BLD-2021-0297InspectionRecordINSPECTION RECORD
CITY HALL
10300 Torre Avenue • Cupertino, CA 95014-3255
PHONE 408-777-3228
WWW.CUPERTINO.ORG
BUILDING ADDRESS: 909 PROVIDENCE CT Cupertino APN: 356 11 052 PERMIT NO: BLD-2021-0297
OWNER'S NAME: TALAPANENI VENKATESWARLU AND SOBHA OWNER'S PHONE: 4087182311
CONTRACTOR: TALENT DECIDE INC, 218 HARDING AVE LOS GATOS CONTRACTOR PHONE: (408) 306 3968
DATE ISSUED 3/20/2024 4:00:08 PM ISSUED BY:VALUATION: $420000
JOB DESCRIPTION
BUILD 2-STORY SINGLE FAMILY DWELLING - (2694.66 SF) WITH (5) BEDROOMS AND (4.5) BATHROOMS; ATTACHED GARAGE - (468 SF); (1) PORCH REV #1- WATER HEATER AND
FURNACE RELOCATED; SHEAR WALL BETWEEN GARAGE AND LIVING ROOM IS REDUCED IN LENGTH FROM 19' TO 12' - APPROVED 11/09/2021 DEF#1 - ROOF TRUSSES - APPROVED
11/23/21 REV # 2 - REVISED LANDSCAPE PLANS, ADD A WATER FOUNTAIN-APPROVED 5/31/2023 REV # 3 - REVISE (4) WINDOWS; ADD (4) EXTERIOR LIGHTS FRONT AND BACK-
APPROVED 2/22/2024
INSPECTION TYPE DATE STATUS INSPECTOR
FOUNDATION 2021-08-04 Passed Antonio Torrez
FOUNDATION 2021-08-18 Cancelled
FOUNDATION 2021-08-20 Cancelled
FOUNDATION 2021-08-23 Passed Rodney Weathers
UNDERFLOOR PLUMBING 2021-09-09 Passed Antonio Torrez
UNDERFLOOR MECHANICAL 2021-09-09 Passed Antonio Torrez
UNDERFLOOR FRAMING 2021-09-09 Passed Antonio Torrez
UNDERFLOOR INSULATION 2021-09-13 Passed Antonio Torrez
EXTERIOR SHEAR 2021-12-10 Failed Antonio Torrez
ROOF NAIL 2021-12-10 Passed Antonio Torrez
FIRE DEPT - SPRINKLERS - ROUGH 2022-03-01 Passed Santa Clara County Fire
EXTERIOR SHEAR 2022-03-16 Cancelled Antonio Torrez
ROUGH ELECTRICAL 2022-03-16 Cancelled Antonio Torrez
ROUGH FRAME 2022-03-16 Cancelled Antonio Torrez
ROUGH MECHANICAL 2022-03-16 Cancelled Antonio Torrez
ROUGH PLUMBING 2022-03-16 Cancelled Antonio Torrez
EXTERIOR SHEAR 2022-03-15 Passed Antonio Torrez
ROUGH ELECTRICAL 2022-03-15 Passed Antonio Torrez
ROUGH FRAME 2022-03-15 Passed Antonio Torrez
ROUGH MECHANICAL 2022-03-15 Passed Antonio Torrez
ROUGH PLUMBING 2022-03-15 Passed Antonio Torrez
EXTERIOR LATH 2022-05-02 Conditional Antonio Torrez
INSULATION 2022-05-02 Passed Antonio Torrez
SHEETROCK 2022-05-11 Passed Antonio Torrez
SCRATCH COAT 2022-06-06 Conditional Antonio Torrez
SHOWER PAN 2022-06-07 Failed Bob Sabich
INTERIOR LATH 2022-06-07 Passed Bob Sabich
SHOWER PAN 2022-06-09 Passed Antonio Torrez
ELECTRIC METER RELEASE 2022-07-19 Passed Antonio Torrez
UNDERGROUND WATER SERVICE 2022-08-05 Rescheduled
UNDERGROUND SEWER 2022-08-05 Cancelled
UNDERGROUND SEWER 2022-08-08 Passed Antonio Torrez
UNDERGROUND WATER SERVICE 2022-08-08 Passed Antonio Torrez
PROPERTY LINE CLEANOUT 2022-08-08 Conditional Antonio Torrez
SANITARY - VISUAL 2022-08-09 Passed cupsanitary
FOUNDATION 2022-09-29 Cancelled Antonio Torrez
FIRE DEPT - SPRINKLERS - FINAL 2022-09-29 Passed Santa Clara County Fire
FIRE DEPT - FINAL 2022-09-29 Passed Santa Clara County Fire
SANITARY - FINAL 2023-08-10 Passed cupsanitary
PW – DEV SERVICES FINAL 2024-01-29 Passed Kevin Rieden
FINAL BUILDING 2024-03-13 Failed Antonio Torrez
FINAL ELECTRICAL 2024-03-15 Passed Antonio Torrez
FINAL MECHANICAL 2024-03-15 Passed Antonio Torrez
FINAL PLUMBING 2024-03-15 Passed Antonio Torrez
FINAL BUILDING 2024-03-20 Passed Antonio Torrez
EVERY PERMIT ISSUED SHALL BECOME INVALID UNLESS THE WORK ON THE SITE AUTHORIZED BY SUCH PERMIT IS COMMENCED WITHIN 12 MONTHS AFTER ITS ISSUANCE, OR IF THE WORK
AUTHORIZED ON THE SITE BY SUCH PERMIT IS SUSPENDED OR ABANDONED FOR A PERIOD OF 12 MONTHS AFTER THE TIME THE WORK IS COMMENCED.