Loading...
BLD-2022-2263InspectionRecordINSPECTION RECORD CITY HALL 10300 Torre Avenue • Cupertino, CA 95014-3255 PHONE 408-777-3228 WWW.CUPERTINO.ORG BUILDING ADDRESS: 22120 WALLACE DR Cupertino APN: 326 03 035 PERMIT NO: BLD-2022-2263 OWNER'S NAME: BROWNSON CHRISTINA A TRUSTEE OWNER'S PHONE: 408-921-7188 CONTRACTOR: CRAFTSMEN'S GUILD INC, 10566 SO DE ANZA BLVD CUPERTINO CONTRACTOR PHONE: 408-497-2617 DATE ISSUED 6/5/2024 9:45:20 AM ISSUED BY:VALUATION: $220000 JOB DESCRIPTION ADDITION TO FIRST FLOOR OF (E) 2-STORY HOUSE (498 SF) TO CREATE THE NEW KITCHEN/DINING AND MASTER BATH /CLOSET; CONVERT (E) KITCHEN TO BECOME PANTRY/LAUNDRY/HALLWAY (115 SF); RELOCATE A/C CONDENSER; (N) EXTERIOR STAIRS FOR 2ND-STORY; CHANGE SLIDER TO SWINGING DOOR ON 2ND-STORY. REV # 1 - ADD SINK TO THE KITCHEN-APPROVED 9/26/2023 INSPECTION TYPE DATE STATUS INSPECTOR FOUNDATION 2023-06-21 Failed Antonio Torrez UNDERFLOOR FRAMING 2023-06-26 Failed Antonio Torrez UNDERFLOOR FRAMING 2023-07-05 Passed Antonio Torrez UNDERFLOOR INSULATION 2023-07-05 Passed Antonio Torrez UNDERFLOOR PLUMBING 2023-07-05 Passed Antonio Torrez ROOF NAIL 2023-07-14 Passed Paul O'Sullivan EXTERIOR SHEAR 2023-07-14 Passed Paul O'Sullivan FOUNDATION 2023-07-05 Passed Antonio Torrez EXTERIOR LATH 2023-08-02 Conditional Antonio Torrez ROUGH PLUMBING 2023-08-29 Conditional Antonio Torrez ROUGH MECHANICAL 2023-08-29 Passed Antonio Torrez ROUGH ELECTRICAL 2023-08-29 Passed Antonio Torrez INSULATION 2023-09-05 Passed Antonio Torrez SHEETROCK 2023-09-12 Passed Antonio Torrez SHOWER PAN 2023-10-03 Passed Antonio Torrez SCRATCH COAT 2023-10-12 Passed Antonio Torrez FINAL BUILDING 2024-06-04 Rescheduled   FINAL BUILDING 2024-06-05 Passed Antonio Torrez FINAL ELECTRICAL 2024-06-05 Passed Antonio Torrez FINAL MECHANICAL 2024-06-05 Passed Antonio Torrez FINAL PLUMBING 2024-06-05 Passed Antonio Torrez ROUGH PLUMBING 2024-06-05 Passed Antonio Torrez EVERY PERMIT ISSUED SHALL BECOME INVALID UNLESS THE WORK ON THE SITE AUTHORIZED BY SUCH PERMIT IS COMMENCED WITHIN 12 MONTHS AFTER ITS ISSUANCE, OR IF THE WORK AUTHORIZED ON THE SITE BY SUCH PERMIT IS SUSPENDED OR ABANDONED FOR A PERIOD OF 12 MONTHS AFTER THE TIME THE WORK IS COMMENCED.