Loading...
25-081 Griffin Painting_Service Order #1 dated 9-15-25 BBF Golf Course RR Floors New Epoxy ProjectContract/Purchasing Action Personnel Information Name Nathan Vasquez Department Public Works  Division Facilities Date 09.02.2025 Service Order Upload Quote Quote, Description of Project, Scope of Service, Schedule of Performance and Compensation Blak Berry Floors.pdf Service Order Amount $16,235.00 Master Agreement Number 2025-029 Contract Start Date 06/03/2025 Contract End Date 06/30/2028 Firm Name Griffin Painting Inc.Address 3580 Haven Ave, Redwood City, CA 94063, USA Phone (650) 222-8031 Consultant/Contractor Name Griffin Painting Inc.Consultant/Contractor Email mark@griffinpainting.com Project Name SO 1 BBF Golf Course RR Floors New Epoxy Project Project Location BBF Golf Course Cupertino Project Manager Name Nathan Vasquez Cupertino Project Manager Email nathanv@cupertino.org Master Agreement Maximum Compensation $60,000.00 Total Previously Encumbered to Date $0.00 Encumbrance this Service Order $16,235.00 Master Agreement Unencumbered Balance $43,765.00 SO GL #560-87-260 700-702 NWS Project Code Signature       09/09/2025 PDT  Consultant/Contractor Signature Date       09/09/2025 PDT  Manager/Supervisor Signature Date Appropriation Certification: I hereby certify that an unexpended appropriation is available in the above fund for the above contract as estimated and that fund are available as of this date of signature.       09/15/2025 PDT  Management Analyst Signature Date Date: 09/09/2025 PDT Email: mark@griffinpainting.com Date: 09/09/2025 PDT Email: nathanv@cupertino.gov Date: 09/15/2025 PDT Email: jindyg@cupertino.org Estimate Date 7/22/2025 Estimate # 974 Name / Address City Of Cupertino 10300 Torre Ave. Cupertino, CA 95014-3202 Griffin Painting Inc Cal Lic 599026 3580 Haven Ave # 2 Redwood City, Ca 94063 Project Blackberry Farm Golf Course RR Floors Approval Signature Total Description Total Scope of work: Restroom Floors: Demo existing floor coating down to raw concrete at mens and womens restrooms. Prepare and install epoxy resin flake system with integral 6" cove base. 14,795.00 Restroom Doors: Prepare and repaint restroom doors to clean up. *Excludes all other painting.1,440.00 _____________________________________ $16,235.00 SO 1 BBF Golf Course RR Floors New Epoxy Project - Service Request Created:09/03/2025 Status:Signed Transaction ID:08f0f859-b700-4f4c-8d45-466f796ecefa "SO 1 BBF Golf Course RR Floors New Epoxy Project - Service Request" history Sundari Pilaka created the document 09/03/2025 4:52:44 PM PDT - IP address 73.202.170.100 Document was emailed to Griffin Painting Inc. 09/03/2025 4:52:45 PM PDT Griffin Painting Inc. opened the document 09/09/2025 5:32:33 AM PDT - IP address 70.90.173.30:50217 Griffin Painting Inc. signed the document 09/09/2025 5:32:57 AM PDT Document was emailed to nathanv@cupertino.gov 09/09/2025 5:32:58 AM PDT nathanv@cupertino.gov opened the document 09/09/2025 10:44:53 AM PDT - IP address 64.165.34.3:46504 nathanv@cupertino.gov signed the document 09/09/2025 10:45:44 AM PDT Document was emailed to Public Works Management Analyst 09/09/2025 10:45:45 AM PDT Public Works Management Analyst opened the document 09/15/2025 8:11:34 AM PDT - IP address 73.202.170.100:51075 User Jindy Gonzalez delegated the document 09/15/2025 12:09:16 PM PDT - IP address 64.165.34.3 Document was emailed to Jindy Gonzalez 09/15/2025 12:09:17 PM PDT Jindy Gonzalez opened the document 09/15/2025 12:09:21 PM PDT - IP address 64.165.34.3:15687 Jindy Gonzalez signed the document 09/15/2025 12:09:52 PM PDT Document was successfully signed and filed 09/15/2025 12:09:52 PM PDT