23-002 Tanko Lighting_Service Order No. 4 dated 6-30-25 - 2025-540          CITY OF CUPERTINO           MASTER AGREEMENT CONSULTANT SERVICES           SERVICE ORDER NO. 4 MASTER AGREEMENT NO#:M.A. Date: Maximum Compensation: June 30, 2026 Consultant:Firm Name: Address: Contact: Phone:  Email:Jason@tankolighting.com Project Name:LED Streetlight Transition X City Project Management Managing Department: Public Works Project Manager: Susan Michael for Jo Anne Johnson Fiscal/Budget : Amount $336,172 $178,667 $0 $123,642 $33,863 P.O. # TBD Project #: ST 058.02.02 Date:  Approvals: Consultant:Date: CIP Manager:Date: Appropriation Certification:  I hereby certify that an unexpended appropriation is available in the above fund  for the above contract as estimated and that fund are available as of this date of signature Management Analyst    Total Previously Encumbered to Date: Minus Liquidated to Date Encumbrance this Service Order: Balance: S.O. Accʹt No.: 420‐99‐258‐900‐905 Jason Tanko 415‐254‐7579 Project Description:    Design and CM services for LED streetlight transition See attached Scope of Services Task 1.01 through 1.05 Master Agreement Maximum Compensation: 2023‐07 January 1, 2023 $336,172.00 M.A. End Date: Tanko Streetlighting, Inc. 220 Bayshore Blvd., San Francisco, CA 94124 Tanko Streetlighting Master Agreement Page 1 of 1 Service Order No.        Date:City Finance: 06/27/2025 06/28/2025 06/30/2025 Page 1 of 5 Service Order No. 3 to Master Service Agreement Consultant Services – City of Cupertino & Tanko Streetlighting, Inc. Construction Management – Scope of Services Task 1.0: LED Conversion Phase Task 1.01: Community Outreach and Notification CONSULTANT shall coordinate with the CITY’s media office to help develop a community outreach and notification plan prior to the commencement of any project activities. The plan will ensure project awareness and minimize public disturbance. CONSULTANT shall develop the message and provide the planned installation schedule to the CITY’s media staff for distribution through the CITY’s existing media outlets (press releases, website, etc.). Deliverables: •Project Messaging and Schedule: Specific language, draft press release, and timelines related to installation to assist with notifying community members of the project. Pricing – Task 1.01: Community Outreach and Notification Position Hourly Rate Estimated Hours Extended Price Principal $250 10 $2,500 Project Manager $188 32 $6,016 Data Analyst $156 12 $1,872 Total Not to Exceed Price: $10,388 Task 1.02: Logistics Management CONSULTANT shall: •Ensure the selected installation contractor stages the receipt of fixture shipments for installation in a manner that ensures the secured storage of materials. •Provide the CITY with a schedule of anticipated shipping dates for materials once the materials order is placed. •Develop an installation plan that minimizes inconvenience to the CITY and includes ordering schedules, traffic control plans, waste disposal and recycling procedures (that comply with all applicable State and Federal laws), and installation and commissioning schedules as required to the CITY. •Facilitate a pre-construction Kick-Off meeting with CITY staff and the installation contractor to review the traffic control plans, work safety, permitting requirements public safety and waste material handling procedures and requirements prior to the start of installation. •Coordinate and participate in regularly scheduled progress meetings with CITY staff. Deliverable: •Logistics Management Details: Ordering, traffic control plans, required permits, disposal strategy, pre-construction meeting, ongoing meetings, installation and commissioning schedules. Exhibit A2 - C2 Page 2 of 5 Service Order No. 3 to Master Service Agreement Consultant Services – City of Cupertino & Tanko Streetlighting, Inc. Pricing – Task 1.02: Logistics Management Principal $250 21 $5,250 Project Manager $188 104 $19,552 Data Analyst $156 67 $10,452 Task 1.03: Installation Management CONSULTANT shall: •Develop installation maps and provide installers and relevant CITY staff for accurate project tracking. •Ensure that any poles missing pole tags are updated with pole tags consistent with CITY’s existing system. •Ensure that installers are equipped with handheld devices and train them in collecting relevant data on both the HPS fixtures being removed, as well as the LED fixtures being installed. •Track each crew’s daily progress via time-stamped data on every fixture location. •Provide immediate instruction to crews on any course corrections necessary. Deliverable: •Installation Maps: Maps with locations and fixture information used to dispatch installation crews and allow CITY staff to track installation routes. •Weekly Installation Report: A detailed listing of the locations completed during the installation phase, along with maps corresponding to locations. Pricing – Task 1.03: Installation Management Principal $250 10 $2,500 Project Manager $188 109 $20,492 Data Analyst $156 173 $26,988 Task 1.04: Commissioning Coordination CONSULTANT shall ensure that the installers perform final inspection on all fixtures, correct any “punch list” items, test lights to ensure that they work, and identify locations where repair needs CITY assistance. CONSULTANT shall provide a complete commissioning report outlining any errors and actions taken to correct errors. Deliverable: •Commissioning Report: Detailed analysis of final installation verification and testing, including an outline of any errors and actions taken to correct errors. Page 3 of 5 Service Order No. 3 to Master Service Agreement Consultant Services – City of Cupertino & Tanko Streetlighting, Inc. Pricing – Task 1.04: Commissioning Coordination Principal $250 8 $2,000 Project Manager $188 45 $8,460 Data Analyst $156 39 $6,084 Task 1.05: Rebate and Tariff Change Coordination CONSULTANT shall: •Research any available rebate programs and facilitate all necessary tasks to ensure that the CITY receives the rebates and billing changes for which it is eligible. •Prepare all necessary and required documentation for the rebates and submit these to the appropriate departments within the agency. •Follow up with the agency to confirm the materials have been received and are in process. •Assist the CITY with responses to any utility/agency questions regarding the submitted applications for rebates. •Coordinate with the utility on changing tariffs to the newly-installed LED fixture rates by preparing the necessary documentation, submitting it to the utility, confirming the materials have been received, and obtaining the timing for the modification to be processed. •If known, provide the contact information for the appropriate party addressing any rate changes for the CITY. •Assist the CITY with responses to any utility questions regarding the submitted applications for tariff changes. Deliverable: •Rebate and Tariff Change Documentation: A compilation of copies of paperwork submitted and processed with the utility regarding rebate applications and tariff changes. Pricing – Task 1.05: Rebate and Tariff Change Documentation Principal $250 0 $0 Project Manager $188 32 $6,016 Data Analyst $156 35 $5,460 Task 1.06: Final Reporting CONSULTANT shall coordinate all final reporting and data requirements to ensure that the CITY considers the project is compliant and complete. This includes finalizing the GIS layer with design and construction data and updating the analysis of gross cost, savings, incentives, net cost, and payback of finalized design, including any operation and maintenance of costs and savings. Additionally, CONSULTANT shall provide contacts and the process whereby the CITY can obtain warranty support with the manufacturer(s) should it be necessary. Page 4 of 5 Service Order No. 3 to Master Service Agreement Consultant Services – City of Cupertino & Tanko Streetlighting, Inc. Deliverable: •Final Reporting Documentation: Final requirements necessary to process the available rebates and tariff changes with the CITY, as well as post-construction electronic GIS records for all newly- installed streetlights in the CITY, including all wattages, badge numbers, locations, and other associate attributes, and environmental disposal documentation. Pricing – Task 1.06: Final Reporting Principal $250 10 $2,500 Project Manager $188 69 $12,972 Data Analyst $156 70 $10,920 OPTIONAL – Task 1.07: Remedy of Miss-Billings Based on the results of the Data Reconciliation Report, CONSULTANT shall provide additional assistance reconciling the streetlight billing discrepancies with the utility to credit the CITY for any miss-billings. Deliverable: •Miss-Billing Documentation: Submission of required documentation to utility to remedy any streetlight mis-billings. Follow up meeting and coordination with CITY and utility as needed. Pricing – Task 1.07: Remedy of Miss-Billings Principal $250 0 $0 Project Manager $188 12 $2,256 Data Analyst $156 16 $2,496 OPTIONAL – Task 1.08: Custom Design for Decorative Fixtures Any decorative fixture beyond the standard design process (defined as any non-cobra head fixture where the design can be determined through the audit process or has already been designed) will require a custom LED replacement design, provided on a per custom design created (not on a per fixture basis). CONSULTANT shall design the custom LED retrofit (note this shall be one custom design for an estimated twenty (20) shoebox fixtures), dispatch of a contractor to measure the fixture, design of a custom insert, coordination with a metal fabricator to create a sample, etc. Should the CITY opt for this Task, it will be performed prior to Task 1.03 – Installation Management. Deliverable: •Custom Retrofit Fixture: A custom designed LED retrofit that preserves the aesthetics of the existing shoebox fixture while providing the improved light quality and energy saving benefits. Page 5 of 5 Service Order No. 3 to Master Service Agreement Consultant Services – City of Cupertino & Tanko Streetlighting, Inc. Pricing – OPTIONAL Task 1.08: Custom Design for Decorative Fixtures Principal $250 4 $1,000 Project Manager $188 6 $1,128 Data Analyst $156 0 $0 Summary of Services Task 1.01: Community Outreach and Notification $10,388 Task 1.02: Logistics Management $35,254 Task 1.03: Installation Management $49,980 Task 1.04: Commissioning Coordination $16,544 Task 1.05: Rebate and Tariff Change Coordination $11,476 Task 1.06: Final Reporting $26,392 OPTIONAL Task 1.07: Remedy of Miss-Billings $4,752 OPTIONAL Task 1.08: Custom Design for Decorative Fixtures $2,128 SO No 4_Tanko Lighting Final Audit Report 2025-06-30 Created:2025-06-28 By:Jindy Gonzalez (jindyg@cupertino.org) Status:Signed Transaction ID:CBJCHBCAABAANpT08VX3SddF87pj2GzCHJ_6cgG7C7_k "SO No 4_Tanko Lighting" History Document created by Jindy Gonzalez (jindyg@cupertino.org) 2025-06-28 - 0:34:42 AM GMT- IP address: 73.241.25.149 Document emailed to jason@tankolighting.com for signature 2025-06-28 - 0:37:43 AM GMT Email viewed by jason@tankolighting.com 2025-06-28 - 0:39:40 AM GMT- IP address: 66.249.80.41 Signer jason@tankolighting.com entered name at signing as Jason tanko 2025-06-28 - 1:53:32 AM GMT- IP address: 174.231.82.135 Document e-signed by Jason tanko (jason@tankolighting.com) Signature Date: 2025-06-28 - 1:53:34 AM GMT - Time Source: server- IP address: 174.231.82.135 Document emailed to susanm@cupertino.gov for signature 2025-06-28 - 1:53:36 AM GMT Email viewed by susanm@cupertino.gov 2025-06-28 - 1:53:43 AM GMT- IP address: 34.219.84.215 Signer susanm@cupertino.gov entered name at signing as Susan Michael 2025-06-28 - 1:26:57 PM GMT- IP address: 76.103.131.113 Document e-signed by Susan Michael (susanm@cupertino.gov) Signature Date: 2025-06-28 - 1:26:59 PM GMT - Time Source: server- IP address: 76.103.131.113 Document emailed to Jindy Gonzalez (jindyg@cupertino.org) for signature 2025-06-28 - 1:27:01 PM GMT Email viewed by Jindy Gonzalez (jindyg@cupertino.org) 2025-06-28 - 1:27:18 PM GMT- IP address: 54.242.71.99 Document e-signed by Jindy Gonzalez (jindyg@cupertino.org) Signature Date: 2025-06-30 - 3:16:23 PM GMT - Time Source: server- IP address: 73.241.25.149 Agreement completed. 2025-06-30 - 3:16:23 PM GMT