BLD-2022-2487InspectionRecordINSPECTION RECORD
CITY HALL
10300 Torre Avenue • Cupertino, CA 95014-3255
PHONE 408-777-3228
WWW.CUPERTINO.ORG
BUILDING ADDRESS: 22641 SAN JUAN RD Cupertino APN: 342 17 066 PERMIT NO: BLD-2022-2487
OWNER'S NAME: ZHANG CONG AND YE ZHOU OWNER'S PHONE: 6504503635
CONTRACTOR: LEVEL CONSTRUCTION LLC, 14451 BRANHAM LANE SAN JOSE CONTRACTOR PHONE: 4086288958
DATE ISSUED 5/16/2024 10:05:14 AM ISSUED BY:VALUATION: $2890000
JOB DESCRIPTION
SECOND FLOOR ADDITION (1193 SF); FIRST FLOOR ADDITION (37 SF); REMODEL FIRST LEVEL (2135 SF); COVERED PORCH (69 SF); PANEL UPGRADE (200 AMP); NEW 2ND FLOOR
HVAC. REVISION #1 - SEE LIST OF REVISIONS ON JOB SITE REVISION LETTER DATED 11.29.23-APPROVED 1/16/2024
INSPECTION TYPE DATE STATUS INSPECTOR
TEMPORARY POWER POLE 2023-07-13 Passed Antonio Torrez
FOUNDATION 2023-08-01 Conditional Antonio Torrez
EXTERIOR SHEAR 2023-09-20 Failed Antonio Torrez
INTERIOR SHEAR 2023-09-20 Failed Antonio Torrez
ROOF NAIL 2023-09-20 Passed Antonio Torrez
FOUNDATION 2023-09-20 Passed Antonio Torrez
INTERIOR SHEAR 2023-09-21 Cancelled
EXTERIOR SHEAR 2023-09-21 Cancelled
UNDERFLOOR PLUMBING 2023-10-17 Passed Antonio Torrez
ROUGH PLUMBING 2023-10-17 Failed Antonio Torrez
PROPERTY LINE CLEANOUT 2023-10-17 Passed Antonio Torrez
SANITARY - VISUAL 2023-10-12 Passed cupsanitary
EXTERIOR SHEAR 2023-10-17 Failed Antonio Torrez
INTERIOR SHEAR 2023-10-17 Failed Antonio Torrez
ROUGH ELECTRICAL 2023-11-22 Rescheduled
ROUGH FRAME 2023-11-22 Rescheduled
ROUGH MECHANICAL 2023-11-22 Rescheduled
ROUGH PLUMBING 2023-11-22 Rescheduled
EXTERIOR LATH 2023-11-28 Passed Antonio Torrez
ROUGH PLUMBING 2023-11-28 Passed Antonio Torrez
ROUGH MECHANICAL 2023-11-28 Failed Antonio Torrez
ROUGH FRAME 2023-11-28 Failed Antonio Torrez
ROUGH ELECTRICAL 2023-11-28 Passed Antonio Torrez
FIRE DEPT - SPRINKLERS - ROUGH 2023-11-20 Passed Santa Clara County Fire
INSULATION 2023-12-13 Rescheduled
INSULATION 2023-12-06 Passed Antonio Torrez
SHEETROCK 2023-12-13 Passed Antonio Torrez
ELECTRIC METER RELEASE 2023-12-06 Passed Antonio Torrez
SCRATCH COAT 2024-01-04 Passed Rodney Weathers
FINAL BUILDING 2024-05-03 Cancelled
FINAL BUILDING 2024-05-06 Passed Antonio Torrez
FIRE DEPT - SPRINKLERS - FINAL 2024-05-06 Passed Santa Clara County Fire
ROUGH MECHANICAL 2024-05-06 Passed Antonio Torrez
SANITARY - FINAL 2024-05-06 Passed cupsanitary
ROUGH FRAME 2024-05-06 Passed Antonio Torrez
FINAL ELECTRICAL 2024-05-06 Passed Antonio Torrez
FINAL MECHANICAL 2024-05-06 Passed Antonio Torrez
FINAL PLUMBING 2024-05-06 Passed Antonio Torrez
FINAL BUILDING 2024-05-16 Passed Antonio Torrez
EVERY PERMIT ISSUED SHALL BECOME INVALID UNLESS THE WORK ON THE SITE AUTHORIZED BY SUCH PERMIT IS COMMENCED WITHIN 12 MONTHS AFTER ITS ISSUANCE, OR IF THE WORK
AUTHORIZED ON THE SITE BY SUCH PERMIT IS SUSPENDED OR ABANDONED FOR A PERIOD OF 12 MONTHS AFTER THE TIME THE WORK IS COMMENCED.