Loading...
BLD-2023-0876_Inspection RecordINSPECTION RECORD CITY HALL 10300 Torre Avenue • Cupertino, CA 95014-3255 PHONE 408-777-3228 WWW.CUPERTINO.ORG BUILDING ADDRESS: 10785 W ESTATES DR Cupertino APN: 369 23 031 PERMIT NO: BLD-2023-0876 OWNER'S NAME: SUN XINYU AND MENG YA OWNER'S PHONE: Not Provided CONTRACTOR: D&Z CONSTRUCTION LLC, 1382 GLENMOOR WAY SAN JOSE CONTRACTOR PHONE: DATE ISSUED 2/28/2024 11:24:07 AM ISSUED BY:VALUATION: $0 JOB DESCRIPTION (N) FAMILY ROOM ADDITION (323 SF). INSPECTION TYPE DATE STATUS INSPECTOR FOUNDATION 2023-08-31 Passed Bob Sabich FOUNDATION 2023-09-01 Cancelled James Lee UNDERFLOOR FRAMING 2023-09-07 Failed James Lee ROUGH FRAME 2023-09-14 Cancelled James Lee ROOF NAIL 2023-09-14 Passed James Lee EXTERIOR SHEAR 2023-09-14 Failed James Lee ROUGH ELECTRICAL 2023-09-22 Passed James Lee EXTERIOR LATH 2023-09-22 Passed James Lee ROUGH FRAME 2023-09-22 Passed James Lee INSULATION 2023-09-27 Passed James Lee EXTERIOR SHEAR 2023-09-22 Passed James Lee ROUGH MECHANICAL 2023-09-22 Passed James Lee SHEETROCK 2023-10-04 Passed James Lee EXTERIOR LATH 2023-10-16 Passed James Lee SCRATCH COAT 2023-10-16 Passed James Lee FINAL BUILDING 2023-12-15 Cancelled   FINAL BUILDING 2023-12-14 Failed Rodney Weathers FINAL BUILDING 2024-02-27 Rescheduled   FINAL BUILDING 2024-02-28 Passed Danielle Carriedo EVERY PERMIT ISSUED SHALL BECOME INVALID UNLESS THE WORK ON THE SITE AUTHORIZED BY SUCH PERMIT IS COMMENCED WITHIN 12 MONTHS AFTER ITS ISSUANCE, OR IF THE WORK AUTHORIZED ON THE SITE BY SUCH PERMIT IS SUSPENDED OR ABANDONED FOR A PERIOD OF 12 MONTHS AFTER THE TIME THE WORK IS COMMENCED.