BLD-2023-0876_Inspection RecordINSPECTION RECORD
CITY HALL
10300 Torre Avenue • Cupertino, CA 95014-3255
PHONE 408-777-3228
WWW.CUPERTINO.ORG
BUILDING ADDRESS: 10785 W ESTATES DR Cupertino APN: 369 23 031 PERMIT NO: BLD-2023-0876
OWNER'S NAME: SUN XINYU AND MENG YA OWNER'S PHONE: Not Provided
CONTRACTOR: D&Z CONSTRUCTION LLC, 1382 GLENMOOR WAY SAN JOSE CONTRACTOR PHONE:
DATE ISSUED 2/28/2024 11:24:07 AM ISSUED BY:VALUATION: $0
JOB DESCRIPTION
(N) FAMILY ROOM ADDITION (323 SF).
INSPECTION TYPE DATE STATUS INSPECTOR
FOUNDATION 2023-08-31 Passed Bob Sabich
FOUNDATION 2023-09-01 Cancelled James Lee
UNDERFLOOR FRAMING 2023-09-07 Failed James Lee
ROUGH FRAME 2023-09-14 Cancelled James Lee
ROOF NAIL 2023-09-14 Passed James Lee
EXTERIOR SHEAR 2023-09-14 Failed James Lee
ROUGH ELECTRICAL 2023-09-22 Passed James Lee
EXTERIOR LATH 2023-09-22 Passed James Lee
ROUGH FRAME 2023-09-22 Passed James Lee
INSULATION 2023-09-27 Passed James Lee
EXTERIOR SHEAR 2023-09-22 Passed James Lee
ROUGH MECHANICAL 2023-09-22 Passed James Lee
SHEETROCK 2023-10-04 Passed James Lee
EXTERIOR LATH 2023-10-16 Passed James Lee
SCRATCH COAT 2023-10-16 Passed James Lee
FINAL BUILDING 2023-12-15 Cancelled
FINAL BUILDING 2023-12-14 Failed Rodney Weathers
FINAL BUILDING 2024-02-27 Rescheduled
FINAL BUILDING 2024-02-28 Passed Danielle Carriedo
EVERY PERMIT ISSUED SHALL BECOME INVALID UNLESS THE WORK ON THE SITE AUTHORIZED BY SUCH PERMIT IS COMMENCED WITHIN 12 MONTHS AFTER ITS ISSUANCE, OR IF THE WORK
AUTHORIZED ON THE SITE BY SUCH PERMIT IS SUSPENDED OR ABANDONED FOR A PERIOD OF 12 MONTHS AFTER THE TIME THE WORK IS COMMENCED.