Loading...
23-092 H.Y. Floor_SO #4 dated 9-26-25 for Activity Room Sanding and Buffing Floor 2026-287Contract/Purchasing Action Personnel Information Name Nathan Vasquez Department Public Works  Division Facilities Date 09.05.2025 Service Order Upload Quote Quote, Description of Project, Scope of Service, Schedule of Performance and Compensation Quinlin CC activity room 25.pdf Service Order Amount $7,120.00 Master Agreement Number 2024-036 Contract Start Date 09/26/2023 Contract End Date 06/30/2026 Firm Name H.Y. Floor Address 961 Commercial St, San Carlos, CA 94070, USA Phone (650) 593-6837 Consultant/Contractor Name H.Y. Floor Consultant/Contractor Email steve@hyfloor.com Project Name SO 4 Activity Room Sanding and Buffing Floor Project Location QCC Cupertino Project Manager Name Nathan Vasquez Cupertino Project Manager Email nathanv@cupertino.org Master Agreement Maximum Compensation $60,000.00 Total Previously Encumbered to Date $27,228.00 Encumbrance this Service Order $7,120.00 Master Agreement Unencumbered Balance $25,652.00 SO GL #100-87-830 700-702 NWS Project Code Comments Using CUPCCAA Signature       09/23/2025 PDT  Consultant/Contractor Signature Date       09/25/2025 PDT  Manager/Supervisor Signature Date Appropriation Certification: I hereby certify that an unexpended appropriation is available in the above fund for the above contract as estimated and that fund are available as of this date of signature.       09/26/2025 PDT  Date: 09/23/2025 PDT Email: steve@hyfloor.com Date: 09/25/2025 PDT Email: nathanv@cupertino.gov Date: 09/26/2025 PDT Email: jindyg@cupertino.org Management Analyst Signature Date Quotation DATE July 16, 2025 961 Commercial St.Quotation #25-1431 San Carlos, CA 94070 Phone (650) 593-6837 Fax (650) 593-7002 License #587127 DIR #1000000156 All Wages Paid are Prevailing Rate To: Ty Bloomquist Quotation valid until:October 14, 2025 City of Cupertino Prepared by:Steve Heller 10555 Mary Avenue steve@hyfloor.com Cupertino, CA 95014 650-280-2809 cell tyb@cupertino.org 408-460-1821 cell PROJECT:Quinlan Community Center - 10185 N. Stelling Road Scrub and Recoat Activity Room Scope of work AMOUNT 7,120.00$ Excluded: TOTAL 7,120.00$ Accepted:_________________________________________________________________________ email to steve@hyfloor.com or fax to 650-593-7002 Please sign, email back and provide a purchase order if you would like to proceed Please allow 2 days to complete job with an additional 3-7 days to cure the finish. The floor may be walked on after 24 hours, but the floor is susceptible to scuffing or marring prior to completion of the curing time. 72 hours is a good average cure time. Do not replace athletic of walk-off mats until finish is fully cured. Do not clean with water or detergent during the first week. cleaner and water. This method makes no dust. Vacuum this dry, rinse and vacuum dry again Apply two coats of VOC compliant Gloss Waterbase Finish Prepare floor by dulling old finish using a SPP pad, driven by a floor machine, in a solution of neutral Pleas note this method of refinishing will not remove scratches, scuff marks under the finish, peeling finish or dirt 'ground' into the grain of the wood, only drum sanding will remove that. My finish is only as strong as the finish under it. Please note paint touch-ups will show a large difference in color and is not recommended. Never use tape on floor, it will pull the finish off. Moving items off floor Repairing floor boards unless approved (there will be a cost impact) Removing and replacing base Bonds or Special Insurance Requirements Refinishing under bleachers Removing tape off floor (there will be a cost impact) We appreciate your business! SO 4 Activity Room Sanding and Buffing Floor - Service Request Created:09/05/2025 Status:Signed Transaction ID:896d1e83-9b63-4256-9d59-4594e81c747f "SO 4 Activity Room Sanding and Buffing Floor - Service Request" history Sundari Pilaka created the document 09/05/2025 4:26:59 PM PDT - IP address 73.202.170.100 Document was emailed to H.Y. Floor 09/05/2025 4:27:00 PM PDT H.Y. Floor opened the document 09/23/2025 6:03:09 AM PDT - IP address 96.74.67.242:58220 H.Y. Floor signed the document 09/23/2025 6:03:34 AM PDT Document was emailed to nathanv@cupertino.gov 09/23/2025 6:03:35 AM PDT nathanv@cupertino.gov opened the document 09/25/2025 8:17:07 AM PDT - IP address 64.165.34.3:1089 nathanv@cupertino.gov signed the document 09/25/2025 8:18:06 AM PDT Document was emailed to Public Works Management Analyst 09/25/2025 8:18:07 AM PDT User Jindy Gonzalez delegated the document 09/26/2025 4:22:20 PM PDT - IP address 73.241.25.149 Document was emailed to Jindy Gonzalez 09/26/2025 4:22:21 PM PDT Jindy Gonzalez opened the document 09/26/2025 4:22:25 PM PDT - IP address 73.241.25.149:60801 Jindy Gonzalez signed the document 09/26/2025 4:38:07 PM PDT Document was successfully signed and filed 09/26/2025 4:38:07 PM PDT