Loading...
21-197 Service Order #15 dated 10-17-23 Elcor Replace Panel Switch at QCC - PO 2024-248 CITY OF CUPERTINO MASTER AGREEMENT CONSULTANT SERVICES SERVICE ORDER NO. MASTER AGREEMENT #:MA Date: Maximum Compensation: Consultant:Firm Name: Address: Contact: Ph: Email Address: Project Name: Description: (simple project description if appropriate) City Project Management Managing Department: Public Works Project Manager: Fiscal/Budget : SO Acc't #:PO #: Project #:Date: Approvals: Date: Date: Appropriation Certification: I hereby certify that an unexpended appropriation is available in the above fund for the above contract as estimated and that fund are available as of this date of signature City Finance:Date: Consultant: Manager: Management Analyst Master Agreement Maximum Compensation: Master Agreement Unencumbered Balance: Total Previously Encumbered to Date: MA End Date: Encumbrance this Service Order: City of Cupertino Master Agreement Service Order 2022-005 8/5/2021 $150,000 6/30/2025 Elcor Electric, Inc 3310 Bassett St, Santa Clara, CA 95054 Troy Martinez 408.986.1320 Nathan Vasquez $150,000 $84,676 $8,831 $56,493 100-87-830 700-702 N/A TBD 10-2-2023 15 tmartinez@elcorelectric.com 4 4 Attachment A: Includes Description of Project, Scope of Service, Schedule of Performance and Compensation Estimate 10-9-2023 Quinlan Community Center – Replace Panel Switch Troy Martinez Oct 12, 2023 Oct 17, 2023 Oct 17, 2023 October 9, 2023 Mr. Nathan Vasquez City of Cupertino 21251 Stevens Creek Boulevard Cupertino, CA 95014 RE: Quinlan Community Center – Replace Panel Switch 10185 N. Stelling Rd., Cupertino, CA Electrical Proposal Dear Mr. Vasquez, We are pleased to submit our proposal to perform electrical work for the above referenced project. This proposal was developed from direction provided by the City of Cupertino and a review of the site conducted by Elcor Electric. Our proposal, with qualifications, is as follows: Scope of Work •Remove existing panel board disconnect switch. •Replace with refurbished GE QMR363. •A full building shutdown will be required to complete this scope of work. •This proposal assumes the panel board switch has a 2-week lead time from date of release. •This proposal assumes all work, except for the shutdown, shall be performed during normal business hours (Monday – Friday 7:00 A.M. – 3:30 P.M.). •We are excluding design, drawings, permit, HVAC, any other special systems, fire alarm system, liquidated damages, any paint and/or patch. Our total bid price for this project is $ 8,831. Bid Breakdown Labor Straight Time: $ 1,930 Double Time: $ 4,680 Material: $ 2,221 The above price is good for twenty (20) days. If you have any questions regarding this proposal, please contact the undersigned at your convenience. Sincerely, Troy Martinez Troy Martinez ELCOR ELECTRIC Proposal/City of Cupertino– Quinlan Community – Replace Panel Switch 10.4.23 Elcor SO 15 Replace Panel Switch at QCC Final Audit Report 2023-10-17 Created:2023-10-12 By:Jindy Gonzalez (jindyg@cupertino.org) Status:Signed Transaction ID:CBJCHBCAABAA5rb1fpcA_-CRIl5Hl60bciKH_-vOLlos "Elcor SO 15 Replace Panel Switch at QCC" History Document created by Jindy Gonzalez (jindyg@cupertino.org) 2023-10-12 - 9:03:28 PM GMT Document emailed to tmartinez@elcorelectric.com for signature 2023-10-12 - 9:07:46 PM GMT Email viewed by tmartinez@elcorelectric.com 2023-10-12 - 9:47:18 PM GMT Signer tmartinez@elcorelectric.com entered name at signing as Troy Martinez 2023-10-12 - 9:49:08 PM GMT Document e-signed by Troy Martinez (tmartinez@elcorelectric.com) Signature Date: 2023-10-12 - 9:49:10 PM GMT - Time Source: server Document emailed to Nathan Vasquez (nathanv@cupertino.org) for signature 2023-10-12 - 9:49:12 PM GMT Email viewed by Nathan Vasquez (nathanv@cupertino.org) 2023-10-17 - 9:00:02 PM GMT Document e-signed by Nathan Vasquez (nathanv@cupertino.org) Signature Date: 2023-10-17 - 9:00:20 PM GMT - Time Source: server Document emailed to Julia Kinst (juliak@cupertino.org) for signature 2023-10-17 - 9:00:21 PM GMT Document e-signed by Julia Kinst (juliak@cupertino.org) Signature Date: 2023-10-17 - 9:02:15 PM GMT - Time Source: server Agreement completed. 2023-10-17 - 9:02:15 PM GMT