BLD-2025-0500_JobCard.pdfCITY OF CUPERTINO - BUILDING DIVISION
10300 TORRE AVENUE • CUPERTINO, CA 95014-3255
PHONE 408-777-3228 • WWW.CUPERTINO.ORG/ACCELA
JOB CARD
THIS CARD MUST BE POSTED AT A LOCATION VISIBLE FROM THE STREET FRONTAGE ON SITE OF THE STRUCTURE
BEING PERMITTED AND IS NOT TO BE REMOVED UNTIL BUILDING FINAL.
A HARD -COPY OF THE APPROVED PLANS AND DOCUMENTS SHALL BE KEPT AT THE SITE OF WORK.
Permit No: BLD-2025-0500 Issued Date: 03/05/2025
Building Address: 21736 NOONAN CT Cupertino Contractor: ARAZ ELECTRIC INC
Job Description:
MAIN PANEL RELOCATION AND UPGRADE (200A); INSTALL NEW LEVEL 2 TESLA GEN 3 WALL CONNECTOR EV CHARGER
(48A); WITH 60A CIRCUIT IN NEW MAIN PANEL (200A) INSIDE GARAGE
EVERY PERMIT ISSUED SHALL BECOME INVALID UNLESS THE WORK ON THE SITE AUTHORIZED BY SUCH PERMIT IS COMMENCED WITHIN 12 MONTHS AFTER ITS ISSUANCE, OR IF THE
WORK AUTHORIZED ON THE SITE BY SUCH PERMIT IS SUSPENDED OR ABANDONED FOR A PERIOD OF 12 MONTHS AFTER THE TIME THE WORK IS COMMENCED.
*PLEASE REFER TO QR CODE FOR ANY REVISIONS OR UPDATED INFORMATION