicable. 3. All conduit runs, control wires, "J" boxes and remote fusible, lockable disconnect for electrical controls and power. 4. Railings/Filler panels next to gate posts. 5. Site preparation, concrete work, striping around lift and all signage. 6. Remote alarm. Respectfully submitted, r MCKINLEY EQUIPMENT CORPORATION ~.~;c~ Neil Chaitin NC1vr 408-777-3215/777-3333 Fax Accepted By Date