Loading...
24-030 Managed Facilities Solutions_Servive Order #2 dated 8-15-25 for Planning Dept. Cubical Reconfiguration ProjectContract/Purchasing Action Personnel Information Name Nathan Vasquez Department Public Works  Division Facilities Date 08.08.2025 Service Order Upload Quote Quote, Description of Project, Scope of Service, Schedule of Performance and Compensation MFS Quote Copy of MS1932-Revision 1-City of Cupertino-Nathan Vasquez-City Hall CIP Planning Cubical Reconfiguration-August 2024.xls Service Order Amount $8,093.34 Master Agreement Number 2024-058 Contract Start Date 03/26/2024 Contract End Date 01/31/2027 Firm Name Managed Facilities Solution Address 128 Component Dr, San Jose, CA 95131, USA Phone (408) 240-8608 Consultant/Contractor Name Mike Simonds Consultant/Contractor Email mike@mfs.team Project Name SO 2 Planning Dept. Cubical Reconfiguration Project Project Location City Hall Basement Cupertino Project Manager Name Nathan Vasquez Cupertino Project Manager Email nathanv@cupertino.org Master Agreement Maximum Compensation $60,000.00 Total Previously Encumbered to Date $2,775.91 Encumbrance this Service Order $8,093.34 Master Agreement Unencumbered Balance $49,130.75 SO GL #100-83-807 700-702 NWS Project Code Signature       08/13/2025 PDT  Consultant/Contractor Signature Date       08/13/2025 PDT  Manager/Supervisor Signature Date Appropriation Certification: I hereby certify that an unexpended appropriation is available in the above fund for the above contract as estimated and that fund are available as of this date of signature.       08/14/2025 PDT  Management Analyst Signature Date Date: 08/13/2025 PDT Email: mike@mfs.team Date: 08/13/2025 PDT Email: nathanv@cupertino.gov Date: 08/14/2025 PDT Email: PWMA@cupertino.gov City of Cupertino 10300 Torre Ave. Cupertino CA 95014 Project: City Hall CIP/Planning Cubical Reconfiguration Scope: Unload used furniture from 3rd party truck. Assist in confirming all furniture ordered was received. Deliver to basement job site(to include stair carry of phone booth components) Swap/install work surfaces of H.A.T.'s. Disassemble 2 cubicle areas to build bullpens per drawing provided. Cut down 2 work surfaces to 24" depth. Move out surplus furniture to storage location on site. Build out 2 bullpen areas per drawing provided with furniture on site. Build phone booth in corner of one bullpen area per drawing provided. Dispose of any surplus furniture/dunnage in recycle bin provided on site. Nathan Vasquez See Scope above. Date TBD Qty Hourly Price Hours Project Manager 1 $125.00 8.00 Supervisor/Master Installer 1 $98.00 8.00 Master Installer 1 $98.00 11.00 Installer 1 $88.00 11.00 Driver 1 $105.00 8.00 Master Installer 1 $98.00 8.00 Installer 3 $88.00 8.00 Fuel Surcharge 1 $87.34 Mover 1 $55.00 8.00 Subtotal Project Total City of Cupertino Responsibilities Provide access during work schedules. Clear all work areas of contents/electronics. Confirm the presence of all hardware needed to build/install used furniture. Managed Facilities Solutions 128 Component Dr. San Jose, CA 95131 Extended Cost $1,000.00 $784.00 $1,078.00 $968.00 $840.00 $784.00 $2,112.00 $87.34 $440.00 $8,093.34 $8,093.34 Deliver to basement job site(to include stair carry of phone booth components) Disassemble 2 cubicle areas to build bullpens per drawing provided. Build out 2 bullpen areas per drawing provided with furniture on site. Build phone booth in corner of one bullpen area per drawing provided. Dispose of any surplus furniture/dunnage in recycle bin provided on site. SO 2 Planning Dept. Cubical Reconfiguration Project - Service Request Created:08/13/2025 Status:Signed Transaction ID:3b406318-5f97-4b56-9371-919b62f7eef8 "SO 2 Planning Dept. Cubical Reconfiguration Project - Service Request" history Sundari Pilaka created the document 08/13/2025 11:10:20 AM PDT - IP address 73.202.170.100 Document was emailed to Mike Simonds 08/13/2025 11:10:21 AM PDT Mike Simonds opened the document 08/13/2025 11:12:08 AM PDT - IP address 73.92.109.151:54609 Mike Simonds opened the document 08/13/2025 11:12:20 AM PDT - IP address 72.153.231.12:11634 Mike Simonds signed the document 08/13/2025 11:12:37 AM PDT - IP address 73.92.109.151:54609 Document was emailed to nathanv@cupertino.gov 08/13/2025 11:12:41 AM PDT nathanv@cupertino.gov opened the document 08/13/2025 2:28:47 PM PDT - IP address 64.165.34.3:46827 nathanv@cupertino.gov signed the document 08/13/2025 2:28:59 PM PDT - IP address 64.165.34.3:46827 Document was emailed to Public Works Management Analyst 08/13/2025 2:29:02 PM PDT Public Works Management Analyst opened the document 08/14/2025 1:46:34 PM PDT - IP address 64.165.34.3:8692 Public Works Management Analyst opened the document 08/14/2025 1:46:53 PM PDT - IP address 20.230.224.3:24578 Public Works Management Analyst opened the document 08/14/2025 1:57:58 PM PDT - IP address 73.241.25.149:50664 Public Works Management Analyst opened the document 08/14/2025 1:57:58 PM PDT - IP address 73.241.25.149:50664 Public Works Management Analyst signed the document 08/14/2025 1:58:09 PM PDT - IP address 73.241.25.149:50664 Document was successfully signed and filed 08/14/2025 1:58:11 PM PDT