Loading...
23-132 SO #3 dated 3-19-25 4Leaf for Orange Avenue Sidewalk Improvements - 2025-450MASTER AGREEMENT NO#:M. A. Date: Maximum Compensation: December 31, 2025 Consultant:Firm Name: Address: Contact: Phone: Email:gbarry@4leafinc.com Project Name:Orange Avenue Sidewalk Improvement Scope: X City Project Management Managing Department: Public Works Project Manager: Susan Michael Fiscal/Budget : Amount 500,000.00 188,806.00 Minus Liquidated to Date 1,213.39 4,200.00 308,207.39 P.O. # TBD Contract Manager: Susan Michael Date: February 28, 2025 Approvals: Consultant: Date: CIP Manager:Susan Michael Date: Appropriation Certification: I hereby certify that an unexpended appropriation is available in the above fund for the above contract as estimated and that fund are available as of this date of signature City Finance: Date: Management Analyst Master Agreement Maximum Compensation: Total Previously Encumbered to Date: Encumbrance this Service Order:Master Agreement Unencumbered Balance: S.O. Acc't No.: 420-99-048 Gene Barry Provide Construction Management Services for the project as described in Attachment A CITY OF CUPERTINO MASTER AGREEMENT CONSULTANT SERVICES SERVICE ORDER NO. 3 2024-048 November 29, 2023 $500,000.00 M.A. End Date: 4Leaf, Inc. 2126 Rheem Drive, Pleasanton, CA 94588 Gene Barry (925) 462-5959 Project Description: Construction of civil and traffic signal improvements related to bike safety. 4Leaf Master Agreement-CM 2024-048 Page 1 of 1 Service Order #3 Mar 18, 2025 Susan Michael Mar 18, 2025 jindy gonzalez Mar 19, 2025 Construction Management  Inspection  Plan Check  Planning 2126 Rheem Drive  Pleasanton, CA 94588  Phone (925) 462-5959  Fax (925) 462-5958 8896 North Winding Way  Fair Oaks, CA 95628  Phone (916) 965-0010  Fax (916) 965-0013 City of Cupertino January 24, 2025 Susan Michael Capital Improvement Project Manager Public Works 10300 Torre Ave. Cupertino, CA 95014 Submitted via E-mail as Acrobat PDF Document to susanm@cupertino.gov RE: Cost Proposal to Provide Project Management Services for Final Closeout Activities for the City of Cupertino Orange Ave. Sidewalk Closure Project. Dear Ms. Michael: 4LEAF, Inc. (“4LEAF”) appreciates the opportunity to submit our Cost Proposal to provide Project Management services in support of final closeout activities for the City of Cupertino (“City”) Orange Ave. Project. The original Service Order No. 1 that was issued to 4LEAF for the Orange Ave. project has been closed by the City and a new Service Order under our existing On-Call Construction Management (CM) and Inspection agreement with the City is needed to assist with the Orange Ave. tasks outlined below. At the completion of Project’s field activities in November 2022, PG&E had yet to relocate two power poles that were located within the footprint of Orange Ave. PG&E has since installed new poles and moved their electrical wires to the new poles; however, AT&T and Comcast have yet to relocate their lines to the new poles. Comcast and AT&T have indicated they are still evaluating if they need to develop design drawings in order to move their lines. 4LEAF perform as the City’s point of contact for general communication and coordination with AT&T and Comcast on moving their lines to the new poles; attend any site visits that require the City’s input to AT&T, Comcast, or the Public; and assist the City with responding as necessary to public concerns from service disruptions when AT&T and Comcast move their lines to the new poles. Coordination of the above activities will be performed by Chris Bryden who was 4LEAF’s on-site representative during the Orange Ave. project. Our estimated time and material, not to exceed costs to perform these tasks is Four Thousand, Two Hundred Dollars ($4,200).1 4LEAF appreciates the opportunity to provide this proposal to the City. If you have any questions, please do not hesitate to contact me by phone at (925) 462-5959 or by e-mail at gbarry@4leafinc.com. Respectfully Submitted, 4LEAF, Inc. Gene Barry, P.E. Vice President 1 Estimated cost is based on 24 hours at our Construction Manager hourly rate of $175. ATTACHMENT A SO 3 Orange Avenue Sidewalk Improvements Final Audit Report 2025-03-19 Created:2025-03-18 By:Sundari Pilaka (Sundarip@cupertino.org) Status:Signed Transaction ID:CBJCHBCAABAAFn6NUjsq1l4ztjXYlPkbQlTzs9dWQqse "SO 3 Orange Avenue Sidewalk Improvements" History Document created by Sundari Pilaka (Sundarip@cupertino.org) 2025-03-18 - 10:16:29 PM GMT- IP address: 64.165.34.3 Document emailed to Gene Barry (gbarry@4leafinc.com) for signature 2025-03-18 - 10:24:28 PM GMT Email viewed by Gene Barry (gbarry@4leafinc.com) 2025-03-18 - 10:24:36 PM GMT- IP address: 52.202.236.132 Document e-signed by Gene Barry (gbarry@4leafinc.com) Signature Date: 2025-03-18 - 11:01:14 PM GMT - Time Source: server- IP address: 71.6.122.174 Document emailed to susanm@cupertino.gov for signature 2025-03-18 - 11:01:16 PM GMT Email viewed by susanm@cupertino.gov 2025-03-18 - 11:01:27 PM GMT- IP address: 52.202.236.132 Signer susanm@cupertino.gov entered name at signing as Susan Michael 2025-03-18 - 11:21:09 PM GMT- IP address: 64.165.34.3 Document e-signed by Susan Michael (susanm@cupertino.gov) Signature Date: 2025-03-18 - 11:21:11 PM GMT - Time Source: server- IP address: 64.165.34.3 Document emailed to jindyg@cupertino.gov for signature 2025-03-18 - 11:21:13 PM GMT Email viewed by jindyg@cupertino.gov 2025-03-18 - 11:21:20 PM GMT- IP address: 52.202.236.132 Signer jindyg@cupertino.gov entered name at signing as jindy gonzalez 2025-03-19 - 3:22:24 PM GMT- IP address: 174.85.102.16 Document e-signed by jindy gonzalez (jindyg@cupertino.gov) Signature Date: 2025-03-19 - 3:22:26 PM GMT - Time Source: server- IP address: 174.85.102.16 Agreement completed. 2025-03-19 - 3:22:26 PM GMT