Loading...
23-041 SO #12 dated 4-1-25 Alvernaz Construction for McClellan Ranch Nature Shop Double Gate Upgrade - 2025-463Contract/Purchasing Action Personnel Information Name Nathan Vasquez Department Public Works  Division Facilities Date 03.26.2025 Service Order Upload Quote Quote, Description of Project, Scope of Service, Schedule of Performance and Compensation McClellan Ranch Nature Shop Double Gate Upgrade Update 032625.pdf Service Order Amount $4,850.00 Master Agreement Number 2023-010 Start Date 05/30/2023 End Date 06/30/2025 Firm Name Alvernaz Construction Address Po Box 366 San Martin CA 95046 Phone (408) 595-2817 Consultant/Contractor Name Michael Alvernaz Consultant/Contractor Email michaelalvernaz@alvernazconstruction.com Project Name SO 12 McClellan Ranch Nature Shop Double Gate Upgrade Project Location McClellan Ranch Cupertino Project Manager Name Nathan Vasquez Cupertino Project Manager Email nathanv@cupertino.org Master Agreement Maximum Compensation $175,000.00 Total Previously Encumbered to Date $147,200.00 Encumbrance this Service Order $4,850.00 Master Agreement Unencumbered Balance $22,950.00 SO GL #100-87-832 700-702 Signature       03/27/2025 PDT  Consultant/Contractor Signature Date       04/01/2025 PDT  Manager/Supervisor Signature Date Appropriation Certification: I hereby certify that an unexpended appropriation is available in the above fund for the above contract as estimated and that fund are available as of this date of signature. Date: 03/27/2025 PDT Email: michaelalvernaz@alvernazconstruction.com Date: 04/01/2025 PDT Email: nathanv@cupertino.gov       04/01/2025 PDT  Management Analyst Signature DateDate: 04/01/2025 PDT Email: PWMA@cupertino.gov Quote March 26, 2025 Alvernaz Construction Po Box 366 San Martin CA 95046 Lic# 711435 408-595-2817 To:Job Name; Nathan Vasquez City of Cupertino McLellan Ranch 10300 Torre Avenue 1-Remove existing gate and fence panel approximately 7 feet. 2-install frame supports for new double redwood gates. 3-Install two new redwood gates . 4- Clean up all unnecessary materials and debris and dump fees included. 5-Note any unforeseen damage will be extra cost. Total cost for materials and labor---------------$ 4,850.00 Thank you Michael SO 12 McClellan Ranch Nature Shop Double Gate Upgrade - Service Request Created:03/27/2025 Status:Signed Transaction ID:8d8beef8-b237-412d-8d80-7ac4b44aee66 "SO 12 McClellan Ranch Nature Shop Double Gate Upgrade - Service Request" history Jindy Gonzalez created the document. 03/27/2025 2:44:02 PM PDT - IP address 174.85.102.16 Document was emailed to Michael Alvernaz 03/27/2025 2:44:03 PM PDT Michael Alvernaz signed the document. 03/27/2025 5:31:23 PM PDT - IP address 174.87.177.71:49594 Document was emailed to nathanv@cupertino.gov 03/27/2025 5:31:24 PM PDT nathanv@cupertino.gov signed the document. 04/01/2025 5:58:43 AM PDT - IP address 64.165.34.3:35339 Document was emailed to PWMA@cupertino.gov 04/01/2025 5:58:44 AM PDT PWMA@cupertino.gov signed the document. 04/01/2025 12:02:19 PM PDT - IP address 174.85.102.16:56265 Document was successfully signed and filed 04/01/2025 12:02:22 PM PDT