Loading...
CC 07-01-2025 Item No. 12 Public Hearing Townhome Development_PresentationCC 07-1-2025 Item No. 12 Public Hearing Townhome Development Presentation 1 City Council July 1, 2025 Housing Development 20840 Stevens Creek Boulevard Project SiteProject Site Address 20770, 20830, & 20840 Stevens Creek Blvd Land Use Commercial/Residential * Zoning P(CG, Res)*, Heart of the City The Crossroads Stevens Creek Blvd Scofield Drive Faria Elementary * Zoning and GP land use vested to January 2024 under state law 1 2 2 Project Background Existing Uses Two former restaurants (Fontana’s & Pizza Hut) and Staples Applications ●SB330 Preliminary Application - January 29, 2024 ●Formal Application - July 22, 2024 Housing Element Context ●2023-2031 Housing Element adopted May 2024 ●Priority Housing Sites #40-43 ●SB330 application submitted prior to HE adoption Applicable State Housing Laws Housing Accountability Act (HAA) Cannot make project infeasible or reduce density. Housing Crisis Act (“SB 330” or “HCA”) Streamlines permit processing and locks-in fees and standards.Vesting Date: January 29, 2024 Density Bonus Law Allows for additional units, waivers, concessions, and reduced parking standards. No Net Loss (SB 166) Sites to accommodate RHNA by income level must be available. 3 4 3 Project Site Plan Project DesignProject Design View from Stevens Creek Boulevard Internal open space 5 6 4 Project Consistency Analysis ●Project is consistent with applicable objective standards as proposed under state law. ●Use Permit proposed to allow residential uses on a mixed-use zoned property. ●Two Density Bonus concessions requested to waive requirement in General Plan and Heart of the City Specific Plan for commercial component. Height WaiverHeight Waiver Waiver Waiver 7 8 5 Front Setback Waiver Front Setback Waiver Required 35’ Setback from curb Provided 26’ Setback from curb Required 18’-6” Setback Provided 15’ Setback Side Setback WaiverSide Setback Waiver Required 18’-8” Setback Provided 16’-2”’ Setback Required 18’-8” Setback Provided 15’ Setback Required 18’-6” Setback Provided 15’ Setback 9 10 6 Rear Setback Waiver Rear Setback Waiver Required 56’ Setback Provided 32’ Setback Building Forms (Terracing) Building Forms (Terracing) Required terracing of second and third stories Provided no terracing of second and third stories 11 12 7 Service Access WaiverService Access Waiver Required Service Access from rear Proposed service access from Stevens Creek Private Outdoor Space ClearancePrivate Outdoor Space Clearance Required 6’ dimension Example of proposed 5’-5” dimension Required 6’ dimension Example of proposed 4’-6” dimension 13 14 8 Parking Planter Strip Parking Planter Strip Location of required planting area No landscape strip provided Lot Coverage and Stall Size ProposedRequiredProject Data 43%40% max.Lot Coverage 9’-10” x 18’10’ x 20’ min.Parking Stall Size 15 16 9 Public Art and Park Land Public Art Dedication ●Proposed public art plaza in the northeastern corner of property. ●To be reviewed and approved by Arts and Culture Commission after project approval. Park Land Dedication ●Staff recommends payment of in-lieu fee. ●Project is conditioned to pay in-lieu fee of $2,538,000 for the 47 market rate units. BMR Requirements Average Unit SizeNumber of  BedroomsNumber of Units 2,166 square feet412BMR Units 1,799 square feet3 15 Market‐Rate Units 2,588 square feet432 12 BMR units – 6 moderate and 6 median income Proposed BMR units are comparable to market rate units in type and size: Average of all Market Rate Units – 2,336 sq. ft. 17 18 10 Categorical Exemption Categorical Exemption Memorandum prepared: ●Reviewed environmental reports: ●Biological Assessment ●Environmental Site Assessment* ●Transportation Analysis ●Arborist Report ●Noise Assessment ●Air Quality Analysis ●Project qualifies for a Class 32 (Infill Development) exemption based on: ●Review of reports ●Implementation of standard requirements of Municipal Code *Conditions added to ensure management of soils per ESA review. Planning Commission Hearing June 10th Planning Commission Hearing: ●Unanimous vote to recommend approval. ●Discussion: ●Potential traffic concerns ●Tree removals ●Loss of retail ●Lack of Very Low-Income housing ●Use of stamped concrete at the driveway ●Rear building setbacks ●Public outreach 19 20 11 Recommended Actions That the City Council adopt the resolutions to: 1.Find the project exempt from CEQA; 2.Make the required findings of No Net Loss; and 3.Approve the following permits: a.Development Permit (DP-2024-002); b.Use Permit (U-2024-007); c.Architectural & Site Approval (ASA-2024-005); d.Tentative Final Map (TM-2024-001); and e.Tree Removal Permit (TR-2024-024). 21